#design #competition for #inhouse #design #architecuture #nyc #navyyard - for @perkinseastman

Page 1

11

2.5

’ SITE DIMENSIONS

TOWARDS

REGIONAL CONNECTION

2.5

The ANNEX Ø1 @ THE NAVY YARD is an inclusive, adaptable, cost/ phase considerate flexible solution that addresses the challenge of providing a cost efficient destination for learning, working and exploring. The site of the intervention provides a unique collaboration between the STEAM program, Brooklyn Navy Yard, and the resilient New York City and beyond. The proposed solution is a facility that allows for the STEAM center to provide educational-vocational training, creative exploration and exchange and community awareness. The modular facility can be built in 3 different phases to provide incremental growth saving up-front cost and provide flexible solutions. Overall the inclusive framework aims to integrate all the partners to provide a holistic environmental, social, and economical solution for the community and beyond.

1328

11

ANNEX Ø1 @ THE NAVY YARD

WORLD TR

ADE CEN

TER

PROPOSED SITE PLAN DESIGN COMPE TITION BROOKLYN NAV Y YARD DE VELOPMENT CORPOR ATION 2018


ANNEX Ø1 @ THE NAVY YARD

1328

TOTAL 8,000 GSF @ 100% BUILD OUT

PHASE 3:

OCCUPIABLE SPACE (ENCLOSED):

TOTAL 8,000 GSF

6,575 SF

OCCUPIABLE SPACE (OPEN PUBLIC SPACE)

1,425 SF TOTAL: 8,000 SF

SECOND FLOOR PLAN

PHASE 2:

OCCUPIABLE SPACE (ENCLOSED):

TOTAL 8,000 GSF

3,200 SF

OCCUPIABLE SPACE (OPEN PUBLIC SPACE)

4,800 SF TOTAL: 8,000 SF

PHASE 1:

OCCUPIABLE SPACE (ENCLOSED):

TOTAL 6,400 GSF

1,600 SF

OCCUPIABLE SPACE (OPEN PUBLIC SPACE)

4,800 SF TOTAL:

SHIPPING CONTAINER TYPES/MODULARS

6,400 SF

EXPLODED AXON - PHASING CONSTRUCTON

GROUND FLOOR PLAN DESIGN COMPE TITION BROOKLYN NAV Y YARD DE VELOPMENT CORPOR ATION 2018


ANNEX Ø1 @ THE NAVY YARD

EXISTING CONDITION

1328

ABOVE:PROPOSED (COMPLETED @ PHASE 3) BELOW:PROPOSED INTERIOR LOOKING TOWARDS MANHATTAN

DESIGN COMPE TITION BROOKLYN NAV Y YARD DE VELOPMENT CORPOR ATION 2018


ANNEX Ø1 @ THE NAVY YARD

GULAM STRUCTURE & STEEL CONNECTION DETAIL

SECTION AA

CONNECTION DETAIL - PLAN

1328

CONNECTION DETAIL - SECTION

GULAM/CURTAIN WALL/SHIPPING CONTAINER TWIST LOCK CONNECTION

SECTION BB DESIGN COMPE TITION BROOKLYN NAV Y YARD DE VELOPMENT CORPOR ATION 2018



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.