![](https://assets.isu.pub/document-structure/220223155144-db4c753c281e63b58a25aaab2dfa7e39/v1/d4bce2389c19d992a244c012f7ef6a8c.jpeg?width=720&quality=85%2C50)
1 minute read
Big Picture
from Mining - March 2022
Northern Goldfields Solar Project
Australia
Advertisement
Work is underway on what BHP claims is one of the world’s largest off-grid mining solar and battery energy storage systems. Under the Northern Goldfields Solar Project, TransAlta is building a 27.4 MW solar farm at Mt Keith, 10.7MW solar farm and a 10.1 MW battery at Leinster, which will be integrated into the remote power grid and result in an estimated reduction of 54,000 tonnes CO2-e per year. Image credit BHP
![](https://assets.isu.pub/document-structure/220223155144-db4c753c281e63b58a25aaab2dfa7e39/v1/edb5cade7d4521aabc21862b60b81c12.jpeg?width=720&quality=85%2C50)