Coal Insights - Sept 2012

Page 1



Chief Editor Rakesh Dubey, Tel: +91 91633 48159, Email: rakesh.dubey@mjunction.in Executive Editor Arindam Bandyopadhyay, Tel: +91 91633 48016 Email: arindam.bandyopadhyay@mjunction.in Editorial Board Alok Srivastava, General Manager, MMTC Ltd Amitabh Panda, Group Director (Shipping & Logistics Operations), Tata Steel Group Anirudha Gupta, Director, P&H JoyMining Equipment India Ltd Ashok Jain, Managing Director, Saumya Mining Ltd Deepak Bhattacharyya, Head – coaljunction, mjunction services ltd Ganesan Natarajan, WT Director, President & CEO, Ennore Coke Ltd Lawrence Metzroth, Vice President – Analysis & Strategy, Arch Coal Inc M K Palanivel, President – All India Bulk, Samsara Group P S Bhattacharyya, former Chairman, Coal India Ltd S N Choubey, Head – Commercial, ABG Cement Ltd Sandeep Kumar, Managing Director, S & T Mining Co Pvt Ltd Shyamji Agrawal, AVP-Central Procurement Cell, Ultratech Cement Ltd Suresh Thawani, Managing Director, Tata Sponge Iron Ltd Advertising Soumitra Bose, Tel: +91 92310 00232, Email: soumitra.bose@mjunction.in Sumit Jalan, Tel: +91 91633 48243, Email: sumit.jalan@mjunction.in Subscription Rachita Das, Tel: +91 91633 48045, Email: rachita.das@mjunction.in Toll Free No.: 1800 4192 000 1. Press 8 for publication Email: publication.tbss@mjunction.in Design Debal Ray, Sobhan Jas For suggestions, feedback and queries, please write to coalinsights@mjunction.in

EDITORIAL Dear Readers, “No man undertakes a trade he has not learned,” said Socrates, “yet everyone thinks himself sufficiently qualified for the hardest of all trades – that of government.” Wise saying, isn’t it? How aptly it describes the modern democracy, the world’s largest democracy, to be more specific. At present there is not one government, but numerous governments ruling this country. But even one government was too many, if you consider the warring ministries and departments. Coal versus Environment, Power versus Coal, Finance versus RBI, Rail versus Finance, States versus Centre, States versus States, and now Centre plus States versus Comptroller & Auditor General (CAG). The whole thing seems pretty long-drawn. The government is busy proving itself innocent (and de-allocating blocks, at the same time). CAG is busy trying to prove that the government is at fault. The Central Bureau of Investigation (CBI) is busy implicating blacklisted allocattees – the root of all chaos. And then there is a new entrant into the ring, the Central Vigilance Commission (CVC), busy demanding that all captive allocations since 1993 be brought under the CBI scanner. Let the country know the truth…full and final. So be it. Let the truth be out, of course. And till such time as it’s not, let production be lost, de-allocattees move court, and growth be stalled.

Registered Office mjunction services limited, Tata Centre, 43 J L Nehru Rd, Kolkata 700 071 Website: www.mjunction.in Corporate Head Quarters: Godrej Waterside, 3rd Floor, Tower 1, Plot V, Block DP, Sector V, Salt Lake, Kolkata 700091, Tel: +91 33 6610 6100, Fax: +91 33 6610 6187  Bhilai: Room 321, 3rd Floor, Ispat Bhavan, Bhilai Steel Plant, Bhilai 490001, Tel: +91 788 6451066, Tele/Fax: +91 788 2221071  Bokaro: Room 19, Old Admin Bldg., Bokaro Steel Plant, Bokaro 827001, Tel/Fax: +91 654 2226132  Burnpur: SAIL - IISCO Steel Plant, Materials Building, Order Department, Ground Floor, Burnpur 713325, Telfax: +91 341 2240107  Chennai: Basement, Begum Ispahani Complex, New No 91, Old No 44, Armenian Street, Chennai 600 001, Tel: +91 44 64624733-35, Fax: +91 44 25216536  Durgapur: Room 618, Ispat Bhavan, Durgapur Steel Plant, Durgapur 713203, Tel: +91 343 6510185, Tele/Fax: +91 343 2586946  Jamshedpur: Kashi Kunj, Ground Floor, Road No. 02, Contractors Area, Bistupur, Jamshedpur 831001, Tel: +91 657 6519985/86/90/91, Fax: +91 657 2230040  Mumbai: Jolly Bhavan II, 403, 4th Floor, 7 New Marine Lines, Mumbai 400020, Tel: +91 22 66510663, Tele/Fax: +91 22 66510662  New Delhi: C127, 2nd Floor, A One Plaza, Naraina Industrial Area, Phase I, New Delhi 110028, Tel: +91 11 65661774/65413288, Tele/Fax: +91 11 25897000  Noamundi: C/o TATA Steel Limited, Mines Purchase Cell, PO: Noamundi, Singbhum (West), Jharkhand 833 217, Tel: +91 9204791638/9234368606  Rourkela: Administrative Bldg., Room 624, 6th Flr, Rourkela Steel Plant, Rourkela 769011, Tel: +91 661 6514142/6511412 mjunction believes that all junctionites, customers, suppliers, partners, etc should practice the highest ethical standards in their daily operations. Report a concern to ethics@mjunction.in

Now what if the truth eludes, just as it has eluded in numerous other cases of grafts and scams? Will the truth-seekers be brought to book for the lost production? Because the truth is that the country is losing on production and growth, every passing day. Enough on the governance part. Now let’s take a look into the fallout of lost production; i.e. ever growing imports. India’s coal imports are projected to touch nearly 50 percent of the country’s consumption by 2025-30. At this rate of development, that scenario may surface even earlier. What will that imply? Well, the thermal power sector will become critically dependent on foreign resources. Now consider the economy’s current dependence on international crude market. Consider the impact of any spike in international crude prices and the vulnerability of economy to periodic shocks. Why make the economy vulnerable on another front? Why make the country susceptible to external shocks in yet another energy vertical? Consider the huge forex outgo and the impact of crude import bill on India’s balance of payments? Why go for the last option when you actually have some others? Happy reading,

Copyright: All rights reserved. No part of Steel Insights can be reproduced or copied in any form or by any means without the prior permission of mjunction services limited. Please inform us if any copyright has been inadvertently infringed. Disclaimer: This document is for information purpose only. Certain information herein has been acquired from various external sources believed to be reliable. While we have taken reasonable care to compile this report, we in no way assume any responsibility for any error or discrepancy in regards to information contained herein. Readers are requested to make appropriate judgment without any prejudice or compulsion.

(Rakesh Dubey) Coal Insights, September 2012

3


Contents

6  |  Cover Story

18 CIL board approves import plan 20 Thermal coal import prices remain flat

Growing coal imports may leave India vulnerable

22 Imported spot coking coal prices ease 28 Delayed delivery defeating purpose of coal e-auction: ICMA 30 SPU loan restructuring to reach `1.5 trillion: CRISIL 32 India’s August power generation falls m-o-m: CEA 38 MoC axes allocation of 10 captive coal blocks

26  |  FEATURE

CIL scraps JV route for mine revival The coal behemoth opts for mine developers and operators (MDOs) route to revive UG mines

40 Coal crisis spares paper industry

36  |  FEATURE

46 MBE CMT India bags order for Pakistan’s first coal washery

Time to wind up standalone DRI plants?

48 JSPL gears up to slash DRI production cost 50 Anupam wins `130 crore order from SAIL 51 MoC blamed for messing up coal block allocations 52 US coal production to drop 6.1% 53 Will China’s decision on export tax further soften coke? 54‑ Traffic handling by major ports down 3.5% in April-August 56 Railway commodity freight revenue down in August 58 Updated data on captive coal blocks

4 Coal Insights, September 2012

Excessive reliance may make India susceptible to external shocks as seen in crude oil

Only forward or backward integration can save the day for ailing sponge iron industry

42  |  TECHNOLOGY

CIMFR offers technology support for environment management The institute develops fly ash soil amendment technology for environmental preservation

44  |  In Focus

Biocoal: the new fuel on the block This cheap, renewable fuel developed from agro-wastes deserves a closer look



Cover Story

W

hen India joined WTO way back in the 1990s, the major plank of the protagonists of free trade was the Ricardian theory of comparative advantage. This classical theory, in simple parlance, proposes that the world would be a better place to live in if individual economies are allowed to hinge on their areas of core competence. For example, if China can produce better peanuts at lower cost, let it produce excess of it so that the rest of the world can be fed better peanuts at cheaper rates. This way the land (and labour and capital etc.) occupied in growing peanuts elsewhere could be released to grow other things, better and cheaper, the theory says. This way the global economy will operate at the peak of its competitiveness and efficiency. While this may work well in case of peanuts, the theory falls flat when it comes to coal, especially steam coal, where India is an extreme example of indulgence and lassitude. In at least this case, the comparative advantage of one country, say Indonesia, is actually making another (India) less competitive in every other field.

Growing coal imports may leave India vulnerable Arindam Bandyopadhyay & Tamajit Pain

6 Coal Insights, August 2012



Cover Story 185, 250, 400…?

It may look like a series of Geometric Progression, but is actually the estimates of coal tonnage that India will be importing five years from now. The presence of multiple numbers indicates the multitude of estimates that keep flowing in ever so often. Only recently, the Plan Panel projected that imports will rise to a “whopping” 185 million tons (mt) by 2017, the terminal year of the current (Twelfth) Five Year Plan. At about the same time last year, the then coal secretary Alok Perti had put this estimate at 250 mt. Two years ago (at about the same time of the year, again) a top functionary of Coal India projected an import volume of 250 mt by 2020. Then again, a globally renowned research consultant estimated (in March 2012) that the country’s thermal coal imports will go up to 400 mt by 2030. While these numbers look pretty impressive, considering that global coal import volume is around 900 mt, some Indian importers go a few steps ahead. The country’s coal imports, according to a trader who sought anonymity, has already crossed 200 mt a year. “If you want to know the ground reality, talk to big importers, check out their figures…! Import was 250 mt in (calendar year) 2011. This year (2012) it is going to be 300 mt,” he claimed. But don’t talk these numbers, a top coal ministry (MoC) official once said. If India started projecting coal import requirements, it would give an indication of the country’s

NTPC’s August coal import falls sharply m-o-m NTPC Limited, one of the leading power utilities of the country, has imported 269,000 tons of coal in August 2012, much below the target of 1,333,000 tons set for the month, according to provisional data available with ICMW, a high-end coal report. NTPC’s coal imports during the previous month (July 2012) stood at 892,000 tons whereas during August 2011, coal import by NTPC stood at 1,148,000 tons against a target of 1,288,000 tons set for the period. During the first five months (April-August) of 2012-13, coal imports by NTPC stood at 3,935,000 tons against a target of 6,667,000 tons set for the period, as per the data. huge appetite to its suppliers in sourcing countries (Australia, Indonesia, South Africa and the US) who may take advantage of the situation. “There will be a race to see who can emerge as the potential supplier. We are already paying huge prices and it is expected to get worse with these projections,” he warned. Coal imports flat in Q1

Contrary to industry expectations and “ground realities”, coal imports into India remained somewhat flat during the first quarter (April-June) of 2012-13 (Q1) and first half of 2012 (H1 2012). According to data available with Coal Insights, coal imports through 12 major ports of the country in Q1 stood at around 19 mt, showing flat growth over the same period last year. Trading sources, however, claimed that the import

Coal import during last 10 years

volume was larger than the figure estimated. Of the total import in Q1, over 10 mt was non-coking coal and 7 mt coking coal. The remaining part comprised pet coal, anthracite coal and pulverized coal injection (PCI) coal. Till August 2012, coal imports through these major ports were estimated at around 27 mt, which included 14.5 mt of noncoking coal and 10.5 mt coking coal. This was significantly lower than around 45 mt imported during April-August 2011. Earlier, overall coal imports in 2012-13 were expected to jump to around 150 mt from around 110 mt in 2011-12. However, as of now, coal imports in the current fiscal seem to fall short of than the volume expected. “The official figures may be on the down side, as our estimates show import volume is rising all through. Even the figures estimated for last year (FY12) was below our estimates. The domestic supply constraints are leading to huge imports by the consuming sectors. Lately, the drop in international prices has made imports all the more attractive,” a coal trader said. However, another estimate by Barclays shows India’s coal imports during H1 2012 (January-June) grew only moderately at 3 percent year-on-year. Imports during the half year stood at around 48.5 mt and lagged expectations, the report said. Stockpile, currency restrict import

Although there remains doubt over the authenticity of various estimates, the coal industry at large agrees that a host of factors have restricted imports during the early months of the current fiscal year. High domestic production Source: MoC

8 Coal Insights, September 2012

Firstly, the higher growth in domestic production during the first quarter was a


GIVE CYCLE TIMES THE CHOP. cHOP. CHOP.

The new G-Series L180G and L220G wheel loader with 20% more lifting power and 10% better breakout force, are the latest workhorses of Volvo’s wheel loader range. New engines and drivelines offer improved productivity, lower emissions, greater smoothness, serviceability and operator comfort. The improvements ensure full buckets, faster cycle times - all day, every day.

Volvo’s G Series wheel loaders: more lift, more shift.

Corporate Office:

For details contact:

Authorized Dealers:

Volvo India Pvt. Ltd.

Toll Free No. 1800 108 6586 E-mail: Info.vcemarcomm@volvo.com www.volvoce.com

Infra Equip Pvt. Ltd., Dhanbad

Volvo Construction Equipment #65/1, Parin Building, Bagmane Tech Park, C V Raman Nagar, Bangalore 560 093 Tel: +91 80 6691 2000 Fax: +91 80 6691 2287

volvo construction equipment

Pollutech Engineering, Bhubaneshwar Suchita Earthmoving Solutions, Guwahati Suchita Millenium Projects Pvt. Ltd., Kolkata


Cover Story positive development that the domestic industry was looking forward to for quite some time now. In the first quarter of 201213, Coal India Ltd (CIL) achieved a growth of about 6.5 percent in offtake, a record high in recent past. Also, production growth hovered around 6 percent in the April-June 2012 period. This came as a major relief to the consumers after stagnant growth in the past two-three years. Although this growth in production and offtake declined in the months of monsoon, the consumers were hopeful that CIL would make up for the lost production in the third quarter. According to CIL chairman S. Narsing Rao, the company is expected to register an overall growth of 6-7 percent during 2012-13. The company plans to produce 464 mt of coal in 2012-13 and despatch about 470 mt as per Annual Action Plan (AAP) compared with actual production of 435.84 mt and despatch of 433.08 mt in 2011-12. This implies an incremental production of about 30 mt in 2012-13, which Rao is confident of achieving. This growth in production and offtake would actually help restrict the growth in imports during the current year, industry sources believe. Stockpile at ports Along with a renewed growth in production, the high stockpile Indian ports posed a major hurdle for imports during the first quarter. The stock of imported coal for supply to power utilities at various ports of the country

Bulging coal stock at ports restricts import

rose by 39.36 percent to 0.524 mt as on August 31, 2012 as compared to 0.376 mt as on July 31, 2012, according to data released by Central Electricity Authority (CEA). This however was lower than the stock of 1.5 mt reported on August 31 last year. The stock had been rising consistently from March 2012 from a level of 0.390 mt to 0.679 mt as on April 30, 2012 while on May 31, 2012 it stood at 0.705 mt but after witnessing a rise for four consecutive months, it had experienced a fall in July. However, the stock level again moved up in the month of August, according to data available with Coal Insights. Overall, the total stockpiles of both unsold and contracted coal for (all user

Stockpile at ports* in 2012 (in mt)

*coal imported for power utilities Source: CEA

10 Coal Insights, September 2012

segments) are reported to be around 5-6 mt at various ports, sources said. Logistics lags The high stockpile at ports is primarily caused by lack of handling capacity and inadequate inland transport facility. This problem becomes acute during the monsoon. According to port sources, handling of coal in the monsoon months takes place only in all-weather ports/terminals. As a result, the stockpile increases. In some cases, environmental factors also restrict handling of the commodity. This was the case with Chennai port, where the High Court had stopped handling of coal on the ground of pollution. During the first five months (April-August) of the current financial year (2012-13), total imports of coking coal via Chennai port stood at 771 tons as compared to 107,717 tons imported during the corresponding period of previous year (2011-12). However, recently the court has reportedly agreed to relax the order. Besides port congestion, shortage of railway rakes was also a factor inhibiting growth of offtake from CIL mines in JulyAugust. “It’s not only rains, but also the wagon availability which brought down the offtake rate lately. It is not as per expectation,” said Rao. In July, the wagon availability was around 177 wagons per day against expectations of around 190 wagons per day. There was a shortfall of 13 rakes a day which had a huge impact.



Cover Story Slack demand

Rupee’s depreciation Lastly, the recent depreciation of Indian rupee (INR) against the US dollar has to some extent restricted import of the commodity. In fact, the currency’s depreciation nullified the impact of a fall in international coal prices. The rupee’s weakness resulted from an adverse

International steam coal price trends in 2012 (FOB) 130.00 120.00 110.00 PRICE ($/TON)

Another factor that inhibited growth in import was lukewarm demand from the domestic industries, which are going through a lean patch. Industrial growth stood at a three-year low of minus 0.1 percent in the first quarter (April-June 2012), against 6.9 percent in the corresponding period of last year. Manufacturing sector witnessed a 3.5 percent de-growth in June 2012. Within manufacturing, capital goods production dropped by more than 20 percent in close succession – October 2011 (25.48 percent), March 2012 (21.3 percent) and June 2012 (27.9 percent). Almost all the coal consuming sectors except power – steel, cement, paper, sponge iron – are facing a demand glut for different reasons. While the steel sector is witnessing slack demand, the cement makers received a severe blow from the Competition Commission of India (CCI) allegedly on earning excessive profit through cartelisation. The sponge iron makers are suffering heavy pressure on margins due to softening demand for steel and increase in raw material prices. All these factors are leading to reduced demand for fuel from these sectors.

100.00 90.00 80.00 70.00 60.00 50.00

South African Coal (6,000 kcal/kg NAR) Indonesian Coal (5,900 kcal/kg GAR)

trade balance and high inflationary pressure. Together these factors pushed the currency down to `56 per US dollar in recent weeks. A sharp rise in dollar often leads to increased risk of default by domestic importers. The current scenario reminded a short spell of rupee’s depreciation in 2011 which stoked fears of default by some large importers. Although there has been a little gain in the rupee lately, economic forecasters predict sustained pressure on the local currency in the coming months. This, if comes true, may restrict coal imports going forward. Prices offset currency pressure

While stockpile and depreciation in the rupee are believed to have restricted India’s import

INR movement against USD

57.0 56.5 56.0 55.5 55.0 54.5 54.0 53.5 53.0

12 Coal Insights, September 2012

Australian Coal (6,300 kcal/kg GAR) Indonesian Coal (5,000 kcal/kg GAR)

of coal during the early months of 2012-13, the steep decline in international coal prices has had a contrary effect. This was true for both thermal and coking coal import by the country. Prices of thermal coal imports from Indonesia dipped 23 percent in the JanuarySeptember period as ample supplies and continued weak demand from India and other buyers weighed, market sources told Coal Insights. Indonesian coal of 5,900 kCal GAR was quoted at $72.8 per ton on September 20, 2012 as compared to $95 per ton on January 3, 2012. Similarly, Indonesian coal of 5,000 kCal GAR is quoted at $56.8 per ton on September 20, 2012 as compared to $74 per ton on January 3, 2012. Simultaneously, imported coal prices from South Africa declined by about 19 percent in the January-September period because of the weak demand. South African coal of 6,000 kCal NAR is quoted at $86.2 per ton on September 20, 2012, down from $106 per ton on January 3, 2012. Imported (thermal) coal prices from Australia dipped by around 20 percent in the January-September period owing to the weak demand conditions prevailing in the market. Australian coal of 6,300 GAR is quoted at $89.5 per ton on September 20, 2012 compared to $112 per ton on January 3, 2012. In the coking coal segment, prices of premium hard coking coal from Australia dipped 36 percent to $140.5 per ton on September 20, 2012 from $219 per ton



Cover Story

International coking coal price trends in 2012 235.00 215.00

FOB ($/TON)

195.00 175.00 155.00 135.00 115.00

HCC Peak Down Region

on January 3, 2012, mainly because of ample supplies from the miners and low demand from steel mills in India and other countries. The semi soft variety also dropped 37 percent to $94.5 per ton on September 20, 2012 compared to $150 per ton on January 3, 2012. As a result of this, prices of imported met coke from Australia also fell 10 percent to $324 per ton CFR India from $363 per ton on January 3, 2012. Sources said there is too much supply for the fourth quarter. The supply overhang is expected to continue unless there is a significant pick-up in global economic growth. Analysts still expect the increase in global thermal coal export capacity in 2012-13 to slightly outpace demand growth, causing the market to remain in a state of slack. There were reports of buying interest in lower-grade coal with a heating value of 5,500 kCal/kg. News of further production and job cuts by Australian coal producers also added bearish sentiment to the thermal coal market. Reports said the world’s biggest miner, BHP Billiton, announced that it would stop production at its Gregory coking coal mine in Queensland. Xstrata, the world’s largest producer of seaborne thermal coal, said in a statement that a significant portion of the Australian thermal and coking coal industry is losing money at current prices. Although coking coal, which is used for steelmaking, and thermal coal, used for power

14 Coal Insights, September 2012

Premium Low Vol

HCC 64 Mid Vol

generation, are largely separate markets, lowgrade coking coal and high-grade thermal coal are sometimes substituted for each other and supply and demand impacts can flow from one market to the other. Power sector most vulnerable

The import boom was started by the sudden increase in coal requirement of the power utilities. While coking coal import remained more or less steady over the years, there was an abrupt increase in thermal coal import since 2002-03. Over the years, what started

as a stop-gap arrangement has become the mainstay of the sector’s expansion strategy. Amid the ongoing debate over Fuel Supply Agreements (FSA) and price-pooling for imported coal, the power utilities becoming critically dependent on imported coal. According to an estimate by the Ministry of Coal and Planning Commission, the demand for coal in the country for power utilities during 2012-13 would be 512 mt. Against this projected demand, supply from indigenous sources for power utilities has been estimated at 409 mt, leaving a shortfall of 103 mt. It is estimated that CIL will supply 347 mt coal to power utilities while SCCL will supply another 37 mt. A total of 25 mt of coal is likely to come from other sources, including captive coal blocks, during the year. The demand-supply gap during 201213 has been envisaged to be met through imports of about 68 mt of coal, equivalent to 103 mt of indigenous coal, according to the estimate. As per the new FSA norms, the power sector may need to procure a substantial chunk of its coal requirements from overseas sources. Even for a non-coastal plant, this share may go up to 35 percent. Overall, the sector’s exposure to imported coal may rise to 30 percent of total consumption from current 13 percent over the next five years.

Growing dependence on imported coal makes power sector vulnerable



Cover Story said, has just begun, and may assume immense proportions in the coming years. While factors like logistics The import of steam coal by Indian power utilities, including lags, currency imported coal based plants, in August 2012 stood at 4.1 million depreciation and tons (mt), up marginally by 2.24 percent from 4.01 mt in July, increasing stockpiles as per provisional data of Central Electricity Authority (CEA) would restrict available with Coal Insights. inflows to some The import in August was lower than the target of 5.83 mt extent, the current set by CEA for the month, but 0.91 mt higher than 3.19 mt fiasco over captive imported in August 2011, the data revealed. block allocation by During August 2012, imported coal based plants had the government may brought in 2.17 mt of coal whereas during the previous month, single-handedly the figure stood at 1.87 mt. open the floodgate The import during the first five months of 2012-13 stood for increased flow of at 21.99 mt, 24.61% lower than the target of 29.17 mt set for the dry fuel into the the period. However, imports during the first five months of country. current financial year were up 22.58 percent compared with There, however, 17.94 mt imported during the corresponding period of 2011may not be any drastic 12, according to the data. impact in the short CEA has set a target of 70 mt for coal import by power term. “I don’t think utilities, including 24 mt by imported coal based plants, for there will be any 2012-13. significant impact of this controversy on Forex outgo raises concern current production by CIL or others. So there Apart from the power sector’s growing will not be any near-term impact, good or dependence on imports, the large forex outgo bad, on import too,” said an industry veteran. also poses a serious concern. In the short term, the coal trading circle At the current rate, coal imports by believes, the international prices will remain India costs more than $10 billion, which is soft and Indian imports will witness a healthy a sizeable part of the country’s total import growth in 2012-13 over last year. “The prices bill. At current exchange rate, India’s coal are likely to remain subdued this year. This is import bill moved up 10 times in the last so because demand scenario is not so good. eight years. In Rupee terms, coal import The US economy is not in a good shape and bill increased from `50.1 billion (bn) in industries dependent on the US market are 2003-04 to a massive `415 bn in 2010-11. not doing well. The Euro Zone too is facing During April-October 2011, the value of a slowdown. Australia is facing weakness in coal imports shot up further to `457.3 bn. Overall, the country has spent over `250,000 India’s coal import value (in `bn) crore on coal imports in the last 10 years. Coking Non-coking Total Year The huge outgo on imports calls for coal coal import attention in view of the rising current account 2003-04 36.7 13.4 50.1 deficit (CAD) of the country. CAD hit a 2004-05 72.4 30.2 102.6 record 4.2 percent of GDP in 2011-12 and 2005-06 95.4 53.7 149.1 rose further to 4.5 percent in January-March 2012. Only recently, Reserve Bank of India 2006-07 101.8 65.1 166.9 (RBI) has expressed grave concern over the 2007-08 121.0 86.4 207.4 rising CAD. Former RBI governor Y.V. 2008-09 226.1 187.3 413.4 Reddy has said that the government viewed a 2009-10 201.3 190.5 391.8 CAD of 2.5 percent of GDP as a safe average.

Indian power utilities’ August import up 2.24% m-o-m

Captive chaos may boost import

The surge in coal imports, trading sources

16 Coal Insights, September 2012

2010-11

208.6

206.9

415.5

2011-12*

241.7

215.6

457.3

*up to October

Source: MoC

industrial growth; so is Japan. Only South America, China and India have some demand,” the expert informed. As a result, prices will continue to remain soft for some time. “It is to be seen how long they can hold on to these prices. Prices may take a beating,” he added. According to Barclays, India’s imports could pick up in the second half of 2012 (JulyDecember) and reach around 62 mt. This would take the annual import volume to over 110 mt in the calendar year, the report said. In the medium term, however, the current controversy over block allocation may actually worsen the domestic supply scenario. If not anything else, the alleged coal scam report released by the Comptroller & Auditor General (CAG) and the subsequent enquiries initiated by the Central Bureau of Investigation (CBI) has put the captive production plans in a quandary. The MoC can do little at the moment to pep up captive block owners to increase production. The only tool in hand is deallocation of blocks. Already, a number of blocks have been de-allocated and some others are in the pipeline. Apparently, nobody is not sure about the fate of these de-allocated blocks. Even if these blocks are handed over to CIL – that again would be a lengthy process – the development and production from the same would be postponed for an indefinite period. All these would lead to increased requirement for imports, not only by the power sector but other consumers as well. At this point, it is to be noted that the ministry’s medium-term goal placed highest importance to the captive production segment. While CIL and SCCL are likely to continue with a moderate rate of growth in production, the captive blocks were banked on for a significant spurt in volume. In the absence of this spurt, India’s dependence on coal imports will only accentuate further, bringing the growth engines of the economy critically dependent on foreign supplies. Moreover, such a scenario would only replicate the country’s vulnerability to crude price movements in the international market. This would open yet another front of assault. The twin impacts of crude price hike on domestic inflation rates and also on the current account deficit and trade imbalance could be witnessed in case of coal as well. “Not the best of options,” said a coal industry veteran, “given that you have an option to avoid that.”



Cover Story

CIL board approves import plan, traders unperturbed

import coal by CIL would add to its cost burden. “The company does not have any exposure to coal import. Also, it will not like to just add another layer in the supply chain and the consumers would not like to source imports by paying a higher price,” said an industry source. Importers not perturbed

Coal Insights Bureau

M

onths after the government asked Coal India Ltd (CIL) to consider imports, the board of directors of the coal monolith has finally given a go ahead. In a recent development, the board has approved import of coal for power producers that are ready to accept it on a cost-plus basis. This arrangement, however, will be in vogue until there is a consensus on the price-pooling mechanism under which customers will be charged a uniform average price for domestic and foreign fuel. This stamp of approval brings to end an impasse over the proposal to import coal to meet the miner’s obligatory fuel supply requirements. As of today, CIL is committed to meet 80 percent of the power producers’ coal requirements, 15 percent of which can be met through imports. As per media reports, CIL may consider going for an import volume of around 15 to 18 million tons (mt) of coal per year. It is, however, still not clear how the company plans to go about the task. CIL chairman S. Narsing Rao had earlier said

18 Coal Insights, September 2012

that the company would not go for adding another layer in the supply chain, nor will it take any hit to its bottomline. The scenario has become complicated after many consumers raised objections over the pricepooling mechanism. Meanwhile, CIL’s plan to import coal has faced opposition from expected quarters. The workers’ unions which see the proposed move as a step towards privatisation have raised their objections to the plan. “We will oppose the plan to import coal by CIL as we oppose any move to privatise the coal sector,” union sources said. Even the board of CIL is still undecided about the diktat from the government. As per the new fuel supply agreement (FSA) proposed by the ministry, CIL needs to sign agreements for 80 percent of fuel supply requirements of power plants, 15 percent of which may be met by imports. However, with the board failing to take any conclusive stance on the issue, the matter is hanging fire. Incidentally, the proposal of CIL importing coal was not received well by the market and experts. Shares of the company dipped on concerns that any decision to

Meanwhile, the pure play traders are not perturbed by CIL’s proposed move to import coal and pool prices to make imports less pricey. Commenting on the issue, a leading south-based importer said, “First, you have to see how much will they import. I don’t think CIL will import much. Secondly, their operating cost will be high. They will give the coal primarily to government power companies. Private power companies will not take it from them.” Also, the government organisations are not very flexible in operations and will perhaps not be able to change their operations to take advantage of price movements, he said. Thus, the proposal may not look very lucrative to them after a while. “Government agencies like MMTC and State Trading Corporation (STC) have high operating costs. There is hardly any accountability on loss. They have a high cost structure as compared to the private players. Also, their transport cost is at par. And they keep 10-12 percent margin. The only advantage they enjoy is that they play on volumes. For instance, these companies can take a few panamax vessels (100,000 tons capacity) at a time. Thus, the law of average helps them manage the operations. But then, their distribution is not good,” the trader said. In comparison, private players who have integrated systems to import, can have proper supervision and have well-managed stocking facility. “Such players will continue to do well, no matter who comes into the trade. The market is huge and it will continue to grow.” He however proposed that “a good model could be to involve small traders who can source and trade.” The ministry could consider outsourcing the activity to these players. The large PSUs, in turn, could bring those sources under one umbrella and do the distribution part, he added.



coal market fundamentals

Thermal coal import prices remain flat in Sept Coal Insights Bureau

I

mported thermal coal prices remained flat in September even as inquiries from India increased as the monsoon season is almost over. However, the rise in inquiries is not translating into business due to a wide gap between bids and offers. Inquiries for low calorific value 3,600 kcal/kg to 4,200 kcal/kg GAR coal have risen, but there is a $2-4 per ton difference between bids and offers. Participants added that Indian buying demand is almost negligible as the country grapples with a sluggish industrial economy and high stockpiles at ports. The stockpiles of both unsold and contracted coal are reported to be around 5 million-6 million tons at various ports, sources said. Some sources said a couple of large power utilities are renegotiating their contracts or finding loopholes to wriggle out of old coal contracts. Meanwhile, the softening of Richards Bay FOB prices has reignited the interest of Indian buyers and inquiries have started coming in for South African coal. Ultratech Cement, for example, is in the market for 170,000 tons of South African coal, according to reports. Sources said that

several cement producers are more interested in cheaper US coal than South African coal. Analysts also expect imports to take place with appreciation of rupee to `53.54 per dollar from levels of `55 per dollar in August. Steam coal CFR India ($/ton) West (6,300 kcal/kg GAR) 107.05 101.15 102.65 101.60 101.70 102.00 104.55 104.25 103.75 104.10 103.90 103.90 101.30 102.70 100.15 99.45 99.15 96.80 98.35 99.60

Date 5-Jul 11-Jul 18-Jul 24-Jul 25-Jul 26-Jul 31-Jul 2-Aug 3-Aug 17-Aug 20-Aug 23-Aug 28-Aug 4-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep 20-Sep

West (5,900 kcal/kg GAR) 83.40 82.00 81.40 80.90 80.75 80.55 79.50 79.05 79.05 79.70 79.70 80.15 80.40 80.75 80.75 80.85 80.85 80.55 80.35 80.55

West (5,000 kcal/kg GAR) 66.65 64.75 64.35 64.35 64.30 64.20 63.40 62.90 62.90 63.75 63.75 64.25 64.65 65.30 64.95 65.10 65.10 64.70 64.50 64.40

East (6,300 kcal/kg GAR) 108.65 102.55 104.10 103.05 103.15 103.50 106.05 105.75 105.25 105.60 105.40 105.40 102.80 104.30 101.65 100.95 100.65 98.10 99.65 100.80

East (5,900 kcal/kg GAR) 82.90 81.40 80.70 80.00 79.80 79.60 78.55 78.10 78.10 78.70 78.70 79.15 79.40 79.75 79.85 79.95 79.95 79.65 79.65 79.95

East (5,000 kcal/kg GAR) 66.15 64.25 64.00 63.70 63.60 63.50 62.70 62.20 62.20 63.05 63.05 63.55 63.95 64.60 64.25 64.45 64.45 64.05 64.05 64.05

commodity is required urgently. No one is buying to stock coal and small power projects are also buying low grade coal with high ash.

Steam coal price trends CFR India 130.00

PRICE ($/TON)

In the international market, Australian thermal coal of heating value of 6,300 kcal GAR is being offered at around $89.55 per ton in September against $90 per ton in August. Offers of South African thermal coal of heating value of 6,000 kcal NAR fell marginally to $86.55 per ton in September from $87.65 per ton in August. Offers of Indonesian coal of 5,900 kcal GAR is hovering around $72.8 per ton in September, while coal of heating value 5,000 kcal/kg GAR is quoted at $56.8 per ton. Traders said deals are struck only if the

120.00

Outlook

110.00

Analysts feel India’s coal imports are expected to rise in the financial year through March 2013 as more end-users turn overseas. Excess supply has hammered international thermal coal prices in recent months, with top exporter Indonesia cutting its output forecast to around 360 million tons (mt) from 390 mt to 400 mt for 2012. According to analysts, based on the current global supply and demand picture, end users expect thermal coal prices to remain well below $100 per ton for the next 10-12 months. 

100.00 90.00 80.00 70.00 60.00

East (6,300 kcal/kg GAR)

20 Coal Insights, September 2012

East (5,900 kcal/kg GAR)

East (5,000 kcal/kg GAR)

17-Sep

11-Sep

5-Sep

30-Aug

24-Aug

18-Aug

12-Aug

6-Aug

31-Jul

25-Jul

19-Jul

13-Jul

7-Jul

1-Jul

25-Jun

19-Jun

13-Jun

7-Jun

50.00



coal market fundamentals

Imported spot coking coal prices ease 12% in Sept Coal Insights Bureau

Coking coal price assessment (FOB)

FOB ($/TON)

I

mported spot coking coal prices eased 12 percent in September, compared to August, on back of plentiful supply and lean buying interest. Premium low-volatile hard coking coal dipped further, while the price for second-tier PCI was supported by Chinese buying. Premium low-vol HCCs traded at around $141 per ton FOB Australia, down from levels of $160 per ton in August end. Low vol PCI prices recovered to $103 per ton from a low $101 per ton with some buying

interest. However, the semi soft variety was quoted at $94 per ton, down from $101 per ton in August. Major miners of Australia were reported to have given relatively lower offers to China, India and Europe, implying increased pressure on producers to get their coal moved. Some indicative bids found from

240.00 230.00 220.00 210.00 200.00 190.00 180.00 170.00 160.00 150.00 140.00 130.00

HCC Peak Down Region

Premium Low Vol

HCC 64 Mid Vol

Coking coal expected to remain weak till Dec: Coke maker Coal Insights Bureau

T

he spot prices of premium coking coal may continue to weaken further till December despite BHP having recently decided to close down operations at two of its mines, an official of a leading coke maker told Coal Insights. “The current weak trend in spot coking coal prices, which is being quoted at around $145 per ton, has forced miners to cut the contract price for the OctoberDecember quarter to around $170 per ton from a high of $221-$225 per ton for the July-September quarter. This weak trend is likely to continue till December and thereafter it will depend on the global economic situation,” the official said. BHP Billiton had in May decided to shut its Norwich Park mine and on September 9 announced to cease production at Gregory mine, both in Australia, citing steep fall in coking coal prices that made its operations unprofitable. “In any case, the quality of coal from these two mines was not that good and thus there were hardly any buyers. The

22 Coal Insights, September 2012

material from these two mines was being sold by BHP at much lower rates. Norwich Park coal was of ultra-low volatile category whereas Gregory mines coal was of high volatile category,” the official said. Miners generally opt for planned shutdowns whenever the prices of coking coal come down in an attempt to reduce supplies to keep price firm. However, this year till now, this strategy does not seem to have worked. According to industry experts, there is abundant availability of coking coal in the market at present while demand from steel makers is not that encouraging due to weak market conditions in most part of the world, including China and India. “It is expected that steel demand will pick up in the fourth quarter of 2012 and that will pave the way for an increase in steel price and consequently an increase in coking coal prices may be from the beginning of 2013 ,” he said. Asked why he feels that coking coal prices would start firming up from January 2013, the official explained that at present miners in the US and Canada are continuing

operations despite not making profits due to sharp fall in prices consequent to decline in natural gas prices and this is maintaining a healthy coal supply situation in the global market. In fact, they are storing the middlings and rejects and exporting the prime material to maintain cash flow, he said. They are storing the material in the hope that prices would revive soon and they would be able to dispose those materials at better prices later on. The same thing is happening in Mozambique from where coking coal is now being exported. They too are storing the middling and rejects as there is no outlet for such material. But there is a limit to which they can continue storing the material, because it amounts to blocking the capital and a stage will surely come when they have to shut operations. Once that happens, probably by December-end, there will be sharp reduction in coking coal supplies world over and then prices would start firming up, the official said.



coal market fundamentals Coking coal FOB Australia ($/ton) HCC Peak Down Region

Date

Premium Low Vol

HCC 64 Mid Vol

Low Vol 12 Ash PCI

Low Vol PCI

Semi Soft

5-Jul

219.00

219.50

175.50

145.00

127.50

109.50

11-Jul

215.50

216.00

171.00

143.00

128.00

105.50

18-Jul

210.00

210.50

170.50

139.50

126.50

104.50

24-Jul

190.50

191.00

165.00

138.00

116.00

102.50

25-Jul

187.50

188.00

163.50

136.50

113.00

102.50

26-Jul

181.50

182.00

158.00

132.50

109.00

95.50

31-Jul

181.00

181.50

157.50

128.50

104.50

95.50

2-Aug

180.00

180.50

157.50

128.00

104.50

96.00

3-Aug

180.00

180.50

157.00

128.00

104.50

96.00

17-Aug

166.50

167.00

146.50

116.00

99.00

108.00

20-Aug

NA

NA

NA

NA

NA

NA

23-Aug

162.00

162.55

139.00

114.50

96.50

104.00

28-Aug

159.50

160.00

139.00

114.00

98.50

101.50

4-Sep

157.50

158.00

133.50

111.00

92.50

98.50

10-Sep

147.50

147.50

131.00

106.50

94.00

98.00

11-Sep

147.00

147.00

131.00

105.00

94.00

98.00

12-Sep

145.50

145.50

130.50

105.00

94.00

98.00

13-Sep

144.00

144.00

128.50

104.00

93.50

98.00

14-Sep

140.50

140.50

124.50

103.50

93.00

97.50

20-Sep

140.50

140.50

124.50

103.00

94.00

94.50

Q4 premium low-volatile hard coking coal price settled earlier by Japan’s Nippon Steel, and BHP Billiton-Mitsubishi Alliance, and signed German Creek premium HCC at $170 per ton FOB. This is down $55 per ton, or 24 percent, from $225 per ton in Q3. The settlement of BHP Mitsubishi Alliance labour unrest has proven to be detrimental to the interests of Australian miners. This has resulted in rebound in

China and Europe were at around $140 per ton FOB; however, no immediate purchase was observed. Elsewhere, Australian coal miner Anglo American and South Korean steelmaker Posco settled their PCI coal contract price at $125 per ton FOB for the fourth quarter, 22.8 percent lower than $162 per ton FOB in the third quarter. The two companies also followed the

Coking coal price assessment (FOB) 170.00 160.00 150.00

FOB ($/TON)

140.00 130.00 120.00 110.00 100.00 90.00

Low Vol PCI

24 Coal Insights, September 2012

Low Vol 12 Ash PCI

Semi Soft

17-Aug

11-Aug

5-Aug

30-Jul

24-Jul

18-Jul

12-Jul

6-Jul

30-Jun

24-Jun

18-Jun

12-Jun

6-Jun

31-May

25-May

19-May

13-May

7-May

1-May

80.00

supply, thereby hurting price sentiment. Sources said the major purchasers from India and China have been reticent owing to monsoon and cheaper availability from domestic and Mongolian sources. However, the reticence in the market is not expected to last long. Indian majors cannot postpone buying for more than a month with inventory levels depleting fast. Moreover, with the end of monsoons in September, construction activity is expected to pick up resulting in more demand for steel. According to Indian coke maker Gujarat NRE Coke Ltd, India’s coking coal import requirement might rise to over 50 million tons per annum (mtpa) from the present 35 mtpa by 2015-16 in line with steel industry production of 120 mtpa by that time. Met coke

Lack of buying appetite continued to characterise the metallurgical coke market. Coke with 12.5 percent ash was quoted at $324 per ton, down from $343 per ton cfr east India a month earlier. In India, met coke prices hovered around `19,500 per ton in the eastern region, sources said. According to Gujarat NRE Coke, only organisations owning large met coke production capacities with strong linkages for raw material sourcing can withstand the competition in the global met coke market with huge opportunities to expand their business. The demand supply gap across the globe for met coke is significantly attracting more players to enter this segment to reap the benefits. However, shortage in availability of crucial raw material i.e coking coal has restricted the entry of new suppliers, making the market skewed in favour of the suppliers, the company said. The future of the met coke industry relies heavily on the future of the steel industry, with majority of steel still being produced through blast furnace route. Therefore, any slump in steel industry would adversely affect the met coke industry. The met coke industry has also been impacted by availability of crucial raw material i.e coking coal with its global supply generally determining the prices of both coking coal and met coke, the company said.



