4 minute read

Feedforward: Not as popular as expected, again

Allan Kern, APC Performance LLC

Feedforward and feedback: Multivariable control, like single-loop control, can be accomplished primarily with feedback control and selective (not wholesale) use of feedforward.

Advertisement

M

More

All control engineers learn about feedforward early in their education and careers. It is not complicated and has the potential to reject process disturbances seamlessly, such that there is no impact on the controlled variable. Not even the best-tuned feedback controllers can do that.

In feedforward control, a process disturbance is measured and translated into a change in controller output, which is implemented in phase with the disturbance, so the output rejects the disturbance, and the controlled variable continues on unaffected, essentially oblivious to this behind-the-scenes help.

Without feedforward, the same process disturbance would upset the controlled variable, resulting in a process deviation (error) from setpoint, and requiring feedback control action to reject the disturbance over time, usually using the well-known proportional-integralderivative (PID) algorithm. This is the inherent limitation of feedback: It requires process error to work; feedforward has the potential to prevent error in the first place. Feedforward is a powerful tool and a fundamental process control concept that almost every process controller in the process industry supports. However, less than 5% of all installed control loops take advantage of feedforward capability. Why is such a powerful and available tool used so sparingly?

Process industry values reliability: Feedforward adds risk

The experience of feedforward in industry over the past 50 to 75 years tells us that industrial process operation places very high value on reliability. Feedforward, for all its virtue, adds cost, risk and maintenance to a control loop. It adds

cost because feedforward inputs and models (output translations) have to be provided. It adds risk because performance becomes dependent on the reliability of the additional inputs and models, with models in particular having proven to be generally problematic and unreliable. Feedforward adds maintenance of the inputs and the models, and performance issues become more difficult to troubleshoot and diagnose, compared to a PID loop by itself. Meanwhile, PID feedback control performance, without feedforward, is almost always considered satisfactory despite inherent transient error. The balance of these trade-offs over time has meant feedforward has been adopted sparingly and with great discrimination by industry. To qualify for feedforward, the inputs must be reliable, the models must be reliable and it must add significant value. In the whole process industry, one applicaKEYWORDS: Feedforward, feedback, multivariable control Less than 5% of all installed control loops throughout industry ANSWERS KEYWORDS: tion routinely meets these criteria: The textbook case of three-element boiler drum level control. In this application, the input is a routine steam flow measurement; the model is eminently robust (it has a fixed gain of 1.0 and instantaneous dynamics, take advantage of feedforward so there is no potential for either gain or dynamcapability. ic error); and the added value is high, especially as Feedforward, for all its virtue, it mitigates the difficult boiler drum “shrink and adds cost, risk and maintenance to a control loop. Model-based multivariable control (MPC) can be thought of as feedforward control on swell” effects in this critical loop. With feedforward control, the potential risk exists, if the feedforward model dynamics are not correct, to double the disturbance, rather than to steroids – it employs feedforward cancel it – or worse if the model gain is also not models for every matrix location. accurate. People often use a reduced feedforward gain to hedge this concern, however, there is no substitute for accurate and reliable model dynamics.

CONSIDER THIS

What are your control loops doing right now? ONLINE

If reading from the digital edition, click on the headline for more resources. www.controleng.com/magazine

History repeats itself: Model-based multivariable control

The experience of model-based multivariable control (MPC) since the 1980s has emphasized these historical lessons of single-loop feedforward.

Figure 1: In classic 3-element drum level control, steam flow serves as feedforward to the level control, so that feedwater flow immediately compensates for changes in steam demand. This is a common/popular use of feedforward in industry, especially due to its simple feedforward model, which has a gain of 1.0 and instantaneous dynamics. Graphics courtesy: APC Performance LLC

Figure 2: Fired heater temperature control, with feedforward based on inlet flow and temperature, is a good example of feedforward in principle, but it is rarely used due to the difficulty of knowing the feedforward models (first-order plus deadtime (FOPDT)) reliably, and introducing additional transmitters into a critical control loop. People generally would rather accept the additional transient temperature error when inlet conditions change, than accept the additional risk and maintenance of the feedforwards.

‘With feedforward control,

the potential risk exists, if the feedforward model dynamics are not correct, to double the

disturbance, rather than to

cancel it – or worse....’

MPC can be thought of as feedforward control on steroids – it employs feedforward models for every matrix location. Where process industry experience traditionally uses less than 5% feedforward models, MPC uses 100%.

Like single-loop feedforward before it, expectations were initially high that MPC would solve process control performance reliability once and for all. Instead, it took support and maintenance to levels not previously dreamed of. The process industry continues to struggle with this today, finding MPC support and maintenance levels nearly unsustainable, but unwilling to give up on the promise of closed loop multivariable control. Fortunately, the process industry is realizing that multivariable control, just like single-loop control, can be reliably accomplished primarily with feedback control and selective (not wholesale) use of feedforward. ce Allan Kern, P.E., is owner,APC Performance LLC. Edited by Mark T. Hoske, content manager, Control Engineering, CFE Media and Technology, mhoske@cfemedia.com.