BIM (MULTI-DISCIPLINARY) MODELLER PORTFOLIO

Page 1

BIM MODELLER

| MULTI-DISCIPLINARY |

PORT FOLIO

2020

BY | IKRAM SHARIFF




MOHD IKRAM BIN SHARIFF

B.E. (Hons)

BIM MODELLER | CIVIL ENGINEER | +60 017 – 328 7837 |

| mohdikram1995@gmail.com |

www.linkedin.com/in/mohdikramshariff/

| Seremban, Negeri Sembilan | https://issuu.com/mohdikramshariff

PROFILE SUMMARY Graduated in Civil Engineering and pursuing 6-months of intensive technical training ‘BIM Specialist Apprenticeship Program 3.0’ as BIM (Multi-Disciplinary) Modeller which were organized by Construction Industry Development Board Malaysia (CIDB), Kementerian Kerja Raya (KKR), Jabatan Kerja Raya (JKR) and BIM UMP Holdings Sdn Bhd. Technical training involves BIM module for fundamental modelling in all four disciplines (Architectural, Structural, Mechanical and Plumbing System and Electrical) and pre-approved project data and delivery by JKR.

ACCREDITATION

EDUCATION UNIVERSITI SAINS MALAYSIA |

2016 – 2020

Bachelor of Engineering (Hons) (Civil Engineering)

KOLEJ POLY-TECH MARA |

2016 – 2020

Diploma of Civil Engineering (Construction Safety)

SMKPENDETA ZA’BA |

2008 - 2012

Sijil Pelajaran Malaysia (SPM) Penilaian Menengah Rendah (PMR)

BIM Modeller (Architectural) Certified by CIDB BIM Modeller (Structural) Certified by CIDB BIM Modeller (Electrical) Certified by CIDB BIM Modeller (Mechanical & Plumbing System) Certified by CIDB


EXPERIENCES BIM (Multi-Disciplinary) Modeller | Jul 2020 – Dis 2020 UMP Holdings Sdn. Bhd.

(Apprenticeship) ▪ ▪ ▪

▪ ▪ ▪ ▪

Third batch of BIM Specialist Apprenticeship Program. Program intensive 6-month technical training under Construction Industry Development Board (CIDB) BIM module for fundamental modelling in all four disciplines including Architectural, Structural, Mechanical and Electrical. Training involves actual pre-approved project data and delivery in collaboration with Kementerian Kerja Raya, Jabatan Kerja Raya (JKR) and Universiti Malaysia Pahang Holdings Sd. Bhd. (UMPH) for future tendering purpose. Created 3D Building Information Model on projects include all disciplines Parametric for most Library created. Ran inter-discipline and intra-discipline clash checks in Naviswork and coordinated among discipline. Simplified project development process by using cloud-based software, such as Autodesk Fusion 360. Present 3D model in through integrating Revit Model in Lumion to create realistic animation and editing video through VegasPro software to create more interesting animation

Site Supervisor | Feb 2015 – May 2015 Matrix Concept Holding Bhd.

(Internship)

Involving in Development area at Bandar Baru Sendayan. Assigned to 2 areas which under construction/development and maintenance team at residential. Updates developing works to ensure the working lies with project management. Prepare daily report on work progress while actively managing disputes in site and managing report of delivery order of materials. Supervised worker working effectively and efficiently according to the plan and schedules given. Assist engineers in the inspection of work (eg: Inspections of materials, steels and QAQC). Demonstrated technical troubleshooting strengths in maintenance works.

▪ ▪ ▪

▪ ▪ ▪

TECHNICAL SKILLS

Site Engineer | Jun 2018 – Aug 2018 Majlis Perbandaran Seremban

(Internship) • • • • •

Involved in maintenenace at 1st floor of Pasar Besar Seremban due to catches fire on Nov, 2017 and maintenance of road and drainage. Supervision of Renovation work and learning new method by using wraps Carbon Fibre at all column infected due to fire. Selected to assist tool design engineers in the developing of design using AutoCAD. Updates developing works to ensure the working on the site are lies according schedules. Assist engineers in the inspection of work (eg: structural building, road design/maintenance and drainage design/maintenance).