Feature

CIL scraps JV route for mine revival, opts for MDO

bidders did not find them economically viable. The companies shortlisted in the first round of bidding included ArcelorMittal India, Rio Tinto, Titan Mining, JSW Steel, JSW Energy, Monnet Ispat, Essar Mineral Reserves and Sunflag Iron & Steel. The primary reason of the mines not being remunerative was the poor quality of coal available in them, according to industry sources. SCCL to revive mines

Coal Insights Bureau

C

oal India Ltd (CIL) has scrapped its earlier plan to revive 18 underground (UG) abandoned mines through selection of joint venture partners due to lack of satisfactory response and the company has now decided to revive these mines by appointing the Mine Developer & Operator (MDO) route, an official of the ministry of coal has said. Initially 18 UG abandoned mines, each having more than 10 million tons (mt) of reserves were identified for revival by inviting expression of interest (EoI) for selection of JV partners. “As the response was not satisfactory, CIL had decided to revive these mines by appointing the MDO,” the official said. Of the 18 mines, Bharat Coking Coal Ltd (BCCL) had the maximum number of eight mines, while Eastern Coalfields Ltd

26 Coal Insights, September 2012

(ECL) and Central Coalfields Ltd (CCL) had six and four mines respectively. The move was in line with new CIL chairman S. Narsing Rao’s expressed intention to focus on MDO route for increasing production. Days after assuming office in April, Rao had said that CIL would appoint MDOs to develop and mine new blocks as well as old blocks in difficult terrains. The issue of reopening abandoned mines has been hanging fire for some time now. Industry sources welcomed the move to opt for MDO route, but expressed doubt about the viability of operations in some of them. Earlier, CIL in 2008 had planned to open 18 abandoned mines with total reserves of around 1.6 billion tons. The company had completed the bidding process in 2009. Although the bidding process was apparently successful and production was expected to start in 2010, the projects failed to take off as

Meanwhile, Singareni Collieries Company Ltd (SCCL) has proposed to revive at least three closed opencast (OC) mines during the 12th Plan period, the coal ministry official said. The mines to be revived are MNG opencast at Manuguru, RKP opencast at Mandamarri and RG opencast III phase 2 at Godavari Khani, he said. SCCL has currently a total of 174 functional and non-functional coal mines. The assessed geological coal reserves in the command area of SCCL stand at about 9,877 mt, of which 2,064 mt stand consumed on account of the production from the mines since inception of the company. About 2,344 mt of reserves are available in the operating mines and about 5,469 mt of reserves are untapped. However, of these untapped reserves, the reserves that can be projectised are assessed to be 2,959 mt and the balance 2,510 mt are difficult to mine and cannot be projectised due to geological disturbances and adverse geo-mining conditions. At the current level of production of about 52 mt, the currently assessed extractable reserves in the command area of SCCL are expected to last for over 60 years. During the 12th Plan (2012-17), an Exploration Programme for Drilling of 650,000 metres in virgin blocks of SCCL command areas is envisaged. It is also planned to carry out 16,500 metres of drilling under Regional Exploration Programme of Geological Survey of India (GSI) and 80,000 meters drilling under the Ministry of Coal’s Plan Scheme of Promotional Exploration during the 12th Plan period in the command area of SCCL. Further, SCCL envisages increasing the current level of production of about 52 mt achieved in 2011-12, the terminal year of the 11th Plan to 57 mt in 2016-17, the terminal year of the 12th Plan and to 63 mt in 202122, the terminal year of the 13th Plan.



feature

Delayed delivery defeating the purpose of coal e-auction: ICMA

(Inset) V K Arora, President, ICMA

Coal Insights Bureau

D

elayed delivery of coal purchased through e-auction is defeating the very purpose of this route and leading to loss of interest among a section of buyers, the Indian Coal Merchants Association (ICMA) has alleged. “E-auction has been of mutual interest for the companies and the consumers who earlier had less opportunity to buy fuel directly from the coal companies, but it has been found that after paying the full price in advance, the supplies from Coal India Ltd (CIL) remained stalled for months with large sums remaining blocked with the coal companies,” ICMA president V.K. Arora said. In fact, a large number of rakes taken in e-auction remain in arrears and consumers are denied timely supplies, he alleged. Arora, who was addressing the 81st Annual General Meeting of ICMA in Kolkata, further said, “In a way, the very spirit of e-auction is lost due to considerable delay in deliveries. We request CIL and Ministry of Coal to seriously look into the matter,” About the likely cause of this problem, he said, “We find a trading of charge going between Railways and the collieries. While

28 Coal Insights, September 2012

Railways put the onus on collieries’ poor loading performance, collieries hold the Railways responsible for their short supply of rakes and heavy left-behinds.” Besides, ICMA was also concerned about the high prices of coal sold through e-auction route. An “ever-widening” gap between the notified price and the e-auction price by `1,500 and more per ton is a huge problem and at times prevents customers from bidding, Arora said. Earlier, some of the ICMA members had expressed their dissatisfaction about the alleged mismatch in coal quality announced and delivered (grade slippage) through e-auction. CIL, on its part, however has claimed that such instances were few and far between. In case of specific complaints, CIL sources said, prompt action is taken to redress the problem. According to data provided by CIL, total revenue from e-auction of coal increased from `1,480.78 crore in 2007-08 to `13,826.88 crore in 2011-12. The total volume of coal sold through e-auction by CIL also increased from 28.79 mt in 2007-08 to 49.70 mt in 2011-12. Non-power sectors

Meanwhile, ICMA has welcomed the

growth in coal production by CIL last year after a period of stagnated growth. “After near-stagnation in the country’s coal production for two consecutive years 2009-10 and 2010-11 at 533 million tons (mt), the year 2011-12 saw a 12-mt rise at 545 mt. Of this, exactly 80 percent (i.e. 436 mt) came from the main producer, Coal India Ltd, as against its achieving 431 mt in the previous two years,” Arora said. He said that: “In a situation of restricted activity with imposition of CEPI (comprehensive environmental pollution index) and ‘go-no-go’ hurdle that continued till March 2012, CIL’s building-up a 5-mt increase is a reasonable achievement”. Arora, however, expressed concern at the lack of growth in production from underground mines. “From 75 mt of country’s underground raising witnessed two decades ago, the situation in UG production has not improved at all and has rather deteriorated. Hardly 60 mt yearly is now produced from UG mines,” he said. On the positive side, Arora noted that S. Narsing Rao, currently the chairman of CIL, had put in serious efforts to bring in modernisation in underground technology at Singareni Colliery Company Ltd (SCCL). This effort had helped significantly improve SCCL’s performance in underground mining. “We are hopeful that under Rao’s stewardship, CIL will soon be able to turn the tables,” he added. Commenting on the ongoing discussions about fuel supply agreement (FSA), he said, “For the power plants, besides the 80 percent trigger level (a precise percentage of annual contract quantity that coal company will supply and consumer will lift), it has now been decided that Coal India will bear penalties on a slab basis – from 1.5 to as high as 40 percent depending on the extent of supplies.” While such penalties are being considered for supplies to the power sector, Arora said similar provisions could be thought of for other coal consuming industries. “It is our request to CIL that the interest of a large number of consumers in non-power group where supplies are never made on quality or quantity terms nor even on time and whose contribution is nonetheless significant in the country’s economy, should not be ignored,” he added.



feature

Power sector feels the heat

SPU loan restructuring to reach `1.5 trillion: CRISIL

Coal Insights Bureau

R

estructuring of bank loans taken by state power utilities (SPUs) may reach a staggering `1.5 trillion for the period 2011-12 to 2012-13, according to a report released by CRISIL. “In recent months, availability of unsecured short-term loans from Indian banks has diminished. This is exacerbating refinancing and liquidity pressure, especially for the SPUs. This will lead to a significant increase in restructuring of SPU loans to nearly `1.5 trillion. So far, SPU loans of `0.6 trillion have been restructured,” says Pawan Agrawal, senior director, CRISIL Ratings. The total volume of loans restructured by Indian banks may increase sharply to `3.25 trillion between 2011-12 and 2012-13,

30 Coal Insights, September 2012

against the earlier estimate of `2.0 trillion, the report says. The majority of restructuring will be in loans to SPUs, construction and infrastructure sectors. The rise is a result of significantly higher funding challenges being faced by companies with large debt. A significant part of the restructured loans may also slip into non-performing assets (NPAs). However, this will depend on the terms of restructuring and fundamental viability of the projects and the companies, the report says. Loans of `1.6 trillion have already been restructured in 2011-12 and in the first quarter of 2012-13. The majority of restructuring will be in loans to the state power utilities (SPUs), and the construction and infrastructure sectors. The rise is a result of significantly higher funding challenges being faced by companies with large debt.

It is most likely SPU-loan restructuring will happen through a centralised scheme coordinated by the government of India (GoI). “Furthermore, inability to raise adequate equity in a timely manner is straining the balance sheets and financial flexibility of developers in infrastructure and construction sectors, resulting in an increased likelihood of restructuring”, adds Agrawal. Other vulnerable sectors include iron and steel, textiles, and engineering. The proportion of restructured loans in this period will be high at around 5.7 percent of banks’ advances as on March 31, 2013. Adds Agrawal, “Around `0.50 trillion of these restructured loans may slip into NPAs, though this will depend on the terms of restructuring and fundamental viability of the projects and the companies. These slippages can aggravate the already stressed asset quality of banks by further increasing NPAs by 50 to 75 basis points beyond March 2013.” The loans to SPUs are unlikely to slip into NPAs, given the support expected from state and central governments. Despite continued weak growth and profitability in the corporate sector, the large restructuring will help limit the increase in the banks’ NPAs in the near term. According to CRISIL’s estimates, the lower GDP growth of 5.5 percent expected in 2012-13 may result in increase in banks’ gross NPAs to 3.5 percent by end-March 2013 from around 3.0 percent at the end of June 2012. The increase will be driven largely by delinquencies in the micro, small and medium enterprises, and agriculture and allied sectors. CRISIL Ratings director, Suman Chowdhury, says, “The banks have sought to arrest the deterioration in asset quality through measures such as strong senior management focus on recovery, setting up dedicated teams for collections, and tightening of underwriting norms. While the banks’ adequate capitalisation, expected support from GoI for public sector banks, and stable resource profiles will continue to support their credit risk profiles, any significant and sustained deterioration in asset quality and earnings may lead to weakening in the banks’ credit quality.”



feature Capacity addition

India’s August power generation falls m-o-m: CEA Sanjukta Ganguly

I

ndia’s power generation in August 2012 fell to 74,338.11 million units (MU) from 76,035.74 MU generated in July, according to provisional statistics of the Central Electricity Authority (CEA). The generation in August was significantly lower than the target of 77,794.00 MU, the data showed. Power generation in August 2011 or the corresponding month of previous financial year was 73,101.19 MU against the target of 72,760.64 MU, which implies that year-onyear generation was up slightly. The country’s power generation during the first five months (April-August) of 201213 stood at 382,305.76 MU, up 1.58 percent compared with the target of 376,363.00 MU for the period and up 4.95 percent compared with 364,281.02 MU generated during the corresponding period of 2011-12. Of the total generation in August 2012, 56,687.72 MU (53,353.32 MU in August 2011) was from thermal sector, 2,579.08 MU (2,719.71 MU) from nuclear sector, 14,036.04 MU (16,004.07 MU) from Hydro sector and Bhutan imports was 1,035.27 MU (1,024.09 MU).

The actual generation was lower than the target of 58,573 MU for thermal sector and 15,818 MU for hydro sector but higher than 2,527 MU target for nuclear and 876 MU for Bhutan import. In July 2012, 60,533.85 MU was generated by thermal sector, 2,709.35 MU by nuclear sector and 11,868.66 MU by hydro sector. Imports from Bhutan stood lower at 923.88 MU.

A total of 550 MW of power generation capacity was added in India during the month of August 2012, taking the total installed generation of the country to 207,006.04 MW, a provisional data prepared by CEA revealed. The capacity addition in July was 950 MW. With this total power generation capacity added during the first five months of 2012-13 (April-August) stood at 6,766 MW, as per CEA’s revised data. The capacity addition of 550 MW in August was in thermal power sector where private sector companies – BPSCL (250 MW) at Bina TPP Unit 1 in Madhya Pradesh and Vidharba Ind. Power Ltd (300 MW) at Butibori TPP Unit 1 in Maharashtra.

Achievement vs target in capacity addition (in MW)

2000 1800 1600 1400

Target

1200

Achievement

1000 800 600 400 200 0

Thermal

Hydro

Nuclear Source: Central Electricity Authority

Categorywise energy generation in August 2012 (in %)

19%

1%

4%

Thermal Nuclear Hydro Bhutan Import 76%

Source: Central Electricity Authority

32 Coal Insights, September 2012

In July 2012 also, the entire capacity of 950 MW was added in the thermal sector of which 150 MW came in Andhra Pradesh at Simhapuri Phase-I while the remaining 800 MW was added in Gujarat at Mundra Ultra Mega thermal power project of Tata Power. Critical coal stock

Inadequate coal supplies by domestic coal companies and lower imports by power utilities have led to critical coal stock position at a number of Indian power plants. According to data available with Coal Insights, a total of 31 plants of the total 89 in the country were faced with critical coal stock position of less than seven days as on August 30.



feature

All India PLF factor in August 2012 (in % )

DPSC welcomes FDI in power exchanges

80 70 60 50

Program

40

Achivement

30 20 10 0

Central

State Sector

Pvt. Utl. Sector

All India Source: Central Electricity Authority

The data further shows that out of the 31 plants facing ‘critical coal stock’ position, 19 were facing ‘super critical’ coal stock position of less than four days. On August 15, out of the 31 plants (out of 89 plants) facing critical coal stock position of less than seven days, 20 were facing ‘super critical’ coal stock position of less than four days. Plants in Uttar Pradesh, Bihar, Andhra Capacity addition (in MW) Months

2012-13

2011-12

April

1,760

735

May

1,070#

550

June

2,376

2,224

July

950

1,660

August

550

1,200

September

786.5

October

345

November

2,807

December

1,158

January

895

February

972

March

5,482*

Total (Apr-Aug)

6,706

6,369

Total (Apr-March)

6,766

18,814.5*

#

*As reported by CEA, capacity addition in March was 5,482 MW, but the total figure for 201112 was increased to 20,501.70 MW instead of 18,814.50 MW following revision in March 2012 figures. CEA had earlier reported that capacity addition in May (2012-13) was 1,070 MW, but it appears that the figures have been revised to 1,130 MW.

#

34 Coal Insights, September 2012

Pradesh and West Bengal were the worst sufferers. Plant load factor

The Plant Load Factor (PLF), a measure of the output of a power plant compared to the maximum output it could produce, for the country for the month of August 2012 stood at 61.47 percent against the planned 65.33 percent. The PLF was 66.84 percent, 72.05 percent and 73.89 percent for July 2012, June 2012 and May 2012, respectively. The PLF of power plants of central sector run companies such as NTPC and DVC in August 2012 stood at 69.65 percent whereas the figure achieved in July 2012 was at 78.26 percent. In August 2012, the plants in the private sector recorded a PLF of 56.82 percent against the planned 60.03 percent. The worst performers were Muzaffarpur TPS and Koderma TPS both of which recorded nil PLF against a target of 16.5 percent and 39.78 percent, respectively. Farakka STPS which recorded a PLF of 46.33 percent against a target of 72.45 percent continued to be a poor performer. Power supply position

In the month of August 2012, the country’s peak power demand was estimated at 82,690 MU, but actual availability was only 75,077 MU, reflecting a shortfall of 7,613 MU or 9.2 percent. Earlier, in the month of July 2012, the country’s peak power demand was estimated

D

PSC Ltd, a power utility and a promoter entity in the National Power Exchange Limited, has welcomed the government’s decision permitting foreign investment in power exchanges in the country. “The government’s decision to permit foreign investment up to 49% in power exchanges is a welcome move for the sector. The decision opens the opportunity for many foreign players to be part of India’s growth story. India has a huge opportunity in the infrastructure sector that includes power,” Anup Bhargava, managing director of DPSC, said in a statement. He said the foreign partnerships would bring in efficiency and technological enhancement for the exchanges. Further, “the partnership would also be helpful in getting financial support from foreign partner. For foreign investors too, the move opens opportunities to become a partner in India’s emerging growth story in the power sector,” he added.

at 85,504 MU, but actual availability was only 77,731 MU, representing a shortfall of 7,773 MU or 9.1 percent. An interesting observation is that despite overall peak shortage of power in the country in August 2012, Chandigarh, Lakshadweep and Sikkim did not have any peak power shortage, according to CEA data. Andhra Pradesh faced the highest shortfall among all states during peak period with a total shortfall of 1,723 MU. Uttar Pradesh recorded the second highest shortfall during the month under review. The state recorded total shortfall of 1,392 MU in August 2012, against 1,377 MU in July 2012. Tamil Nadu was a poor performer recording a shortfall of 1,078 MU against 710 MU in July 2012. Maharashtra recorded a shortfall of 361 MU against 439 MU during July 2012 whereas Bihar faced a shortfall of 161 MU which also stood at the same figure in July.



feature

Time to wind up standalone DRI plants?

