Interior Design Portfolio

Page 1

INTERIOR DESIGN

PORTFOLIO PUN MIU YIN


EDUCATION Mar 2009 - Aug 2011

Mar 2012 - Oct 2014

Diploma of Graphic Design

Griffith University, Brisbane, Australia Bachelor of Interior Design

Swinburne University of Technology,

Melbourne, Australia

WORK EXPERIENCE Sep 2011 - Dec 2011

Assistant Graphic Designer,

Nov 2014 - Present

Freelancer

Top Arts

3D Rendering for The Block Design & Renovation Branding Design for SOHO Mechanical Engineering Company Limited Product Catalog Design for Penrite Oil HK Ltd.

PUN MIU YIN M : +852 6565 0650 E : miupun@ymail.com

SKILLS AutoCAD Revit SketchUp Photoshop InDesign Illustrator Ms Office Ms Excel Ms Power Point


CONTENT INTERIOR DESIGN

NMIT Tafe Cooking School

01

Swin Cafe 08

Aesop Pop-up Store

Student Hub

17

Professor Lodge

22

13

TECHNICAL DRAWING

WORKING EXPERIENCE

Study Room

30

Branding Design

33

Product Catalog

35

37

39

FURNITURE DESIGN

Lightweight Stool

HAND DRAWINGS


NMIT TAFE COOKING SCHOOL Prahran, Melbourne


NMIT TAFE Cooking School This project is to design the cooking school on level 6 and the roof, and aslo the external of building. This sustainable building will focus on passive solar design, water-saving, and lighting.


External Shading Block the sun from the North. No direct sun entering the building

Trombe Wall Hot air being drawn through bottom vent into air gap, rising up to exit at top vent. Heat enters thermal floor and air cirulating inside the building

1

1

3

7

Vertical Shading Bringing the cool breezes from the west and cool down the building

UP

4 6

2

5 5 7

1 Classroom (Kitchen)

Level 6 Floor Plan

External Shading Block the sun from the North. No direct sun entering the building

2 Lecture Room Cafe

4 Atrium

10

5 Sitting Area

9

16/1/2015 16:16:09

3

8

11

6 Laundry and dishwashing

7

Room 7 Storage 8 Kitchen

7 UP

9 Bar 10 Sitting Area 11 Herb Garden

Vegetation Vegetation are good for sun control Roof Garden Floor Plan

03


Roof Garden

04


North

Drawn by

1 : 100

Author Checker

Checked by

A05 Scale

1 : 100

10/06/2014 9:08:40 P

1

1 Level 7 - Roof Garden

2 A103

4800 600

600

841

Water-saving system

634

2140

325

340

600

Kitchen Joinery Details A 1:20 Rainwater System

1

Section 2

1 A103

1 : 20

40

900

40

2140

700

540

615

Sitting Area

Sitting Area

445

755

1200

600

S

1


Summer Sun 76.45

Summer Sun 76.45

External Shading can block the sun heat from the north

Summer Sun 76.45

Winter Sun 29.55

Summer Sun 76.45

Winter Sun Hot air exits from top vent 29.55

External Shading can block the sun heat from the north

Cool air enters from bottom vent

External Shading can block Garden on level the sun heat4from the north Can bring more cool breezes into the building

Garden on level 4 Can bring more cool breezes into the building

External Shading can block the sun heat from the north

Winter Sun 29.55

Winter Sun 29.55

Hot air exits from top ven

Cool air enters from botto Hot air exits from top vent

Hot air exits from top vent

Garden on level 4 Can bring more cool breezes into the building

Cool air enters from botto TrombeCool wallair enters from bottom vent Sunlight enters and warms airspace between glazing and mass, hot air rises through convection

Garden on level 4 Can bring more cool breezes into the building

Trombe wall Sunlight enters and warm between glazing and ma rises through Trombe wall convection

Sunlight enters and warm DoubleTrombe Glazingwall Double Glazing between glazing and mas Sunlight enters and warms airspace rises through convection between glazing and mass, hot air rises through convection Double Glazing

