Felipe Monsalve Architect Portfolio

Page 1

Felipe Monsalve Fernandez Architect Portfolio


Felipe Monsalve Fernandez Architect Msc. Arch - B.Arch date of birth: 20 november 1982 contact phone: +39 3336573093 +57 3052384001 email: moncalves@hotmail.com Linkedin (click here) Full CV (click here)


bogota | colombia

Affordable and productive housing Bogota Social Housing deficit in Colombia is one of the most delicate consequences of many years of underdevelopment and a long lasting internal conflict. Accelerated internal migrations and the lack of an integral housing response by the governments and the private developers hava created rings of poverty around the main cities where the population is forced to live under conditions of risk, segregation and lack of opportunities to reverse the poverty cycle. Household, dwelling space, economical sustainability and crafts, community, territory Available time and productivity

and belonging, urban context and city, are the elements introduced in this proposal of housing that strives to stop the cycle of need and responses that generate further necessities. It is the aim of this project to propose a concrete alternative for affordable quality housing that would become a platform for social interaction and sets the bases to invert a process and reduce the gap of housing inequality in Bogota.

Politecnico di Milano Master Thesis project Prof. Joseph Di Pasquale year. 2013

+ Training and Education +

+ +w Productive Housing Virtuous cycle

Accessibility to market to information

Urban, Productive Affordable Housing

Access to higher paying economical activities

Household Sustainable growth

3


bogota | colombia

Affordable and productive housing Bogota

LONGITUDINAL SECTION C

1:200

4

Felipe Monsalve Fernandez


bogota | colombia

Affordable and productive housing Bogota (to see the full research and project click here)

Housing unit modular system Recycled Tetrapak sandwich panel wall system

Metallic hand rail for balcony

MEP piping under floating floor system

Wooden exterior shutters

U Channel modular Glass system SF60

Wardrobe and door modular system Floating floor with different finishing materials Fixtures tubing below

Sliding glassing panel mounted to walls

Living room/ dinning room

Single bedroom

K

Wc

Kitchen

1.

Bathroom

1. 150 mm white gravel coveringLarger Wc +

Bathroom Aluminum flange top nailed over wood 3 layer bituminous waterproofing membrane Double 1 layer Non woven protective fabric Available space bedroom A/T terrace 100 mm(max) sloped leveling or screed 200 mm reinforced concrete slab

2% min

Prefabricated Kitchen and Bathroom Boxes. Cantilivered metal structure with cementitious fiberboard. Plug in fixtures under floating floor.

L + 24,50m

2. 50 mm Folding wooden shutters on C profile 900 mm steel balcony rail with wooden top 70x150 mm aluminum C profile 40 mm sluminum frame sliding glass door 70x150 mm aluminum C profile anchored to ceiling 15 mm plasterboard panel nailed to C profile

2.

3. L + 21,20m

3. 15 mm Plastered cementitious fiberboard 2 layer bituminous waterproofing membrane 70x150 mm aluminum C profile 2x 15 mm plasterboard panel nailed to C profile 15 mm ceramic tile 19x120 Par-ker 80 mm screed above profile 50 mm metal deck IPE 140 steel beam substructure

4. 15 mm ceramic tile 19 x 120 Par-ker 180 mm M profile aerated lightwieght concrete blocks 1 layers Non Woven protective fabric 2 layer bituminous waterproofing membrane 200 mm reinforced concrete floor slab

5. 40 mm U Channel Glass system SF60 Store Front by Bendheim

6. 30 mm concrete tile 40 x 40

3 layer bituminous waterproofing membrane 70 mm leveling concrete (lightweight) 200 mm reinforced concrete floor slab 200 mm dim gres perforated drain channel Gravel and soil substrate

4.