Coal Insights Bureau

T

he pure-play sponge iron makers are facing extinction. According to an estimate, about 20 percent of the sponge iron units in the country have shut down operations in the last one year, almost all of them being standalone plants. A good number of them have already been sold. For the remaining units, industry sources say, they may not be able to open shop ever again. Over the last few years, the number of major operating sponge iron or direct reduced iron (DRI) plants has nearly halved from 150 in 2005 to around 80 in 2012. Periodic closures are nothing new to this industry. In the past too, there were mass closures of smaller units during severe power outages or crackdown by pollution control boards or slackness in steel demand. But this time round, the sources feel, their basic viability is in peril. Even larger units which run on standalone basis are facing survival woes, and may not survive unless they go for forward or backward integration. “In the current scenario, standalone sponge iron units are no more viable. The market dynamics will not let these plants

36 Coal Insights, September 2012

survive the current downturn. In fact, almost all such units have been sold,” said an industry expert. A short haul

Although the first DRI plant in India was set up in 1979, the sector saw some real action only in the recent past. The emergence of this industry was primarily driven by the shortage of coking coal in the country and relative abundance of non-coking coal and iron ore. Also the scarce supply of scrap for steelmaking played a catalyst. It was not until the late 1990s that production really picked up. According to a Joint Plant Committee (JPC) survey, the number of operational units in 2000-01 was 23 with total production capacity of 6.97 million tons (mt). This number witnessed a prolific growth in the following years. As of 2005, the total number of working DRI plants was 150 and the capacity around 17 mt. Besides, 58 more coal based units were reported as under-commissioning greenfield projects with total capacity of 6 mt. Moreover, another 7 mt of capacity was in the process of being added through brownfield expansion. A salient feature of this expansion drive

was that almost all the new plants were set up as coal-fired units. Of the 150 operating plants in 2005, only three large plants were put up as gas-based units by Essar Steel, Vikram Ispat and Ispat Industries. This was against the global trend and was mainly driven by easy availability of cheap coal. The factors that led to the growth of the DRI plants were steady growth in domestic steel demand, a robust increase in domestic steel production led by the secondary steelmaking sector, low investment requirement for DRI, availability of mineral resources and lower availability of scrap, among others. However, within a short period, the scenario changed altogether. Growth in coal production came to a halt as Coal India Ltd (CIL) faced serious hurdles in obtaining statutory clearances from the environment ministry. Iron ore mining was banned by the Supreme Court in Karnataka due to rampant illegal mining. The increasing demandsupply gap led to a rise in raw material prices. Additionally, the scarcity in power supply and strict pollution norms led to the temporary shutdown of a large number of units. Finally, the sagging demand for steel in the domestic market put price pressure on sponge iron, making small plants unviable altogether. Interestingly, the same factors that helped the sponge iron industry to thrive over the last decade proved their undoing. Poor economics

Commenting on the viability of the standalone units, industry sources said the market condition for sponge iron is currently in a bad shape. “The DRI plants mainly cater to induction furnaces which in turn produce ingots. From ingot, TMT and structural are made, which are long products used in the construction sector. Since the construction industry is down, demand for TMT and structurals is also subdued.” Elaborating on the question of viability, the sources said the current cost structure facing the standalone units makes it clear that these projects are facing worst margin pressure. A rough calculation shows that to produce 1 ton of sponge iron, 1.6 tons of iron ore is required. Currently, the price of iron ore is hovering around `8,000 per ton. Accordingly, the cost of ore (including


feature

DRI exports up in April-July period

E

ven though the domestic market is facing severe survival woes, sponge iron exports from India rose sharply during the April-July 2012 period, latest provisional steel ministry data showed. DRI exports during April-July 2012 stood at 22,590 tons, compared to 880 tons in the same period last year, the data showed. Bar and rod exports from India rose 87 percent year-on-year, while structural exports rose 78 percent yearon-year during the April-July period. GP/GC sheet/coil exports rose 22 percent year-on-year, while ferro alloy exports were up 23 percent year-on-year.

freight) comes to around `15,000 per ton. The cost of coal accounts for another `5,000 per ton of DRI. Adding working capital and other miscellaneous cost components, the

total cost of production is arrived at around `21,000-22,000 per ton. In addition, the sponge iron industry is faced with ongoing problems of high power prices in Maharashtra and power cuts in Andhra Pradesh and Tamil Nadu. Sources said demand has been weak on power issues and most sponge iron plants have reduced production. This further adds to the production costs. Against this, the current price of sponge iron (ex-works) is around `22,000 per ton, which leaves hardly any margin for the plants to recover the fixed costs or loans taken for the plant. Unless the raw material prices dip, which is quite unlikely, or the sponge iron prices rise, the viability of these plants would remain doubtful, a market expert informed. “Only if ore price reduces or sponge iron price increases, they can become viable. But now steel demand is low and therefore sponge iron price is low. In September-October, steel demand increases. Sponge iron price may go up to `25,000-26,000 per ton. But when demand increases, ore price will also increase. So on the whole, standalone units will not be viable,” he added.

United they stand

The problem, the sources said, is not so much for units that are either forwardly or backwardly integrated. Since sponge iron finds its end use in TMT or structural, plants that have forward integration can survive the current onslaught. This is so because the steel mills, though facing low demand, are still earning margins. Similarly, companies that are backwardly integrated (having own captive mines) also have some breathing space. “These companies will survive because of the captive mines. Their mining cost is minimal, if compared with the market price of the minerals. For instance, the mining cost for ore is around `1,000 per ton, compared to the market price of `8,000 per ton. This cost advantage will help them survive tough patches.” Some of the larger firms are now striving to adopt advanced technologies to reduce costs further and also to deal with pollution problems. In the face of severe coal scarcity in the country, some steelmakers are also trying to substitute coal by underground coal gasification (UCG) for their DRI units.

Coal Insights, September 2012

37


feature

Coal crisis spares paper industry Sanjukta Ganguly

A

t a time when coal scarcity has hit expansion plans in almost all consuming sectors, the Indian paper industry has remained by and large untouched by the supply shortage. The paper industry accounts for about 1.6 percent of the world’s production of paper and paperboard has an estimated turnover of `25,000 crore ($5.95 billion). Its contribution to the exchequer is around `2,918 crore ($0.69 billion). Despite having such encouraging figures to look up to, the industry as a whole is faced with a number of challenges which have started putting pressure on the margins. Among these challenges, the strongest is perhaps the ever escalating fuel costs. Against this background, it is surprising enough to find that fuel supply to the sector has been quite adequate, according to some sources. In fact, India’s paper sector has received 4-6 percent higher coal supplies than the Fuel Supply Agreement (FSA) quantities from Coal India Ltd (CIL) during the past three financial years, a coal ministry official said recently. Under the provisions of New Coal Distribution Policy of October 2007, coal is supplied to the paper sector as per the terms of bilateral FSA at 75 percent of normative quantity. A total of 45 paper manufacturing plants have signed FSAs with subsidiary companies of CIL for their coal supply and actual supplies were 79 percent, 86 percent and 81 percent of the annual contract quantity (ACQ) in 2009-10, 2010-11 and 2011-12 respectively, the official said. The official, however, could not provide the details of plant-wise ACQ vis-à-vis coal supplies during the last three years.

Coal supply

The government has recently withdrawn the

38 Coal Insights, September 2012

core sector status of the industry, thereby affecting the industry’s prospects in the face of increasing energy prices. For leading companies such as Tamil Nadu Newsprint Limited (TNPL) and JK Paper, the impact of rising energy costs is substantial. Also, the supply situation with Coal India Limited is a major concern area at present. Although the Indian paper industry’s receipt of coal has been more than the FSA quantity, it is not sufficient when

pitted against the actual requirement of the sector. Since paper companies require power to run their factories, increasing coal costs and/or power cost further add to the woes of the industry. According to a source at TNPL, “Paper manufacturers usually enter into coal linkages with CIL to meet their requirement for coal. However, due to the unavailability of coal domestically they have to import higher


feature priced coal from overseas or buy it from open market at higher prices. This adversely impacts the paper companies’ earnings to a great extent.” Growth prospects

According to K.S. Kasi Viswanathan, chairman of PaperTech 2012 and deputy managing director of Seshasayee Paper and Boards Limited, the outlook for the paper industry looks positive, and is expected to double and reach 20 million tons (mt) over the next eight years, media reports said. “However, as of now, the concern has shifted to becoming more-environmentally viable and sustainable. Adopting clean technology and practicing energy conservation measures is the acute need of the hour to save the environment and to make the Indian industry world-class and globally-competitive,” said R. Karikal Valaven, commissioner of industries, Andhra Pradesh Government, recently. The Bureau of Energy Efficiency (BEE) has identified the pulp and paper industry as one of the sectors to reduce energy

Paper rolling out of a mill

consumption by 3-8 percent by March 2015 under the PAT (perform, achieve, trade) scheme. “Pulp and paper industry is very complex, and there are more than 100 different

product varieties unlike the cement industry. Under the PAT scheme, 31 units have been identified to reduce between 3-8 percent of their current energy consumption,” Valaven added.

Coal Insights, September 2012

39


GOVERNMENT

The CAG effect

MoC axes allocation of 10 captive coal blocks Coal Insights Bureau

E

ven as the government continues to be in denial mode, the coal ministry (MoC) has swung into action to pull up ‘errant’ captive coal block allocattees who had allegedly brought the government a bad name from the federal auditor, Comptroller & Auditor General of India (CAG). In a recent development, the ministry has decided to de-allocate at least 10 captive coal blocks that failed to keep up to the ministry’s expectations. The recommendations for de-allocation and deduction of Bank Guarantee (BG) of block allocattees came from the InterMinisterial Group (IMG) on coal which is entrusted with the job of inspecting the progress at these blocks. All of these recommendations are likely to be accepted by the government as coal minister Sriprakash Jaiswal has already said that his ministry will accept all the recommendations of the IMG. The IMG recommendations have come in three separate lots, the last of which was received on September 19, according to an official communiqué from the ministry. On September 19, the IMG Captive blocks that face punitive action Timeline

De-allocation

Deduction of BG

September 19

(Recommended) North Dhadhu, Choritand Tailaya and Gondkhari

Moitra, Dumri, Durgapur-II/Sariya and Seregraha

September 17

Gourangdih ABC, Rawanwara North and New Patrapara

Nerad Malegaon, Lohari, Radhikapur East and Bijahan

September 13

Bramhadih, Chinora and Warora (Southern Part) and Lalgarh (North)

Marki Mangli-II, III and IV

40 Coal Insights, September 2012

recommended de-allocation of three captive coal blocks and deduction of BG of four blocks for their inability in developing the blocks as per schedule. With this, the IMG recommended de-allocation of a total of 10 blocks, of which seven have already been approved by the government, and deduction of BG of 11 blocks, of which three have been accepted. Earlier, the CAG report had listed 57 captive coal blocks which allegedly brought hefty potential gains to the allocattees due to free allocation (instead of auction) by the government. The total loss to exchequer was estimated at around `186,000 crore. Face the facts

The IMG on September 19 recommended de-allocation of North Dhadhu, Choritand Tailaya and Gondkhari blocks and deduction of BG in respect of Moitra, Dumri, Durgapur-II/Sariya and Seregraha blocks. On September 17, the government had approved de-allocation of Gourangdih ABC, Rawanwara North and New Patrapara coal blocks while deduction of BG was recommended in the cases of Nerad Malegaon, Lohari, Radhikapur East and Bijahan blocks. On September 13, IMG had recommended de-allocation of Bramhadih, Chinora and Warora (Southern Part) and Lalgarh (North) block and deduction of BG in case of Marki Mangli-II, III and IV blocks. North Dhadhu block, which was recommended for de-allocation on September 19, was allotted jointly to Kolkata-based Electrosteel Castings Limited, Pawanjay Steel & Power Ltd and Jharkhand Ispat Pvt Ltd. Choritand Tailaya was allotted to Rungta Mines Ltd whereas Gondkhari block was allotted jointly to Kesoram Industries Ltd, Maharashtra Seamless Ltd and Dhariwal Infrastructure Pvt Ltd.

According to information available with Coal Insights, only `29 crore was spent on Gondkhari block post the allotment in November 2008. The block has estimated reserve of 98.7 million tons of coal and the allocatees had paid a BG of `11.871 crore. The progress on the development of the block was delayed due to lack of forest and environmental clearances. Electrosteel Castings Ltd and others had spent a total of `19.72 crore on development of North Dhadu block, including `6.3 crore on land acquisition. The block has estimated reserve of 923.945 million tons and a BG of `56.03 crore was provided by them. North Dhadhu block had fallen into “No Go” area initially, which was subsequently modified in October 2011. Mining lease proposal for obtaining prior approval under section 5(1) of MMDR Act is lying with the Director (Mines) of Government of Jharkhand for last almost two years. Purchase of land and compensatory afforestation land against North Dhadu block was delayed due to the order of Jharkhand High Court wherein it was stated that purchase of land belonging to schedule cast, schedule tribe and other backward class people without the approval of the state government would not be allowed. Choritan Tailaya block was allotted to Rungta Mines in May 2008 and the company had till June 2012 spent `7.62 crore on the project, excluding a BG of `15.38 crore. The block has estimated reserve of 97 million tons.


GOVERNMENT Huge delay in the grant of forest clearance for Choritan block in West Bokaro area of Jharkhand and Mining Lease was attributed as main reason for delay in development of the block. Of the blocks for which deduction of BG was recommended on September 19, Moitra coking block was allotted to Jayaswal Neco Industries Ltd in May 2005. It has estimated reserve of 215.78 million tons. Jayaswal Neco Industries Ltd has already invested around `119 crore on developing Moitra block and had provided a BG of `12.5 crore. The development was affected due to delay in granting proposal approvals by Jharkhand government and the Ministry of Environment and Forest (MoEF). Dumri block was allotted jointly to Nilachal Iron and Steel Ltd and Bajrang Ispat Pvt Ltd. A total of `22.50 crore has already been invested on development of the block while another `6.5 crore has been provided as BG. The allocatees – Bajrang Ispat and Nilachal Iron – according to information available with Coal Insights, had assured in June 2012 that they will start mining by December 2012 as they have already acquired

around 200 hectares of land out of the total land requirement of 280 hectares. DB Power Ltd has so far invested around `11.50 crore on development of DurgapurII/Sariya block, which has an estimated reserve of 91.6 million tons besides providing a BG of `17.6 crore. The development of the block was delayed allegedly due to delay in getting EMP clearance even as land acquisition has been completed to great extent, a source said. Saregraha block was allotted jointed to Arcelor Mittal India Ltd and GVK Power (Govindwal Sahib) Ltd in January 2008. The block has estimated reserve of 150 million tons. The two companies have so far spent `7.50 crore on development of the block besides providing a BG of `32.4 crore. The legal angle

The recent decisions taken by the government to de-allocate captive coal blocks on alleged delay in development of the blocks might by challenged in appropriate courts, industry sources told Coal Insights. As mentioned above, the government has already de-allocated 7 captive coal blocks and will de-allocate three more blocks soon

and has decided to deduct BG provided by owners of eight other blocks. “The decision of the government might be legally challenged as it has been found that in majority of the cases de-allocation was done on the ground of delay in development of the blocks. These delays, in some cases, were largely on account of delays in getting appropriate clearances from the respective state government and central government offices and not because of the deliberate delays by the allocattees of the blocks,” an industry official said. “The development of some of the blocks was also delayed because these were classified under “No Go Area” identified by the Ministry of Environment and Forest (MoEF) and in such cases, the holder of the blocks cannot be blamed,” the official said. However, a section of the industry feels that the aggrieved parties may not immediately move the court challenging government’s order, but might wait for some time till the recent political uncertainty in the country is settled.  For latest update on captive blocks see Annexure on Pg 58

Coal Insights, September 2012

41


technology

CIMFR offers technology support for environment management Coal Insights Bureau

E

nvironmental problems are inseparably associated with coal conversion and processing, and the Central Institute of Mining and Fuel Research (CIMFR), Digwadih campus, is copiously involved in carrying out research and development work in the area of environmental management related to coalbased industries. This includes the monitoring of quality of air (aerosols, biotic/ abiotic particulates), water, soil and suggesting/ developing appropriate methods for their minimising/ abatement; development of environmental standards, soil quality index; making environmental impact assessments and management plans; mitigation of GHGs; management of solid waste from coalbased industries, principally the fly/bottom/ pond ash from TPPs and mine refuse/spoil generated during mining operations, besides addressing the associated environmental problems. In the context of sustainable management of solid waste from thermal power plants (TPPs), systematic R & D work has been successfully carried out, over the past one and half decades or so. This comprises detailed physico-chemical characterisation and determination of potentially toxic trace/heavy metals and radionuclides in coal ash and its bulk use in brick making and agriculture/ forestry sector (as liming agent, soil modifier and amendment, source of essential plant nutrients, and also for the reclamation of waste/degraded lands/low lying area/mine spoil/abandoned ash ponds), according to a paper from CIMFR. Besides, R & D work includes the diversified area for developing the suitable technology for recovery of some of the value added products. The institute also organises national/international symposia/seminars and training courses on various R & D activities from time to time.

42 Coal Insights, September 2012

The CIMFRDigwadih campus has developed wide ranging expertise and created excellent infrastructure facilities – in terms of both technical manpower and equipment, for solving the problems of environmental concerns of various coal-based industries. It has well equipped laboratories, backed by richly experienced and qualified scientists in different disciplines such as Agriculture Chemistry, Soil Science, Microbiology, Biotechnology, Botany, Environmental Science, Analytical Chemistry (for chemical, biological and instrumental analyses), Radiation chemistry, Chemistry, etc. all under one roof of the Environmental Management Division for carrying out such work in the area of management of environment. The expertise/processes/technologies developed at the Institute on the coal ash utilisation encompass such diversified areas as: Fly Ash Soil Amendment Technology (FASAT)

The CIMFR-Digwadih Campus has developed the fly-ash soil amendment technology (FASAT), which has been extensively demonstrated through field trials under different agro-climatic conditions and soil types in different parts of the country for cultivation of various cereals, oil yielding, root, leguminous and vegetable crops in actual agricultural fields/waste land/mine spoil and for growing different forestry species. ♦♦ Waste Land Reclamation ♦♦ Reclamation of Mine Spoil/OB Dumps/ low lying area

♦♦ Bio-restoration of abandoned Ash Pond ♦♦ Urea Fly-Ash Pellets Mitigation of GHG through afforestation and infusion of fly ash

Technology for Mitigation of GHG (CO2) through plantation of different photosynthetic-efficient plant species has been successfully developed. Also a process for in situ infusion of fly ash with CO2 in TPPs leading to substantial mitigation of GHG in TPPs has been developed. Bio-solubilisation of Lignite to Humic Acid

Process for bio-solubilisation of lignite to humic acid using fungal and bacterial strains has been successfully developed, which is quite comparable with the standard humic acid and found rather superior in nutritional status especially for agro-forestry application in an ecofriendly manner particularly in respect of trace/heavy metals and PAH (Under process). Fly ash bricks/blocks

The process for the manufacturing of high


technology strength fly ash bricks using a high percentage of fly ash along with other ingredients like lime, sand, etc. by steam curing process has already been patented and commercialised at Jaggadhatri Brick Works, Barrackpore, Pulver ash Projects, W.B. (IP No. 128684, 1970) Value added products from fly ash

The process for the extraction of different value added materials including hard scouring powder on a commercial scale has been developed. (US Patent No.10/107, 613 US dt.28.03.2002; PCT Patent No.PCT/ IB02/011 : WO 26-03-2002) Other activities

Other activities include: • Assessment of Aerosols/Abiotic and Biotic particulates, their periodical variations in and around coal fields and other coal-based industries; correlation between such particulates and prevailing seasonality; find out associated allergenic disorders; preparation of pollen and fungal spore calendar. • Insects as Biosensor, Identification of insects and evaluation of their risk to human and ecological health with reference to coal mining and processing industry; suggesting of remediation, developing an index of biological integrity. • Rapid and Comprehensive Environmental Impact Assessment studies have been made at the industrial sites of TALOJA & TARAPUR of MIDC, Mumbai for selection of integrated hazardous waste management sites.

refresher courses, training and extension programme for popularisation of bulk use of fly ash through demonstration trials in the fields of farmer of the local villages in the vicinity of different TPPs, apart from organisation of Kisan gosthis and Kisan mela from time to time. Improving waste land

CFRI has developed fly-ash soil amendment technology (FASAT), which has been extensively demonstrated through field trials under different agro-climatic conditions and soil types in different parts of the country for cultivation of various cereals, oil yielding, root, leguminous and vegetable crops in actual agricultural fields/waste land and/mine spoil and for growing different plant species and established the following advantages: in physico-chemical • Improvement properties of the soils • Substantial increase in crop yield (2060%) • Early maturity of crops • Higher nutritional value of the crops • Less pest incidence • No carry over of the trace/heavy metals/ radioactivity beyond permissible limits and without any other adverse effect • Encouraging growth performance of various plant species including the timber, oil yielding, fruit bearing and ornamental and medicinal plants.

Paddy cultivation in mine spoil at NLC Neyveli (TN) Reclamation of mine spoil/OB dumps

Mine spoil/refuge in the vicinity of different mines such as BCCL, NLC, MCL have been successfully reclaimed using the FASAT and other amendments depending on the fertility of the mine spoil/refuge and various crops and plant species including timber, oil yielding, fruit bearing and ornamental, and medicinal plants have been grown with encouraging growth performance and established the suitability of the technology for crop farming/social forestry through bulk use of fly-ash.

Specialised services

♦♦ Leaching characteristics of solid wastes ♦♦ Consultancy Services for Safe Disposal and Gainful Utilisation of Coal Ash ♦♦ Monitoring of different pollutants of air (aerosols, abiotic and biotic particulates) and water, preparation of pollutant calendars and suggesting the abatement strategies ♦♦ Environmental Impact Assessment and management Projects ♦♦ Soil Quality and Human Health ♦♦ Development of Nano-pesticides ♦♦ Soil-C sequestration through Bio-Char ♦♦ Testing Facilities CFRI has been conducting various programmes, i.e. organising of seminars,

2002 2000

2001

This technology covers the following areas: Waste land reclamation

Waste/degraded land/low lying areas near in the vicinity of different TPPs viz. Farakka STPP, Bhusawal TPS, Chandrapur STPP, Harduaganj/ Obra/ Anpara TPPs of UPRVUNL, NLC and in Jharkhand have been reclaimed and made suitable for crop farming /social forestry through bulk use of fly-ash. Fly-Ash has been established to act as excellent soil conditioner/ modifier.