Autodesk Revit

Microsoft Office

Autodesk AutoCAD

EMME 4.0

Lumion

Orion

PERSONAL SKILLS ✓

Leadership

Team Player

Creative

Fast Learner

Multi-Tasking

Self-Independent

VegasPRO

LANGUAGES Malay BASIC

INDEPENDENT

PROFICIENT

INDEPENDENT

PROFICIENT

INDEPENDENT

PROFICIENT

English BASIC

Arabic BASIC


▪ DRAWING ▪ TEMPLATE ▪ AUDIT REPORT

.02

.01

CONTENTS

INPUT

SETUP ▪ REVIT PROJECT JKR FILE NAMING ▪ REVIT FAMILY JKR FILE NAMING ▪ LIBRARIES & FAMILIES


▪ ARCHITECTURAL MODEL ▪ STRUCTURAL MODEL ▪ MECHANICAL & PLUMBING SYSTEM MODEL ▪ ELECTRICAL MODEL

COORDINATION ▪ MODEL INTERGRITY CHECKING ▪ MODEL QUALITY CHECKING ▪ CLASH ANALYSIS

.05

.04

.03 MODELLING

OUTPUT ▪ JKR STANDARD SCHEDULE ▪ JKR STANDARD TANGGING ▪ JKR STANDARD TITTLEBLOCK/SHEET ▪ RENDERING REVIT ▪ RENDERING LUMION


KLINIK KESIHATAN (TANJUNG) PINDAAN B

| 01


ARCHITECTURAL DRAWING

STRUCTURAL DRAWING

01 1

INPUT |

DRAWING

ELECTRICAL DRAWING

MECHANICAL & PLUMBING SYSTEM DRAWING | 02


ARCHITECTURAL TEMPLATE

| 03

01

INPUT |

TEMPLATE


01

INPUT |

TEMPLATE

STRUCTURAL TEMPLATE

ELECTRICAL TEMPLATE

DOOR FAMILY TEMPLATE

MECHANICAL TEMPLATE | 04


AUDIT REPORT

ARCHITECTURAL AUDIT REPORT

STRUCTURAL AUDIT REPORT

| 05

01

INPUT |


01

INPUT |

AUDIT REPORT

ELECTRICAL AUDIT REPORT

MECHNANICAL AUDIT REPORT

| 06


02

SETUP |

REVIT PROJECT JKR FILE NAMING

File Revit Version – 2019 (19)

Discipline (AR, ST, ME, EL) Progress / Backup (a,b,c,..)

Verification Date/ Progress/ Revision/ Version (YYMMDD)

Fasa/Kategori Model : Perancangan – Model Asal (1a), Rb Konsep (1b) Rekabentuk – Rb Awalan (2a), Rb Terperinci (2b) Perolehan – Tender (3a), Addendum (3b) Pembinaan (4a), NSC (4b), Shop (4c) Serahan As-built (5a) Senggara – Facility Management (6a)

Building Category and Classification

201212a_jkrAR19_3a_(BMkk7b1_P19-002)_A1_w-01_(H).rvt Project No (YY-123), PAP (Pyy-123) Building Block/Zone (A1, B1, C1), Overall (W1), Component Family & Detailing (W2) BIM Model Type – General Model (w-), Plan Model (wx), Site Model (wt) File Type – Central ©, Local (L), Stand Alone (S), Host (H), Link (K)

| 07


Inner-OutterFinishing Code

System Code

Organization, Discipline

Thickness

02

SETUP |

REVIT FAMILY JKR FILE NAMING

LOD Level

Height Level

Description

jkrAR_wll_DGb_bb1_150_UMM-emp1-emp1_in_ae_(DGb233a)-3 @BMkk7b1 150mm Dinding bata lepaan simen luar dalam Inner-OutterSpacing Code