A

A

5. L + 4,90m

Daycare Center

B

B Commercial Space for Rent

Arts & Crafts Shop

Food Market

Restaurant Laundry Service

6. 2% min

Bike Cafe

N Car Sharing

L + 0,00m

N Bike Sharing

HOUSING BUILDING DETAILED SECTION

1:50 PUBLIC LEVEL FLOOR PLAN

1:200

5


Kobuleti | Georgia

Kobuleti house

construction state picture

winter garden render view

transversal section

6

construction state picture

Felipe Monsalve Fernandez


Kobuleti | Georgia

Kobuleti house

north facade

waterfront terraces render

Hembert Penaranda Officina Architetti Milan, Italy Project under construction Built area: 4.000 sqm

general situation plan

Budget: 13 million euro Design team. Hembert Penaranda Andres Morales, Olena Fedosenko, Stefano Dellepiane, Felipe Monsalve year. 2012-2013

7


Milan | Italy

Cittรก studi sustainable campus The Politecnico di Milano campus, along with the Universitรก di Milano have proposed a radical renovation project of cittรก studi, the main educational area of Milan. Under the name of Sustainable Campus, the aim of the project is to re-propose the relationship that the campus has with the city. Mobility , easiness of access and lively urban activities are the main elements proposed to re-activate the campus as a node for urban live.

trifoglio open building render

The project proposes to make usse of every under-exploited space, such as parking, underground and service areas, to provide a network of 24/7 soft activities that become the backbone of the campus.

central courtyard intervention section

Eng. PoliMi

general axonometry

Trifoglio

uniMi to trifoglio section

8

Felipe Monsalve Fernandez


Milan | Italy

Cittรก studi sustainable campus

trifoglio open building exploded

trifoglio open building render

building courtyard new section

Politecnico di Milano Academic project

Prof. Remo Dorigati Design team. Manuelle Mossoni year. 2012

9


Guilin | China

Kingsborn sport park, village and resort

brise soleil shading cover

mountain view panoramic rooms mountain view wedding chapel

The masterplan defines a 250,000 square meters area 10 km south of the urban area of Guilin, with commercial village, sports facilities, and a 200 rooms four-star hotel. The idea is to imagine the growth of the commercial village and the hotel as a unitary body with the same relationship that actually exists between the bamboo forest and mountains that characterize the natural surrounding environment. The village is in fact composed of a large shading canopy which covers the commercial pavilions arranged in a pattern that is prosecuting the fabric of the existing village northward. The hotel is the symbolic landmark of the complex. The typological structure

10

is made of a circular base that contains lobby, bar, restaurants and a wellness centre, on which on the upper floors is growing a perimetrical ring of rooms on several floors at different heights to allow better exposure to the sun and view for all the rooms. The ring is topped with a shading roof that caresses the different odds of the rooms ring. At the center of the ring on the lobby club is placed a few inches of water tank that makes a reflection effect inside the ring. A water courtyard that plays in architectural terms, the iconic image of the mountains reflected in the water of the Lijiang River. Text taken from A.M Progetti website.

A.M Progetti Milan, Italy

Design. Joseph Di Pasquale Design team. Matteo Ranghetti, Maria Novozhilova, Esteve Borja, Felipe Monsalve year. 2013

mountain view panoramic rooms

entrance hall mountain view lounge bar mountain view wedding baquet rooms mountain view spa and wellness center

