1 minute read

Axonometric Drawing

The Axonometric drawing currently in view highlights the new build elements of the the theatre. The new build consists of a new entrance foyers, along with its own honor staircase. The Expansion also includes new F&B outlets on all the levels. The F&B outlet on the ground floor is in operation during the day, allowing extra income for the theatre. The rest of the outlets are mostly operable during time of a show. The extension also happens to include several supporting facilites such as extra toilets, as well as many storage rooms for coats during the winter time

Advertisement

This article is from: