compilation of selected Design works from 2016-2022 by
about Being born and brought up in nature’s own paradise “Kerala” I have always been closely associated with nature from childhood and wanted to be a part of it. I also earnestly yearn to create beautiful things on my own and thought that architecture can satisfy my imagination in space, materials and colour. Having followed my passion and taken architecture and studied for the past semesters, what has been engrained in us is “ the process of architecture ” (from analysis of site, concept and aspirations, connection to the context, etc…) more than the end product. We are trained to analyse the context of the design - about life styles, ways of seeing, ways of living - human behaviour etc. this contributes more to the function, about how our built environment caters and nurtures to the individual, the group and community at large. The intangibles are as important as the tangibles, which is the key design generator. We are guided to see if architecture is rooted in place, its culture and the aspirations of the society are considered during design process. The buildings have to be mired in context and not alien implants from across the seas.
contents 01. . EMBRACE RURAL RESILIENCE, 02. 10 semester. VIRIDESCENT QUIETUDE, 03. 9 semester. URBAN PLAZA, 04. INTERNSHIP -8 semester. ENVISAGING THE ETHREAL, 05. 4 semester. OTHER WORKS, 06. ILLUSTRATIONS, DETAILINGS, RENDERS. nAVAH LOUNGE,
PROFESSIONAL-PROJECT ARCHITECT
th
th
th
th
01.
NAVAH LOUNGE VIJAYWADA, aNDHRA PRADESH, india.
PRoffesional - PROJECT ARCHITECT
Invicon Navah located in Vijaywada, Andhra Pradesh Brief of this project was to re-design a lounge space which was dedicated for these residential units, there had been an exisiting proposal, since the builders were not able to achieve the numbers which they intended due to lack of community spaces, lounge..etc, so we tried understanding the old design with multiple criterias like strength, weakness, threat, opportunities.... based on the study, we concluded in designing this space. First two levels of A, B Block and the threshold between these blocks were boundaries which was given to design, by creating an axes at ground level which acts as a passage that emphasizes the axis from entry node surrounded by landscaped planters & seaters which hollistically becomes one community space was the design provided here at masterplan level. Exterior & Interior finishes of this project were treated with contrasting materials like corten steel, dark grey ips, light grey ips, rust finish paints etc...at various junctions different levels of strategies has been implemented to solve the design with logical strategies & also to achieve visual aesthetics.
Block - A Entry node
Pedestrian node Lobby
Block - B
Clubhouse node
Invicon Navah - Site Plan
Ground Floor Plan of Lounge - Old (left) and New Proposal (right)
Previous Proposal
Current Proposal
-By analysing the user behaviour based on activities, we were able to identify spaces that were required to function and also to enhance the experience, specified activities based spaces were added in new proposal. -Existing Blockworks were removed, to achieve porosity was the ultimate goal, we achieved it throughout the lobby using landscapping which created calm and serene environment.....where as the previous proposals had lot of walls that created barriers between lot of activities. -By creating a landscaped park inside a built a entity to achieve characteristics of an open park was a strong thought which constantly made us arrive at such kind of a space, also elements like sculpture typically found in an open park....staircase was designed in a way that it would resembele an artistic sculpture while looking at it visually.
Interior View Of Grand Lobby
First Floor Plan of Lounge - Old (left) and New Proposal (right)
Previous Proposal
Current Proposal
-First Floor consists of Multipurpose Hall, Business Lounge at A Block & Gym at B Block, Rustic pallete used in ground floor level were also used here to enhance the user experience, large joinerys were used here to bring in chunk amount of natural lights at walls facing facades on both the blocks. -Various types of portals were used to hightlight entrances of different rooms...at ground level most of rooms were designed using cement fibre board finished with criag & rose - rust finish paint, where at first floor most of the entrances has steel grey granite jams happing on all four sides.
Interior View Of Grand Lobby
Interior View Of Grand Lobby
Interior
Interior View Of Grand Lobby
Exterior View Of Lobby
Interior View Of Creche
Interior View Of Indoor Games Room
View Of Informal Lounge
Interior View Of Multipurpose Hall
SSL 100.75 LVL FFL 101.050
DRIVEWAY
SSL 101.125 LVL FFL 101.175
block work & joinery layout detailed drawing
450
SEATER @450MM FROM FFL
SEATER @450MM FROM FFL
4 EQUAL PARTS FG1
FG1
SD9
SD9
SD9
SD9
FG1
FG1
1250
400
450 2550
2550
2050
4240 300
PLANTER BOX - P7 @450MM FROM FFL
PLANTER BOX - P8 @450MM FROM FFL
1745 400
V1
V1
SSL 101.125 LVL FFL 101.200
900
V1
1370
V1
1300
1300
600
D7 D5
D5
D5
D7
D6 ALIGN BLOCK WORK TO REF LINE 10 EQUAL PARTS
SD8
SD8
SD8
SD8
SD8
SD8
SD8
4200
4940
3600 PLANTER BOX - P5 @450MM FROM FFL
PLANTER BOX - P4 @450MM FROM FFL 4200
600
2700
600
2700
ALIGN SEATERS TO REF LINE