rivershore luxury suites

Felipe Monsalve Fernandez


Milan | Italy

Preservation of a XXc. heritage building ENTRANCE HALL DEMOLITION

ENTRANCE HALL

DEMOLITION

SERVICES

OPEN SPACES

CENTRAL HALL

SERVICES

OPEN SPACES

WL. DEMOLITION OF EXISTING WALL PARTITION ROOMS

EXHIBITION SPACE

WL. DEMOLITION OF EXISTING WALL PARTITION

WL. DEMOLITION OF EXISTING WALL PARTITION

WL. DEMOLITION OF EXISTING WALL PARTITION ROOMS WL. DEMOLITION OF EXISTING WALL PARTITION PATIO

WL. DEMOLITION OF EXISTING WALL PARTITION

WL. DEMOLITION OF EXISTING WALL PARTITION WL. DEMOLITION OF EXISTING GLASS PARTITION

EXHIBITION SPACE

CENTRAL HALL

WL. DEMOLITION OF EXISTING GLASS PARTITION

WL. DEMOLITION OF EXISTING WALL PARTITION PATIO

MODIFICATION MODIFICATION

FL. RAISE LEVEL TO MATCH MAIN LEVEL

FL. RAISE LEVEL TO MATCH MAIN LEVEL

FL. RAISE LEVEL TO MATCH MAIN LEVEL

FL. RAISE LEVEL TO MATCH MAIN LEVEL WL. CLOSE DOOR OPENING

FL. RAISE LEVEL TO MATCH MAIN LEVEL WL. MODIFY WALL PARTITION TO PIVOTING SYSTEM

WL. MODIFY WALL PARTITION TO LOW RISE WALL

FL. RAISE LEVEL TO MATCH MAIN LEVEL FL. MODIFY FLOOR FINISH TREATMENT

WL. CLOSE DOOR OPENING WF. MODIFY GLASS FACADE DETAIL

WL. MODIFY WALL PARTITION TO PIVOTING WL. MODIFY SYSTEM GLASS

WL. MODIFY WALL PARTITION TO LOW RISEGLASS WALL WL. MODIFY

PANEL DETAIL

PANEL DETAIL

WL. DEMOLITION OF EXISTING GLASS PARTITION

WF. MODIFY GLASS FACADE DETAIL WF. MODIFY GLASS FACADE FOR DOOR OPENING

WL. MODIFY GLASS PANEL DETAIL WL. MODIFY WALL TO DOOR OPENING

WL. MODIFY GLASS PANEL DETAIL

WL. DEMOLITION OF EXISTING GLASS PARTITION

WF. MODIFY GLASS FACADE FOR DOOR OPENING FL. MODIFY FLOOR FINISH TREATMENT

WL. MODIFY WALL TO DOOR OPENING WL. MODIFY BLOCK WALL WITH GLASING

FL. MODIFY FLOOR FINISH TREATMENT CL. NEW SKYLIGHT OPENINGS

WL. MODIFY BLOCK WALL WITH GLASING WL. NEW SLIDING WALL PANELS

CL. NEW SKYLIGHT OPENINGS

WL. NEW WALL ADDITION

WL. NEW NICHE EXHIBITION SPACES

CL. NEW SKYLIGHT OPENINGS FL. NEW FLOOR FINISH TREATMENT

WL. NEW WALL ADDITION WL. NEW GLASS PARTITION

WL. NEW NICHE EXHIBITION SPACES FL. NEW FLOOR FINISH TREATMENT

FL. NEW FLOOR FINISH TREATMENT

WL. NEW GLASS PARTITION

FL. NEW FLOOR FINISH TREATMENT

ADDITION ADDITION

CL. NEW SKYLIGHT OPENINGS WF. NEW GLASING PANEL FOR DOUBLE FACADE

WL. NEW SLIDING WALL PANELS

WF. NEW GLASING PANEL FOR DOUBLE FACADE WF. NEW GLASS BOX

FL. MODIFY FLOOR FINISH TREATMENT

45%

15%

VALUE REMAINS CONSISTENT

15%

15%

10% 15%

10%

VALUE REMAINS CONSISTENT

15%

15%

10% 15%

10%

15%

VALUE INCREASES SLIGHTLY

VALUE INCREASES SIGNIFICANTLY

10%

35%

10%

35%

10% 10% 10%

USE USE

USE USE

10%

40% 20%

20%

20% 10%

20%

25%

20%

30%

25%

20%

30%

15%

10% PROFESSORS:

ARCH. ANDREA CANZIANI ARCH. COSIMO MONTELEONE ARCH. RODOLFO MAFFEIS

10%

15%

30%

35%

15%

35%

25%

10% 25%

15%

30%

35%

15%

35%

25%

25%

20% 20%

15% 25% 25%

15% 10% 10%

Matrix of Values

10% 10%

20% 40%

15%

NEWNESS NEWNESS

15%

VALUE DECREASES SLIGHTLY

VALUE INCREASES SLIGHTLY

20%

10%

HISTORICAL HISTORICAL

45%

VALUE DECREASES SLIGHTLY

NEWNESS NEWNESS

45%

USE USE

USE USE

15%

HISTORICAL HISTORICAL

30%

45%

NEWNESS NEWNESS

30%

HISTORICAL HISTORICAL

VALUE DECREASES SIGNIFICANTLY

NEWNESS NEWNESS

30%

HISTORICAL HISTORICAL

30%

NEWNESS NEWNESS

USE USE

HISTORICAL HISTORICAL

VALUE DECREASES SIGNIFICANTLY

30%

10%

WF. NEW GLASS BOX FOR ENTRANCE

The preexistences are assessed with a Matrix of values to decide the possible impact of the intervention on the identity, in relationship to the relevance of the proposed feature and decide the convenience of such intervention. The new use proposed for the previous education building is a Contemporary art Museum and Academy.

