CHAPEL STREET DOCUMENTATION PACKAGE

PRODUCED BY: EDWARD ROBINSON

CHAPEL STREET DOCUMENTATION PACKAGE

1



ACKNOWLEDGMENT We would like to acknowledge that we are situated on the traditional land of the Boonwurrung and Wurundjeri people an offer our respects to their elders past and present. We recognise and respect the cultural heritage of this land.

CHAPEL STREET DOCUMENTATION PACKAGE

3


4

CHAPEL STREET DOCUMENTATION PACKAGE


CONTENTS ACKNOWLEDGMENT

DESIGN PROPOSAL 2

INTRODUCTION INTRODUCTION, PRIORITY ISSUES

7

INFORMATION ABOUT SITE THE BROADER CONTEXT

8 9

22

LANDSCAPE LAYOUT PLAN

23

RENDERED VISUALISATION

24

DESIGN DOCUMENTATION DRAWINGS

DISTRICT GREEN POLITICS OF STREETS 10 DISTRICT GREEN - PRJOECT PANORAMIC

ACTIVITY ZONING PROPOSAL

11

THE EXSISTING SITE

GENERAL ARRANGEMENT PLAN

25

SITE PROTECTION AND REMOVAL PLAN

26

HARDSCAPE AND MATERIAL PLAN MATERIAL PLAETTE

27 28

EXISTING SITE CONTEXT MAP

13

SITE SURROUNDINGS MAP

14

TREE PLANTING PLAN

29

CIRCULATION MAP

15

SHRUB PLANTING PLAN

30

GRADING MAP

16

SHRUB PLANTING PLAN 1 : 50

31

SHRUB PLANTING SCHEUDLE / INSTRUCTIONS

32

TREE PLANTING SCHEDULE

33

RE GRADING PLAN

34

HYDROLOGICAL FLOW / DRAINAGE PLAN

35

ENVIRONMENTAL ANALYSIS HYDROLOGICAL FLOW MAP

17

WSUD/STORM WATER DRAIN LOCATIONS

18

VEGETATION COVERAGE MAP

19

TREE COVERAGE MAP

20

CHAPEL STREET DOCUMENTATION PACKAGE

5


HYDROLOGICAL FLOW / DRAINAGE PLAN 1:50

36

SECTIONAL ELEVATION

37

SECTIONAL ELEVATION

38

CONSTRUCTION DRAWIGS PAVEMENT CONSTRUCTION PLAN

39

PAVEMENT CONSTRUCTION SECTIONS

40

MEDIAN STRIP AND WSUD CONSTRUCTION SECTIONS

41

TREE PLANTING INSTRCUTION

42

6

CHAPEL STREET DOCUMENTATION PACKAGE


1

INTRODUCTION

CHAPEL STREET DOCUMENTATION PACKAGE

7


INTRODUCTION

PRIORITY ISSUES

DESIGN PRINCIPALS

1.1 OVERVIEW

Increase CIRCULATION

The report's priorities are based on Reclaiming streets for shared spaces through the Politics of Streets area of interest. It looks to improve the handling of the urban water runoff in this 'hot point' as identified in the previous Chapel Street Master plan report and improve the shared space prioritises and tree canopy cover experienced on the street. The design principles outlined in the Chapel Street Master plan 2021 report have been used as guidelines while preparing this summary and The March Issue: Public Space Diagnostic report. Both identify streets' policies as an area for improvement regarding the lack of WSUD locations and initiatives within this section of Chapel Street, South Yarra.

WSUD PRINCIPALS

in

avaubillity

of

pavements

and

Accessibility bike

paths,

redcued

through widing

vechile

of

parking

Integrate stormwater treatment into the landscape. reduce peak flows on-site employing temporary storage measures and minimise impervious areas

Promote open space areas through the the widening of footpaths and the restriction of cars. SIGHT LINES:

STORM WATER POINTS

URBAN FABRIC:

ECOLOGICAL DESIGN

Reallocation of space available to pedestrians, via the removing of strategic carparks as well as pedestrianising key locations.

Through wsud increase the amount and canopy of existing and new trees and increase in the variety of endemic species.

Public through PUBLIC REALM

TREE CANOPY

8

CHAPEL STREET DOCUMENTATION PACKAGE

agency

and

increased

Community greening

of

health space


1.2 INFORMATION ABOUT THE SITE The larger study area is part of the City of Stonnington municipality and is the traditional country of the Woi Wurrung and Boon wurrung peoples. Their connection with the landscape has evolved according to factors such as climate change, resource availability, and cultural change throughout this long history. As identified in Stonnington's Indigenous History, the study zone is an important Aboriginal site in the municipality. The ravine near the junction of Toorak Road and Chapel Street was an Aboriginal campsite set in tea-tree scrub, which was used by Aboriginal people visiting from Gippsland. The location is now unfamiliar and unrecognisable with Western culture and urban structure placed on it. Major connecting streets into Chapel street include Malven and Commercial Road on the South and Toorak Road on the Northside. Streets parallel to this section of Chapel street are Surry road on the east side and Osbourne street on the West; both are makers for the boundary extent for the study zone as well as connections to areas with critical public facilities such as the house commissions South Yarra train station and access to Prahran market via Elizbeth street. The majority of landmark points on Chapel street are situated to the South of our field of investigation. However, three key strategic development sites exist between Malvern rd and Toorak rd, creating an exciting opportunity for site intervention. These sites are The Jam Factory, The Horace Petty Estate, and the Prahran Market. In addition, former light industrial sites in the side streets surrounding the Jam Factory precinct have been identified as potential redevelopment areas. Within the activity centre boundary, the only existing open space is limited to the North-Eastern point of Simmons street.