Bio-restoration of over burden dump Bio-restoration of abandoned Ash Pond/low lying area

Technology for restoration of biological system in abandoned ash pond and make it productive and suitable for agro-forestry purpose via biotechnological methods in eco-friendly manner has been successfully developed. The approximate cost of the FASAT package is `25,000 per acre, including transportation of pond-ash up to 25 km @ 50 t/ha.

Coal Insights, September 2012

43


IN FOCUS

Bio-coal: The new fuel on the block

Technical specifications Calorific Value: 3,700 kCal/kg to 4,500 kCal/kg Ash content: 5-15% Moisture content: less than 10% Briquette Dia: around 90 mm Briquette length: 100 mm to 200 mm Chemical details: VM% 60.30, FC% 20.00

Coal Insights Bureau

B

io-coal (or white coal) is a solid eco-friendly fuel manufactured by compressing biomass (agricultural waste). It is mainly processed by using groundnut shell waste, mustard stalk, saw dust, bagasse and other agricultural wastes which are converted into solid fuel. Bio-coal is generally manufactured in the form of briquettes of various sizes such as 60, 70 or 90 mm. The briquettes have high specific density (1,200 Kg/m3) and bulk density (800 Kg/m3) compared to 60 to 180 Kg/m3 of loose biomass. The calorific value of the bio-coal depends on the raw material (biomass) from which it is manufactured. The average heating capacity ranges from 3,700 kCal/ kg to 4,500 kCal/kg. Due to its numerous advantages over traditional fuel sources such as coal and wooden logs, bio-coal is fast emerging as an alternative source of fuel and

44 Coal Insights, September 2012

tasting great success in some parts of the country, especially in western Indian states like Gujarat. However, this product is yet to get large scale penetration in the Indian market. Given the ongoing crisis faced in coal and frequent price hikes in imported fuels, bio-coal could be one of the next generation fuels for the energy guzzling Indian industry. According to industry sources, this source can play a significant supplementary role to the primary fuel sources in coming years. Bio-coal briquetting

Bio-coal briquetting is the process of converting agricultural waste into high density and energy concentrated fuel briquettes. Bio-coal briquetting plants can be of various sizes. These briquettes are ready substitutes of coal/wood in industrial boiler and brick kiln for thermal application. The fuel briquettes are manufactured from numerous sources. The biodegradable

wastes used for briquetting include rice husk, sugarcane bagasse, groundnut shell, mustard stalks, cotton stalks, saw dust, caster seed shells/stalk, wood chips, bamboo dust, tobacco waste, tea waste, paddy straw, wheat straw, sunflower stalk, palm husk, soyabean husk, veneer residues, barks & straws, forestry waste, seeds cases etc. Bio-coal made from bagasse and saw dust is a viable energy option suitable for widespread application. It requires an efficient, economical, and convenient energy transformation pathway to meet consumers’ energy needs. The appliances like boilers and furnaces are capable of burning moderately high ash briquetted agricultural fuels at better efficiency. Although still not widespread in its use in India, bio-coal briquettes find application in a number of industries. According to industry sources, bio-coal can be used as a fuel source in textiles, power plants, ceramic tiles, chemical plants, paper mills, pharmaceutical manufacturing units, and food and liquor industries, among others. As already mentioned, briquettes of biocoal directly substitutes coal, lignite or any other fuel, and can be utilised on a large scale without significant air pollution. Benefits

There are a number of benefits which biocoal offers as an alternative source of energy. Firstly, bio-coal is cheaper than coal. The average price of bio-coal is significantly lower than that of equivalent grade of thermal coal.


IN FOCUS Secondly, the biomass briquettes are ecofriendly renewable energy in our country. It causes no pollution to the environment; no toxic gas is released. There is no sulphur emission and even no odor. In contrast, the high sulfur content of oil and coal, when burnt, pollutes the environment. There is no fly ash produced as a byproduct. Bio-coal leaves only white ash without any fixed carbon. The ash content generally ranges from 5 percent to 15 percent as compared to over 20-40 percent in black coal. The moisture content is also low, less than 10 percent. A major benefit is that bio-coal offers high purity (99 percent). It scores over domestic coal in terms of quality or grade slippage. It is also easy to burn. Bio-coal has lower ignition temperature compared to coal. There is smokeless burning and sustained combustion and the temperature requirement is achieved due to very efficient combustion. Overall, the full heat value is utilised. Bio-coal is easy to handle and 1,000 kgs of briquettes per cubic meter can be stored and transported against 50 kgs of agro-waste. No binder is used in this fuel. The natural polymer lignin acts as a binder and provides

mechanical support and also provides resistance to decay and repels water. Bio-coal is very well suited to gasify which can run any engine because of the combustion efficiency and solid form. A typical usage of briquettes made out of paper mill sludge mixed with iron sludge power is made in big furnaces to keep the temperature alive for easy start up. Bio Coal Briquettes have consistent quality, have high burning efficiency, and are ideally sized for complete combustion. It doesn’t have any Ignition Problem. Combustion is more uniform compared to coal and boiler response to changes in steam requirements is faster due to higher quantity of volatile matter in bio-coal briquettes. Bio-coal briquettes are usually produced near the consumption centers and supplies do not depend on erratic transport from long distances. Due to low ash content, material handling cost would be an added advantage. Also, high density of bio-coal provides easy handling, preservation and low shortage/ wastage during transportation against conventional fuels. Heavy consumers can avail carbon credit benefits also.

Applications

♦♦ Gasify System ♦♦ Food Process Industries ♦♦ Lamination Industries ♦♦ Chemical Units ♦♦ Brick Kilns ♦♦ Leather Industries ♦♦ Solvent Extraction Plant ♦♦ Textile Units ♦♦ Pharmaceutical Manufacturers ♦♦ Ceramic Industries ♦♦ Vegetable Plants ♦♦ Paper mills ♦♦ Dyeing Plants ♦♦ Milk Plants ♦♦ All industries having Gasify system ♦♦ S team boilers, furnaces, roasters, hot air or water generators

Industry

Although not having widespread use in India, bio-coal has gained acceptance and witnesses growing demand from across the world. This form of fuel is preferred in many advanced countries main because of three major roles: ♦♦ C reating a safe and hygienic way of disposing waste ♦♦ Containing pollution ♦♦ Meeting energy demand

A bio-coal briquetting plant

Little wonder then, that bio-coal is gaining popularity in advanced countries which are focusing on renewables and alternative sources of energy to reduce their carbon footprint and release of greenhouse gases. Post Kyoto Protocol, the need to find alternatives to fossil fuels has raised interest in bio-coal around the world. The use of bio-coal can significantly reduce greenhouse gases and heating costs and sustainably assist the development of rural communities. In India, most of the manufacturers are concentrated in the western region. The industry is fragmented with small manufacturers operating on a small scale and offering, in many cases, customised products.

Coal Insights, September 2012

45


Corporate

MBE CMT India bags order for Pakistan’s first coal washery

$2.5-3 million. MBE CMT will provide the engineering design, critical process equipment and supervisory services for the project. The work for the TSI washery will commence shortly. The first shipment of equipment from India is expected to be sent out soon. The design and construction work is likely to be completed by end of 2013. Coal supply to the plant would be sourced locally. Asked about the selection of an Indian entity for the project, Mustafi said the credit goes to MBE CMT group, which has a high brand value globally. Also, the design expertise of the Indian subsidiary was a big advantage. Global engineering hub

Arindam Bandyopadhyay

A

midst speculations over IndoPak business relations, an Indian company has quietly broken new ground as Kolkata-based MBE Coal and Mining Technology (CMT) India Pvt Ltd bagged the order for Pakistan’s first coal washery coming up near Islamabad. “This is a very positive development. It is not just a new project for us. We see it as a breakthrough in bilateral industrial relations,” said company CEO and director, Gurudas Mustafi. Pakistan’s first coal washery will be set up by Karachi-based Trade Serve International (Pvt) Ltd, which has chosen the Indian outfit of the MBE CMT group from among a number of international competitors. MBE CMT India is the Indian subsidiary of McNally Bharat Engineering Company Limited, a part of the Williamson Magor Group. While this will be a pioneering project for

46 Coal Insights, September 2012

the Pakistani trading group (TSE), for MBE CMT India, “it will give us a foothold in that country. In future, as the country’s coal sector grows, there will be more number of washery projects coming up. We will be happy to lend our expertise to such ventures.” Elaborating on the project, Mustafi said the BATAC® Jigging washery will have a capacity of 1 million tons per annum (mtpa) and involve total investments of around

Meanwhile, the MBE CMT Group is mulling to make India its global engineering hub for the design and engineering part of both Coal & Mineral beneficiation and its growing centrifuge business. The MBE CMT group (formerly Coal & Mineral division of Humboldt Wedag) is trying to expand its presence in the Indian market and is also finding it cost effective as a technology centre. “The group wants to grow in the Indian market and also build it as an engineering hub. This is very cost effective for MBE CMT operations across the globe,” Mustafi informed. Already a large chunk of global projects in coal and mineral beneficiation as well as centrifuge are being provided engineering support from the country. This includes plant design and project consultancy, among others, he said. Currently, the Indian subsidiary is providing the entire engineering back-up

A coal washery set up by MBE CMT in West Bengal


Corporate for projects in Brazil, Indonesia, Mongolia, Chile and others to name a few. The design and engineering services, however, are offered as part of the group’s offerings. MBE CMT India is also carrying out projects in collaboration with their global partners in other countries where MBE CMT group does not have an office. “Across the globe we have built plants for coal and mineral beneficiation, even in countries where we don’t have offices.” However, Cologne, Germany, continues to remain the group’s technical knowledge centre, backed by a strong R&D unit, he said, “and we are trying to jointly take up projects with CMT Cologne, especially in southeast Asian markets.” As for plant operations in India, MBE CMT, which was formed after MBE took over the Coal and Mineral technology division of Humboldt Wedag in 2009, had its own factory at Kharagpur. This unit was started in 1984. With the acquisition of the coal and mineral division of Humboldt, MBE CMT India now can also avail the manufacturing facilities another four factories of the holding company located in Kumardubi, Baroda, Asansol and Bangalore. Centrifuge business

While the mineral beneficiation business (of formerly Humboldt Wedag’s CMT division)

is more than a century old, MBE CMT India is witnessing fast growth in its centrifuge business, Mustafi said. “We also have a centrifuge division. We received a record number of orders and achieved highest despatch of centrifuge machines last year,” he said. The company caters to various industries like pharmaceuticals, waste water treatment, refineries, sewage treatment plant, chemical industries and food processing industry. Lately, it is trying to further expand the reach of this market and tap new segments such as grain distilleries, instant tea and textiles. Geographically, MBE CMT India is trying to expand its reach to southeast Asian markets like Indonesia and Malayasia where centrifuge machines are for extraction of oil by the local palm oil industry. Interestingly, there is a typical complementary relationship between the beneficiation and centrifuge businesses, Mustafi said. “We have found that when mineral industry is in bad shape, centrifuge does well. Last financial year, we sold more than 125 centrifuge machines in India. This was a record.” With various environment issues coming up, requirement of this centrifuge machines is increasing by the day. Even in big realty projects, the need for segregating Sludge from

Pak coal sector at a glance ♦♦ Total coal reserves of around 185.5 billion tons, sixth largest in the world; ♦♦ Coal belts are spread over Sindh, Punjab and Baluchistan provinces; Largest coal reserves in Sindh, approximately 184.623 billion tons; ♦♦ Proven reserves are around 600 million tons; ♦♦ Average annual coal production is 4.5 million tons; ♦♦ More than 90 percent of production is consumed in the brick and cement industry. water is leading to increased requirement of this machine, he said. Growing competition

MBE CMT’s environmental centrifuge

Meanwhile, the competition in coal and mineral beneficiation is intensifying with global players in the Indian market. In coal beneficiation, Schenck Process of China has started its operations in the country. Also, Metso Minerals is now also in the India coal Beneficiation market though globally they have a larger presence in the Iron ore. Other major competitors include Allmineral and Bateman of South Africa. But MBE CMT group is not perturbed. “We are confident of taking on competition in India or globally,” averred Mustafi, “a long history, superior process technology and customer focus are the mainstay of our business. We hope to maintain our stronghold in the Indian beneficiation industry in years to come.” A time span of more than 155 years is enough to create and develop a brand, but also a long time to maintain the claim established, Mustafi concluded.

Coal Insights, September 2012

47


Corporate

JSPL gears up to slash DRI production cost

order to align the production activities, the company is using laser technology currently which has slashed maintenance cost by 20-22 percent. Value engineering in maintenance practices implemented by JSPL’s employees has also resulted in significant reduction in outsourcing activities. Along with this, many

JSPL arm acquires Canada’s CIC Energy

J

Sanjukta Ganguly

J

indal Steel & Power Ltd (JSPL), which boasts of having the world's largest coalbased sponge iron manufacturing facility and is one of the market leaders in coalbased sponge iron making within India, has pulled up its socks to reduce costs involved in production of sponge iron. The company, along with others involved in DRI making, has been facing tough challenges in recent times. In the current scenario where input costs are escalating exponentially, the company has explored all avenues of keeping cost under check and has also found out multiple opportunities for cost reduction, senior general manager & head of DRI activities at JSPL (Raigarh), Vivek Agarwal, told Coal Insights. “At a time when the entire industry is reeling under pressure, improving the bottomline of the company by cost reduction has become increasingly important,” he said.

48 Coal Insights, September 2012

According to Agarwal, JSPL has devised and started to implement a number of measures to reduce the company’s DRI production cost which have already started to reap benefits for the company. Cost reduction

As a primary measure for cost reduction, JSPL has resorted to using pellets instead of iron ore fines for DRI production and this is being done through proper process optimisation combined with improved quality standards. This, along with use of better improved technology, has in turn helped in reduction of coal consumption by about 10 percent for the company. In addition to this, consumption of refractories has been brought down significantly from about 2 kg per ton to 1 kg per ton for DRI production which has also impacted the cost structure. JSPL, currently on the path of ‘optimisation of resources’, has decided to use the best maintenance practices which has led to up to 99.5 percent availability. In

indal BVI, a subsidiary of Jindal Steel and Power Limited (JSPL), has acquired Canada’s coal company CIC Energy for about $115 million (about `600 crore) by merging Jindal BVI with the foreign company, JSPL said in a statement. The Minister of Minerals, Energy and Water Resources of Botswana where CIC has its coal mines, has already approved the change of control from CIC to JBVI and all other approvals for the merger have already been granted. The merger certificate will be issued in the next few days, marking the completion of the acquisition, the statement said. The deal will provide JSPL access to CIC’s high quality thermal coal in Greater Mmamabula coalfield in SE Botswana which is estimated to be in excess of 6 billion tons (approx) (including Measured and Indicated resource of 2.4 billion tons). “This is another step in the direction of backward integration as the coal assets will give the company self-sufficiency when it comes to dependence on natural resources. This will enable JSPL to become a more self-reliant and fuel secure enterprise,” JSPL’s Director and Group CFO, Sushil Maroo said while speaking on the occasion. The deal will provide JSPL the opportunity to tap the highly lucrative and power deficient South African Development Community (SADC) countries and given the huge resource, will also provide an opportunity to set up a coal to hydrocarbons project, the statement added.


Corporate other such activities which were earlier being outsourced by JSPL to other companies, are now being executed by JSPL’s own employees. Inventory control techniques have also played an important role in significantly reducing the wastage of resources, and have helped to bring down the inventory control cost from about `11 crore to about `7 crore, Agarwal said.

Minimisation of breakdown time has been possible by introduction of value engineering as well as accretion generation from DRI has been reduced simultaneously. “Along with curtailing cost, we have also initiated waste utilisation which includes selling of char and castables from kiln which are being sold at `1,600 per ton. However, with the use of the right technology, dust

generation has been reduced,” Agarwal said. According to company sources, these measures have helped the company to save `500 per ton (approx.) leading to a total saving of about `66 crore annually, excluding the cost of coal and iron ore. However, keeping cost under control, how much the company can pull up their revenue figures during the current fiscal is to be watched.

CIL’s 236 projects await forestry, environmental clearances

A

s many as 236 proposals of Coal India Ltd (CIL), which are expected to contribute around 231 million tons per annum (mtpa) of coal during the 12th Plan, are awaiting forestry and environmental clearances, CIL chairman S. Narsing Rao has said. Of the total, 179 proposals are awaiting forestry clearances and 57 are awaiting environmental clearances, Rao said. Of the total 179 proposals awaiting forestry clearances, 130 proposals involving a total area of 15,656 hectares are awaiting Stage-I clearance and 49 proposals involving 13,115 hectares are awaiting Stage–II clearances, he said. Further, of the 179 proposals, 45 are awaiting approvals at MoEF level (26 Stage-I proposals and 19 Stage-II proposals). The 26 forestry proposals awaiting clearances at MoEF Stage–I are expected to contribute around 25 million tons (mt) and 19 proposals awaiting clearances at MoEF Stage-II level are expected to contribute around 69 mt during the terminal year of 12th Plan (2016-17). Regarding the 57 proposals awaiting environmental clearance at different levels, Rao said these have potential for an incremental capacity of 137 mtpa. “Out of these 57 proposals, 8 proposals with an incremental capacity of 14.44 mt are awaiting TOR approval, 3 proposals with an incremental capacity of 21.86 mt are awaiting dates for EAC meeting and 29 proposals, with an incremental capacity of

77.26 mt are awaiting final clearances. Out of the total 57 proposals, 15 require forestry clearance at Stage – 1 level,” he added. Commenting on the growth profile of the company, Rao said a total of 72 projects with an estimated capacity of 257.26 mt have been identified to be taken up during the 12th Plan period. In addition to these projects, 59 projects identified in 11th Plan with an ultimate estimated capacity of 156.29 mt and two projects of 10th Plan would also be taken up during 12th Plan, he said. “With this it can be said that a total of 133 projects with an estimated capacity of 420.85 mt are being planned to be taken up during 12th Plan of which 88 projects will contribute about 86 mt during the terminal year i.e. 2016-17,” Rao said.

He said that there are 147 ongoing projects in different stages of implementation with an ultimate capacity of 437.08 mtpa. “In 2011-12, 85 of the on-going projects contributed 211.39 mt and 100 projects are planned to contribute 228.67 mt during the current financial year (201213). In addition, 136 ongoing projects have been planned to contribute 333.83 mt during the terminal year of Twelfth Plan i.e 2016-17,” Rao said. He said of the 147 ongoing proejcts, 80 have acquired forestry and environmental clearances, whereas environmental and forestry clearances are awaited for 13 and 34 proejcts respectively. For 20 projects, both forestry and environmental clearances are awaited, he added.

Coal Insights, September 2012

49


Corporate

Anupam wins `130-cr order from SAIL

Coal Insights Bureau

I

ndia’s largest EOT crane manufacturing company Anupam Industries Ltd has been awarded an order worth more than `130 crore by SAIL’s Rourkela Steel Plant (RSP) to supply 22 cranes and hoists of various capacities. These cranes will be used for various applications at RSP’s plate mill modernisation plant based at Rourkela in Odisha. As per a communication from the company, the scope of work would involve

50 Coal Insights, September 2012

design, engineering, supply, installation, commissioning and training. The project is scheduled for completion in June 2014. RSP presently has the capacity to produce 2 million tons (mt) of hot metal, 1.9 mt of crude steel and 1.67 mt of saleable steel. It is SAIL’s only plant that produces silicon steels for the power sector, high quality pipes for the oil and gas sector and tinplates for the packaging industry. Its wide and sophisticated product range includes various flat, tubular and coated products.