30%

30%

10% 10%

FOR ENTRANCE

The Architectural Preservation Studio topic is to achieve a comprehensive conservation project on the modernist project, Istituto Marchiondi (1957) by Vittoriano Vigan贸.

30%

10% 20% 20% TOTAL

10%

PROFESSORS:

ARCH. ANDREA CANZIANI ARCH. COSIMO MONTELEONE ARCH. RODOLFO MAFFEIS

KATARZYNA KROL ALEXANDRA SHATSKAYA FELIPE MONSALVE CAMILO PELAEZ KATARZYNA KROL ALEXANDRA SHATSKAYA FELIPE MONSALVE CAMILO PELAEZ

10%

TOTAL

VALUE INCREASES SIGNIFICANTLY

In the design process, the building is surveyed to register the actual state of decay. Politecnico di Milano Academic project

Prof. Andrea Canziani Design team. Alexandra Shatskaya, Katarsyna Kroll, Camilo Pelaez year. 2011

Plan and Section of Intervention with Value analysis

11


Milan | Italy

Milan expo 2015 main entrance building Required program volume in Plot

Facade facing EXPO grounds

Design Process diagrams

12

Ground floor general plan

Felipe Monsalve Fernandez


Milan | Italy

Milan expo 2015 main entrance building

Section 1, 2 & 3

external façade

scale : 1:5

Section detail

scale : 1:20

2x 8mm laminated safety glass + 16mm air cavity. SGG Planitherm Futur N. U value 1.4 W/m2K

Schüco aluminum window frame system AWS70 with window sill.

150 mm white gravel covering

22,25 m

3 layer bituminous waterproofing membrane 100 mm rigid foam sheet thermal insulation vapour barrier 150 mm leveling concrete (lightweight) 120 mm concrete above profile 46 mm metal deck IPE 330 steel beam suspended ceiling Knauf system 25mm plasterboard Knauf system

35x50 mm anodized aluminum profile for facade supporting structure.

2 x 20 mm wood board for window frame. Glued and bolted to profile 50x100 mm aluminum C profile for Knauf system. Section 1 1:5 detail section on table 2

2 x Drywall scruw TN for Knauf system 100 mm Eco-eficient sandwich panel with metal exterior finish. by MBCI. Nailed.

Section 4 1:5 detail section on table 2

Section 2 1:5 detail section on table 2

Vapor barrier, taped.

Section 5 1:5 detail section on table 2 13mm cover LEP 13 25mm panel FHB 25 120mm transition profile

3 layer bituminous sealing membrane.

120 mm concrete above profile

2 x 60mm Mineral wool insulation

46 mm metal deck IPE 330 steel beam suspended ceiling Knauf system 25mm plasterboard Knauf system

2 X 15 mm plasterboard panel for Knauf system, nailed to C profile.

Knauf CW 100 stud, bolted to C profile. Section 3 1:5 detail section on table 2

15 mm wood skirting, bolted. 150x100 mm aluminum C profile for Knauf system, bolted to concrete with Knauf nailable plug.

2 x 35 mm wood board. Glued and bolted.

13mm cover LEP 13 25mm panel FHB 25 120mm transition profile

Shöck Isokorb type KST system for thermal bridging on facade's structure.

120 mm concrete above profile 46 mm metal deck IPE 330 steel beam 100mm mineral wool thermal insulation 40mm supporting frame 50mm Isoclear polycarbonate panel, colored.

50x70 mm anodized aluminum anchored to concrete for facade supporting structure.

2x 35x70 mm anodized aluminum profile for facade supporting structure.

Anodized aluminum grid welded to aluminum profile. MetFloor 80edge trim fixed to decking sheet.

0m

External metal cladding on 4mm copper perforated sheeting, bolted to aluminum frame.

The World EXPO 2015 will take place in Milan, Italy and has rapidly become the center of most of the urban, politic and architectural discussions, both in the center of the academic and the professional life. 100 mm Eco-eficient sandwich panel with metal exterior finish. by MBCI. Nailed to profile.

Schüco aluminum window frame system AWS70.

The lands located 25 minutes north of the city center will be urbanized and provided with the main urban infrastructure to host this major international event. Section &5 The4polemic project has adopted an urban sustainabinternal façade scale : to1:5 lity approach in attempt reduce the social resistance 35x50 mm anodized aluminum profile for facade supporting structure.