Category

Material Code

Component Code

Project Component Code

Functioning Code

Brickwall

Cement render and weatherproof paint

| 08


SETUP |

LIBRARIES & FAMILIES

02

DOOR FAMILY

LIBRARY | ARCHITECTURAL

01

WINDOW FAMILY

02

03

| 09

04

WINDOW GRILLE FAMILY

05

WINDOW & WINDOW GRILLE FAMILY

06

DOOR GRILLE FAMILY

SPECIAL EQUIPMENT CURTAIN FAMILY

COUNTER CABINET FAMILY


LIBRARY | STRUCTURAL

01

COLUMN FAMILY

02

BEAM FAMILY

LIBRARY | MECHANICAL

01

TANK FAMILY

02 03

FIRE EXTINGUISHER FAMILY

FLOOR TRAPFAMILY

02

SETUP |

LIBRARIES & FAMILIES

LIBRARY | ELECTRICAL

01

SWITCH FAMILY

02

03

SIGNAGE ‘KELUAR’ FAMILY

COOPER TAPE FAMILY

| 10


03

MODELLING | ARCHITECTURAL

SOUTH VIEW

| 11


EAST VIEW

03

MODELLING | ARCHITECTURAL

WEST VIEW

NORTH VIEW

| 12


SOUTH PERSPECTIVE VIEW

FIRST FLOOR

| 13

03

MODELLING | ARCHITECTURAL


03

MODELLING | ARCHITECTURAL

NORTH PERSPECTIVE VIEW

SECOND & THIRD FLOOR

| 14


| 15

03

MODELLING | STRUCTURAL


03

MODELLING | STRUCTURAL

TOP VIEW

EAST-WEST VIEW

SOUTH-NORTH VIEW

| 16


| 17

03

MODELLING | STRUCTURAL


03

MODELLING | STRUCTURAL

3D MODEL DETAILING

3D MODEL ANALYTICAL

3D MODEL STRUCTURE & ANALYTICAL

| 18


| 19

03

MODELLING |

MECHANICAL & PLUMBING SYSTEM


03

MODELLING |

MECHANICAL & PLUMBING SYSTEM

| 20


03

MODELLING | ELECTRICAL

| 21


03

MODELLING | ELECTRICAL

| 22


| 23

04

INTERGRITY COORDINATION | MODEL CHECKING


04

QUALITY COORDINATION | MODEL CHECKING

ARCHITECTURAL MODEL AUDIT FORM

ARCHITECTURAL MODEL AUDIT FORM

| 24


| 25

AIR CONDITIONING MECHANICAL VENTILATION MODEL AUDIT FORM

FIRE PROTECTION SYSTEM MODEL AUDIT FORM

COLD WATER SYSTEM MODEL AUDIT FORM

SANITARY SYSTEM MODEL AUDIT FORM

04

QUALITY COORDINATION | MODEL CHECKING


STRUCTURAL Vs ELECTRICAL

04

COORDINATION | CLASH ANALYSIS

MECHANICAL Vs ELECTRICAL

MECHANICAL Vs MECHANICAL

SETS FOR MECHANICAL, ELECTRICAL & STRUCTURE

| 26


04

COORDINATION | CLASH ANALYSIS

PIPE (SN) Vs LIGHTING FIXTURE (EL)

BEAM (ST) Vs CONDUIT (EL)

DUCTS (ACMV) Vs CONDUITS (EL)

COMMUNICATION DEV (EL) Vs AIR TERMINAL (MP)

PIPES (SN) Vs CONDUIT (EL)

| 27


05

JKR STANDARD

OUTPUT | SCHEDULE

| 28


jkrARt_rom : Room Tags

jkrARt_spc-eq : Special Equipment

| 29

jkrARt_sit : Site Tangs for Description

jkrARt_rom_sc : Room Tags for Ceiling Level

05

JKR STANDARD

OUTPUT | TAGGING


05

JKR STANDARD

OUTPUT | TITTLEBLOCK/SHEET

| 30


| 31

05

OUTPUT | RENDERING REVIT


05

OUTPUT | RENDERING REVIT

| 32


| 33

05

OUTPUT | RENDERING REVIT


RENDERING REVIT

05

OUTPUT |

| 34


YOUTUBE LINK FOR RENDERING ANIMATION KLINIK KESIHATAN 7 (YANJUNG) PINDAAN B (https://youtu.be/UhBXtpIHxI4)

| 35

05

OUTPUT | RENDERING LUMION


05

OUTPUT | RENDERING LUMION

| 36


| 37

05

OUTPUT | RENDERING LUMION


| 38



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.