Double Glazing !"##$%&'&+,-./

)*

!"##$%&'&+,-./

!"##$%&'&()*

Summer Daylight

Winter Daylight

!"##$%&'&()*

!"##$%&'&+,-./

!"##$%&'&+,-./

&'&()*

Summer Night 0,1/$%&'&()*

Winter Night 0,1/$%&'&+,-./

0,1/$%&'&+,-./

0,1/$%&'&+,-./

0,1/$%&'&()*

0,1/$%&'&+,-./

06

+234&4567&899:,1-&!;.99<& +234&4567&899:,1-&!;.99<&


Cafe

07

Classroom (Kitchen)


SWIN CAFE Prahran, Melbourne


SWIN CAFE This project is to design a Cafe for Swinburne University which sits in the heart of Chapel Stree, Prahran. The use of materials that were exposed and retained during construction, as well as the addition of reclaimed timbers and striped white brick walls. Those all convey a homelike feeling.


1 A05

-

Floor Plan

No.

Description

Date

Unnamed Project number

A01

Date

www.autodesk.com/revit

Drawn by Checked by

Author Checker

Scale


1 A03

5510

1700

Counter Section

5510

1 First Floor 1700

Section 1

Description

1

2

A05

A03

Date

Unnamed Project number

A05

Date Drawn by

odesk.com/revit

Checked by

Section 2

11

Author

1

Checker

Section 3

Scale

1 : 100

16/1/2015 16:22:24

No.

1 A04

1 : 100

No.

Description

Date

Unna

Project num


12


AESOP POP-UP STORE CBD, Melbourne


AESOP POP-UP STORE Aesop is a skincare brand which was founded in Melbourne in 1987. Today it offers superlative skin, hair and body care products in more than sixty signature stores internationally.


No.

Description

Date

Owner

Unnamed Project number

Project Name

www.autodesk.com/revit

Date

0001

A106

Issue Date

Drawn by

Author

Checked by

Checker

Scale

1 : 25

16/1/2015 16:39:35

Floor Plan

Section 1

Description

Date

Owner

Unnamed Project number Date

Project Name

www.autodesk.com/revit

Drawn by Checked by

0001

A104

Issue Date Author Checker

Scale

1 : 25

16/1/2015 16:39:32

No.

Section 2

Description

Date

Owner

Unnamed Project number Date

0001 Issue Date

A105

015 16:39:33

No.



STUDENT HUB Hawthorn, Melbourne


STUDENT HUB This project is to design a student hub at level 3 for Swinburne University. The Hawthorn Campus is located seven kilometres east of Melbourne city in the heart of Hawthorn with good public transport system. The campus has a high density of buildings and is urban in nature. This student hub accommodate functional and secure space to support students and academic staff in meeting their needs for onsite learning, sustainment and amenity. The design aims at providing the University a flexible, inclusive space with pedagogical and social benefits to students from a diversity of cultures and age groups.


1 A-02

1 Study Area 2 Sitting Area

1

3 Computer/ Working Space

5

4 Sitting Area 5 Lecture Room

2 3

4

1

www.autodes

A-­03

Consultant Address Address Phone Fax e-­mail

1 : 200

Hawthorn Campus

No.

Description

Date

Level 3 Floor Plan

Project Name Design Project - AMDC Building

AMDC Building

/

Project number

A-01

23/5/2013

Date Drawn by

Miu Yin Pun

Checked by

Miu Yin Pun

1 : 200

Scale

Consultant Address Address Phone Fax e-­mail 16/1/2015 16:31:36

1

Floor Plan

LEVEL 3 FLOOR PLAN

1 A-­02

Section 1

1

Section 1 1 : 100

Hawthorn Campus Section 3 1 : 100

AMDC Building

19

No.

No.

Description

Date

Section 2 Project Name Design Project -­ AMDC Building

Unnamed Project number Date Drawn by Checked by

/

A-­02

23/5/2013 Author Checker

Scale

1 : 100

16/1/2015 16:31:39

1

Descrip


Sitting Area

Computer/ Working Space

20


Sitting Area

21


PROFESSOR LODGE Hawthorn, Melbourne


PROFESSOR LODGE The purpose of the professor lodge is to explore the recycling of unused shipping containers to a small hotel for academic event visitors to the university especially deisgn professors and researchers who may have been invited as special guests or speakers. The professor lodge sits in the university campus in the Parhran.


24


1

2

3000

3

2300

3 A11

A A06

4

23628

5014

Owner:

C A08 5

-

6

6000

8

7

2438

4876

W1

NOTES:

A

All dimensions are to be read and not to be scaled. Contractor must verify all dimensiions as per site before commencement of any work. Contractor must notify Architect and/or Project Manager of all discrepancies in the drawing clarify with us. All door and window opeinings to be verified as per schedule. All services to be co-ordinated with structures. Shear walls to be co-ordinated with struucture drawing. Refer structural drawings for column sizes and reinforcement details

2715

A

B

2303

6568

B

WC C

UP

W1

W1

INTERNET ROOM

D

D2 D

STORGE 2 A10

5560

C

12582

-

CAFE

BOOOKSHOP

Date

Issue

E

D1 D2

STAFF ROOM

F

WC LOBBY

D2

2134

F

G

G

Project Title:

Professer Lodge

D2

B A07

AT 4 PATERSON STREET

W1

Sheet Title: 6628

6628

WC

KITCHEN

Ground Floor Plan W1

D3

DRWAN BY:

DESIGNED BY:

CHECKED BY:

MIU YIN PUN

MIU YIN PUN

MIU YIN PUN

SCALE : 1:100 H

1 25

No.

D2 D1

D4

4 A12

3338

E

24228

-

Ground Floor 1 : 100

-

1 A09

APPROVED BY:

DATE: 06/06/14

H

DRG. NO.

A-01

REVISION:


Owner:

NOTES:

25610 1226

2591

3086

23210

1174

All dimensions are to be read and not to be scaled. Contractor must verify all dimensiions as per site before commencement of any work. Contractor must notify Architect and/or Project Manager of all discrepancies in the drawing clarify with us. All door and window opeinings to be verified as per schedule. All services to be co-ordinated with structures. Shear walls to be co-ordinated with struucture drawing. Refer structural drawings for column sizes and reinforcement details Date

2591

2591

No.

2855

13714

Issue

Project Title:

1

Professer Lodge

Section A-A 1 : 100

AT 4 PATERSON STREET

Sheet Title:

Section A-A DRWAN BY:

DESIGNED BY:

CHECKED BY:

MIU YIN PUN

MIU YIN PUN

MIU YIN PUN

SCALE : 1:100 DRG. NO.

APPROVED BY:

DATE: 06/06/14 REVISION:

A-06

26


Owner:

NOTES: All dimensions are to be read and not to be scaled. Contractor must verify all dimensiions as per site before commencement of any work. Contractor must notify Architect and/or Project Manager of all discrepancies in the drawing clarify with us. All door and window opeinings to be

Roof Garden 10364

Third Floor 7773

All services to be co-ordinated with structures. Shear walls to be co-ordinated with struucture drawing. Refer structural drawings for column sizes and reinforcement details Date

Issue

No.

Second Floor 5182

First Floor 2591

Ground Floor 0

2

East Elevation 1 : 100

Project Title:

Professer Lodge AT 4 PATERSON STREET

Sheet Title:

East Elevation DRWAN BY:

DESIGNED BY:

CHECKED BY:

MIU YIN PUN

MIU YIN PUN

MIU YIN PUN

SCALE : 1:100 DRG. NO.

A-10

27

APPROVED BY:

DATE: 06/06/14 REVISION:


Owner:

4876 1159

507

1580

933

864

862

1919

1781

NOTES:

All services to be co-ordinated with structures. Shear walls to be co-ordinated with struucture drawing. Refer structural drawings for column sizes and reinforcement details

2

4000

1

A11

3

4

Date

Issue

No.

2477

6337

10320

All dimensions are to be read and not to be scaled. Contractor must verify all dimensiions as per site before commencement of any work. Contractor must notify Architect and/or Project Manager of all discrepancies in the drawing clarify with us. All door and window opeinings to be

Project Title:

1200

1200

Professer Lodge AT 4 PATERSON STREET

Sheet Title:

Double Bed Room Floor Plan

1

Double Bed Room Floor Plan 1 : 50

DRWAN BY:

DESIGNED BY:

CHECKED BY:

MIU YIN PUN

MIU YIN PUN

MIU YIN PUN

SCALE : 1:50 DRG. NO.