CHAPEL STREET DOCUMENTATION PACKAGE

9


1.3 IMASTER PLAN SUMMARY DISTRICT YELLOW - GRAFFITI RIVER Graffiti River seeks to remedy the high levels of graffiti removed in the city of Stonnington, through the creation of communal street art areas to enrich and integrate the urban fabric of Chapel St. This takes the form of a ‘river’ that winds through the street, ending at Oxford street, which has been pedestrianised and converted into an area of local creative expression. It also acts as a vegetated buffer zone, preventing cars from Chapel St access to the residents of Oxford St.

DISTRICT BLUE - PUBLIC REALM The public agency interface explores how the public realm can support demographic shifts and trends by providing accessible platforms offering agency to the populace. Enabling direct feedback and flowing on to foster the culture and identity of the area. Bolstering the health and diversity of the community.

DISTRICT GREEN - STORM WATER + TREE CANOPY INTERFACE The stormwater and tree canopy interface utilises the stormwater drains in the highest density area to capture, filter, trans-locate and use to create an increase in biodiversity through development in endemic vegetation and increase and continued support to the tree canopy or green spine network that is currently fractured in this section of Chapel Street.

DISTRICT ORANGE - STREET CULTURE INTERFACE The Street Culture Interface connects the high end retail district of Chapel street with street culture by removing cars from Grey street, creating a space for users to express themselves through ‘sliding sports’. The design aims to connect different user groups through either participation or as a spectacle.

DISTRICT PINK - CIRCULATION INTERFACE Circulation interface aims to reappropriate space for safer sustainable transport. The removal of on street parking along chapel street has provided various opportunity to increase the usability of the space. Re-designed intersections and road allocations promote safer circulation for cyclists and pedestrians to promote a decrease in car use.

10

CHAPEL STREET DOCUMENTATION PACKAGE


Shared space reprioritised to serve pedestrians and cyclists.

Increased canopy cover throughout the intervention

Stormwater drainage points utilised in WSUD installs.

Carparking spaces given reoccupation to water recycling to help canopy and vegetation growth spaced throughout

1.4 DISTRICT GREEN POLITICS OF STREETS THE district green combines the need for public realm increases in green space with the expanded use of WSUD, which would run on the North-South axis through the site providing water runoff filtration. With opportunities to increase the residents' overall wellbeing through the 'greening of the urban fabric. With the increased tree canopy cover as part of the WSUD system, the heat island effect will be mitigated along with improving the overall community mental health and wellbeing as suggested and researched as part of the 202020 vision report ' Where are all the trees?' With the increase of parklets and the reduction of parking spaces brought about by the pandemic, the permanent removal of selected parking spots will increase the pavement width and incorporate the new WSUDs along the stretch of the district.

Existing tree pits upgraded to incorporate new stormwater routes

A mix of endemic species used in swales and WSUD points

CHAPEL STREET DOCUMENTATION PACKAGE

11


1.4 DISTRICT GREEN - PRJOECT PANORAMIC COMMERICAL ROAD

TOORAK ROAD

WEST VIEW ORIENTAL TEA HOUSE

GROSVENER STREET

CLIFF STREET

FITZGERALD STREET

TRAM STOP

TOORAK ROAD

GARDEN STREET

BRIDIE 0'REILYS PUB

PLAZA WILSON STREET

TRAM STOP

12

CHAPEL STREET DOCUMENTATION PACKAGE

MALVERN ROAD

EAST VIEW ELLIS STREET

TEMPERNCE HOTEL


2

EXISTING SITE

CHAPEL STREET DOCUMENTATION PACKAGE

13


Bench

Service pole

Pedestrian crossing button Steps

Bin

Tactile Paving

Tram Track

Service Covers

Sign and Bike Ring

Fencing

Storm water drain

DISTRICT GREEN - Politics of Streets

14

CHAPEL STREET DOCUMENTATION PACKAGE

Contour Line

Tram Stop

Street Lamp

Street Tree Alfresco Dining

Building

Pre cast concrete pavers

Asphalt road

Asphalt pavement

Concrete road / Tram way

Concrete gutter Curb - Concrete and Bluestone

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

001

Bluestone block wall 400mm high

001

NORTH


Bench

Service pole

Pedestrian crossing button Steps

Bin

Tactile Paving

Tram Track

Service Covers

Sign and Bike Ring

Fencing

Storm water drain

SITE SURROUNDINGS DISTRICT GREEN - Circulation

Contour Line

Tram Stop

Street Lamp

Street Tree Alfresco Dining

Building

Pre cast concrete pavers

Asphalt road

Asphalt pavement

Concrete road / Tram way

Concrete gutter Curb - Concrete and Bluestone

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

001

Bluestone block wall 400mm high

001

NORTH

CHAPEL STREET DOCUMENTATION PACKAGE

15


Service Covers Bench

Service pole

Bin

Tactile Paving Fencing Storm water drain

Service Covers Sign and Bike Ring

Bench

Service pole

Tactile Paving

Bin

Storm water drain Fencing

Sign and Bike Ring Service Covers

Tram Track Pedestrian crossing Contour button Line Steps

Tram Track

Bench

Service pole

Contour Line Pedestrian crossing button Steps

Bin

Tactile Paving

Tram Track

Sign and Bike Ring

DISTRICT GREEN - Circulation

Storm water drain

DISTRICT GREEN - Circulation

16

Pedestrian crossing button Steps

Fencing

CHAPEL STREET DOCUMENTATION PACKAGE

Contour Line

Tram Stop

Street Lamp

Pre cast concrete pavers

Street Tree Alfresco Tram Stop Dining

Street Tree

Alfresco Dining Tram Stop

Bluestone block wall 400mm high Concrete gutter

Curb - Concrete and Bluestone

Building

Street Lamp

Street Tree Alfresco Dining

Curb - Concrete and Bluestone

Asphalt Concrete road pavement / Tram way Pre cast Asphalt road concrete pavers

Building Street Lamp

Concrete gutter

Asphalt road

Asphalt pavement

Concrete road / Tram way

Pre cast concrete pavers

Asphalt road

DRAWING NUMBER:Concrete 001

MAY 2021

ISSUED:

DRAWN BY:

E.ROBINSON

SHEET:

CHECKED BY:

E. ROBINSON

SCALE:

BuildingDATE:

pavement

Concrete gutter Curb - Concrete and Bluestone

Asphalt 2020-013

PROJECT NUMBER:

Bluestone block wall 400mm high

road / Tram way

Bluestone block wall 400mm high

001

ENVIRO 4

1/01

NORTH

1:200 @ A3

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

001

001

001

001

NORTH


3.33% 3.33%

3.33% 3.33%

13000 1300

1:30 1:30 3.33% 3.33%

1:30 1:30

3.33% 3.33%

3.33% 3.33% 2.0% 2.0%

2.0% 2.0%

RL12100 RL12100 + +

2.0% 2.0%

1:8

1:8

1:30 1:30

TF1300 TF1300 + +

BF12000 BF12000 + +

12000 1200

2.0% 2.0%

1:30 1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:8

2.0% 2.0%

1:8

1:8

+SB11800 +SB11800 +ST126060 +ST126060

2.0% 2.0%

2.0% 2.0%

2.0% 2.0%

1:8

1:8

RL11800 RL11800 + +

2.0% 2.0% BW11800 BW11800 + +

TW13300 TW13300 + +

2.0% 2.0%

2.0% 2.0%

1:30 1:30 1:30 1:30

RL11800 RL11800 + +

Service ServiceCovers Covers

Fencing Fencing

Bench Bench

Service Servicepole pole

Pedestrian Pedestriancrossing crossing button button Steps Steps

Bin Bin Service Covers Sign Signand andBike BikeRing Ring Bench Relative RelativeLevel Level Bin

Tactile TactilePaving Paving Fencing Storm Stormwater waterdrain drain Service pole Top TopofofWall Wall Tactile Paving

Tram Track Tram Track crossing Pedestrian button Contour Line Contour Steps Line Top TopofofFence Fence Tram Track

TW13300 TW13300 + +

Sign and Bike Ring

DISTRICT DISTRICTGREEN GREEN--Circulation Circulation

DISTRICT GREEN - Grading Circulation

Storm water drain

TF1300 TF1300 + +

Contour Line

Tram TramStop Stop

Street StreetLamp Lamp

Pre Precast cast concrete concrete pavers pavers

Street StreetTree Tree Tram Stop Alfresco Alfresco Dining Dining +ST126060 +ST126060

Street Tree

Top TopofofSeat Seat Alfresco Dining

Asphalt Asphalt pavement Pre cast pavement concrete pavers

Street Lamp Building Building 1:30 2.0% 2.0%

Cross CrossFall Fall

BW11800 BW11800 + +

Building

Concrete Concretegutter gutter

Asphalt Asphaltroad road

Curb Curb- -Concrete Concrete and andBluestone Bluestone

Concrete Concreteroad road / /Tram Tramway way Asphalt road

Bottom BottomofofWall Wall

BF12000 BF12000 + +

Asphalt pavement

Bottom BottomofofFence Fence

Bluestone Bluestoneblock blockwall wall 400mm high Concrete gutter 400mm high

Concrete road / Tram way

PROJECT NUMBER: PROJECT NUMBER:

2020-013 2020-013

DRAWING NUMBER: DRAWING NUMBER:

DATE: DATE:

MAY 2021 MAY 2021

ISSUED: ISSUED:

ENVIRO 4 ENVIRO 4

DRAWN BY: DRAWN BY:

E.ROBINSON E.ROBINSON

SHEET: SHEET:

CHECKED BY: CHECKED BY: PROJECT NUMBER:

E. ROBINSON E. ROBINSON 2020-013

SCALE: SCALE: DRAWING NUMBER:

1/01 1/01 1:200 @ A3 1:200 @ A3 001

Curb - Concrete Bottom ofofSeat Bottom Seat and Bluestone

+SB11800 +SB11800

Bluestone block wall 400mm high

001 001

001

001

001

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

NORTH NORTH

NORTH

CHAPEL STREET DOCUMENTATION PACKAGE

17


HYDROLOGICAL FLOW A WIDER VIEW OF THE HYDROLOGIAL FLOW

A map of a broader view of the surrounding landscape and its projected overfall hydrological flow on a macro scale. The site highlighted by the dashed box.


ED. ROBINSON

Tree pit

URBAN ECOLOGY WSUD , STREET TREE AND STORM WATER DRAIN LOCATIONS

WSUD

District Green

Open Soil

The municipal tree canopy and vegetation coverage encompassing Chapel Street and its surroundings are, in some locations, linear and united in its design and implementation. However, there are locations with little to no urban tree canopy coverage either through unsuitability of land or death and damage of the street tree locales. In turn, leaving pockets of trees creating small ‘oasis’ type patches within a high urban heat index area leading to heat extremes and vulnerabilities of the remaining tree canopy. Further analysis of the stormwater runoff drainage locations and, as shown, lack of design intercepts reveal vast opportunities in supplementing rainwater and street swales throughout the site. These two factors combined reduce the potential for biodiversity, either exotic or native species. The connection and improvement of both these conditions would likely lead to an increase in biodiversity within the chapel street sector. CHAPEL STREET DOCUMENTATION PACKAGE