3 layer bituminous waterproofing membrane 70 mm leveling concrete (lightweight) 120mm concrete above profile 46mm metal deck IPE 360 steel beam

MetFloor 80 metaldeck system 120/240 IPE steel beam with anti corrosion paint coating.

100 mm Mineral wool insulation glued to beam. External metal cladding on 4mm copper perforated sheeting, bolted to aluminum frame.

2% min

30 mm concrete tile 40 x 40

Expansion anchor for concrete HSL-3 M8 / 40 by Hilti

- 4,20 m

2% min

50mm polished concrete

Anodized bolting. Electroplated, approx. 7 – 10 μm Zn + yellow or bright chromating.

200mm concrete slab 100mm thermal insulation(XPS) PVC covering 300mm gravel

Ventilated facade detailed section 1:5

Facade section detail 1:20

2 X 15 mm plasterboard panel for Knauf system, nailed to C profile.

GROUP 8

Detailed sections 1: 20

table 1

Structural scheme of facade support. suggesting a low impact fair with buildings that will be work together during the EXPO and provide a suitable re-adapted and re-used after the EXPO to minimize its and self-standing office building for when the EXPO impact. 2015 is over. (same in both facades)

2x 70mm Mineral wool insulation

150x100 mm aluminum C profile for Knauf system.

The project of the Studio is the Main entrance Building that will host the Auditorium, Press Office and Open Plaza, among others. The impact of this features and its incompatibility with scale : 1:10 a post-expo situation become the theme of the project where, Temporary and Permanent (post-expo) have to 20 mm wood board for window frame. Glued and bolted to profile

2x 8mm laminated safety glass + 16mm air cavity. SGG Planitherm Futur N. U value 1.4 W/m2K

Politecnico di Milano Academic project

Prof. Joseph Di Pasquale, Andrea Tartaglia Design team. Zlatina Kaladzhieva, Breandan O’Donell, Paolo Volpeti year. 2011

13 2x 8mm laminated safety glass + 16mm air cavity. SGG Planitherm Futur N. U value 1.4 W/m2K

FW 70 Schüco aluminum window frame for curtain wall glassing


Bogota | Colombia

Project management on commercial projects Titรกn Plaza Shopping Mall Bogota, Colombia

Caribe Plaza Shopping Mall Cartagena, Colombia

Ventura Plaza Shopping Mall and Business Center Cucuta, Colombia

2007 - 2010

2009 - 2010

2006 - 2010

My roll:

My roll:

Coordination of architecture with technical designs. Coordination of major department stores (Carrefour, Falabella, Zara, Cinecolombia) Project managment, financial model, cash flow, cost control and execution.

Aprove and coordinate the design of all individual commercial units. (Team work) Coordination of architecture with technical designs and construction quality control. Coordination of major department stores. Project managment, financial model, cash flow, cost control and execution.

Aprove and coordinate the design of all individual commercial units. (Team work) Coordination of architecture with technical designs. Coordination of all major department stores. Project managment, financial model, cash flow, cost control and execution.

Project features:

Project features:

Project features:

170.000 covered sqm - 190 commercial units LEED certification candidate Business Center - Opens august 2012 Architectural design: Tamayo Montilla Archs

80.000 covered sqm - 200 commercial units Urban renovation plan Architectural design: Tamayo Montilla Archs

60.000 covered sqm - 180 commercial units Urban renovation Business Center in 2nd stage over building Architectural design: Tamayo Montilla Archs

My roll

14

(in team work):

Felipe Monsalve Fernandez


Bogota | Colombia

Student housing at Universidad Nacional

Project description:

Ground floor general plan (Autocad)

On the National University, and its modern architecture as a field of study, the students suggest the ideal location for the new student residences building. The function, seeks to rescue the campus spirit where living and studying came

4th Floor and terrace plan (Autocad)

Physical model scale 1:500

together and would be supported by every pie- from where the functional boxes rise and throuce of non lineal analysis made by each student. gh long circulations, end up in the interior spaIn my project the central motive would be the ces of each student, all the way to the detail. junction of non established circulations made across time by the daily walk of the students 15


Felipe Monsalve Fernandez ARCHITECT moncalves@hotmail.com 2013


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.