Damascus international airport's Thesis

Page 39

SWOT Analysis for examples

S w o t

Beijing Zaha Hadid

Harbin MAD

Jewel Changi S-Architects

Large skin without columns in the mid Stand more than 45 million passengers per annum

Large skin without columns in the mid Skin works as structure for building

Making forest inside main hall to add sustainable system to building Skin works as structure for building

High cost . High cost . Airport was used a lot of Airport was used a lot of spaces . spaces .

need maintenance periodically .

Airport can expansion in Airport can expansion in the future . the future .

attractive for all tourist .

Any defect in metal joint Any defect in metal joint leads to a high risk . leads to a high risk .

Any defect that spoils the environmental system of the building .

38


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.