19


NATASHA BURGESS

20

CHAPEL STREET DOCUMENTATION PACKAGE

VEGETATION COVERAGE PERCENTAGE COVER OF TOTAL VEGETATION


ED. ROBINSON

TREE COVERAGE PERCENTAGE COVER FOR TREES

CHAPEL STREET DOCUMENTATION PACKAGE

21


3 22

DESIGN PROPOSAL

CHAPEL STREET DOCUMENTATION PACKAGE


3.33%

3.33%

13000

1:30 3.33%

1:30

3.33%

3.33% 2.0%

2.0%

2.0%

2.0%

RL12100 + TF1300 +

BF12000 +

12000

1:30

1:30

1:30

1:30

1:30

1:30

+SB11800 +ST126060

2.0%

2.0%

2.0%

2.0% RL11800 +

2.0% BW11800 +

Service Covers

Service pole

Bench

Service Bin Covers

Fencing Tactile Paving

Sign and Bike Ring Bench

Storm water drain Service pole

Pedestrian crossing Tram Track button Steps Contour Line

Bin

Tactile Paving

Tram Track

Storm water drain

Sign and Bike Ring RL11800 +

Relative Level

TW13300 +

Top of Wall

ACTIVITY ZONING PROPOSAL DISTRICT GREEN - Circulation

Tram Stop

Pedestrian crossing button Steps

Fencing

Top of Fence

Tram Stop

Street Lamp

Pre cast concrete pavers

Street Lamp Building

Alfresco Dining Street Tree

Alfresco Dining +ST126060

Top of Seat

Building

2.0%

Cross Fall

BW11800 +

Curb - Concrete and Bluestone

PreAsphalt cast pavement concrete pavers

Concrete road Asphalt road / Tram way

Asphalt pavement

Concrete road / Tram way

Concrete Bluestonegutter block wall 400mm high Curb - Concrete and Bluestone

BF12000 +

Bottom of Wall

Bottom of Fence

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

E. ROBINSON

Concrete gutter

Asphalt road

PROJECT NUMBER:

CHECKED BY:

DISTRICT GREEN - Circulation

2.0%

1:30 1:30

Street Tree

Contour Line TF1300 +

2.0%

TW13300 +

001

SCALE:

Bluestone block wall 400mm high +SB11800

Bottom of Seat

001

NORTH

1:200 @ A3

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

001

001

NORTH

1:200 @ A3 CHAPEL STREET DOCUMENTATION PACKAGE

23


3.33%

3.33%

13000

1:30 3.33%

1:30

3.33%

3.33% 2.0%

2.0%

2.0%

2.0%

RL12100 + TF1300 +

BF12000 +

12000

1:30

1:30

1:30

1:30

1:30

1:30

+SB11800 +ST126060

2.0%

2.0%

2.0%

2.0% RL11800 +

2.0% BW11800 +

Service Covers

Service pole

Bench

Service Covers Bin

Fencing Tactile Paving

Sign and Bike Ring Bench

Storm water Service pole drain

Pedestrian Tram Track crossing button Steps Contour Line

Bin

Tactile Paving

Tram Track

Storm water drain

Sign and Bike Ring RL11800 +

Relative Level

TW13300 +

Top of Wall

LANDSCAPE LAYOUT PLAN DISTRICT GREEN - Circulation

24

CHAPEL STREET DOCUMENTATION PACKAGE DISTRICT GREEN - Circulation

Tram Stop

Pedestrian crossing button Steps

Fencing

TF1300 +

Top of Fence

1:30

Tram Stop

Alfresco Dining

Top of Seat

TW13300 +

Pre cast concrete pavers

Street Lamp Building

Alfresco Dining Street Tree

+ST126060

2.0%

1:30

Street Lamp

Street Tree

Contour Line

2.0%

2.0%

Curb - Concrete and Bluestone

Asphalt Pre cast pavement concrete pavers

Concrete road Asphalt road / Tram way

Cross Fall

BW11800 +

Concrete gutter Bluestone block wall 400mm high Curb - Concrete and Bluestone

Asphalt pavement

Building

Concrete gutter

Asphalt road

Concrete road / Tram way

Bottom of Wall

BF12000 +

Bottom of Fence

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

001

Bluestone block wall 400mm high +SB11800

001

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

001

NORTH

001

NORTH

Bottom of Seat


SECTION RENDER

CHAPEL STREET DOCUMENTATION PACKAGE

25


3.33%

3.33%

13000

1:30 3.33%

1:30

3.33%

3.33% 2.0%

2.0%

2.0%

2.0%

RL12100 + TF1300 +

BF12000 +

12000

1:30

1:30

1:30

1:30

1:30

1:30

+SB11800 +ST126060

2.0%

2.0%

2.0%

2.0% RL11800 +

2.0%

Service Covers

Service pole

Bench Bin Service Covers Sign and Bike Ring Bench

Tactile Paving Fencing Storm water drain Service pole

Tram Track Pedestrian crossing button Contour Line Steps

Bin

Tactile Paving

Tram Track

Storm water drain

Sign and Bike Ring RL11800 +

Relative Level

TW13300 +

Top of Wall

ARRANGEMENT PLAN DISTRICT GREEN - GENERAL Circulation

26

CHAPEL STREET DOCUMENTATION PACKAGE

Tram Stop

Pedestrian crossing button Steps

Fencing

Top of Fence

Street Lamp

Street Tree Alfresco Tram Stop Dining

Street Tree

+ST126060

Top of Seat

2.0%

Cross Fall

BW11800 +

Concrete road / Tram way

Curb - Concrete and Bluestone Concrete road / Tram way

Bottom of Wall

BF12000 +

Bottom of Fence

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

2020-013

Bluestone block wall 400mm high Concrete gutter

Asphalt road

PROJECT NUMBER:

PROJECT NUMBER:

Concrete gutter Curb - Concrete and Bluestone

Asphalt pavement

Building

2.0%

Asphalt road

Asphalt pavement Pre cast concrete pavers

Building Street Lamp

Alfresco Dining

2.0%

TW13300 +

Pre cast concrete pavers

1:30 1:30

Contour Line TF1300 +

BW11800 +

DRAWING NUMBER:

001

Bluestone block wall 400mm high +SB11800

001

001

001

NORTH

Bottom of Seat


3.33%

3.33%

13000

1:30 3.33%

1:30

3.33%

3.33% 2.0%

2.0%

2.0%

2.0%

RL12100 + TF1300 +

BF12000 +

12000

1:30

1:30

1:30

1:30

1:30

1:30

+SB11800 +ST126060

2.0%

2.0%

2.0%

2.0% RL11800 +

2.0%

Service Covers

Service pole

Bench Bin Service Covers Sign and Bike Ring Bench

Tactile Paving Fencing Storm water drain Service pole

Tram Track Pedestrian crossing button Contour Line Steps

Bin

Tactile Paving

Tram Track

Storm water drain

Sign and Bike Ring RL11800 +

Relative Level

TW13300 +

Top of Wall

PROTECTION AND REMOVAL PLAN DISTRICT GREEN -SITE Circulation

Tram Stop

Pedestrian crossing button Steps

Fencing

Top of Fence

Street Lamp

Street Tree Alfresco Tram Stop Dining

Street Tree

+ST126060

Top of Seat

2.0%

Cross Fall

BW11800 +

Concrete gutter Curb - Concrete and Bluestone

Concrete road / Tram way

Bluestone block wall 400mm high Concrete gutter

Asphalt road

Curb - Concrete and Bluestone

Asphalt pavement

Building

2.0%

Asphalt road

Asphalt pavement Pre cast concrete pavers

Building Street Lamp

Alfresco Dining

2.0%

TW13300 +

Pre cast concrete pavers

1:30 1:30

Contour Line TF1300 +

BW11800 +

Concrete road / Tram way BF12000 +

Bottom of Wall

Bottom of Fence

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

001

Bluestone block wall 400mm high +SB11800

Bottom of Seat

001

NORTH

001 CHAPEL STREET DOCUMENTATION PACKAGE 001

ENVIRO 4

27


+RGP01

+RGP01

3.33%

3.33%

13000

+BP01 +TG01

+SBP01

3.33%

+RGP01

+RGP01

1:30

+BP01

+SBP01

1:30

+ASH01

+BK01

+RGP01

3.33%

3.33% +BK01

+MSG01 2.0%

+RGP01

+BK01 +MSG01 2.0%

2.0%

2.0%

RL12100 +

+MSG01 1:30

+CON01

+MSG01

+BK01

+RGP01

TF1300 +

BF12000 +

12000

+MSG01 1:30

1:30

+BK01

+BK01

+RGP01

+SBP01

+RGP01 +ASH01

+SBP01

+TG01 +TG01

+TG01

1:30

1:30

+SBP01

1:30

+BK01

+BP01

+CON01

+BP01 +SB11800 +ST126060

2.0%

2.0%

2.0%

2.0% RL11800 +

2.0%

SBP01 Sawn bluestone paverService Covers 450 x 450 x 90

BP01 Bluestone pitchers 600 x 200 x 200

Fencing Service pole

Bench

Tactile Paving Fencing

Sign and Bike Ring Bench

Storm water drain Service pole

Tram Trackcrossing Pedestrian button Contour Line Steps

Bin

Tactile Paving

Tram Track

Storm water drain

Relative Level

TW13300 +

Top of Wall

DISTRICT GREEN - Circulation DISTRICT GREEN - HARDSCAPE CirculationAND MATERIAL PLAN

28

TG01 Tactile Ground Pedestrian crossing Surface Indicators button 300 x 300 x 10 Steps

Bin Service Covers

Sign and Bike Ring RL11800 +

BK01 Bluestone Kerb 300x300mm

CHAPEL STREET DOCUMENTATION PACKAGE

Top of Fence

RGP01 MSG01 1:30 Tram Stop Raingarden pits Median Strip Garden Street Lamp Pre cast Made of several layers 1:30 Bed concrete Various sizespavers

2.0%

ASH01 Asphalt

Asphalt road

CON01 Concrete

Concrete gutter

Alfresco Dining

Top of Seat

Concrete road / Tram way Asphalt road

BW11800 Cross Fall PROJECT NUMBER: +

Bottom 2020-013

Bluestone block wall Concrete gutter 400mm high

Curb - Concrete and Bluestone

Asphalt pavement

Building

2.0%

Curb - Concrete and Bluestone

Asphalt Pre cast pavement concrete pavers

Street Lamp Building

Street Tree

+ST126060

TW13300 +

2.0%

Street Tree

Tram Stop Alfresco Dining

Contour Line TF1300 +

BW11800 +

Concrete road / Tram way

BF12000 of Fence of Wall DRAWING +NUMBER:Bottom 001

Bluestone block wall 400mm high +SB11800

001

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

PROJECT NUMBER: CHECKED BY:

2020-013 E. ROBINSON

DRAWING SCALE: NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

DRAWN BY:

E.ROBINSON

SHEET:

001

NORTH

0011:200 @ A3

001

NORTH

001 ENVIRO 4

NORTH

Bottom of Seat


HARD SURFACE MATERIALITY PALETTE ASHO101 All material selections are apprised from the City of Stonnington Chapel Street Palette; the pavement materiality consists of bluestone sawn pavers of a uniformed size and thickness. Creating unity throughout and rectifying the notable use of mixed material is likely from previous iterations and repair works. Located at the crossing points and tram stops, Tactile Ground Surface Indicators (TGSI) will be inlaid with the pavement aiding in the safe use by the visually impaired. In addition, the median strips and rain garden pits are kerbed in the same material (Bluestone Kerb) used a the kerbing along the pavement edge. This was chosen as most of the kerb material that currently exists through the site is the bluestone kerb; new asphalt of a colour will be poured as the new bike lane is constructed. The surfaces of the rain gardens are constructed of four layers as per instructions, with the median strip beds being top laid with a suitable long term mulch.