SEATER - S2 @450MM FROM FFL
SEATER - S3 @450MM FROM FFL
PLANTER BOX - P9 @450MM FROM FFL 600
4200
PLANTER BOX - P2 @450MM FROM FFL
ALIGN PLANTER BOX TO WIDTH OF SHAFT
PLANTER BOX - P6 @450MM FROM FFL
ALIGN PLANTER BOX WITH COLUMN WIDTH
ALIGN SEATER TO COLUMN
SEATER - S1 @450MM FROM FFL 3860
SSL 101.275 LVL FFL 101.350
1700
EQ
EQ
EQ
SD1
480
605
480
ALIGN BLOCK WORK TO REF LINE
2370
1800 FG2
FG2
SD7
SD7
SD7
FG4
FG4
FG4
FG4
SSL 101.275 LVL FFL 101.350
SSL FFL
100.75 LVL 100.90
GROUND FLOOR BLOCKWORK & JOINERY LAYOUT
FLOOR BLOCKWORK LAYOUT scaleGROUND - nts
SCALE- 1:100
SD7
FG2
FG2
4 EQUAL PARTS
EQ SD1
SSL FFL
900
PLANTER BOX - P1 @450MM FROM FFL
2980
ALIGN BLOCK WORK TO COLUMN
ALIGN BLOCK WORK TO REF LINE SEATER - S4 @450MM FROM FFL
450
GD2
D1
ALIGN BLOCK WORK TO REF LINE
100
1800
670
BRICK JAALI TO DETAIL
370 550
1700
ALIGN WOR BEAM
595
1025
230
2350
V1
D1
V1
3000
1480
1500
800
ALIGN WOR BEAM
PLANTER BOX - P10 @450MM FROM FFL
550
100
300
1320
ALIGN BLOCK WORK TO COLUMN
W1 EQ
3000
450
SD6
EQ
350
1500
ALIGN PLANTER TO COLUMN
970
300
GD1
PLANTER BOX - P3 @450MM FROM FFL TYPE 1
100
SD8
900
4000
1700
SD8
ALIGN BLOCK WORK TO REF LINE 900
900
ALIGN BLOCK WORK TO REF LINE
SD8
ALIGN BLOCK WORK TO REF LINE
100.45 LVL 100.60
FG5
FG
SSL 100.75 LVL FFL 101.050
DRIVEWAY
architecture SCHEDULE OF JOINERY OPENING SIZE SILL LVL (MM) FROM FFL WIDTH (MM)
TYPE
RED research+design
villa b, sai anugraha, 27/1, rukmani street ext.,besant nagar, chennai - 600 090 t-044.430.33669, www.architecturered.com copyright 2021 architectureRED all rights reserved
LINTEL LVL (MM) FROM FFL
DESCRIPTION
Navah Lounge & Clubhouse
SLIDING
SD1
3000
NA
BEAM BOTTOM
1 SLIDING AND 2 FIXED PANELS
SD5
2680
NA
BEAM BOTTOM
2 EQUAL SLIDING SHUTTERS
SD5A
2680
NA
SD6
2765
NA
2 EQUAL SLIDING SHUTTERS 2300
project:
project number:
21015
client:
Invicon
2 EQUAL SLIDING SHUTTERS
SD6A
2765
NA
SD7
1650
NA
BEAM BOTTOM
4 EQUAL 2FIXED, 2 SLIDING
SD8
1260
NA
BEAM BOTTOM
10 EQUAL 6 FIXED, 4 SLIDING
SD9
1650
NA
BEAM BOTTOM
4 EQUAL 2FIXED, 2 SLIDING
FG1
1200
NA
BEAM BOTTOM
FG4
695
NA
LINTEL BOTTOM
FG5
545
NA
LINTEL BOTTOM
FG6
2445
NA
LINTEL BOTTOM
800
NA
2300 2300
2 EQUAL SLIDING SHUTTERS
mep: structural: landscape:
general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architectureRED. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the drawings shall be brought to the notice of the architects' office for clarifications. 4- all drawing units are in the metric scale
DOOR
V1
V1
D6 ALIGN BLOCK WORK TO REF LINE
V1
D5
D5
V1
D5
V1
D1
D5
D2
1000
NA
D3
1500
NA
D4
1200
NA
D5
800
NA
2300
D6
900
NA
BEAM BOTTOM
D7
1150
NA
BEAM BOTTOM
GLASS DOOR
900
2020
NA
2445
NA
GD3
2400
NA
BEAM BOTTOM
GD4
2240
NA
BEAM BOTTOM
W1
1800
900
2300
W2
1460
900
BEAM BOTTOM
GD1
ALIGN BLOCK WORK TO REF LINE
GD1 GD2
Marking & Stacking Of Bricks - Jaali Wall
2300
750 X 1100
BEAM BOTTOM
600
W2
680
TYPE 2
D2
W4
N BLOCK RK TO M B219
N BLOCK RK TO M B323
ALIGN BLOCK WORK TO REF LINE
Wall Niches
SD5
GFC
purpose of issue: 1155 590
drawn by
date of issue: revision:
LEGEND FG5
SD1
EQ
EQ
SD1
VI 05-02-2022 R3 19-12-2021
R1
27-12-2021
R2
12-01-2021
R3
05-02-2022
R4
08-06-2022
scale and north :
CD drawing title. SSL FFL
checked by
R0
sheet no.
100
ZN
EQ
570
EQ FG5
600
G5
BEAM BOTTOM
100.75 LVL 100.90
1: 100 1/2 GROUND FLOOR - BLOCK WORK & JOINERY SCHEDULE
A1.01
Granite Laying & Matching Floor Joints
drawing no.
With Planters & Seaters
P6 BOTTOM
A R
R R
500
SEATER - S1 @450MM FROM FFL
R
750
750
R
R
1500 R
750
1000
R
1500
1000
R R
R
1000 R
R
1000
1000
R
1000
R
1500
B
B
R
1000
B
750
R
R
750
R
1000
R
REF. LINE - 5 ALIGN WITH PLANTER BOX P1
1500
A B
R
1000
R
750 500
R
A
750
R R
1000
R
R
PLANTER BOX - P1 @450MM FROM FFL R
500
1500
R R
750
A
R
500
B
1500
A
R
B
B
R 500
REF. LINE - 7 REF. LINE - 6 ALIGN WITH SEATER S1
A
R
750
A
REF. LINE - 5 ALIGN WITH PLANTER BOX P1
1000
R
R
A
500
REF. LINE - 6 ALIGN WITH SEATER S1
R
R
A
R
1000
500
B
R
1500
R
R
R
A
A
1000
A
P6 BOTTOM
ALIGN REFERENCE LINE B TO COLUMN A45 REF. LINE - 7
REF. LINE - 4
REF. LINE - 4
500
R
REF. LINE - 1
REF. LINE - A
R
EQ
A B R
1000 1500
R R
EQ
A
1000 1250
R
500 EQ
R R
R 1500
A
REF. LINE - 2
SEATER 05 @450MM FROM FFL
B
R R
R
EQ
A
750
1250 1500
R
1250
EQ
EQ
EQ
EQ
REF. LINE - C
REF. LINE - B ALIGN REFERENCE LINE B TO COLUMN A45
600
REF. LINE - 3
R
A
R
500
1500 R
ALIGN WITH THIS OPENING
ALIGN WITH SEATER 05
A
R
R 1500
B ALIGN WITH SEATER 05
R
750
A
REF. LINE - 3
1250
R
REF. LINE - 2
R
B
500
R
ALIGN REFERENCE LINE B TO COLUMN A45
R
REF. LINE - 1
R
1500
A
ALIGN WITH THIS OPENING
REF. LINE - D
LAYING INSTRUCTIONS
SCALE- 1:50
ALIGN REFERENCE LINE B TO COLUMN A45 REF. LINE - 7
REF. LINE - 7
REF. LINE - 6
REF. LINE - 6
ALIGN WITH SEATER S1
ALIGN WITH SEATER S1 SEATER - S1 @450MM FROM FFL
REF. LINE - 5 ALIGN WITH PLANTER BOX P1
REF. LINE - 5 ALIGN WITH PLANTER BOX P1
PLANTER BOX - P1 @450MM FROM FFL
REF. LINE - 4
REF. LINE - 4
ALIGN WITH THIS OPENING
ALIGN WITH THIS OPENING
ALIGN REFERENCE LINE B TO COLUMN A45 SEATER 05 @450MM FROM FFL
REF. LINE - 3
REF. LINE - 3 ALIGN WITH SEATER 05
ALIGN WITH SEATER 05
REF. LINE - 2
REF. LINE - 2
REF. LINE - 1
REF. LINE - 1
REF. LINE - A
REF. LINE - C
REF. LINE - B ALIGN REFERENCE LINE B TO COLUMN A45
600
REF. LINE - D
FLOORING FINISHES SCALE- 1:50
REF. LINE-E
REF. LINE-F
REF. LINE-G
PLANTER P7
STEEL GREY GRANITE 20MM THK.
MUDHUGAL GREY GRANITE 20MM THK.
REF. LINE-H
PLANTER P8
PIGMENTED POLISHED CONCRETE
REF. LINE-16
REF. LINE-15 REF. LINE-14
GRANITE SIZES: A - 300MM X 1500MM B- 600MM X 1500MM
REF. LINE-13 REF. LINE-12
PLANTER P3
PLANTER P4
PLANTER P5
REF. LINE-11
REF. LINE-10 SEATER 02
SEATER 05
REF. LINE-9 PLANTER P2
PLANTER P6
REF. LINE-8
REF. LINE-7 REF. LINE-6
SEATER 01
REF. LINE-5
PLANTER P1
REF. LINE-4
REF. LINE-3 REF. LINE-2
SEATER 05
REF. LINE-1
REF. LINE-A
Gf grand lobby flooring layout - part01
REF. LINE-B
REF. LINE-C
REF. LINE-D
KEY PLAN
scale - nts
SCALE- NTS
architecture
900 1200
30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR
275
EQ
1500
EQ
900
1200
2420
TERRACE FFL @ +5135 MM
6MM THK MS SHEET AS PARAPET @1000 FROM TOP OF TREAD WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS
300
31 30
100
TERRACE SSL
XX 28
10MM THK MS SQUARE SOLID BAR - GAURD RAIL WELDED TO SIDE OF MS FOLDED STAIRS
21015
820
20
client:
Invicon
10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS
09
6MM THK MS FOLDED STAIRS
EQ EQ EQ EQ EQ EQ
17
16
BLOCK WORK UPSTAND general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architectureRED. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the drawings shall be brought to the notice of the architects' office for clarifications. TERRACE4-FFLall drawing units are in the metric scale
1000
900
19
900
15
14
13
11
12
20MM THK STEEL GREY GRANITE
ALIGN FINISHED EDGE OF STAIRS TO OPENING
SCALE- 1:25
project number:
landscape:
DETAIL B
PLAN @ +1700 MM FROM FFL
Navah Lounge & Clubhouse
27
30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR
275
structural:
26
THK MS SHEET AS PARAPET TREAD :6MM 275MM @1000 FROM TOP OF TREAD RISER : 165MM WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS
project:
mep: 29
275
10
11
1825
900
research+design
18
BRICK JALI SCREEN WALL
10
RED
villa b, sai anugraha, 27/1, rukmani street ext.,besant nagar, chennai - 600 090 t-044.430.33669, www.architecturered.com copyright 2021 architectureRED all rights reserved
6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER
09
04 10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS
110
900
08
450
275
07
925
275
06
275
900
05
275
900
275
550
03DETAIL A
275
85
02
275
1175/EQ
01
275
1175/EQ
275
300
275
PLAN @ +3450 MM FROM FFL SCALE- 1:25
TREAD : 275MM RISER : 165MM
6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER
17 16 15 14 6MM THK MS FOLDED STAIRS
13
6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER
18
275
275
19
20
12
900
18
08 07
1175/EQ
grand lobby flooring & ms staircase detailed drawing TOP PLANTER BOX @+825MM
DETAIL C
19
20
21
22
900
900
06
05
23
09
10
275
11
01
EQ EQ EQ EQ EQ EQ
16
15
14
DETAIL A XX
25
SCALE- 1:5
DETAIL A
31
12
13
900
1175/EQ
GROUND FLOOR FFL @+/-0MM
17
24
02
SECTION XX
SCALE- 1:25
TERRACE FFL @ +5135 MM
10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS
30
29
28
27
26
TERRACE FFL
10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS
900
550
03
275
04
31 30
TERRACE SSL
29
PLAN @ +3450 MM FROM FFL
PLAN @ +6200 MM FROM FFL
TREAD : 275MM RISER : 165MM
TREAD : 275MM RISER : 165MM
SCALE- 1:25
SCALE- 1:25
28 27
6MM THK MS FOLDED STAIRS
26
30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR
20
21
22
900
19
1000
6MM THK MS SHEET AS PARAPET @1000 FROM TOP OF TREAD WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS
20MM THK GRANITE TRAD AND RISER 18
30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR
900
BLOCK WORK UPSTAND
1000
900
DETAIL B 20MM THK STEEL GREY GRANITE
17
85
12MM THK PLY TERRACE FFL
16 15
PLANTER BOX
24
6MM THK MS FOLDED STAIRS
13 12
25
20MM THK GRANITE TRAD AND RISER
31
30
29
275
28
27
26
6MM THK MS SHEET AS PARAPET purpose of issue: @1000 FROM TOP OF TREAD GOOD FOR CONSTRUCTION WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS
6MM THK MS FOLDED STAIRS XX WELDED TO 6MM THK MS LANDING BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER
VI
drawn by
08
checked by 07
DETAIL C date of issue:
07/05/2022
revision:
TOP PLANTER BOX @+825MM
165
150
6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER
495
FRAMEWORK BUILT OF 25X25 MM MS SHC
TERRACE FFL
14
23
06
05 04
GROUND FLOOR FFL 03 02 01
PLAN @ +6200 MM FROM FFL TREAD : 275MM RISER : 165MM
SCALE- 1:25
DETAIL B
GROUND FLOOR FFL @+/-0MM
SCALE- 1:5
scale and north :
TAIL A DETAIL C SCALE1:5
SCALE- 1:5
metal staircase - plan & section
sheet no.
SECTION XX
SCALE- 1:25 drawing title.
VARIES 1/2 METAL STAIRCASE DETAILS
scale - nts
4 EQUAL COURSE WORK
ALIGN REF. LINE TO PLASTERED FIRST FLOOR LINTEL LVL.
REF. LINE A ALIGN REF. LINE TO FINS
REF. LINE C ALIGN REF. LINE TO PLASTERED COLUMN A45
11 EQUAL COURSE WORK
B A B A B A B A B A B ALIGN REF. LINE A TO 1485MM LVL. B FROM FIRST FLOOR A FFL. B A B A B A B A B A B A B A B ALIGN REF. LINE TO A PLASTERED B UPSTAND LVL. A B A B A B A ALIGN REF. LINE B TO PLASTERED A GROUND FLOOR B LINTEL LVL. A B A B A B A B NGE MS L FLANGE A LVL. ERED LINTEL LVL. @PLASTERED LINTEL B A B A B A B A B A B A B A B A B A B A
REF. LINE B ALIGN REF. LINE TO CENTER OF SD4A
REF. LINE D ALIGN REF. LINE TO PLASTERED COLUMN A45
KEY STONE / START BRICK
MS L FLANGE @PLASTERED LINTEL LVL.
PORTAL P5
PORTAL P6
PORTAL P5
MS L FLANGE @MS LINTEL BTM. L INCREASE WALL PLASTER ALIGN WITH FINISHED JAALI LVL..
PORTALP6P5 PORTAL
17 EQUAL COURSE WORK
HANDRAIL TO DETAIL
INCREASE WALL PLASTER ALIGN WITH FINISHED JAALI LVL..
10 EQUAL COURSE WORK
ALIGN WALL PLASTER TO FINISHED JAALI LVL.
KEY STONE / START BRICK
KEY STONE / START BRICK
MS L FLANGE MS L FLANGE MS L FLANGE @PLASTERED LINTEL@PLASTERED LVL. LINTEL LVL. LINTEL LVL. @PLASTERED
28 EQUAL COURSE WORK
MS L FLANGE @PLASTERED LINTEL LVL.
P1
P2 PORTALPORTAL P1
PORTAL P1
PORTAL P3
PORTAL P2
PORTALP3P2 PORTAL ALIGN WALL PLASTER TO FINISHED JAALI LVL.
PLANTER P9
PLANTER P9
BLOCK --jaali JAALI CLADDING INSTRUCTIONS aA block laying instructions
SCALE- 1:25
scale - nts
ALIGN REF. LINE TO PLASTERED FIRST FLOOR LINTEL LVL.
ALIGN REF. LINE TO 1485MM LVL. FROM FIRST FLOOR PTO FFL. MM LVL. RST FLOOR FFL.
JAALI UPTO +1485MM LVL. FROM FIRST FLOOR FFL.
MS LINTEL FRAME ANCHORED TO SLAB
MS LINTEL FRAME ANCHORED TO SLAB
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
5MM THK MS L-FLANGE WELDED TO MS LINTEL FRAME
5MM THK MS L-FLANGE WELDED TO MS LINTEL FRAME
8MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT
8MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT
PORTAL P5
JAALI UPTO +1485MM LVL. FROM FIRST FLOOR FFL.
HANDRAIL TO DETAIL
ALIGN REF. LINE TO PLASTERED UPSTAND LVL.
ALIGN REF. LINE K TO PLASTERED x130MM GROUND FLOOR GE LINTEL LVL. RED TO BEAM.
DETAIL A
DETAIL A
VE N BRICKS
12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT
12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT
ADHESIVE BETWEEN BRICKS
ADHESIVE BETWEEN BRICKS
230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT
230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.
DETAIL A
12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT. GD1.
THK BLOCK WORK UPTO M LVL. FROM FFL
R
LOCKWORK WITH HED PLANTER P3
ALIGN BLOCKWORK WITH FINISHED PLANTER P3
FFL
FFL
SCALE- 1:25
scale - nts
230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT
ADHESIVE BETWEEN BRICKS
ADHESIVE BETWEEN BRICKS
12MM THK. V BOARD DETAIL A FINISHED WITH C&R RUST PAINT.
ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
DETAIL A
50X25MM MS HORIZONTAL FRAMEWORK 5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.
12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT. GD1.
CORTEN STEEL TILE.
CORTEN STEEL TILE.
PLANTER P3
PLANTER P3
FFL
SECTION -- BJAALISECTION -B A BLOCK FRAMEWORK SCALE- 1:25 SCALE- 1:25
230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT
MS L FLANGE 5MM THK @PLASTERED LINTEL LVL. MS 100x130MM L-FLANGE ANCHORED TO BEAM.
CORTEN STEEL TILE
PORTAL P1
SECTION of portal p4
ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.
50X25MM MS HORIZONTAL FRAMEWORK
5MM THK 5MM THK MS 100x130MM MS 100x130MM MS L FLANGE L-FLANGE L-FLANGE @PLASTERED LINTEL LVL. ANCHORED TO BEAM. ANCHORED TO BEAM. 50X25MM MS 50X25MM MS HORIZONTAL FRAMEWORK. HORIZONTAL FRAMEWORK.
110(B) X 75(H) NISHIED GHT GREY PAINT
HANDRAIL TO DETAIL
ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.
CORTEN STEEL TILE
PORTAL P2
FFL
FFL
SECTION - C
SCALE- 1:25
SECTION - C
SECTION of portal p3 & p6 SCALE- 1:25
scale - nts
FFL
SECTION - D
SCALE- 1:25
SECTION - D
SCALE- 1:25
LEGEND: KEY STONE / START BRICK
PLASTER.
REF. LINE E
REF. LINE F
ALIGN REF. LINE TO CENTER OF OPENING
ALIGN REF. LINE TO WALL OFFSET
FULL BRICK
D3 WOODEN JOINERY
STRUCTURAL SLAB.
STRUCTURAL SLAB. PLASTER. REF. LINE G ALIGN REF. LINE TO CENTER OF GD1
D3
SCALE- 1:25
FFL
TO
5MM THK MS BASE PLATE ANCHORED TO SLAB. 50X50MM MS HORIZONTAL FRAMEWORK.
6MM THK PLY FINISHED WITH AS PER SPECIFICATION.
PORTAL P6 5 PORTAL P6
2MM THK MS PLATE WELDED TO MS LINTEL.
5
TO
DETAIL C
JAALI UPTO +1485MM LVL. FROM FIRST JAALI FLOORUPTO FFL. +1485MM LVL. FROM FIRST PLAN @ +4290MM LVL.FLOOR FFL. COURSE WORK -A
MS LINTEL FRAME ANCHORED TO SLAB.
DETAIL A
MS LINTEL FRAME ANCHORED TO SLAB.
12MM THK PLY SCREWED TO MS LINTEL FRAME.
MS L FLANGE ABOVE JAALI @1485MM LVL. FROM FIRST MS FLOOR FFL. ABOVE L FLANGE JAALI @1485MM LVL. FROM FIRST FLOOR FFL.
PORTAL P6
12MM GYPSUM FALSE CEILING FINISHED WITH AS PER SPECIFICATION. 50X25MM MS HORIZONTAL FRAMEWORK FINISHED WITH C&R RUST PAINT.
REFER DWG. NO. A4.13 FOR JAALI DETAILS
20MM THK STEEL GREY GRANITE JAM.
PLASTERED SLAB BTM. LVL. PLASTERED SLAB BTM. LVL.
REFER DWG. NO. A4.13 FOR JAALI DETAIL
SCALE- 1:25
50X50MM MS VERTICAL FRAMEWORK.
50X50MM MS VERTICAL FRAMEWORK.
LVL.
REF. LINE H
ALIGN REF. LINE TO PLASTERED WALL
FFL 5MM THK MS BASE PLATE ANCHORED TO SLAB. 50X50MM MS HORIZONTAL FRAMEWORK.
RESIDUE BRICK
REFER DWG. NO. A4.15 FOR HANDRAIL DETAIL
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
6MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT. 6MM THK PLY FINISHED WITH LIGHT GREY PAINT.
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
JOINERY.
12MM THK PLY SCREWED TO MS LINTEL FRAME.
JOINERY.
FIRST FLOOR FFL
20MM THK STEEL GREY GRANITE JAM.
DETAIL A
50X25MM MS HORIZONTAL FRAMEWORK
DETAIL C
SD6A. 8MM THK FLOOR TILE.
SCALE- 1:25
SCALE- 1:25
12MM GYPSUM FALSE CEILING FINISHED WITH DARK GREY PAINT.
PLAN @ +2325 MM LVL.
STEEL GREY GRANITE FLOORING.
KEY STONE / START BRICK
8MM THK QUTONE COTTO BRONZE TILE
MS L FLANGE @PLASTERED LINTEL LVL. MS L FLANGE @PLASTERED LINTEL LVL.
MS LINTEL FRAME ANCHORED TO SLAB.
DETAIL A
COURSE WORK -A
PLAN @ +1920 MM LVL. COURSE WORK -B
GD2 MS L FLANGE @PLASTERED LINTEL LVL.
FIRST FLOOR FFL
PLAN @ +2580MM LVL. COURSE WORK -B
FFL
FFL 6MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT.
GD2
PORTAL SCALEP3 1:25 PORTAL P3
SD6A PORTAL P4 SCALE1:25 PORTAL P4
6MM THK PLY FINISHED WITH LIGHT GREY PAINT. 12MM THK PLY SCREWED TO MS LINTEL FRAME.
+450MM LVL. FROM GF FFL. +450MM LVL. FROM GF FFL.
20MM THK STEEL GREY PLANTER P9 GRANITE JAM.
PLANTER P3
12MM THK GYPSUM PLANTER P9 FC. FINISHED WITH C&R RUST PAINT.
GROUND FLOOR FFL PLANTER P3
GROUND FLOOR FFL
LEGEND: KEY STONE / START BRICK
SD5A.
FULL BRICK RESIDUE BRICK
JAALI WALL & PORTAL DETAIL DRAWINGS STEEL GREY GRANITE FLOORING.
SD5A
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
REFER DWG. NO. A4.13 FOR JAALI DETAILS
5MM THK DETAIL C MS
50X25MM MS HORIZONTAL FRAMEWORK
8MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT
SEATER TOP @450MM LVL. FROM FFL
PORTAL P7
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
EQL
EQL
EQL
EQL
5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.
ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.
50X25MM MS HORIZONTAL FRAMEWORK.
1915
50X25MM MS VERTICAL FRAMEWORK FINISHED WITH 230(L) X 110(B) X 75(H) C&R RUST PAINT. BRICK FINISHIED
PORTAL P7
8MM THK QUTONE COTTO BRONZE TILE
50X50MM MS VERTICAL FRAMEWORK
SCALE- 1:25
DETAIL A
12MM THK. V BOARD ON TOP OF 50X25MM MS HORIZONTAL FRAMEWORK.
PORTAL P7
DETAIL A
EQL
200
FINISHED WITH C&R RUST PAINT. 50X25MM1 MS GD1 - TYPE
EQL
PORTAL P3
TILE 50X25MM MS VERTICAL FRAMEWORK FINISHED WITH C&R RUST PAINT.
PORTAL P7
GD1 (TYPE 1)
PORTAL P7 PORTAL P6
D
PLANTER P9
FFL PORTAL P7 - PLAN @ 130MM FFL
GD2
PLAN of portal p7 scale - nts
SCALE- 1:25 STRUCTURAL SLAB.
SECTION -D PLASTER.
SCALE- 1:25
SD6A
FFL
DETAIL D
5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.
12MM THK PLY SCREWED TO FRAMEWORK.
ADHESIVE MS L FLANGE BETWEEN BRICKS @PLASTERED LINTEL LVL.
20MM THK STEEL GREY GRANITE PORTAL CLADDED ON PLY.
5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.
230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT
FALSE CEILING FRAMEWORK AS PER VENDOR SPECIFICATION. GD1(TYPE 2) GRANITE PORTAL 01
PORTAL P4
+450MM LVL. FROM GF FFL.
FFL
FFL
PLANTER P3
SD5A D3
200
FIRST FLOOR FFL
MS LINTEL FRAME ANCHORED TO SLAB.