The cranes will be supplied in various capacities ranging from 15 tons to 175 tons capacity with different applications for RSP’s slab yard, slab charging bay, furnace entry, mill aisle, roll shop, heavy plate area, motor bay, finished plate despatch bay and cross bay. These cranes are customised to carry out specialised operations at the steel plant. One of the cranes supplied for the slab yard is the 75 ton duplex motorised scissor type tong with maximum grip, 360 degree swivelling facility and adjustable stools for lifting the slabs. The 175+175t EOT crane has lifting beam with motorised central hook of 200 ton capacity at the beam centre. Anupam will also design and manufacture special 60 ton magnet cranes with telescopic spreader beam for handing of steel plates. These cranes are packed with high end features such as anti-collision device, travel restriction and load control, DSL system, twin motor drive via planetary gear box for main hoist motion, emergency brake, and rope oil lubrication system. Anupam has been supplying customised cranes to SAIL for the past few years and this large order reinforces SAIL’s trust in Anupam as the best lifting solutions provider to the integrated steel industry, managing director of Anupam Industries. Mehul Patel, said. With this order, Anupam will continue its endeavour to supply high quality customised cranes at competitive price to the steel sector globally. Anupam has a formidable presence in the Indian steel industry for supplying ladle/ forging/ charging cranes and steel mill duty cranes. Anupam cranes handle more than 21 mt of liquid/hot metal and finished products annually at various steel plants in India and abroad. Anupam’s cranes and components are specially customised and designed to meet the challenging requirements of critical applications at integrated steel plants. The company provides international standard cranes for various applications to meet the requirements of core sectors in India and abroad in the sectors of steel, power, heavy & general engineering, construction, ports, cement, shipyard, fertilisers and petrochemicals, the communication said. It added that within a span of 40 years, it has supplied and commissioned more than 5,000 cranes up to 500 ton capacity.


social buzz

MoC blamed for messing up coal block allocations Coal Insights has recently started a group on LinkedIn called India Coal Market Watch (ICMW). The readers are welcome to join the group and participate in daily conversations and surveys conducted by ICMW on the online forum. Coal Insights may, at its discretion, publish the result of such surveys and discussions for the benefit of a larger audience.

have taken another five years for going for competitive bidding.” CAG doubts coal reserves

Another topic that caught the attention of members was CAG’s doubts over the authenticity of India’s coal reserves, as estimated by Geological Survey of India (GSI) and CMPDI. In its draft report, CAG hinted that the proven, economic reserves of the country would be less than the quantity estimated. This was due to differences between the measurement techniques followed by GSI and the one followed in some other countries. Commenting on the issue, Syed Khadry, Sr. General Manager (Mines) at Utkal Coal Limited (IMFA), said, “The estimation of reserves by GSI and CMPDI are correct generally; there are not many cases where the error has crossed 5%.” Tanay Duttagupta, Sr. Geologist at Geological Survey of India, said, “It would be interesting to know the points CAG considered to doubt GSI’s estimate of coal reserve.” Blame game over power outage

Steel Insights Bureau

A

s the government continues to defend its positions in the alleged coal block allocation scam, the members of ICMW group on LinkedIn put the blame on the coal ministry, if not for indulging in a “loot”, for mismanagement of the blocks under review. While it was generally agreed that the government didn’t do anything wrong in sticking to a well laid down process of allocation, the fringe benefits given to select block holders called for attention. There could be little to talk in defence of the companies found guilty, but that does not make the entire process faulty, they said. Post scam, the decision to de-allocate blocks and possibly re-allocate them in a hurry would again lead to further complications, the members maintained.

It was also noted that Comptroller & Auditor General (CAG), the federal auditor, is under pressure to prove its “findings” and refute the government’s claims of “zero loss” from the allocation. Coming to the defence of the government’s procedure of allocation, Jaganath Prasad Panda, Chief Operating Officer at MJSJ Coal Ltd, said, “Most of the coal blocks were not prospected. How could they be auctioned? Prospecting would take 3-5 years in many cases. Neither CMPDIL nor MEC have enough drilling rigs and infrastructure to do prospecting of all. How can auction be done without knowing the coal available in quantity and quality and the depth? How would be the minimum price of bid fixed without knowledge about the geology? If blocks (except those already prospected) were not allocated it would

With the memory of the two-day power outage across north Indian states still fresh in memory, the members of ICMW discussed possible ways to avert such incidents in future. The members scoffed at the blame game that followed the chaos. Incidentally, the head of India’s national grid, facing a backlash for the worst-ever power outage in July, acknowledged transmission infrastructure failures played a role in the crisis. Along with that, the loss of generation due to shortage of coal grabbed attention of the forum. Indian power utilities reported a generation loss of about 2.9 billion unit (BU) between April and June 2012 owing to coal crisis. Such a situation may recur if the government did not clear the mess and take immediate steps to augment supply, the members averred.

Coal Insights, September 2012

51


International

US coal production to drop 6.1% on consumption decline Coal Insights bureau

C

oal consumption in the electric power sector, which averaged over 1 billion short tons annually from 2003 through 2008, might not reach that threshold for the fourth consecutive year in 2012. According to a forecast made by US Energy Information Administration (EIA), coal consumption in the electric power sector is about to reach 829 million short tons (MMst) in 2012. Lower electric power sector natural gas prices have led to a significant increase in the share of natural gas-fired generation. EIA projects power sector coal consumption is to grow by 7.8 percent to 894 MMst in 2013 as electricity consumption increases and higher natural gas prices lead to a reduction in natural gas-fired generation.

the same period. EIA expects that production will total 1,028 MMst in 2012, 66 MMst below the 2011 total. The agency further estimates production to grow by 1.4 percent (14 MMst) in 2013 to meet the increase in consumption. Electric power sector stocks, which ended 2011 at 175 MMst, are forecast to total 192 MMst at the end of the 2012. Inventories are expected to decline slightly in 2013, but they will remain at elevated levels. Coal trade

According to EIA, US coal exports would remain strong in 2012 and exceed the level of 107 MMst exported in 2011. The US exported 12.7 MMst of coal in June, topping April’s record-setting amount, and it was the third consecutive month with exports exceeding 12 MMst. EIA projects coal exports to total a record 124 MMst in 2012. US coal supply Coal exports will decline in 2013 but remain Coal production will decline by 6.1 percent above 100 MMst. in 2012 as domestic consumption falls, The primary reasons for the export decline according to an analysis by EIA. Production include China’s slower economic growth for the first seven months of 2012 was 33 and increased exports from major coalMMst (5 percent) below last year’s level for exporting countries, particularly Indonesia and Australia. US coal consumption US exports could be higher if there are supply disruptions from any of the major coal-exporting countries. US coal exports averaged 56 MMst in the decade preceding 2011. US coal prices Source: Short-Term Energy Outlook, September 2012

52 Coal Insights, September 2012

Delivered prices to

coal the

electric power industry have increased steadily over the last 10 years and this trend continued in 2011, with an average delivered coal price at $2.40 per MMBtu (a 6 percent increase from 2010). However, EIA expects the decline in demand for coal, combined with the large coal inventories, will begin to put downward pressure on coal prices and contribute to the shut-in of higher-cost production. This leads to a forecast that the delivered coal price in 2012 will average $2.39 per MMBtu, and remain at that level in 2013. US electricity consumption & generation

Recent power generation and fuel cost data indicate that over the last few quarters the generation fuel mix has been much more responsive to changes in relative fossil fuel prices than it has been in past years. The share of total generation fueled by natural gas during the first half of 2012 averaged 30.4 percent compared with 22.3 percent during the same period last year. This increase in fuel share was driven by a cost of natural gas that was very low relative to the cost of coal. However, in June, the average Henry Hub natural gas spot price surpassed the average spot price for Central Appalachian coal for the first time since October 2011, indicating that the recent trend of substituting coal-fired generation with natural-gas-fired generation may be slowing and is likely to reverse. In light of the data indicating that power generators have recently been more responsive to changes in relative fuel costs, EIA has revised its projections for the generation fuel mix during 2013. EIA now expects that the higher natural gas prices next year will lead to a 9.5 percent decline in natural gas-fired generation while coal-fired generation increases by 9.3 percent. EIA expects the nominal US residential electricity price will rise by 1.0 percent during 2012 to an average of 11.91 cents per kilowatthour. During 2013, US residential retail electricity prices increase 0.9 percent over the average 2012 price. When measured in real terms, the US residential electricity price declines by an annual average of 0.8 percent in both 2012 and 2013.


INTERNATIONAL

China’s decision on export tax may soften coke prices

Coal Insights Bureau

A

midst speculation that China will soon withdraw the 40 percent export tax on coke that will increase availability of the material in the world market, questions are being raised on whether this will lead to a further softness in global coke prices. The prices of coke in the world market is down from a high of around $355 per ton in June to current level of around $325 per ton due to sharp fall in spot coking coal prices and a weak demand from steel makers. A few players contacted by Coal Insights believe that a clear picture on whether the prices will soften will emerge only after the Chinese price opens. Till then, there is possibility of wide fluctuation in prices as contracted price of coking coal, as per initial report, of $170 per ton for OctoberDecember quarter is significantly higher compared with current spot price of around $145 per ton. “Currently, the basic coke price in China comes to around $230 per ton and if 40 percent export tax is added, the cost should go up to $325 per ton, but coke prices from North China is currently being quoted at around $390 per ton,” an industry source said.

Another source, however, said, “If Chinese material starts arriving, there will be a sharp fall in coke prices globally and it will hamper overall sentiment.” “My expectation is that met coke prices will not fall as China will not reduce export price despite cut in export duty because overall availability of coke in the world market is not that high,” an official said. “Today Japan is exporting its rejected coke whereas the quality of Columbian, Russian and Ukrainian coke is very bad. In such a situation, China may not reduce prices, considering the fact their coke quality is comparatively better,” he added. WTO ruling

Although China has indicated that it might withdraw the export tax on met coke to adhere to World Trade Organisation (WTO) ruling of July 2011, steel industry sources in India feel that some other issues might have forced China to change its earlier decision. “Earlier they (China) were saying that they will not pollute the environment and had imposed the tax in order to discourage production of coke, which ultimately led to sharp reduction in global supplies of coke and consequent firmness in prices. So why is it that China is now thinking of withdrawing

the tax?” an official of a leading coke maker said. Recently it had been reported, quoting Director in the Department of Foreign Trade, Ministry of Commerce, Huang Xin, that China’s central government is working on removing all barriers to coke exports by the end of this year. The decision was believed to be in response to the WTO ruling in July last year that export restrictions, including the 40 percent tax imposed since 2008 and the licence and quota system that has been in place since 1995 were a violation of WTO bylaws. “The change in Chinese thinking may be due to their intention to stop diversion of Mongolian coking coal to world market as currently only China is buying Mongolian coal. My feeling is that China does not want to allow Mongolian coal to go out,” the Indian official argued. “Today China is largely taking Indonesian coal and making coke, but going forward the supply of Mongolian coal is likely to increase significantly and unless China increases its coke production capacity, Mongolian miners will have to look at alternative buyers,” he said. “China does not want Mongolian coal to go out of the region. But it wants to ensure that it increases its consumption of Mongolian coal and one way to do that is by increasing its own coke production as additional output can easily be exported,” the official felt. However, the export of coke from China will not be feasible if there is 40 percent tax because that makes Chines coke unviable in the world market. “So by withdrawing export tax, China can create a situation wherein its coke will find a market and at the same time it will ensure that it can have control over Mongolian coal,” the official added. He pointed out that Mongolian coal production is growing gradually, but right now it is largely being consumed by Chinese companies. “If China is unable to procure the entire material mined in Mongolia, the miners there will have to look at alternate sources and they might start considering exporting their material either though Vladi Vostok port in Russia or the Shanghai port. In a way it is now in the interest of China to withdraw export tax,” the official said.

Coal Insights, September 2012

53


logistics

Traffic handling by major ports down 3.5% in April-Aug Coal Insights Bureau

T

he 12 major Indian ports have handled 229.01 million tons (mt) of traffic during the first five months (April-August) of 2012-13, 3.51 percent lower than 237.33 mt recorded during the same period last year. According to data released by the Indian Ports Association (IPA), the country’s major ports handled a total of 13.04 mt of coking coal in April-August period, up 1.73 percent as compared with 12.82 mt handled in the same period last year. However, the movement of thermal coal through the major ports was up 2.11 percent

to 21.39 mt during April-August, compared to 20.95 mt achieved in the same period last year. Movement of iron ore through the major ports showed a significant drop of 38 percent in April-August Traffic handled at major ports due to restrictions (During Apr-Aug, 2012* vis-a-vis Apr-Aug, 2011) imposed on mining and a hike in export (*) Tentative (in '000 tons) duty on iron ore. The April to august traffic % Variation against Ports major ports together prev. year traffic 2012* 2011 handled 17.03 mt KOLKATA of iron ore in the April-August period Kolkata Dock System 4835 5140 -5.93 compared to 27.46 Haldia Dock Complex 12232 14282 -14.35 mt handled in the TOTAL: KOLKATA 17067 19422 -12.13 same period last year. PARADIP 21079 24244 -13.05 Mormugao port handled the highest VISAKHAPATNAM 25766 30539 -15.63 volume of 7.42 ENNORE 6794 5264 29.07 mt of iron ore in CHENNAI 22829 24713 -7.62 April-August. This volume, however, was V.O. CHIDAMBARANAR 11945 11772 1.47 about 20.81 percent COCHIN 8636 8131 6.21 lower than the iron NEW MANGALORE 14043 13973 0.50 ore traffic moved MORMUGAO 11661 14726 -20.81 through the port in the same period last MUMBAI 24164 21969 9.99 year. JNPT 27599 26721 3.29 Movement of KANDLA 37435 35864 4.38 container traffic in TOTAL 229018 237338 -3.51 terms of tonnage and TEUs showed Source: IPA

54 Coal Insights, September 2012

an increase in the April-August period. The major ports handled 51.37 mt of tonnage and 3.30 million TEUs in April-August period compared to 49.40 mt of tonnage and 3.23 mt of TEU in the same period last year. Among the major ports, Paradip port had the distinction of handling the highest volume of thermal coal of around 7.03 mt in April-August period. Visakhapatnam port handled the highest quantity of 2.94 mt of coking coal during the period. Movement of coking coal through Paradip, Kolkata, Visakhapatnam, Chennai, Cochin and Mormugao ports declined during the period when compared to the corresponding period last year. Seven major ports showed positive growth in traffic handling during the AprilAugust period of the current fiscal, while the remaining five showed negative growth on a year-on-year basis. In terms of growth, Ennore port topped the list with a 29.07 percent increase in cargo throughput. New Mangalore port’s growth was lowest at about 0.50 percent during the period. In terms of traffic volume, Kandla port clinched the top rank with a cargo volume of 37.43 mt recorded for the period. The Mormugao port registered the highest decline of 20.81 percent in traffic handling during the period due to fall in iron ore export.



Logistics

Railways commodity freight revenue down in Aug m-o-m ore for exports, steel plants and for other domestic user in August fell to `620.84 crore, down 7.53 percent from `671.39 crore in July. The quantity of iron ore transported fell to 9.21 mt in August from 9.83 mt in the previous month. Revenue from transportation of cement in August stood at `551.57crore (7.52 mt) from `587.09 crore (8.18 mt) in July, while

that from foodgrains transportation rose to `597.09 crore (4.22 mt) in August from `499.83 crore (3.83 mt) in the previous month. The Railways revenue from transportation of fertilisers in August rose sharply to `427.08 crore (4.29 mt) from `374.18 crore (4.09 mt) in July. Revenue from transportation of petroleum oil and lubricant (POL) in August stood at `409.31 crore (3.83 mt), while the same from pig iron and finished steel from steel plants and other points was `397.9 crore (2.95 mt). Revenue from container services was `293.32 crore (3.31 mt) and from transportation of other goods was `381.92 crore (5.15 mt).

Commodity-wise revenue Commodity

Quantity (in mt) August 2011

Earning (`cr)

August 2012

August 2011

August 2012

Coal i) for steel plants

3.95

4.24

158.28

223.18

ii) for washeries

0.12

0.1

1.11

0.94

22.23

22.99

1455.21

1733.52

7.9

9.36

421.65

580.06

v) Total

34.2

36.69

2036.25

2537.7

Raw material for steel plants except ore

1.15

1.26

75.83

111.55

iii) for thermal power houses iv)for public use

Pig iron and finished steel i) from steel plants

2.4

2.4

269.94

361.33

ii) from other points

0.62

0.55

47.02

36.57

iii) Total

3.02

2.95

316.96

397.9

Iron ore

Coal Insights Bureau

T

he Indian Railways’ revenue earnings from commodity-wise freight traffic fell month-on-month in August due to lower transportation of coal and cement. Revenue earnings from commodity-wise freight traffic during August 2012 stood at `6,328.28 crore, down 2.46 percent compared with `6,487.94 earned in July, according to information available with Coal Insights. The Railway’s revenue from transportation of coal fell to `2,537.7 crore in August from `2,702.17 crore in July. The Railways transported 36.69 million tons (mt) of coal in August compared with 39.36 mt transported a month ago. Revenue from transportation of iron

56 Coal Insights, September 2012

i) for export

1.49

0.68

373.85

150.77

ii) for steel plants

4.74

5.4

189.59

223.11

iii) for other domestic users

2.71

3.13

176.71

246.96

iv) Total

8.94

9.21

740.15

620.84

Cement

8.53

7.52

492.58

551.57

Foodgrains

3.58

4.22

325.49

597.09

Fertilizers

4.43

4.29

322.47

427.08

3.3

3.83

256.45

409.31

Mineral Oil (POL) Container Service

0.8

0.75

79.65

74.45

ii) EXIM containers

i) Domestic containers

2.33

2.56

195.3

218.87

iii) Total

3.13

3.31

274.95

293.32

Balance other goods

5.51

5.15

364.04

381.92

75.79

78.43

5205.17

6328.28

Total revenue earning traffic



Annexure

Details of coal blocks allocated so far with current status I. The following coal blocks have been allotted in pursuance of recommendations of Screening Committee meetings held from 14/7/93 to 18/10/05 as indicated against each block, after obtaining approval of the competent authority. Sl. No.

Block allocated

Name of the Company

Date of Allotment

State

Private / Government

End -Use

Geological Reserves (in MT)

Current Status

No. of Screening Committee Meeting (Date of the Meeting)

1

Sarisatolli

RPG Industries/CESC Ltd.

10.08.1993

West Bengal

P

Power

140.47

Producing

1st (14/7/93)

2

Talabira-I

Hindalco Industries

25.02.1994

Orissa

P

Power

22.55

Producing

4th (12/1/94)

3

Tara (East)

WBSEB

14.07.1995

West Bengal

G

Power

84.47

Producing

7th (6/6/95)

4

Tasra

Steel Authority of India Ltd.

26.02.1996

Jharkhand

G

Sponge Iron

285

Producing

8th (4/10/95)

5

Tara (West)

WBPDCL

17.04.1996

West

G

Power

125.71

Producing

5th (20/12/95)

6

Gare-Palma-IV/1

Jindal Steel & Power Ltd

20.06.1996

Chhattisgarh

P

Sponge Iron

124

Producing

3rd (27/9/93)

7

Gotitoria (East)

BLA Industries

21.06.1996

Madhya Pradesh

P

Under S.3(3) (c) (i ) small isolated dispensation

5.15

Producing

10th (3/4/96)

8

Gotitoria (West)

BLA Industries

21.06.1996

Madhya Pradesh

P

Under S.3(3 (c) (i) small isolated dispensation

4.19

Producing

10th (3/4/96)

9

Gare-Palma-IV/5

Monet Ispat and Energy Ltd

21.06.1996

Chhattisgarh

P

Sponge Iron

126

Producing

12th (3/4/98)

Central Collieries Ltd. (cancelled) .

29.05.1998

Maharastra

P

Power

40

Deallocated on 23.06.2003

12th (3/4/98)

Lloyd Metals & Engineering Ltd

29.05.1998

Non Producing

12th (3/4/98)

Producing

12th (3/4/98)

10

Takli-Jena-Bellora

Sponge Iron

11

Utkal-C

Utkal Coal Ltd. (formerly ICCL)

29.05.1998

Orissa

P

Power

208.77

12

Gare-Palma-IV/2

Jindal Power Ltd

01.07.1998

Chhattisgarh

P

Power

123

13

Gare-Palma-IV/3

Jindal Power Ltd

01.07.1998

Chhattisgarh

P

Power

123

Producing

12th (3/4/98)

14

Gare-Palma- IV/4

Jayaswal Neco Ltd

16.08.1999

Chhattisgarh

P

Sponge Iron

125

Producing

14th (18/6/99)

15

Utkal-B2

Monet Ispat and Energy Ltd

16.08.1999

Orissa

P

Sponge Iron

106

Non-Producing

14th (18/6/99)

16

Brahmadiha

Castron Techologies Ltd

01.09.1999

Jharkhand

P

Iron & Steel

Non-Producing

14th (18/6/99)

17

Gare-Palma-IV/7

Raipur Alloys & Steel Ltd

25.04.2000

Chhattisgarh

P

Sponge Iron

156

Producing

15th (6/3/2000)

18

Marki Mangli-I

B.S. Ispat

25.04.2001

Maharastra

P

Sponge Iron

34.34

Producing

15th (6/3/2000)

19

Pachwara Central

Punjab State Electricity Board

28.12.2001

Jharkhand

G

Power

562

Producing

16th (31/5/2001)

20

Tokisud North

GVK Power (Govindwal Sahib) Ltd

07.01.2002

Jharkhand

P

Power

92.3

Non- Producing

17th (28/4/2001)

21

Gangaramchak

WBPDCL

23.06.2003

West Bengal

G

Power

10

Non- Producing

18th (5/5/2003)

22

Barjora

WBPDCL

23.06.2003

West Bengal

G

Power

8

Producing

18th (5/5/2003)

23

GangaramchakBhadulia

WBPDCL

23.06.2003

West Bengal

G

Power

4

Non- Producing

18th (5/5/2003)

24

Chinora

Fieldmining & Ispat Ltd

08.10.2003

Maharastra

P

Sponge Iron

20

Non- Producing

19th (26/5/03)

25

Warora (West) Southern Part

Fieldmining & Ispat Ltd.