MSG01

SBP01

POURED COLOURED ASPHALT

MEDIAN STRIP KERBING

SAWN BLUESTONE PAVERS

120MMDEPTH

300 x 300 x 1000

450 X 450 X 90

BP01

TG01

BK01

BLUESTONE PITCHERS

TACTILE GROUND SURFACE INDICATORS

BLUESTONE KERB

600 X 200 X 200

300 x 300 x 10

300 x300 x 1000

RGP01 RAIN GARDEN KERBING 300 x 300 x 10

CHAPEL STREET DOCUMENTATION PACKAGE

29


N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

1300

Eucalyptus leucoxylon 'Rosea' Red Flowering Yellow Gum x8 Common Name Foliage Form Mature Family Genus Species

Red Flowering Yellow Gum Evergreen Oval Size 2-15 x 7m Myrtaceae Eucalyptus Leucoxylon

DISTRICT GREEN

30

TREE PLANTING PLAN

CHAPEL STREET DOCUMENTATION PACKAGE

Eucalyptus polyanthemos Red Box x7

Common Name Foliage Form Mature Size Family Genus Species

Red Box Evergreen Oval 10-15 x 5m Myrtaceae Eucalyptus Polyanthemos

Exsisting Street tree Melia azedarach China Berry x7

Common Name Foliage Form Mature Size Family Genus Species

White Cedar, China Berry Deciduous V-Shaped 10 x 8m Meliaceae Melia Azedarach

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

001

001

NORTH

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

+MSG01


+RGM01

N +3.30

+RGM01

+MSM01

+MSM01

N +3.30

N +3.30

+RGM01

+MSM01

+MSG01

+RGM01

+RGM01

N +3.30

N +3.30

N +3.30

N +3.30

+MSM01

RAIN GARDEN MIX (RGM01) Mix of low and moderate maintenance species:

MEDIAN STRIP MIX (MSM01) Mix of low and moderate maintenance species:

Up to 25% moderate maintenance plants and at least 50% primary species. The remaining plants made up of low maintenance secondary species.

Up to 50% moderate maintenance plants and at least 50% primary species.

Suggested group: • 25% Carex appressa • 25% Ficinia nodosa • 10% Dianella longifolia • 15% Donea viscosa • 15% Myoporum parvifolium • 10% Correa 'dusky bells'

DISTRICT GREEN

+MSM01

+MSM01

+MSM01

+RGM01

+RGM01

+RGM01

+RGM01

+MSM01

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

N +3.30

+RGM01

+RGM01

N +3.30

N +3.30

1300

SHRUB PLANTING PLAN

Suggested group: • 50% Lomandra species • 50% Dianella Revoluta

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

001

001

NORTH

CHAPEL STREET DOCUMENTATION PACKAGE

31


N +3.30

N +3.30

+RGM01

RGM01+

RGM01+

+RGM01 Bench

Service pole

Pedestrian crossing button Steps

Bin

Tactile Paving

Tram Track

Service Covers

+MSM01

Sign and Bike Ring

Fencing

Storm water drain

PLANTING PLAN DISTRICT GREEN - Circulation

32

CHAPEL STREET DOCUMENTATION PACKAGE

Contour Line

Tram Stop

Street Lamp

Street Tree Alfresco Dining

Building

Pre cast concrete pavers

Asphalt road

Asphalt pavement

Concrete road / Tram way

Concrete gutter Curb - Concrete and Bluestone Bluestone block wall 400mm high

MSM01+

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @@ A3 A3 1:50

001

001

NORTH


RGMO1 - MIX Primary Species

Secondary Species lla long ane i Di

a

ia fol

pp rex A ress Ca

Common Name: Tall Sedge Size at maturity (HXW): 1.5-1.2 x 0.5-1m Recommended density: 10/m2

D

od

Common Name: Knobby Club Rush Size at maturity (HXW): 0.5 -1 x 0.5 -1m Recommended density: 10/m2

My

Common Name: Sticky Hop Bush Size at maturity (HXW): 1-3 x 1-3 m m Recommended density: 1/m2

rum par vi

iu fol

o op

m

Common Name: Creeping Boobialla Size at maturity (HXW): 0.2 x 1.5-5m Recommended density: 2/m2

a 'Dusky B rre

s' ell

Co

Common Name: Smooth Flax Lily Size at maturity (HXW): 0.5-1 x 1m Recommended density: 8/m2

onaea Visc

osa

ia nodos

a

in Fic

Common Name: Dusky Bells Size at maturity (HXW): 0.45 x 2 m Recommended density: 2-3 / m2

MSMO1 - MIX

ol

dra Longif an

ia

Common Name: Spiny Head Mat Rush Size at maturity (HXW): 1-2 x 1-2m Recommended density: 10/m2

Secondary Species Dia

Primary Species Lom

PLANTING PALETTE: SHRUBS

ne

evo lla r luta Common Name: Blue Flax Lily Size at maturity (HXW): 0.6 x 0.5m Recommended density: 8/m2

CHAPEL STREET DOCUMENTATION PACKAGE

33


PLANTING PALETTE: TREES

Eucalyptus leucoxylon 'Rosea' Red Flowering Yellow Gum Common Name Foliage Form Mature Size Family Genus Species

34

Red Flowering Yellow Gum Evergreen Oval 12-15 x 7m Myrtaceae Eucalyptus Leucoxylon

CHAPEL STREET DOCUMENTATION PACKAGE

Eucalyptus polyanthemos Red Box Common Name Foliage Form Mature Size Family Genus Species

Red Box Evergreen Oval 10-15 x 5m Myrtaceae Eucalyptus Polyanthemos

Melia azedarach White Cedar, China Berry Common Name Foliage Form Mature Size Family Genus Species

White Cedar, China Berry Deciduous V-Shaped 10 x 8m Meliaceae Melia Azedarach


3.33% 3.33%

3.33%

1300 3.33%

N +3.30

13000

N +3.30

1:30 3.33%

1:30 1:30

3.33%

1:30

N +3.30

N +3.30

3.33% 3.33%

3.33%

2.0% 2.0%

2.0%

1:8

RL12100 + RL12100 +

N +3.30

2.0%

TF1300 BF12000 + + TF1300 +

1200 N +3.30

2.0%

2.0%

BF12000 +

12000

N +3.30

2.0% 2.0%

3.33% 1:8

1:30

1:30

1:30

1:30 1:30

1:30

1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:30

+MSG01

1:30

1:30

1:30

2.0% 2.0%

1:8

1:8

2.0% 2.0%

2.0% 2.0%

2.0%

N +3.30

N +3.30

N +3.30

N +3.30

+SB11800 +SB11800 +ST126060 +ST126060

1:8

N +3.30

1:30

2.0%

1:8

1:8 2.0%

1:30 1:30

Service Covers

RL11800 RL11800 ++

Bench

Service pole

Bin Service Covers

Fencing Tactile Paving

SignBench and Bike Ring

Storm water drain Service pole

Relative Bin Level

TW13300 TW13300 + +

Top of Wall Tactile Paving

Sign and Bike Ring

DISTRICT DISTRICTGREEN GREEN- Circulation Re- Grading DISTRICT GREEN - Circulation

Storm water drain

Tram Stop

Pedestrian crossing button Steps

Fencing

TF1300 TF1300 + +

Top of Fence Tram Track Contour Line

+ST126060 +ST126060

Top of Seat Alfresco Dining

Pre cast concrete pavers

2.0%

2.0%

2.0%

1:30 2.0%

Curb - Concrete and Bluestone

Cross Fall Building

Concrete road / Tramroad way Asphalt

Bottom of Wall

BW11800BW11800 + +

Asphalt pavement

Concrete gutter

Asphalt road

Asphalt Pre cast pavement concrete pavers

Street Lamp Building

2.0%

RL11800 +2.0%

1:30

Street Lamp

Tram Stop Alfresco Dining Street Tree

RL11800 + BW11800 TW13300 BW11800 +TW13300 + + +

1:30

Street Tree

Pedestrian Tram Track crossing button Steps Line Contour

2.0%

Bottom of Fence

BF12000 BF12000 + +

Bluestone block wall Concrete gutter 400mm high Curb - Concrete and Bluestone Bottom of Seat

+SB11800 +SB11800

Concrete road / Tram way

PROJECT NUMBER: 2020-0132020-013 PROJECT NUMBER:

DRAWINGDRAWING NUMBER:NUMBER: 001

DATE: DATE:

MAY 2021 MAY 2021

ISSUED: ISSUED:

ENVIRO 4ENVIRO 4

DRAWNDRAWN BY: BY:

E.ROBINSON E.ROBINSON

SHEET: SHEET:

1/01

CHECKED BY: CHECKED BY: PROJECT NUMBER:

E.2020-013 ROBINSON E. ROBINSON

SCALE: SCALE: DRAWING NUMBER:

001

001

001

Bluestone block wall 400mm high

001

1/01

NORTHNORTH

1:200 1:200 @ A3 001 @ A3

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

NORTH

CHAPEL STREET DOCUMENTATION PACKAGE

35


3.33%

3.33%

1300 N +3.30

N +3.30

1:30 3.33%

1:30 N +3.30

N +3.30

3.33%

3.33% 2.0%

2.0% RL12100 +

B

1:8

1:8

2.0%

TF1300 +

BF12000 +

N +3.30

1200

2.0%

N +3.30

N +3.30

A

B

1:30

1:30

1:30

1:30

1:30 1:30

1:30 1:30

1:30 1:30

1:30

+MSG01

1:30

1:30

2.0%

1:8

N +3.30

N +3.30

N +3.30

N +3.30

1:8

N +3.30

1:30

+SB11800 +ST126060

1:8

2.0%

2.0%

2.0%

A

1:8

1:8

RL11800 +

2.0% BW11800 +

2.0%

2.0%

TW13300 +

1:30 1:30

Service Covers

Service pole

Bench

Tactile Paving

Bin RL11800 +

Sign and Bike Ring

TW13300 +

Storm water drain

Tram Stop

Pedestrian crossing button Steps

Fencing

TF1300 +

Pre cast concrete pavers

Street Tree

Tram Track +ST126060

Contour Line

Street Lamp

Alfresco Dining

1:30 2.0%

BW11800 +

Building

PROJECT NUMBER: DATE:

DISTRICT GREEN GRADING AND DRAINAGE PLAN DISTRICT GREEN - Circulation

36

CHAPEL STREET DOCUMENTATION PACKAGE

Curb - Concrete and Bluestone

Asphalt pavement

2020-013 MAY 2021

Concrete gutter

Asphalt road

Concrete road / Tram way

BF12000 +

DRAWING NUMBER:

001

DRAWN BY: PROJECT NUMBER:

E.ROBINSON 2020-013

SHEET: DRAWING NUMBER:

CHECKED BY: DATE:

ROBINSON MAYE.2021

SCALE: ISSUED:

DRAWN BY:

E.ROBINSON

SHEET:

1:200 1/01 @ A3

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @ A3

001

Bluestone block wall 400mm high

001 ENVIRO 4

ISSUED:

+SB11800

001 1/01

1:200 ENVIRO 4 @ A3

NORTH NORTH


3.33%

1:30 N +3.30

N +3.30

3.33%

3.33% 1:8

2.0%

1:8

RL12100 + BF12000 +

1200

Bench

Service pole

Pedestrian crossing button Steps

Bin

Tactile Paving

Tram Track

Service Covers

1:30

Sign and Bike Ring

Fencing

Storm water drain

AND DRAINAGE PLAN DISTRICT GREEN - GRADING Circulation

Contour Line

Tram Stop

Street Lamp

Street Tree Alfresco Dining

Building

Pre cast concrete pavers

Asphalt road

Asphalt pavement

Concrete road / Tram way

Concrete gutter Curb - Concrete and Bluestone

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @@ A3 A3 1:50

001

Bluestone block wall 400mm high

1:30

001

NORTH

CHAPEL STREET DOCUMENTATION PACKAGE

37


SECTIONAL ELEVATION 01

1800

900 300

A

Bench

Service pole

Pedestrian crossing button Steps

Bin

Tactile Paving

Tram Track

Service Covers

Fencing

Sign and Bike Ring

Storm water drain

3600

ELEVATION 01 DISTRICT GREEN -SECTIONAL Circulation

38

CHAPEL STREET DOCUMENTATION PACKAGE

Contour Line

TPD01

Tram Stop

Street Lamp

Street Tree Alfresco Dining

Building

Pre cast concrete pavers

Asphalt road

Asphalt pavement

Concrete road / Tram way

Curb - Concrete and Bluestone

CMS01 1400

1500

Concrete gutter

Bluestone block wall 400mm high

A

RGC01

6000

1550

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:501:200 @ @A3A3

001

001

NORTH


SECTIONAL ELEVATION 02

Bench

Service pole

Pedestrian crossing button Steps

Bin

Tactile Paving

Tram Track

Service Covers

B

Sign and Bike Ring

Fencing

Storm water drain

CLP01

3600

ELEVATION 02 DISTRICT GREEN - SECTIONAL Circulation

Contour Line

1400

Tram Stop

Street Lamp

Street Tree Alfresco Dining

Building

Pre cast concrete pavers

Asphalt road

Asphalt pavement

Concrete road / Tram way

Curb - Concrete and Bluestone

TS01

6000

1550

Concrete gutter

Bluestone block wall 400mm high

B

BS01

1550

PROJECT NUMBER:

2020-013

DRAWING NUMBER:

DATE:

MAY 2021

ISSUED:

ENVIRO 4

DRAWN BY:

E.ROBINSON

SHEET:

1/01

CHECKED BY:

E. ROBINSON

SCALE:

1:200 @@ A3 A3 1:50

001

001

NORTH

CHAPEL STREET DOCUMENTATION PACKAGE

39


CONSTRUCTION DRAWINGS 600 x 300 Bluestone pavers Refer to Bluestone Specification for laying instructions (BS01) Oriental Teahouse FALL

0

50

400 X 400 TGSI Laid on 25mm bedding mix

1600

1:8 FALL

KERB FLUSH WITH CHANNEL

FALL

1:8 FALL FALL

FALL

65

0

FALL

KERB - Bluestone CHANNEL - Bluestone Gutter stone

1600

KERB FLUSH WITH CHANNEL

40

CHAPEL STREET DOCUMENTATION PACKAGE

CONSTRUCTION PLAN LAYOUT PAVEMENT PLAN 1 :30 @ A3

CLP01


400

300

12 mm Joint spacing

300

Bluestone Bluestone Pavers finish Pavers flushfinish flush with TSGI'S with TSGI'S

400

400

600 x 300 Bluestone pavers Refer to Bluestone Specification for laying instructions (BS01)

400 x 400 400 x 65mm x 400TSGI x 65mm Pavers TSGI Pavers 300mm Bluestone 300mm Bluestone gutter stone gutter stone flush with roadside flush withand roadside TSGISand TSGIS

TACTILE GROUND SURFACE INDICATORS PLAN 1 :20 @ A3

01

BLUESTONE PAVER LAYOUT PATTERN PLAN 1 :20 @ A3

02

12MM Joint 600 x 300 Bluestone pavers 50

50MM Mortar setting mix 150 150

150MM Poured concrete 150MM Compacted aggregate 400 x 400 400 x 65xTSGI 400 xPavers 65 TSGI laidPavers on laid on 30mm dry 30mm mix mortar dry mix bedding mortar bedding Compacted subgrade

600 CONSRUCTION DRAWING BLUESTONE PAVING SCALE 1 :20 @ A3

BS01

50MM

150M 150M

150

150

50

Butt- Joined Butt- Finish Joined flush - Finish with flush with paving paving 400 x 400 x 65 TSGI Pavers laid on 50MM MORTAR 50MM MORTAR SETTING SETTING 30mm dry mix mortar bedding

12M

150

150MM POURED 150MM POURED CONCRETE CONCRETE 150MM COMPACTED 150MM COMPACTED AGGREGATE AGGREGATE ButtJoined - Finish flush with

150

150

50MM Mortar setting mix 400

00

95

paving COMPACTED COMPACTED SUB-GRADE SUB-GRADE

300

150MM Poured concrete 150MM Compacted aggregrate Compacted subgrade Bluestone Pavers finish flush with TSGI'S

CONSRUCTION DRAWING TACTILE SURFACE GROUND INDICATORS SCALE 1 :20 @ A3

TS01

CHAPEL STREET DOCUMENTATION PACKAGE

41


Modified Kerb and Flat channel Water inlet Road

Over flow pipe connected to storm water system via perforated pipe Pavement

150 150

300

Mulch 75mm max Filter and plant media Fine layer filter medium Drainage layer

300

Soil matrix Cast in situ concrete surround

CONSTRUCTION SECTION MEDIAN STRIP PLAN 1 :20 @ A3

CMS01

Refer to Landscape plan for planting pattern and species. tree planting details refer TPD01

600

Mulch Geo textile root barrier Filter and plant media 150 150

1200

780

Blue Stone retainer kerbs

Fine layer filter medium Drainage layer Soil matrix Root Ball / Top soil mix min Depth 1m Over flow pipe connected to storm water system via perforated pipe

42

CHAPEL STREET DOCUMENTATION PACKAGE

CONSTRUCTION SECTION RAIN GARDEN PIT PLAN 1 :30 @ A3

RGC01


Refer to planting palette fro Tree species

Staking required for 6 months. Do not penetrate rootball. 300 min deep imported topsoil as specified Mulch Geo textile root barrier Filter and plant media Fine layer filter medium Drainage layer Soil matrix Planting hole to be 2 x the width and 1.5 x the depth of rootball. Break up sides and base of hole with crow bar to aid root and moisture penetration.

Tree root ball to be placed on 300mm deep lightly compacted premium garden soil. Top of root ball to be 20mm below finished surface level.

TREE PLANTING CONSTRUCTION PLAN 1 :30 @ A3

TPD01

CHAPEL STREET DOCUMENTATION PACKAGE

43


44