FFL 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
50X50MM MS TILE VERTICAL FRAMEWORK. 12MM THK. V BOARD ON TOP OF 50X25MM MS HORIZONTAL FRAMEWORK FINISHED WITH C&R RUST PAINT. .
2X
REFER DWG. NO. A4.14 FOR JAALI DETAILS.
ADHESIVE BETWEEN BRICKS
CORTEN STEEL
1915 GD1 (TYPE 2)
X 600
10MM GAP BETWEEN PORTAL AND JAALI. BLOCKWORK UPSTAND.
12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
50X25MM MS HORIZONTAL FRAMEWORK. CORTEN STEEL
FL
EQL
600
2X
EQL EQL
X X
EQL
EQL
5MM THK MS 100x130MM
FINISHED WITH C&R RUST PAINT.
50X25MM MS HORIZONTAL FRAMEWORK
HORIZONTAL SCALE1:25 FRAMEWORK
L-FLANGE MS 50X25MM ANCHORED TO BEAM. VERTICAL FRAMEWORK FINISHED WITH C&R RUST PAINT.
PLAN @ 130MM FROM FFL.
230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT
PORTALADHESIVE P7 - PLAN @ 675MM FFL BETWEEN BRICKS
X HANDRAIL 12MM THK. V BOARD TO DETAIL
WITH LIGHT GREY PAINT
12MM THK. V BOARD FINISHED WITH C&R12MM RUST THK. PAINT. V BOARD
PLAN @ 675MM FROM FFL. 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT. GD1(TYPE 1).
PLANTER P3
JAALI UPTO +1485MM LVL. FROM FIRST FLOOR FFL. 5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.
12MM THK. GYPSUM FC FINISHED TO MATCH WITH INTERIOR PAINT FINISH.
50X25MM MS HORIZONTAL FRAMEWORK. 600
EQL
50X25MM MS VERTICAL FRAMEWORK HANDRAIL FINISHED WITH TO C&RDETAIL RUST PAINT.
MS L FLANGE ABOVE 5MM THK JAALI @1485MM LVL. MS 100x130MM FROM FIRST FLOOR FFL. L-FLANGE ANCHORED TO BEAM.
50X25MM MS HORIZONTAL FRAMEWORK FINISHED WITH C&R RUST PAINT. 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
200
PORTAL P6
12MM THK. GYPSUM FC FINISHED TO WITH LIGHT GREY PAINT FINISH. 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.
L-FLANGE WELDED TO MS LINTEL FRAME
PLASTERED SLAB BTM. LVL.
DETAIL B
700
MS LINTEL FRAME ANCHORED TO SLAB
SCALE- 1:25
MS LINTEL FRAME ANCHORED TO SLAB.
12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT
450
FL
SECTION SECTION - of E portal p7 scale - nts
SCALE- 1:25
GROUND FLOOR FFL
FFL
02.
embrace rural resilience south kainakary, alapuzha, kerala, india.
10th semester.
POLDER SYSYTEM
FISHING | BOATING
2020 FLOOD - SOUTH KAINAKRY
“KUTTANADU - RICE BOWL OF KERALA “ in Alappuzha district is known for its picturesque expanse of paddy cultivation which forms the main source of the famous ‘boiled rice’ of the state. As a tourist destination, it holds great geographical peculiarities. It is a vast area of partly reclaimed land, covered with the bright green paddy fields, separated by dykes. The unique feature about paddy cultivation in Kuttanad is that the level of water is a few feet higher than the level of the surrounding land. It’s the area with the lowest altitude in India, and one of the few places in the world where farming is carried out below sea level. The place is an amazing labyrinth of shimmering waterways composed of lakes, canals, rivers and rivulets. Lined with dense tropical greenery, it offers a glimpse into the rural life-styles of Kerala. Agriculture and seasonal fishing is the main occupation of the natives of Kuttanadu. After monsoon, cultivation is taken up on lands bounded by waterways by erecting bunds along the flow of water. When water flow increases, the bunds are breached causing floods in the paddy fields. This region has been under intense and increasing anthropogenic pressure over the years, which has adversely affected its ecology as well as the livelihood of the people. The high level of pollution with organic, inorganic and toxic material locally generated and brought in by the rivers, aggressive spread of water hyacinth, poor drainage due to choked water ways, increasing intensity of flooding resulting in loss of flora and aquatic fauna.
INDIA | KERALA
KERALA | ALLAPUZHA
ALLAPUZHA | KUTTANADU
KUTTANADU | SOUTH KAINAKARAY
2009
2018
MORPHOLOGY // SETTLEMENT PATTERN
1700 - Lake & Deltatic Plains
1814 - 1912 - First Stage of Land Reclamation
Rich Organic deposition mixed with water. The highlands are dense with green and lower marshy wetlands. Terraced farming was practised on the upper regions.
Parayas reclaimed the land (Kayals) and did below sea level farming. Followed later by Nairs and Syrian Christians. Due to Apprehension of the Presidency of Madras that land reclamation may affect the Port of Cochin, Land Reclamation was stopped.
1912 - 1945 - Second Stage of Land Reclamation
1949 - Last Stage of Land Reclamation
The Kings of Travancore encouraged Kayal Reclamation after withdrawal of the act by Madras province. In 1943 slavery was demolished and the labours demanded wages for the works done, hence the reclamation of kayals reduced as the owners did not want to pay wages.
Reclaimed kayals were initially huge parcels of land difficult to maintain, It was broken into smaller parcel of lands for easy maintenance and effective polder system of agriculture and bi seasonal fishing activity.
1990- Scattered Settlements Scattered settlements within the paddy feilds, an random settlement based on land accessiblity.
CURRENT- Settlemnet along the water channels Scattered settlements within the paddy feilds, an linear settlement along the roads and water ways.
BELOW SEA-LEVEL FARMING // POLDER SYSTEM CONSTRUCTION PROCESS Kuttanad Below Sea-level Farming System (KBSFS) is an unique farming system in India
that practices rice cultivation below sea level. The major land use structure of KBSFS is flat stretches of
rice fields in about 50,000 ha, of mostly reclaimed kayal delta swamps. They exist in three landscape
elements: Karapadam (upland rice fields), Kayal (wetland rice fields) and Kari (land buried with black coal like materials). The rice fields are popularly known as “Puncha Vayals”.
Traditionally KBSFS favoured only one crop of paddy followed with inland and estuarine fish
wealth, notably the endemic prawn species, pearl spot and clams. Farmers of Kuttanad developed
and mastered the spectacular technique of below sea level cultivation, which has several similarities with the Dutch polder system, over 150 year ago. They made this system unique as it contributes remarkably well to the conservation of biodiversity and ecosystem services including several livelihood services.
The recognition of KBSFS as a Globally Important Agricultural Heritage System will instill
pride and will lead to the conservation of this unique below sea level rice-fish farming system.
1. MARKING OF BOUNDARY
2. HAMMRING COCONUT POLES
3. FENCING
4. DEWATERING
INTEGRATED OCCUPATION // ACTIVITY //HABITAT ANALYSIS // 24*7 1. Domestic Spaces_1BHK+Dock+2Wheeler Parking. 2.Domestic Spaces_2BHK+Dock+2Wheeler Parking. 3.Domestic Farming_Dairy Farm. 4.Domestic Farming_Chicken/ Ducks Area. 5.Grainary Storage. 6.Common Toilets. FARMING 1. Domestic Spaces_1BHK+Dock+2Wheeler Parking. 2. Domestic Spaces_1BHK+Dock+Shop. 3.Domestic Spaces_2BHK+Dock+2Wheeler Parking. 4.Fish Market. 5. Boat Manufacture/ Workshop. 6. Dry Fishing Yard. 7.Net storing space. FISHING 8.Common Toilets.