APPROVED BY:

DATE: 06/06/14 REVISION:

A-15

28


Owner:

LEGEND WALL MOUNTED LIGHT OVERHEAD LIGHT F

EXHAUST FAN

NOTES:

SMOKE DETECTOR

All dimensions are to be read and not to be scaled. Contractor must verify all dimensiions as per site before commencement of any work. Contractor must notify Architect and/or Project Manager of all discrepancies in the drawing clarify with us. All door and window opeinings to be verified as per schedule. All services to be co-ordinated with structures. Shear walls to be co-ordinated with struucture drawing. Refer structural drawings for column sizes and reinforcement details

FLOURESCENT LIGHT S

SWITCH DUPLEX RECEPTACLE, 125V, 20A SINGLE PHONE LINE OUTLET

J

JUNCTION BOX

SS

UP

Date

Issue

No.

S SS

S J

Project Title:

Professer Lodge

SS

F

AT 4 PATERSON STREET

Sheet Title: J SS

Ground Floor Electrical Plan DRWAN BY:

DESIGNED BY:

CHECKED BY:

MIU YIN PUN

MIU YIN PUN

MIU YIN PUN

SCALE : 1:100

1 29

Ground Floor Electrical Plan 1 : 100

DRG. NO.

A-18

APPROVED BY:

DATE: 06/06/14 REVISION:


WORKING EXPERIENCE / MULTI-FOUNCTIONAL ROOM The Block Design & Renovation Hong Kong


OPTION 1

MULTI-FUNCTIONAL ROOM The client is a pilot who wants to renovate his spare room to a multi-functional room with an open wardrobe, a shoe cabinet, a storage closet and a bench. My job is to communicate with the client and give him some ideas of materials use. Also, present some 3D renderings for the client to show how everything work together. MOOD BOARD (OPTION 1) ISSUE DATE: 31/01/2015

2015.01.31

RENDER 1

31


OPTION 2

OPTION 3

MOOD BOARD (OPTION 3) ISSUE DATE: 31/01/2015

MOOD BOARD (OPTION 2) ISSUE DATE: 31/01/2015

2015.01.31

RENDER 2

2015.01.31

RENDER 3

32


WORKING EXPERIENCE / BRANDING DESIGN SOHO Mechanical Engineering Company Limited Hong Kong


盧偉豪

Louis Lo Sales Manager

M: (852) 6565 0686 F: (852) 2358 4825 E: SohoMechEng@gmail.com 安裝及維修廠房地址: 新界西貢蠔涌鹿尾村29號 Lot No. 322 Lot No. 322, No. 29 Luk Mei Tsuen, Ho Chung, Sai Kung, N.T.

金霸吊機 中港澳總代理

MODEL 型號 - 933 RDC 6S

專營買賣吊機(1-85噸)及環保斗勾載系統

負載限制裝置(黑盒)系統 主要功能:使用者能夠在顯示屏上 觀察吊機狀態的所有情況及負載限

歐洲名廠 金霸吊機

制提示

伸縮吊扞速度提升系統 伸展速度比較圖 Extensions speed comparison Model/型號 秒 秒

TECHNICAL SPECIFICATIONS

技術及規格說明

Max. Lifting Moment Max. Lifting Capacity Max. Reach Lifting Capacity Max. Lifting Height Horizontal Outreach Slewing Angle

最大吊力矩 最大吊重能力 最遠吊重能力 最高伸展高度 最遠油壓伸展 中柱回轉孤度

STANDARD CRANE

標準規格

Hydraulic Extensions Stabilizers Spread Maximum Articulated Stabilizer Feet Oil Tank Capacity Width Folded Slewing Hook Capacity Standard Crane Weight Standard Color Proportional Control Valve Multi-function Radio Remote Control High Pressure Oil Filter Factory LED Tower Light EBB Loading Limit Device SGS System SDD System Dimension

油壓式伸縮吊扞 平衝腳最長伸展闊度 活動式平衝腳底板 油缸容量 標準機身闊度 (摺合狀態) 回轉吊勾能力 標準機體自重 標準顏色 比例式油壓系統 多功能無線控遙器 高壓油過濾器 LED 原廠負載機示燈* 負載限制裝置(黑盒) EBB* 伸縮吊扞速度提升系統* 輕放式下降系統* 機身體積

31.25tm 10250kg @ 2.57m 1280kg @ 16.50m 20m 16.5m 397°

秒 秒

輕放式下降系統

秒 秒

輕放式系統能夠有效地減少吊機震盪

自設廠房 一站式特快 安裝各類車身工程 及維修服務

6S 6.20m √ 160L 2.5m 16t - 11.5t 4600kg Black 黑色 DANFOSS SCANRECO √ √ √ √ √ 1.17 x 2.50 x 2.40 m

全港獨有單手式遙控器

歡迎查詢

歡迎查詢

T: (852) 6565 0686 T: (852) 5927 3339 E: SohoMechEng@gmail.com

秒 秒

HK, MACAU & CHINA OFFICAL DEALER 中港澳地區總代理

T: (852) 6565 0686 T: (852) 5927 3339 E: SohoMechEng@gmail.com

HK, MACAU & CHINA OFFICAL DEALER 中港澳地區總代理

歡迎查詢

安裝及維修廠房地址

T: (852) 6565 0686 / (852) 5927 3339 E: SohoMechEng@gmail.com

新界西貢蠔涌鹿尾村29號 Lot No. 322 Lot No. 322, No. 29 Luk Mei Tsuen, Ho Chung, Sai Kung, N.T.

34


WORKING EXPERIENCE / PRODUCT CATALOG Penrite Oil HK Ltd. Hong Kong


6

10 Tenths Racing 的好處 & 特點

.100% PAO & ESTER 全合成機油 .FULL ZINC + 令機油減至最低損耗 .SHEAR FREE 保持機油的粘性令行車更佳 .令引擎及機油的壽命更長

RACING 5 5W-30 Size: 5 公升 Base Oil: Full Synthetic 100% PAO & Ester 全合成 規格: API SL/CF, ACEA A1/B1, MB 229.31, BMW LL-98, Ford M2C913-A/B/M2C 912-A1 特點: FULL ZINC +, SHEAR FREE, 低磨擦, 比賽認可證明

A Better Class of Oil Proudly Australian Since 1926 澳洲百威機油

A Better Class of Oil Proudly Australian Since 1926 澳洲百威機油

RACING 10 10W-40

A Better Class of Oil Proudly Australian Since 1926 澳洲百威機油

Size: 5 公升 Base Oil: Full Synthetic 100% PAO & Ester 全合成 規格: API SN/CF, ACEA A3/B3, MB 229.1/229.3, BMW LL-98, VW 502/505, Porsche GL 特點: FULL ZINC +, SHEAR FREE, 低磨擦, 比賽認可證明

RACING 15 15W-50 Size: 5公升 Base Oil: Full Synthetic 100% PAO & Ester 全合成 規格: API SN/CF, ACEA A3/B3, MB 229.1, BMW LL-98, VW 502/505, Porsche GL 特點: FULL ZINC +, SHEAR FREE, 低磨擦, 比賽認可證明

直線電話查詢: (852) 6565 0686 Fax: (852) 2358 4825 Email: (852) SohoMechEng@gmail.com

RACING 20 20W-60 Size: Base Oil: 規格: 特點:

5公升 Full Synthetic 100% PAO & Ester 全合成 API SN/CF, ACEA A3/B3, MB 229.1, BMW LL-98 FULL ZINC +, SHEAR FREE, 底磨擦, 比賽認可證明

HPR 的好處 & 特點

100%澳洲制造

.Extra TEN 技術保護 .Full Zinc 技術保護 .原廠認證 .最新 API & ACEA 工業規格

澳洲NO.1獨立油廠

蘇豪機械 中港澳總代理

安裝及維修廠房地址: 新界西貢蠔涌鹿尾村29號Lot No. 322 Lot No. 322, No. 29 Luk Mei Tsuen, Ho Chung, Sai Kung, N.T.

Envior + 的好處 & 特點

.低炭,令引擎減低排放污染 .100% 全合成機油 (中至底 SAPS) .額外慳油功能, 令引擎及機油的壽命更長 .原廠認證 .最新 API & ACEA 工業規格 Enviro+ 5W-20

The Penrite Difference 百威機油的特點

HPR 0 0W-30

EXTRA TEN 技術在引擎啟動時進行保護, 並在 FULL ZINC+ 外層增加一道保護層令引擎保持健康 FULL ZINC 在引擎轉數在 1200rpm - 1600rpm 進行加強保護, 低抗磨損 FULL ZINC+ 利用更多化學元素在引擎轉數在 2200rpm 以上進行加強保護, 低抗磨損 SHEAR FREE 在引擎啟動時進行保護, 高速行車時保持油溫溫度及機油的黏性, 令賽車或比賽時發揮最佳性能

Size: 5 公升 Base Oil: 100% 全合成機油 規格: API SL/CF, ACEA A3/B4, GM 4718M, MB 229.3, Ford M2C913-A/913-B 特點: Extra Ten, Full Zinc

Shear Free技術 ﹣ 不會損耗機油的黏性

Enviro+ 5W-30

機油黏性損耗 油壓消耗 市面上的機油

HPR 5 5W-40 引擎時間 百威機油 雙層保護

時間

普通SAE 機油

百威機油和市面上普通 SAE 機油的分別

.優質機油 .全合成 .最新的 API & ACEA 規格 .FULL ZINE + EXTRA TEN 技術

SHEAR FREE 功能的機油與普通 RACING 機油在時間上的黏性損耗比較表

.全合成 (中至底 SAPS) .最新 API & ACEA 規格得到更好的保護 及減少活塞的污泥和沉澱物 .額外慳油功能, 令行車公里比一般更多 .獲多間歐洲名車廠證可規格的保養機油

Size: 5 公升 Base Oil: 100% 全合成機油 (中至底 SAPS) 規格: API SN, ACEA C2, BMW 16182, Chrysier MS-6395, Ford M2C153-H, M2C925-A, M2C930-A, M2C945-A 特點: 最新機油技術及額外慳油功能

Size: 5 公升 Base Oil: 100% 全合成機油 規格: API SL/CF, ACEA A3/B4, JASO MA1, VW 502/505, GM 4718M, GM-LL-B-025, Ford M2C912-A/913-A/913-B/913-C/153-G/153-H 原廠認證: MB-Approval 229.5, BMW Longlife - 01 特點: Extra Ten, Full Zinc, 原廠認證

.高性能機油 .全合成機油 PAO (GROUP 4) & Ester (GROUP 5) 原油 .SHEAR FREE 技術 .FULL ZINC+ 技術 .高性能賽車證書及引擎的信心保證

HPR 10 10W-50 Size: 5 公升 Base Oil: 100% 全合成機油 規格: API SN/CF, ACEA A3/B4, MB229.1, Ford M2C905-A3/910-A/153-F/153-G, Holden HK 2100, VW 500/502/505, BMW Longlife - 98 特點: Extra Ten, Full Zinc

Size: 5 公升 Base Oil: 100% 全合成機油 (中至底 SAPS) 規格: BMW Long Life-04, MB 229.51/229.31, VW505.01(2005), Porsche C30 原廠認證: VW 504/507 特點: 長效額外慳油功能, 原廠認證

Enviro+ 5W-40 Size: 5 公升 Base Oil: 100% 全合成機油 (中至底 SAPS) 規格: API SN/CF, ACEA C2/C3, MB 229.31, VW 505.01 原廠認證: VW 502/505, GM dezos2TM 牌照, Porsche A40, MB-Approval 229.51, BMW Long Life-04 特點: Extra Ten, 最新機油技術, 原廠認證

Enviro+ 10W-40 Size: 5 公升 Base Oil: 100% 全合成機油 (中至底 SAPS) 規格: API CJ-4/SM, ACEA E4/E6/E9, MB 228.31, MAN 3277CRT/3477/3575, Caterpillar ECF-3-a, MTU Type 3, JASO DH-2 原廠認證: MB-Approval 228.51, CumminsCES 20081, Volvo VDS-4, Mack EO-O Premium Plus, Renault RLD-3 特點: Extra Ten, 最新機油技術, 原廠認證

36


FRUNITURE DESIGN Lightweight Stool


X1 1.6mm Aluminium

X4 1.6mm Aluminium

Completed Stool

1:1 Cardboard Model Completed Stool


HAND DRAWING PRACTICE St Joseph’s Church


40



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.