08.10.2003

Maharastra

P

Sponge Iron

18

Non- Producing

19th (26/5/03)

26

Chotia

Prakash Industries Ltd

04.09.2003

Chhattisgarh

P

Sponge Iron

34.48

Producing

19th (26/5/03)

58 Coal Insights, September 2012



Annexure

Sl. No.

Block allocated

Name of the Company

Date of Allotment

State

Private / Government

End -Use

Geological Reserves (in MT)

Current Status

No. of Screening Committee Meeting (Date of the Meeting)

27

Utkal B 1

Jindal Steel & Power Ltd

29.09.2003

Orissa

P

Sponge Iron

228.4

Non- Producing

20th (6/6/2003)

28

Kathautia

Usha Martin Ltd

29.09.2003

Jharkhand

P

Sponge Iron

29.76

Producing

20th (6/6/2003)

29

Majra

Gondwana Ispat Ltd

29.10.2003

Maharastra

P

Sponge Iron

31.5

Non- Producing

20th (6/6/2003)

30

Badam

Tenughat Vidyut Nigam Limited

03.11.2003

Jharkhand

G

Power

144.63

Non- Producing

20th (6/6/2003)

31

Baranj - I

KPCL

10.11.2003

Maharastra

G

Power

68.31

Producing

21st (19/8/2003)

32

Baranj - II

KPCL

10.11.2003

Maharastra

G

Power

Producing

21st (19/8/2003)

33

Baranj - III

KPCL

10.11.2003

Maharastra

G

Power

Producing

21st (19/8/2003)

34

Baranj - IV

KPCL

10.11.2003

Maharastra

G

Power

Producing

21st (19/8/2003)

35

Kiloni

KPCL

10.11.2003

Maharastra

G

Power

39.51

Producing

21st (19/8/2003)

36

Manora Deep

KPCL

10.11.2003

Maharastra

G

Power

44.7

37

Jamkhani

Bhushan Ltd.

12.11.2003

Orissa

P

Sponge Iron

38

Bhandak West

Shree Baidyanath Ayurved Bhawan Ltd.

27.11.2003

Maharastra

P

39

Utkal-D

Orissa Mining Corporation

19.12.2003

Orissa

40

West of Umaria

Garuda Clays Ltd

24.05.2004

41

Utkal 'E'

NALCO

42

Gidhmuri

CSEB

43

Patoria

44

Belgaon

45 46

Producing

21st (19/8/2003)

80

Non- Producing

21st (19/8/2003)

Power

36.18

Deallocated on 31.05.2011

19th (26/5/2003)

G

Commercial

153.31

Non- Producing

16th (31/5/2001)

Chhattisgarh

P

Cement

7

Deallocated in September 2006

19th (26/5/03)

27.08.2004

Orissa

G

Power

194

Non- Producing

17th (28/11/2001)

23.09.2004

Chhattisgarh

G

Power

80.27

Non- Producing

22nd (4/11/03)

CSEB

23.09.2004

Chhattisgarh

G

Power

269.25

Non- Producing

22nd (4/11/03)

Sunflag Iron Steel Ltd

28.03.2005

Maharastra

P

Sponge Iron

Producing

23rd (29/11/2004)

Pachvara North

WBPDCL

26.04.2005

Jharkhand

G

Power

125.71

Non- Producing

18th (5/5/2003)

Moitra

Jayaswal Neco Ltd

13.05.2005

Jharkhand

P

Sponge Iron

215.78

Non- Producing

24th (9/12/04)

47

Brinda

Abhijeet Infrastructure P. Ltd.

26.05.2005

Jharkhand

P

Sponge Iron

34.72

Non- Producing

24th (9/12/04)

48

Sasai

Abhijeet Infrastructure P. Ltd.

26.05.2005

Jharkhand

P

Sponge Iron

26.35

Non- Producing

24th (9/12/04)

49

Meral

Abhijeet Infrastructure P. Ltd.

26.05.2005

Jharkhand

P

Sponge Iron

17.05

Non- Producing

24th (9/12/04)

50

Parbatpur-Central

Electrosteel castings Ltd

07.07.2005

Jharkhand

P

Pig Iron

231.22

Producing

27th (1/3/2005)

51

Lalgarh (North)

Domco Smokeless Fuel Pvt. Ltd

8.07.2005

Jharkhand

P

Pig Iron

30

Non- Producing

23rd (29/11/2004)

15.3

52

Kotre -Basantpur

TISCO

11.08.2005

Jharkhand

P

Pig Iron

148.4

Non- Producing

24th (9/12/04)

53

Pachmo

TISCO

11.08.2005

Jharkhand

P

Pig Iron

101.99

Non- Producing

24th (9/12/04)

54

Lohari

Usha Martin

24.08.2005

Jharkhand

P

Sponge Iron

9.99

Non- Producing

24th (9/12/04)

55

Chitarpur

Corporate Ispat Ldt

02.09.2005

Jharkhand

P

Sponge Iron

212.0 1

Non- Producing

20th (6/6/03)

56

Panchbahani

Shree Radhe Industries

06.09.2005

Chhattisgarh

P

Sponge Iron

11

Deallocated in September 2006

28th (15/4/2005)

57

Marki Mangli-II

Veerangana Steel Limited

06.09.2005

Maharastra

P

Sponge Iron

19

Non- Producing

28th (15/4/2005)

58

Marki Mangli-III

Veerangana Steel Limited

06.09.2005

Maharastra

P

Sponge Iron

Producing

28th (15/4/2005)

59

Marki Mangli-IV

Veerangana Steel Limited

06.09.2005

Maharastra

P

Sponge Iron

Non Producing

28th (15/4/2005)

60 Coal Insights, September 2012


Annexure

Sl. No.

60

61

62

63

Name of the Company

Block allocated

Talabira II

Utkal-A

North Dhadu

Bijahan

Date of Allotment

State

Private / Government

End -Use

MCL

10.11.2005

Orissa

G

Power

NLC

10.11.2005

Orissa

G

Power

Hindalco Industries

10.11.2005

Orissa

P

Power

MCL

29.11.2005

Orissa

G

Power

JSW Steels Ltd./ Jindal Thermal Power Ltd.

29.11.2005

Orissa

P

Power

Jindal Stainless Steel Ltd.

29.11.2005

Orissa

P

Power

Geological Reserves (in MT)

Current Status

No. of Screening Committee Meeting (Date of the Meeting)

Non Producing

25th (10/1/2005)

Non Producing

25th (10/1/2005)

Non Producing

27th (1/3/2005)

Non Producing

25th (10/1/2005)

152.33

333.4

Shyam DRI Ltd.

29.11.2005

Orissa

P

Power

Jharkhand Ispat Pvt. Ltd

13.01.2006

Jharkhand

P

Sponge Iron

Pavanjay Steel & Power Generation Pvt. Ltd

13.01.2006

Jharkhand

P

Sponge Iron

Electrosteel castings Ltd

13.01.2006

Jharkhand

P

Sponge Iron

Adhunik Alloys & Power Ltd.

13.01.2006

Jharkhand

P

Sponge Iron

923.94

Bhusan Ltd.

13.01.2006

Orissa

P

Sponge Iron

Mahaveer Ferro

13.01.2006

Orissa

P

Sponge Iron

130

Coal Insights, September 2012

61


Annexure

Sl. No.

64

6566

67

68

69

70

Block allocated

Madanpur South

Nakia I + Nakia II

New Patrapara

Gare Palma IV/6

Gare Palma IV/8

Madanpur (North)

Name of the Company

Date of Allotment

State

Private / Government

End -Use

Hindustan Zinc Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

Akshya Investment Pvt. Ltd

13.01.2006

Chhattisgarh

P

Sponge Iron

Chhattisgarh Steel & Power Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

Chhattisgarh Electricity Corporation Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

MSP Steel & Power Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

Chhattisgarh Captive Coal Mining Ltd. (Consortium of five Co. )

13.01.2006

Chhattisgarh

P

Sponge Iron

Ispat Godavari

13.01.2006

Chhattisgarh

P

Sponge Iron

Ind Agro Synergy

13.01.2006

Chhattisgarh

P

Sponge Iron

Shri Nakoda Ispat

13.01.2006

Chhattisgarh

P

Sponge Iron

Vandana Gobal Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

Shree Bajrang Power & Ispat Ltd

13.01.2006

Chhattisgarh

P

Sponge Iron

Bhusan Steel & Strips Ltd.

13.01.2006

Orissa

P

Sponge Iron

Adhunik Metaliks Ltd.

13.01.2006

Orissa

P

Sponge Iron

Deepak Steel & Power Ltd.

13.01.2006

Orissa

P

Sponge Iron

Adhunik Corp. Ltd.

13.01.2006

Orissa

P

Sponge Iron

Orissa Sponge Iron Ltd.

13.01.2006

Orissa

P

Sponge Iron

SMC Power Generation Ltd.

13.01.2006

Orissa

P

Sponge Iron

Sree Metaliks Ltd.

13.01.2006

Orissa

P

Sponge Iron

Visa Steel Ltd.

13.01.2006

Orissa

P

Sponge Iron

Jindal Steel & Power Ltd

13.01.2006

Chhattisgarh

P

Sponge Iron

Nalwa Sponge Iron Ltd.

13.01.2006

Current Status

No. of Screening Committee Meeting (Date of the Meeting)

Non Producing

30th (18/10/2005)

Non Producing

30th (18/10/2005)

Non Producing

28th (15/4/2005)

Non Producing

30th (18/10/05)

175.65

399

1042

156 Chhattisgarh

P

Sponge Iron

Jayaswal Neco Ltd

13.01.2006

Chhattisgarh

P

Sponge Iron

Ultratech Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

Singhal Enterprises

13.01.2006

Chhattisgarh

P

Sponge Iron

Nav Bharat Coalfield Ltd

13.01.2006

Chhattisgarh

P

Sponge Iron

Vandana Energy & Steel Pvt. Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

Prakash Industries Ltd

13.01.2006

Chhattisgarh

P

Sponge Iron

Anjani Steel Pvt. Ltd.

13.01.2006

Chhattisgarh

P

Sponge Iron

Chhattisgarh Captive Coal Mining Ltd. (Consortium of five Co.)

13.01.2006

Chhattisgarh

P

Sponge Iron

62 Coal Insights, September 2012

Geological Reserves (in MT)

107.2

241.61

Non Producing

30th (18/10/05)

Non Producing

30th (18/10/05)


Annexure

Sl. No.

71

72

73

74

75 76 77

78

Block allocated

Gondulpara

Dumri

Nerad Malegaon

Radhikapur (East)

Name of the Company

Date of Allotment

State

Tenughat Vidyut Nigam Limited

13.01.2006

Jharkhand

Radhikapur (West)

Ardhagram

End -Use

G

Power

Damodar Valley Corporation

13.01.2006

Jharkhand

G

Power

Nilachal Iron & Power Generation

13.01.2006

Jharkhand

P

Sponge Iron

Geological Reserves (in MT)

Current Status

No. of Screening Committee Meeting (Date of the Meeting)

Non Producing

27th (1/3/2005)

Non Producing

27th (1/3/2005)

Non Producing

28th (15/4/2005)

Non Producing

25th (10/1/2005)

Non Producing

27th (1/3/2005)

140

Bajrang Ispat Pvt. Ltd.

13.01.2006

Jharkhand

P

Sponge Iron

Gupta Metallics & Power Ltd.

13.01.2006

Maharastra

P

Sponge Iron

Gupta Coalfiels & Washeries Ltd.

13.01.2006

Maharastra

P

Sponge Iron

Tata Sponge Iron Ltd

07.02.2006

Orissa

P

Sponge Iron

Scaw Industries Ltd

07.02.2006

Orissa

P

Sponge Iron

SPS Sponge Iron Ltd

07.02.2006

Orissa

P

Sponge Iron

Essar Power Ltd.

12.04.2006

Madhya Pradesh

P

Power

18

19.5

Mahan Bundu

Private / Government

115

144.2

Hindalco Industries

12.04.2006

Madhya Pradesh

P

Power

Rungta Mines Limited

25.04.2006

Jharkhand

P

Sponge Iron

Rungta Mines Limited

25.04.2006

Orissa

P

Sponge Iron

OCL India Ltd.

25.04.2006

Orissa

P

Sponge Iron

102.52

Non Producing

27th (1/3/2005)

Non Producing

25th

Non Producing

27th (1/3/2005)

210

Ocean Ispat Ltd.

25.04.2006

Orissa

P

Sponge Iron

Sova Ispat Limited

06.12.2007

West Bengal

P

Sponge Iron

121

Jaibalaji Sponge Ltd.

06.12.2007

West Bengal

P

Sponge Iron

122

II. Government Dispensation

The following coal blocks have been allotted under Government Dispensation to the Central Govt. & State Govt. Companies, after obtaining approval of the competent authority. Sl. No.

Block allocated

Name of the Company

Date of Allotment

State

Government

End -Use

Geological Reserves (in MT)

Current Status Non- Producing

1

Tara

Chhattisgarh Mineral Development Corporation Limited

14.08.2003

Chhattisgarh

G

Commercial

259.47

2

Namchi Namphuk

Arunachal Pradesh Mineral Dev. Corporation

28.10.2003

Arunachal Pradesh

G

Commercial

27

3

Pakri-Barwadih

NTPC

11.10.2004

Jharkhand

G

Power

4

Trans Damodar

West Bengal Mineral Dev. Trading. Corp.

14.01.2005

West Bengal

G

Commercial

1600 103.15

Producing Non- Producing Producing

5

Barjora (North)

Damodar Valley Corporation

03.03.2005

West Bengal

G

Power

85.49

Producing

6

Kagra Joydev

Damodar Valley Corporation

03.03.2005

West Bengal

G

Power

196.15

Non- Producing

7

Kasta (East)

Damodar Valley Corporation

03.03.2005

West Bengal

G

Power

105

8

Tadicherla - I

Andhra Pradesh Power Generation Corpn. Ltd.

06.12.2005

Andhra Pradesh

G

Power

61.28

Non Producing

9

Mahal

Rashtriya Ispat Nigam Limited

09.12.2005

Jharkhand

G

Sponge Iron

1098.5

Deallocated on 07.03.2011

10

Amelia

Madhya Pradesh State Mining Corporation

12.01.2006

Madhya Pradesh

G

Commercial

214.41

Non Producing

11

Amelia (North)

Madhya Pradesh State Mining Corporation

12.01.2006

Madhya Pradesh

G

Commercial

101.24

Non Producing

12

Talaipali

NTPC

25.01.2006

Jharkhand

G

Power

965

Non Producing

Deallocated in May

Coal Insights, September 2012

63


Annexure Sl. No.

Block allocated

Name of the Company

Date of Allotment

State

Government

End -Use

Geological Reserves (in MT)

Current Status

13

Kerandari

NTPC

25.01.2006

Jharkhand

G

Power

229

Deallocated on 14.06.2011

14

Chatti Bariatu

NTPC

25.01.2006

Jharkhand

G

Power

243

Deallocated on 14.06.2011

15

Dulanga

NTPC

25.01.2006

Orissa

G

Power

260

Non Producing

16

Brahmini

NTPC +CIL JV

25.01.2006

Jharkhand

G

Power

1900

Deallocated on 14.06.2011

17

Chichro Patsimal

NTPC +CIL JV

25.01.2006

Jharkhand

G

Power

356

Deallocated on 14.06.2011

18

Sugia Closed mine

Jharkhand State Mineral Development Corporation

30.01.2006

Jharkhand

G

Commercial

2

Non Producing

19

Rauta Closed mine

Jharkhand State Mineral Development Corporation

30.01.2006

Jharkhand

G

Commercial

1

Non Producing

20

Burakhap small patch

Jharkhand State Mineral Development Corporation

30.01.2006

Jharkhand

G

Commercial

2.5

Non Producing

2122

Mahanadi Machhakata

GSECL

06.02.2006

Orissa

G

Power

480

Non Producing

MSEB

06.02.2006

Orissa

G

Power

720

23

Parsa

Chhattisgarh State Electricity Board

02.08.2006

Chhattisgarh

G

Power

150

Non Producing

24

Gare Pelma, Sector I

Chhattisgarh Mineral Development Corporation Limited

02.08.2006

Chhattisgarh

G

Commercial

900

Non Producing

25

Gare Pelma, Sector II

Maharastra State Mining Corpn.

02.08.2006

Chhattisgarh

G

Power

768

Non Producing

Tamil Nadu State Electricity Board

02.08.2006

Chhattisgarh

G

Power

26

Morga-I

Madhya Pradesh State Mining Corporation Limited

02.08.2006

Chhattisgarh

G

Commercial

250

Non Producing

27

Morga II

GMDC

02.08.2006

Chhattisgarh

G

Commercial

350

Non Producing

28

Gomia

MMTC

02.08.2006

Jharkhand

G

Commercial

355

Non Producing

29

Pindra- DebipurKhaowatand

Jharkhand State Mineral Development Corporation

02.08.2006

Jharkhand

G

Commercial

110

Non Producing

30

Saria Koiyatand

Bihar Rajya Khanij Vikas Nigam (BRKVN) Patna.

02.08.2006

Jharkhand

G

Commercial

202

Non Producing

31

Jainagar

Gujarat Mineral Development Corporation (GMDC)

02.08.2006

Jharkhand

G

Commercial

100

Deallocated in 2008

32

Rajbar E&D

Tenughat Vidyut Nigam Limited

02.08.2006

Jharkhand

G

Power

385

Non Producing

33

Banhardih

Jharkhand State Electricity Board

02.08.2006

Jharkhand

G

Power

400

Deallocated on 14.06.2011

34

Latehar

Jharkhand State Mineral Development Corporation

02.08.2006

Jharkhand

G

Commercial

220

Non Producing

35

Dongeri Tal-II

Madhya Pradesh State Mining Corporation (MPSMC)

02.08.2006

Madhya Pradesh

G

Commercial

175

Non Producing

36

Marki-Zari-JamaniAdkoli

Maharastra State Mining Corpn.

02.08.2006

Maharastra

G

Commercial

11

Non Producing

NCT of Delhi, Delhi

02.08.2006

Madhya Pradesh

G

Power

477.5

Non Producing

37

Mara II Mahan

Haryana Power Generation Generation Corp Ltd (HPGCL)

02.08.2006

G

Power

477.5

Orissa Mining Corporation

02.08.2006

Orissa

G

Commercial

38

Nuagaon Telisahi

Andhra Pradesh Mineral Development (APMDC) Hyderabad

02.08.2006

Orissa

G

Commercial

39

Ichhapur

West Bangal Mineral Dev. Trading. Corp.

02.08.2006

West Bengal

G

40

Kulti

West Bangal Mineral Dev. Trading. Corp.

02.08.2006

West Bengal

G

4142

Chendipada, Chendi II

UPRVUNL

25.07.2007

Orissa

G

CMDC

25.07.2007

Orissa

G

MAHAGENCO

25.07.2007

Orissa

G

Power

294.5

64 Coal Insights, September 2012

733

Non Producing

Commercial

335

Non Producing

Commercial

210

Non Producing

Power

794.5

Non Producing

Power

500


Annexure Sl. No.

Block allocated

Name of the Company Kerala State Elec. Board

43

Baitarni West

Date of Allotment 25.07.2007

State Orissa

Government

End -Use

G

Power

Geological Reserves (in MT)

Current Status

200.66

Non Producing

Orissa Hydro Power Generation Cor

25.07.2007

Orissa

G

Power

200.66

Gujarat Power Generation Corp

25.07.2007

Orissa

G

Power

200.66

Assam Mineral Dev. Cor

25.07.2007

Orissa

G

Power

300

Meghalaya Mineral Dev. Corp

25.07.2007

Orissa

G

Power

300

Tamil Nadu State Electricity Board

25.07.2007

Orissa

G

Power

300

Non Producing

44

Mandakini B

Orissa Mining Corporation

25.07.2007

Orissa

G

Power

300

45

Chhati Bariatu South

NTPC

25.07.2007

Jharkhand

G

Power

354

Deallocated on 14.06.2011

46

Saharpur Jamarpani

Damodar Valley Corporation

25.07.2007

Jharkhand

G

Power

600

Deallocated on 14.06.2011

47

Manoharp ur

Orissa Power Generation Corporation

25.07.2007

Orissa

G

Power

181.68

Non Producing

48

Dipside Manoharpur

Orissa Power Generation Corporation

25.07.2007

Orissa

G

Power

350

Non Producing

49

Naini

GMDC

25.07.2007

Orissa

G

Power

500

Non Producing Non Producing

50

Urma Paharitora

PIPDICL

25.07.2007

Orissa

G

Power

JSEB

25.07.2007

Jharkhand

G

Power

437

BSMDCL

25.07.2007

Jharkhand

G

Power

263

51

Patratu

Jharkhand State Mineral Development Corporation

25.07.2007

Jharkhand

G

Commercial

450

Non Producing

52

Rabodih OCP

Jharkhand State Mineral Development Corporation

25.07.2007

Jharkhand

G

Commercial

133

Non Producing

53

Jaganathpur A

West Bangal Mineral Dev. Trading. Corp.