1.House Boats. 2.Wetland restoration parks. 3.View Points/ Decks. 4.Broadwalks/ Promenade. 5.Jetty. 6.House boat terminal. 7.Tourist Center. 8.Craft / Souvenir Shops. HOUSE BOATS-TOURISM
1.Primary School/ Angamvadi. 2.Primary health care center. 3.Community Gathering. 4.Co-Operative Society. 5.Public toilet. 6.OAT. 7.Panjayat Office. 8.Religious: Church/ Temple. BOATS FOR TOURISTS
9.Recreational Space. 10.Market Square. 11.Petti Shops. 12.Community Gathering Hall. 13.Parking Area For tourist around jetty. 14.Bio- Sewage waste management. 15.Water cleaning/ water management. DOMESTIC WORKER - HOTEL
5% 21% 46%
28% 18%
SITE // MACRO ANALYSIS South Kainakary - Rice Bowl of Kerala has a rich agricultural heritage with exclusive infrastructure wide waterways and roadways. The landuse is primarly agriculture with agri mix residential used development. The Pamba river with its tributries acts as a main source of transportation. The Meenapali kayal acts as the main soure of fishing area. There is no health care center or school within 1km radius from the Kollathu Jetty Point. There is a distinct architectural style that climatic conditions and economic condition of the people.
LIGHT HOUSE ALAPPUZHA
WATER WAY KAINAKARY
TOWARDS ALAPPUZHA
VERNACULAR HOUSE AT ALAPPUZHA
TOWARDS ALAPPUZHA-CHENGANASHERY ROAD ATDC BOAT JETTY ALAPPUZHA
TOWARDS NORTH KAINAKARY
TOWARDS KOTTAYAM
BRIDGES CHILD CARE/ ANGAMVADI SCHOOLS MAVELI STORE RATION SHOP HEALTH CARE
M
M 900
8 00 M
7 00 M
5 00
M 600
KOLLATHU JETTY
0 100
MEENAPALLY KAYAL
M
SITE
WATER BODIES AGRI BELT MIXED USE ROADWAY TOWARDS ALAPPUZHA
TOWARDS CHENGANASHERY
WATERWAY
PROPOSED SITE PLAN|
land parcel-15 residential land p ar reside cel-14 ntial
lan re
vembanad kayal
land
parc el-2 reside ntial
kollathu jetty
land p arcel -1 reside ntial
land par reside cel-4 ntial
tempo
land par reside cel-3 ntial
land parce residentia
rary m
land p ar reside cel-5 ntial
arket
+ publ
ic par
k
temporar ym
land par cel residentia -13 l
nd parcel -1 esidential 2
land parcel -1 primary sch 1 ool
land parcel play ground-10
land parcel-8 water tank solar power
pamba river
el-6 al
market +
land parcel-9 primary school
land parcel-7 community center govt. office water tank
public pa
rk
SITE STUDY MODEL Re-Thinking the urban planning of south Kainakary by analysing and implementing the theory Elements of the city by Kevin Lynch. Taking its principles path, edge, district, node and Landmark, Site parcelling is done by establishing road networks as path and the parcels between paths as districts, CRZ setback becomes edge of the city, creating prominent landmarks and nodes by identifying existi
Nodes through Pamba River
Post Site Parcelling
Before Flood
During Flood
view of agri - 2bhk units
view of agri - 2bhk // plan 10.00
DOMESTIC FARM +0mm lvl.
3.65
3.65
A
SIT OUT +1.2m lvl.
2.00
5.00
SIT OUT +1.2m lvl.
3.00
CHILDREN'S BEDROOM BEDROOM
KITCHEN
3.00
UTILITY | LAUNDRY
LIVING
up TOILET
5.00
FOYER +1.2m lvl.
TWO WHEELER PARKING
2.00
up
2.00
3.00
3.00 10.00
plan @1.5m lvl.
2.00
view of agri - 2bhk // plan//construction details
.65
TYPE - 01 - BAMBOO MATS
A
FLOORING DETAILS
3.65
TYPE - 01 - BAMBOO MATS
A
FLOORING DETAILS
.00
SIT OUT +1.2m lvl.
TYPE - 01 - BAMBOO HA
2.00
SERVICE LOFT SOLAR PANEL BATTERY BACK UP
MULTI WORK SPACE
SERVICE LOFT SOLAR PANEL BATTERY BACK UP
3.00
ROOF SKYLIGHTMULTI WORK SPACE
WALL DETAILS
ROOF SKYLIGHT
SERVICE LOFT
WALL DETAILS
GRAIN STORAGE
SERVICE LOFT
GRAIN STORAGE
dn
dn
OPENING DETAILS
OPENING DETAILS
5.00 B
B DECK
DECK
2.00
3.00
3.00
plan @5m lvl.
3.00
3.00
TYPE - 01 - BAMBOO HALF MATS
PRODUCED PRODUCED BY AN AUTODESK BY AN AUTODESK STUDENT STUDE VE
agri - 2bhk //- sections AGRICULTURE AGRICULTURE 2BHK - 2BHK MODULE MODULE
PRODUCED BY AN AUTODESK STUDE PRODUCED BY AN AUTODESK STUDENT VE
Solar Photovoltaic Solar Photovoltaic cells for power cells for po distribution to distribution the houseto the house
AGRICULTURE - 2BHK MODULE AGRICULTURE - 2BHK MODULE 0.75
0.75
Bamboo and Bamboo thatch and sloped thatch roofsloped ro Sky Light 2.10
2.10
0.75
0.75
Sky Light
Solar Photovoltaic cells for po Solar Photovoltaic cells for power distribution distribution to the houseto the house
Loft for SolarLoft Battery for Solar storage Battery & storage & Grains storage Grains storage Bamboo and thatch Bamboo and thatch sloped roofsloped ro Sky Light 7.57
7.57 2.10
3.10
7.57
2.10
7.20
7.20
7.57
7.20
3.10
1.25
1.25
Bamboo walls Bamboo as perwalls detail asAper detail A
Rain Water Collection Water Collection Loft for Solar Battery Loft for SolarRain Battery storage & storage & Barrel Domestic Barrel -storage Domestic use Grainsuse Grains-storage Bamboo tieBamboo ropes tie ropes Bamboo Mat Bamboo FlooringMat withFlooring tie ropes with tie r to pull up and to pull tie to upthe andwalls tie to the walls
3.10
3.10
Sky Light
7.20
section - aa
SECTION SECTION - AA - AA
Open floor Open opening floor to opening change the to chang plastic drums. plastic drums. Bamboo walls asAper detail A Bamboo walls as per detail Steel framesSteel supporting frames the supporting floor & the flo Water Collection Rain Water Rain Collection the pontoons the pontoons Barrel use - Domestic use Barrel - Domestic Plastic drumsPlastic 500mm drums x 900mm 500mmstacked x 900mm Bamboo tieBamboo ropes tie ropes to create floating to create pontoons. floating pontoons. Bamboo with tie r Bamboo Mat FlooringMat withFlooring tie ropes to pull upthe and tietowith tothe thebase walls w to pullPillars up and tieto to the walls Steel Steel fixed Pillars fixed base foundation foundation bolts and bolts andthe floor opening toplates chang Open floor Open opening toplates change plastic drums. plastic drums. frames the supporting Steel framesSteel supporting floor & the flo the pontoons the pontoons drums 500mmstacked x 900mm Plastic drumsPlastic 500mm x 900mm to create floating pontoons. to create floating pontoons.
1.25
0.75
1.25
Pillars the base w Steel Pillars Steel fixed to the fixed basetowith bolts and plates foundation foundation bolts and plates Solar Photovoltaic Solar Photovoltaic cells for power cells for po distribution to distribution the houseto the house
0.75
SECTION SECTION - AA - AA
Bamboo and Bamboo thatch and sloped thatch roofsloped ro Sky Light 2.10
2.10
0.75
0.75
Solar Photovoltaic cells for po Solar Photovoltaic cells for power distribution tostorage the house distribution to the house Ran water collection Ran water tocollection in to storag drum transferdrum to kitchen transferand to kitchen toilet and to Flushing wash Flushing basin &and washthatch basin Bamboo Bamboo&and thatch sloped roofsloped ro Sky Light
7.57
7.57 2.10
3.10
7.57
2.10
7.20
Ran watertocollection to storag Ran water collection storage in Rain Collection Water drum transferCollection to kitchen drum Water transferRain to kitchen and toilet and to Barrel Domestic Barrel use Domestic use Flushing & wash basin Flushing & wash basin Bamboo tieBamboo ropes tie ropes
7.57
7.20
3.10
1.25
1.25
Sky Light
7.20
3.10
3.10
Sky Light
7.20
Open floor Open opening floor to opening change the to chang plastic drums. plastic drums. Water Collection Rain Water Rain Collection Barrel use - Domestic use Barrel - Domestic Plastic drumsPlastic 500mm drums x 900mm 500mmstacked x 900mm Bamboo tieBamboo ropes tie ropes to create floating to create pontoons. floating pontoons.
Steel Pillars Steel fixed to Pillars the fixed basetowith the base w foundation foundation bolts and bolts andthe floor opening toplates chang Open floor Open opening toplates change plastic drums. plastic drums.
SECTION - BB - BB SECTION 1.25
Wastetowaste Waste to waste to Soil waste to Soil waste Recycle Recyclefarm |Domestic use farm use Septic TankSeptic Tank |Domestic
drums 500mmstacked x 900mm Plastic drumsPlastic 500mm x 900mm to create floating pontoons. to create floating pontoons.
1.25
Pillars the base w Steel Pillars Steel fixed to the fixed basetowith bolts and plates foundation foundation bolts and plates
CED AN AUTODESK BY AN AUTODESK STUDENT STUDENT VERSION VERSION
section - bb
SECTION SECTION - BB - BB
Waste Wastetowaste to waste to Soil waste Soil waste to Recyclefarm |Domestic Recycle use farm use Tank |Domestic Septic TankSeptic
ERSION
agri - 2bhk // views
ERSION
FRONT ELEVATION - STATIC POSITION
FRONT ELEVATION - FLOOD POSITION
PROD
FRONT ELEVATION - FLOOD POSITION
PRODUCED BY AN PRODUCED AUTODESK BYSTUDENT AN AUTODESK VERSION STUDENT VERSION
FRONT ELEVATION - STATIC POSITION
plan of fishing // 1bhk units
FISHING - 1BHK MODULE
A
5.00
0.70
STANDING DECK
5.00
TOILET 1.60
3.00
1.23
0.70
3.00
3.00
3.00
STANDING DECK
3.15
B
SHOWER BEDROOM
1.23
1.35
BEDROOM
up
1.80
3.70
KITCHEN STORE
2.51
COMMUNITY GATHERING & DRY FISH YARD
1.80
KITCHEN STORE
3.70
3.70
10.00
SECTIO skylight above
+1.2m Lvl.
10.00
LIVING ROOM STANDING DECK
LIVING ROOM
3.00
0.70
3.00 3.00
3.00
up +0.0m Lvl.
PLAN @ 1.5m Lvl.
plan SCAE: 1:50
STANDING DECK
3.15
0.70
7.40
sections of fishing // 1bhk units
Solar Photovoltaic for powe Solar Photovoltaic cells forcells power distribution to the to house distribution the house 1.50
2.55
Bamboo and thatch slopedsloped roof roof Bamboo and thatch Sky Light Sky Light
Ran water to storage in Ran collection water collection to storage i drum transfer to kitchen and toilet drum transfer to kitchen and toilet FlushingFlushing & wash&basin wash basin
B
Cold Storage for fish for fish Cold Storage
Bamboo windows Bamboo windows 2.95
floor opening to change Open Open floor opening to change the t plasticplastic drums. drums.
Plastic Plastic drums 500mm x 900mm stacked drums 500mm x 900mm sta to create floatingfloating pontoons. to create pontoons.
Steel Pillars the to base Steel fixed Pillarstofixed thewith base with foundation bolts and foundation boltsplates and plates
ECTION TION -A-A
section - a
WasteWaste waste to waste toSoil waste Soil to waste to Recycle |Domestic farm use Recycle |Domestic farm use SepticSeptic Tank Tank
1.21
Solar Photovoltaic cells forcells power Solar Photovoltaic for powe distribution to the to house distribution the house 1.36
1.36
Bamboo and thatch slopedsloped roof roof Bamboo and thatch 0.28
Sky Light Sky Light 2.81
1.20 3.61
2.35
Solar storagestorage & forBattery Solar Battery & 2.35 Loft forLoft Net & Net Cold&Storage Cold Storage
0.45
.40 7.40
Bamboo walls aswalls per as detail Bamboo per detail
2.71
Rain Water Collection Rain Water Collection Barrel -Barrel Domestic use use - Domestic
2.95 2.40
2.40
Open Open floor opening to change the t floor opening to change plasticplastic drums. drums. Steel frames supporting the floor Steel frames supporting the&floor the pontoons the pontoons
1.20
1.20
Plastic Plastic drums 500mm x 900mm stacked drums 500mm x 900mm sta to create floatingfloating pontoons. to create pontoons.
Steel Pillars the to base Steel fixed Pillarstofixed thewith base with foundation bolts and foundation boltsplates and plates
ON - B - B ECTION
section - b
before flooding
during flood
primary community school // plan
PRIMARY COMMUNITY SCHOOL//elevation
PRIMARY COMMUNITY SCHOOL//SECTIONAL PERSPECTIVE
primary community school // view
view of kollathu jetty during nehru boat race
03.
viridescent quietude ayanavaram, chennai, india
9th semester.
aim
concrete jungle
pedestrain freindly community spaces
viridescent quietude
Cities are growing at a substantial rate and increasing population affects built areas while causing further urban sprawl. There is a need to understand and focus on the effects of this phenomenon on our cities keeping in view its liveability, cultural identity and vitality. We need to acknowledge the fact that cities cannot and should not extend their limits endlessly. Most of our cities lack efficient streets, good public places and any distinct character in the built form. This is partly attributable to rapid urbanization and to the lack of a distinct focus on the problems concerning the liveability of a city. The premise is that all the cities must provide and support good public life by constantly improving and upgrading the city infrastructure along with maintaining its identity. Community or neighbourhood attachment can be defined as cultural identity, loyalty, optimism, pride, and passion that people feel about the place where they live. What makes people want to invest their future in a place? Is it a welcoming and friendly community? Are there available social offerings such as entertainment, recreation, places to sit and eat parks and green spaces? Or is it a physically attractive space with greenery? Yes is the answer to the entire above question. Ayanpuram, or Ayanavaram, is one of the prominent localities of Chennai and is located in Central Chennai at about 8 km from the city's centre. Ayanavaram is one of the peripheral commercial belts of Chennai. Ayanpuram is the original name, derived from an old historic story mentioning "a battle between Lord Brahma and Lord Muruga, where Lord Muruga admonished Brahma and took over the process of creation on earth, later Lord Brahma prayed to Lord Shiva and got his action of creativity of life back. It is believed that Lord Brahma worshipped Lord Shiva here. It is in recognition of that event Ayanpuram is named. It was also called Brahmapuri. A place with such a rich historic background and prominent position has lost its identity in the fast pace growth over time. The core intent of this design proposal is to study the present scenario of Ayanavaram and understand its growth, needs and to create a healthy green cultural community identity to this locality. This project looks at possibilities of renewal and redevelopment within the functioning city without losing the core identity and functionalism of the neighbourhood. "VIRIDESCENT QUIETUDE"- a green relaxing space offering all the needs of the immediate neighbourhood.
place making // objectves
URBAN ANALYSIS
URBAN FORM DETERMINANTS ,COMAPCT AND LINEAR SETTLEMENT
DESIGN DEVELOPMENT
URBAN LANDSCAPE
COMMERCIAL INFRASTRUCTURE
ISSUES & SITE IDENTIFIED
view of plaza
view of plaza
GROUND floor plan and section aa’
first floor plan and sectionbb’
sectional perspective cc’
sectional perspective dd’
1. view from entry plaza
2. view from mid-level plaza 4
3 1
5 6
AERIAL VIEW OF VIRIDESCENT QUIETUDE
6. AERIAL VIEW OF MID LEVEL PLAZA AND MEDITATION DECK
7. VIEW OF O.A.T
3. INTERIOR COURT VIEW OF FOOD COURT 2
4. view from pedestrain pathway
7
8
5. view OF PLAY AREA
8. VIEW OF LANDSCAPED SEATER AREA
04.
urban plaza tiruppur, tamilnadu, india.
internship - webe design lab
DESIGN PARAMETERS OPENESS
FLEXIBILITY
CATALYST
material pallete
CARDBOARD
REINFORCED THERMOCOL WALLS
Experiential Factor
Concept of a Park
POLYCARBONATE
TENSILE FABRIC
ROOF COVERINGS
METAL FRAMES & POSTS
[JOY,FRESH & COLORFUL]
Street side cafes
B
SITE LAYOUT GENERATOR ROOM
ELECTRICAL ROOM
TWO WHEELER PARKING NO - 15
TWO WHEELER PARKING NO - 26
TWO WHEELER VEHICULAR ENTRY + 0.0m Lvl.
PEDESTRIAN ENTRY + 0.0m Lvl.
1
2
3
4
5
6
8
9
FOOD KIOSK
FOOD KIOSK
FOOD KIOSK
FOOD KIOSK
FOOD KIOSK
FOOD KIOSK
FOOD KIOSK
7
FOOD KIOSK
FOOD KIOSK
F
155 SQ.FT
155 SQ.FT
155 SQ.FT
155 SQ.FT
155 SQ.FT
155 SQ.FT
155 SQ.FT
155 SQ.FT
155 SQ.FT
1
RAMP
1
2
FOOD FOOD KIOSK KIOSK 105 SQ.FT 105 SQ.FT
A
FOUR WHEELER PARKING NO - 11
3
4
FOOD KIOSK FOOD KIOSK
105 SQ.FT
105 SQ.FT
RAMP OFFICE ROOM 150 SQ.FT
ROA
TH D WID
et)
.54 fe
m (28
OF 8.7
GENERAL NOTES * DRAWINGS NOT TO BE SCALED. * ALL MEASUREMENT ARE IN MM UNLESS OTHERWISE SPECIFIED. * DRAWINGS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL DRAWINGS. * THIS DRAWING IS COPYRIGHT PROTECTED. IT IS THE PROPERTY OF WEBE DESIGN LAB. * IT IS NOT TO BE REPRODUCED, COPIED,HANDED OVER TO A THIRD PARTY OR USED FOR ANY PURPOSE OTHER THAN FOR WHICH IT AS BEEN LOANED.
REVISIONS S.NO DATE
REVISION DETAIL
COMMENTS 10
11
12
FOOD KIOSK
FOOD KIOSK
FOOD KIOSK
155 SQ.FT
155 SQ.FT
155 SQ.FT
KEY PLAN FOOD
105 S
1 KIOSK
Q.FT
FOOD
105 S
2 KIOSK
Q.FT
FOOD
3
KIO 105 SQ SK .FT FOOD
105 S
SEAL
4 KIOSK
Q.FT
FOO
5
D KIO 105 SQ SK .FT
FOUR WHEELER PARKING NO - 13
6
FOOD
105 S
KIOSK
Q.FT
7
FOOD
105 S
KIOSK
Q.FT
FOOD
8
KIO 105 SQ SK .FT
ARCHITECTS
MEN'S TOILET ACCESSIBLE TOILET
WOMEN'S TOILET
FOUR WHEELER VEHICULAR ENTRY + 0.0m Lvl.
WEBE DESIGN LAB
PROJECT
URBAN PLAZA DRAWING TITLE
SITE LAYOUT
DRAWING NUMBER
WB145/XX/XXXX
DRAWN BY
ZAYAN
SCALE
CHECKED BY
PREETHI
1:250/A3
N
APPROVED BY
YOGESH
ISSUE DATE
03-03-2020
STATUS
FOR DISCUSSION
d
e
s
i
g
n
l
a
b
8/3B, 5th STREET, NANDANAM EXTENSION, CHENNAI - 600 035 architects@webedesignlab.com www.webedesignlab.com / PH : 044-24341833
VIEW OF ENTRANCE
VIEW OF DIFFERENT SPACES
05.
ENVISAGING THE ETHREAL FICTIOANAL SITE
4th semester.
THE BLUE WAS VEILED BY THE HAZE OF GOLDEN YELLOW AIM This design aims aat exploring and expressing the memory lane through a series of experiences. It conceptualises a form of architecture uncommitted to a visible, tangible materiality and explores an evolving impermanent and invisible architecture drawn wholly from the body moving air - filled space. A form is given to the intangible character treating him as a living being expressing the intangible emotions experienced in the space.
“Drawing is not an exercise of particular dexterity but above all means of expressing intimate feelings and moods”. Henri Matisse
BUIO ALBAA WEATHER & LIGHT
It all began with roaring voice of my grandfather calling ‘mone elunelkku tahajuddin samayam ayi!” I wokeup rubbing the sleep from my eyes, crying to wake up at three in the morning at the age of seven. To pacify me, he promised he promised that he would take me out if i woke up and do my prayers. On his promise, I woke up, took bath, prayed and waited as eager as beaver for him. Holding his hands i started my life’s most memorable journey. As we stepped out from our house a misty blanket of heavy black clouds rolled over us i kept on asking him “ enne evidekanu kondu pokunne uppapa ?”. He smiled holding me and pointed the silent mountains as transient as clouds - “The Palakaya Thattu, Kannur”. Listening to the silence of nature and the whispering winds, we started to walk through the cold streets, dimly lit only by the fire flashing across the sky. Our first stop in this journey was the thattu kada, small thatch roof huts along the river bed, with benches. The shopsinvited us with the melody of old Malayalam and Hindi old songs that a brought a smile as big as moon on my uppapa’s face, that steaming the hot glass of lemon tea and undaputtuin that chill weather was like eating sunshine. Uppapa used to tell me stories about our hometown and I loved listening to it, there used to a be small group of people sitting and sharing their lives to each other and enjoying the quiet whispering winds. Uppapa borrowed cycle from his friend’s shop and we started our next part of the journey, The mountain seems no more a souless thing, but rather as a shape of ancient fear in darkness and the winds of chaos born, amid the lord less heavens thundering - a presence
Medium : WaterColour
crouched, enormous and austere before whose feet the mighty waters mourn. I sat in front holding the handle bar of the cycle with my tiny hands listening silent rhythm of nature wondering if the magical moment was a dream or reality. The misty paths unvieled the unknown at every twist and turns. Listening to the stories that uppapa was telling about the small villages, i was eagerly watching at the small sparkes if flames that peaked out from the dark mountains. Suddenly there was a sheet of rain slicing the soggy ar into bits, We took shelter at the small cluster of huts that sparked fire from the common fire that was litin the centre. Sitting in thier Verandha we looked down at the path what we drove. The heat that came from the small camp fire was like drinking a hut cup of tea in freeze time. The warmth that created wa not only physically but internally from deep withing. The rain reduced to a drizzle on the high ridges and mist everywhere. We continued to bike uphill to the top. We reached the top when the greyish blue sky was veiled with the haze of golden yellow.
PLAN & SECTIONS
06.
OTHER WORKS renders, posters, illustrations
View Of Reception
View Of Conference Room
View Of Reception
View Of Conference Room
View Of Reception
View Of Conference Room
Maquette Render Of Dodla School
ACTIVITY MAPPING // BEFORE PANDEMIC
ACTIVITY MAPPING // AFTER PANDEMIC
THANK YOU !
Contact:
work.zayanmohammed@gmail.com
Zayan.Work