25.07.2007

West Bengal

G

Commercial

273

Non Producing

54

Jaganathpur B

West Bangal Mineral Dev. Trading. Corp.

25.07.2007

West Bengal

G

Commercial

176

Non Producing

55

Suliyari

APMDC

25.07.2007

Madhya Pradesh

G

Commercial

75

Non Producing

56

Marki Barka

Madhya Pradesh State Mining Corporation (MPSMC)

25.07.2007

Madhya Pradesh

G

Commercial

80

Non Producing

57

Shankarpur Bht II

Chhattisgarh Mineral Development Corporation Limited

25.07.2007

Chhattisgarh

G

Commercial

80.13

Non Producing

58

Morga III

Madhya PradeshSMCL

25.07.2007

Chhattisgarh

G

Commercial

35

Non Producing

59

Morga IV

Madhya PradeshSMCL

25.07.2007

Chhattisgarh

G

Commercial

35

Non Producing

60

Sondhia

Chhattisgarh Mineral Development Corporation Limited

25.07.2007

Chhattisgarh

G

Commercial

70

Non Producing

61

Semaria/Piparia

Madhya Pradesh State Mining Corporation (MPSMC)

25.07.2007

Madhya Pradesh

G

Commercial

38.62

Non Producing

62

Sahapur East

National Mineral Dev. Corp

25.07.2007

Madhya Pradesh

G

Commercial

42

Non Producing

63

Sahapur West

National Mineral Dev. Corp

25.07.2007

Madhya Pradesh

G

Commercial

42

Non Producing

64

Bicharpur

Madhya Pradesh State Mining Corporation (MPSMC)

25.07.2007

Madhya Pradesh

G

Commercial

36

Non Producing

65

Mandla South

Madhya Pradesh State Mining Corporation

25.07.2007

Madhya Pradesh

G

Commercial

72

Non Producing

66

Agarzari

MSMCL

25.07.2007

Maharastra

G

Commercial

137

Deallocated on 28.06.2010

67

Warora

MSMCL

25.07.2007

Maharastra

G

Commercial

73

Non Producing

68

Parsa East

RRVUNL

25.06.2007

Chhattisgarh

G

Power

180

Non Producing

69

Kanta Basan

RRVUNL

25.06.2007

Chhattisgarh

G

Power

180

Non Producing

Coal Insights, September 2012

65


Annexure Sl. No.

Block allocated

Name of the Company

Date of Allotment

State

Government

End -Use

Geological Reserves (in MT)

Current Status

210

Non Producing

70

Sitarampur

West Bengal Mineral Dev. Trading Corp.

27.12.2007

West Bengal

G

Commercial

71

Gare Pelma Sector III

Goa Industrial Development Corporation

12.11.2008

Chhattisgarh

G

Power

210.2

Non Producing

72

East of Damogoria (Kalyaneshwari)

West Bengal Power Development Corporation Limited (WBPDCL)

27.02.2009

West Bengal

G

Power

337

Deallocated on 21.10.2011

III. 33rd / 34th Screening Committee

The following coal blocks are allotted in pursuance of the recommendations of the 33rd Screening Committee meeting held on 31st August - 2nd September, 2006 and 34th Screening meeting held on 7th -8th September, 2006 and in the meeting held on 22nd September, 2006, after obtaining approval of the competent authority. Sl. No. 1

Block allocated

Name of the Company

Date of Allotment

State

Private / Government

End -Use

Geological Reserves (in MT)

Current Status

Kosar Dongergaon

Chaman Metaliks Ltd.

20.02.2007

Maharastra

P

Sponge Iron

22.51

Non Producing

2

Biharinath

Bankura DRI Mining Manufacturers Co. Pvt. Ltd.

20.02.2007

West Bengal

P

Sponge Iron

95.16

Non Producing

3

Chakla

Essar Power Generation Ltd.

20.02.2007

Jharkhand

P

Power

83.05

Non Producing

4

Jitpur

Jindal Steel & Power Ltd.

20.02.2007

Jharkhand

P

Power

81.09

Non Producing

5

Warora West (North)

Bhatia International Ltd.

20.02.2007

Maharastra

P

Sponge Iron

10

Deallocated on 30.05.2011

6

Anesttipali

Andhra Pradesh Power Generation Corpn. Ltd.

20.02.2007

Andhra Pradesh

G

Power

26.89

Deallocated on 30.05.2011

7

Punkula-Chilka

Andhra Pradesh Power Generation Corpn. Ltd.

20.02.2007

Andhra Pradesh

G

Power

38.11

Deallocated on 30.05.2011

8

Sitanala

Steel Authority of India Ltd.

11.04.2007

Jharkhand

G

Steel

108.8

Non Producing

9

Penagaddppa

Andhra Pradesh Power Generation Corpn. Ltd.

29.05.2007

Andhra Pradesh

G

110.87

Deallcoated on 30.05.2011

10

Sial Ghoghri

Prism Cement Limited

29.05.2007

Madhya Pradesh

P

Cement

30.38

Non Producing

11

Ravanwara Noth

SKS Ispat Limited

29.05.2007

Madhya Pradesh

P

Sponge Iron

174.07

Non Producing

12

Brahampuri

55.05

Non Producing

189

Non Producing

Power

Pushp Steel and Minining Ltd.

16.07.2007

Madhya Pradesh

P

Sponge Iron

Hindalco

01.08.2007

Jharkhand

P

Power

13

Tubed

Tata Power Ltd

01.08.2007

Jharkhand

P

Power

14

Mandla North

Jaipraskash Associates Ltd

17.09.2007

Madhya Pradesh

P

cement

194.96

Non Producing

15.*

Jogeshwar & Khas Jogeshwar

Jharkhand State Mineral Development Corporation Ltd.

11.04.2008

Jharkhand

G

Commercial

84.03

Non Producing

16

Choritand Tailiaya

Non Producing

17

Rohne

18

Lohara (East)

19

Tenughat-Jhirki

20

Mednirai

Rungta Mines Limited

14.05.2008

Jharkhand

P

Sponge Iron

18.7

Sunflag Iron Steel Ltd

14.05.2008

Jharkhand

P

Sponge Iron

8.72

JSW Steel Ltd.

05.06.2008

Jharkhand

P

Sponge Iron

172.53

Bhushan Power & Steel Ltd.

05.06.2008

Jharkhand

P

Sponge Iron

60.23

Jai Balaji Industries Ltd

05.06.2008

Jharkhand

P

Sponge Iron

17.23

Murli Industries Ltd.

27.06.2008

Maharashtra

P

Cement

11.96

Grace Industries Ltd.

27.06.2008

Maharashtra

P

Sponge Iron

16.14

Rashtriya Ispat Nigam Limited

10.09.2008

Jharkhand

G

Steel

215.756

Deallocated on 07.03.2011

80.83

Non Producing

Rungta Mines Limited

28.05.2009

Jharkhand

P

Power

Kohinoor Steel (P) Ltd.

28.05.2009

Jharkhand

P

Sponge Iron

Non Producing

Deallocated on 17.05.2010

* Initially not recommended by the Screening Committee, but allotted subsequently to JSMDCL in pursuance of orders of Hon’ble Supreme Court.

66 Coal Insights, September 2012


Annexure IV. 35th Screening Committee

The following coal blocks are allotted in pursuance of the recommendations of the 35th Screening Committee in its meetings held on 20th- 23rd June, 2007, 30th July, 2007 and 13th September, 2007, after obtaining approval of the competent authority. Sl. No. 1

Block allocated

Name of the Company

Date of Allotment

State

Private / Government

End -Use

Geological Reserves (in MT)

Current Status

Ashok Karkatta Central

Essar Power Ltd.

06.11.2007

Jharkhand

P

Power

110

Non Producing

2

Patal East

Bhushan Power and Steel Ltd.

06.11.2007

Jharkhand

P

Power

200

Non Producing

3

Sayang

AES Chhattisgarh Energy Pvt. Ltd

06.11.2007

Chhattisgarh

P

Power

150

Non Producing

4

DurgapurI I/Sarya

DB Power Ltd.

06.11.2007

Chhattisgarh

P

Power

91.67

Non Producing

5

DurgapurI I/Taraimar

Balco

06.11.2007

Chhattisgarh

P

Power

211.37

Non Producing

6

Lohara West Extn.

Adani Power Ltd

06.11.2007

Maharastra

P

Power

169.832

Non Producing

Monet Ispat and Energy Ltd

09.01.2008

Orissa

P

Power

96.84

Non Producing

Jindal Photo Ltd

09.01.2008

Orissa

P

Power

96.84

7

Mandakini

8

Seregarha

9

Mahuagarhi

10

11-12

13

14

Amarkonda Murgadangal

Rampia & Dip Side of Rampia

Fatehpur East

Fatehpur

15

Ganeshpur

16

Gourangdih ABC

Tata Power Company Ltd

09.01.2008

Orissa

P

Power

96.84

Arcelor Mittal India Ltd

09.01.2008

Jharkhand

P

Power

83.33

GVK Power (Govindwal Sahib) Ltd

09.01.2008

Jharkhand

P

Power

66.67

CESC Ltd

09.01.2008

Jharkhand

P

Power

110

Non Producing

Jas Infracture Capital Pvt Ltd

09.01.2008

Jharkhand

P

Power

Jindal Steel and Power Ltd

17.01.2008

Jharkhand

P

Power

205

Non Producing

Gagan Sponge Iron Pvt. Ltd

17.01.2008

Jharkhand

P

Power

205

Sterlite Energy Ltd. (IPP)

17.01.2008

Orissa

P

Power

112.22

GMR Energy (IPP)

17.01.2008

Orissa

P

Power

112.22

Arcelor Mittal India Ltd.. (CPP)

17.01.2008

Orissa

P

Power

84.16

Lanco Group Ltd. (IPP)

17.01.2008

Orissa

P

Power

112.22

Navbharat Power Pvt. Ltd. (IPP)

17.01.2008

Orissa

P

Power

112.22

Reliance Energy Ltd. (IPP)

17.01.2008

Orissa

P

Power

112.22

JLD Yavatmal Energy Ltd

23.01.2008

Chhattisgarh

P

Power

99.12

R.K.M. Powergen Pvt. Ltd

23.01.2008

Chhattisgarh

P

Power

99.12

Visa Power Ltd

23.01.2008

Chhattisgarh

P

Power

99.12

Green Infrastructure Pvt Ltd

23.01.2008

Chhattisgarh

P

Power

99.12

Vandana Vidyut Ltd

23.01.2008

Chhattisgarh

P

Power

53.52

SKS Ispat and Power Ltd

06.02.2008

Chhattisgarh

P

Power

73.85

Non Producing

Non Producing

Non Producing

Non Producing

Prakash Industries Ltd

06.02.2008

Chhattisgarh

P

Power

46.15

Tata Steel Ltd.

28.05.2009

Jharkhand

P

Power

137.88

Non Producing

Adhunik Thermal Energy Ltd.

28.05.2009

Jharkhand

P

Power

Himachal EMTA Power Ltd.

10.07.2009

West Bengal

P

Power

68.85

Non Producing

JSW Steel Ltd.

10.07.2009

West Bengal

P

Power

68.85

Coal Insights, September 2012

67


Annexure V. 36th Screening Committee

The following Coal Blocks are allotted in pursuance of the recommendations of 36th Screening Committee in its meetings held on 7th - 8th December, 2007, 7th - 8th February, 2008 and 3rd July, 2008, after obtaining approval of the competent authority. Sl. No.

Block allocated

Name of the Company

Date of Allotment

State

Private / Government

End -Use

Geological Reserves (in MT)

Current Status

1

Kesla North

Rathi Udyog Ltd.

05.08.2008

Chhattisgarh

P

Sponge Iron

36.15

Non Producing

2

Macherkunda

Bihar Sponge Iron Ltd.

05.08.2008

Jharkhand

P

Sponge Iron

23.86

Non Producing

3

Tandsi III & Tandsi III (Extn.)

Mideast Intergrated Steels Ltd.

05.08.2008

Madhya Pradesh

P

Steel

17.39

Non Producing

4

Bikram

Birla Corporation Ltd.

12.08.2008

Madhya Pradesh

P

Cement

20.98

Non Producing

5

Datima

6

Rajhara North (Central & Eastern)

7

8

9

10

Gondkhari

Thesgora B/ Rudrapuri Bhaskarpara

Bander

11

Khappa & Extn.

12

Rajgamar Dipside (South of Phulakdih Nala)

13

14

15

Dahegaon/ Makardhokra IV

Andal East

Moira-Madhujore

Binani Cement Ltd.

05.09.2008

Chhattisgarh

P

Cement

13.3

Deallocated on 27.04.2010

Mukund Limited

20.11.2008

Jharkhand

P

Steel

10.05

Non Producing

Vini Iron & Steel Udyog Limited

20.11.2008

Jharkhand

P

Steel

7.04

Maharashtra Seamless Limited

21.11.2008

Maharashtra

P

Sponge Iron

29.91

Dhariwal Infrastructure (P) Ltd.

21.11.2008

Maharashtra

P

Sponge Iron

23.93

Kesoram Industries Ltd.

21.11.2008

Maharashtra

P

Cement

44.87

Kamal Sponge Steel & Power Limited

21.11.2008

Madhya Pradesh

P

Sponge Iron

30.67

Revati Cement P. Ltd.

21.11.2008

Madhya Pradesh

P

Cement

14.37

Electrotherm (India) Ltd.

21.11.2008

Chhattisgarh

P

Sponge Iron

24.69

Grasim Industries Ltd.

21.11.2008

Chhattisgarh

P

Sponge Iron

22.22

AMR Iron & Steels Pvt. Ltd.

29.05.2009

Maharashtra

P

Steel

31.53

Century Textiles & Industries Ltd.

29.05.2009

Maharashtra

P

Cement

47.29

J.K.Cement Ltd.

29.05.2009

Maharashtra

P

Cement

47.29

Sunflag Iron Steel Ltd

29.05.2009

Maharashtra

P

Steel

53.6

Dalmia Cement (Bharat) Ltd.

29.05.2009

Maharashtra

P

Cement

31.12

Monet Ispat and Energy Ltd

03.06.2009

Chhattisgarh

P

Steel

49.93

Topworth Steel Pvt. Ltd.

03.06.2009

Chhattisgarh

P

Sponge Iron

11.77

IST Steel & Power Ltd

17.06.2009

Maharashtra

P

Steel & Sponge Iron

70.74

Gujarat Ambuja Cement Ltd.

17.06.2009

Maharashtra

P

Cement

36

Lafarge India Pvt. Ltd.

17.06.2009

Maharashtra

P

cement

25.26

Bhushan Steel Ltd.

03.07.2009

West Bengal

P

Steel

237.23

Jai Balaji Industries Ltd.

03.07.2009

West Bengal

P

Sponge Iron

229.5

Rashmi Cement Ltd.

03.07.2009

West Bengal

P

Sponge Iron

233.27 685.39

Ramswarup Lohh Udyog Ltd.

06.10.2009

West Bengal

P

Steel & Sponge Iron

Adhunik Corporation Ltd

06.10.2009

West Bengal

P

Sponge Iron

Uttam Galva Steels Ltd.

06.10.2009

West Bengal

P

Steel & Sponge Iron

Howrah Gases Ltd.

06.10.2009

West Bengal

P

Sponge Iron

68 Coal Insights, September 2012

Non Producing

Non Producing

Non Producing

Non Producing

Non Producing

Non Producing

Non Producing

Non Producing

Non Producing


Annexure Sl. No. 15

Block allocated Moira-Madhujore

16

Urtan North

17

Rajgamar Dipside (Deavnara )*

18

Vijay Central **

Name of the Company

Date of Allotment

State

Private / Government

End -Use

Geological Reserves (in MT)

Vikas Metal & Power Ltd.

06.10.2009

West Bengal

P

Steel & Sponge Iron

ACC Ltd.

06.10.2009

West Bengal

P

Cement

Jindal Steel & Power Ltd

12.10.2009

Madhya Pradesh

P

Sponge Iron

46.55

Monet Ispat and Energy Ltd

12.10.2009

Madhya Pradesh

P

Sponge Iron

23.27

API Ispat & Powertech Pvt. Ltd.

14.10.2011

Chhattisgarh

P

Sponge Iron

20.34

CG Sponge Manufacturers Consortium Coalfield Pvt. Ltd.

14.10.2011

Chhattisgarh

P

Sponge Iron

58.12

Coal India Limited

01.11.2011

Chhattisgarh

G

-

40.67

SKS Ispat & Power Ltd.

01.11.2011

Chhattisgarh

P

Sponge Iron

16.08

Current Status

Non Producing

Non Producing

Non Producing

* A letter contemplating allocation of above block calling for options regarding the mining by the joint allocatees was issued on 22.02.2010. However, on account of change in the constituents of M/s CG Sponge Manufacturers Consortium Coalfields Pvt Ltd., the final allocation was issued on 14.10.2011 after examination of the issues arising therefrom. ** The Screening Committee has recommended for allotment of this coal block to M/s Prakash Industries Ltd and M/s SKS Ispat & Power Ltd. However, due to litigation in the Hon’ble High Court of Delhi, the coal block could not be allotted. The coal block was finally allotted to Coal India Limited as leader who would provide the share of coal to M/s SKS Ispat & Power Ltd. The Screening Committee meeting was held on 29/6/2011 in pursuance of the orders of Hon’ble Delhi High Court in Contempt case (c) No. 420 of 2011 of W.P. No. 6449/2006. The Screening Committee met again on 4.10.2011 in pursuance of orders of Hon’ble High Court of Delhi on 28.9.2011 in the above case.

VI. UMPP

The following coal blocks are allotted for Ultra Mega Power Projects on the recommendations of the Ministry of Power, after obtaining approval of the competent authority. Sl. No.

Block allocated

Name of the Company

Date of Allotment

State

Private / Government/ UMPP

End -Use

Geological Reserves (in MT)

Current Status

1

Meenakshi

Power Finance Corporation Orissa UMPP

13.09.2006

Orissa

UMPP

Power

285.24

Non Producing

2

Meenakshi B

Power Finance Corporation Orissa UMPP

13.09.2006

Orissa

UMPP

Power

250

Non Producing

3

Dip side of Meenakshi

Power Finance Corporation Orissa UMPP

13.09.2006

Orissa

UMPP

Power

350

Non Producing

4

Moher

Power Finance Corporation Sasan UMPP

13.09.2006

Madhya Pradesh

UMPP

Power

402

Non Producing

5

Moher- Amlori Extn

Power Finance Corporation Sasan UMPP

13.09.2006

Madhya Pradesh

UMPP

Power

198

Non Producing

6

Chhatrasal

Power Finance Corporation Sasan UMPP

26.10.2006

Madhya Pradesh

UMPP

Power

150

Non Producing

7

Kerandari BC

Power Finance Corporation Tilaiya UMPP Jharkhand

20.07.2007

Jharkhand

UMPP

Power

972

Non Producing

8

Bhivkund

MAHAGENCO (M/s Aurangabad Co.Ltd., SPV)

17.07.2008

Maharashtra

UMPP

Power

100

Non Producing

9

Mourya

Karanpura Energy Ltd. (SPV of JSEB)

26.06.2009

Jharkhand

UMPP

Power

225.35

Non Producing

10

Puta Parogia

Akaltara Power Ltd. (SPV of Chhattisgarh UMPP)

09.09.2009

Chhattisgarh

UMPP

Power

692.16

Non Producing

11

Pindrakhi

Akaltara Power Ltd. (SPV of Chhattisgarh UMPP)

09.09.2009

Chhattisgarh

UMPP

Power

421.51

Non Producing

12

Bankhui

Sakhigopal Integrated Power Company Ltd. (SPV of first additional Orissa UMPP)

21.06.2010

Orissa

UMPP

Power

800

Non Producing

Coal Insights, September 2012

69


Tear along the dotted line

70 Coal Insights, September 2012 Tear along the dotted line




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.