MK
ARCHITECTURE PORTFOLIO MONEESHA KUMAR
REG NO : 1451320035 SRM UNIVERSITY , Chennai
MONEESHA KUMAR
( 3rd year B Arch - present )
ABOUT ME HI , I am a highly motivated and hardworking person who looks for creativity in smallest of things . My passion for architecture is extensive and I'm determined to adept it . For me architecture has always been about the people , the way they live , use and experience the space . I am looking forward to gain more practical knowledge , and technical skills thorough the training period .
EDUCATION 2000 - 2012
Sacred Heart mat,hr sec, school Church Park , Chennai 2013 - present SRM University , Ramapuram, Chennai
HOBBIES AND INTERESTS PROFILE NAME
MONEESHA K
DATE OF BIRTH
22nd September 1995
ADDRESS
29 , Alsa Nat Ville , North Boag Road , T.Nagar , Chennai 600017 .
CONTACT +91 9789938443
moneesha.arch@gmail.com
Dance
Travel
Music
Books
TRANSFERABLE SKILLS Manual drafting Pen and Ink rendering Pencil Sketching Model making Team management
TECHNICAL SKILLS
Auto CAD Autodesk Revit Sketchup Photoshop Lumion
COMPETIONS 2013 NASA - Dance entry 2014 Zo Nasa , Nasa - Reubens , LIK Trophy 2015 Zo Nasa , Nasa , Reuben’s Trophy
22.5
45
67.5
90
CONTENTS
Women are always told, 'You're not going to make it, its too difficult, you can't do that, don't enter this competition, you'll never win it,' - they need confidence in themselves and people around them to help them to get on. - ZAHA HADID
SINGLE SPACE - BEDROOM
03
2ND SEMESTER ,1ST YR , 2013
04
RESIDENTIAL DESIGN 2ND SEMESTER ,1ST YR , 2013
INSTITUTIONAL DESIGN
05
3RD SEM , 2ND YR , 2013
07
LIBRARY DESIGN 4TH SEMESTER . 2ND YR , 2013
COMMERCIAL DESIGN
09
5TH SEMESTER , 3RD YR , 2013
13
INDUSTRIAL DESIGN 5TH SEMESTER , 3RD YR , 2013
INSTITUTIONAL DESIGN (CAMPUS)
15
6TH SEMESTER , 3RD YR , 2013
SKETCHES
23
MONEESHA KUMAR 02
01
SINGLE SPACE DESIGN
CONCEPT The brain of a kid undergoes development through various stages , the various level of maturity depends on the development stages . the kids space is designed with various levels symbolising the different stages a kid goes through . The levels thereby enables active movement of the kid throughout the spaces .
KID’S BEDROOM A
B
A
B
W
/R
PROJECT :
Toilet
Study
To Design a kid’s space which includes, bedroom with attached toilet , play area and a study area . As the brief says “KID’S SPACE” we presume the various character of the space as COLOURFUL , INTERESTING , LIVELY .
Balcony
Bed room
Play indoor
UP
A MAIN BUILDING
Dn B
B
de
Play out door
MAIN BUILDING
A
ra
r Te
ce
r ga
n
KEY ASPECTS
GROUND FLOOR PLAN
First floor plan
300
300
BALCONY
3200
TERRACE GARDEN
STUDY
MAIN BUILDING 1000
2100
3200
300
INTERIOR VIEW
3200 2100
300
600
2100
3200
PLAY OUTDOOR
Section A
03 MONEESHA KUMAR
and sleep from play
PROJECT HIGHLIGHTS
PLAY INDOOR
3500
BED ROOM
To create an interesting space A space which keeps the kids active levels to create areas of interest cleverly dividing the areas of study
SECTION - AA Section B
2 Bedded sleeping area- 12 sq.m Indoor play area 5 sq.m Study area 8 sq.m Toilet 4 sq.m Outdoor play area 9 sq.m
CONCEPT
A grid that evenly divides spaces paves way to maximum functionality . The grids eventually forms squares and rectangle which is shaped according to various functions involved in a residence and office space . The resultant of the formed functional spaces are designed as a beautiful garden area which fortunately serves and a good view points from almost all the areas of the house
RESIDENTIAL ARCHITECTECT’S RESIDENCE CUM OFFICE
PROJECT :
KEY ASPECTS 11'-121"
5'-0"
Landscaped area
20'-0"
Fully functional spaces Central courtyard micro climate Lawns surrounding the major areas Clear privacy between residence and office Separate entry and parking for residence and office
60'-0"
12'-6"
To design an architect’s residence having the office/studio facility along with it . As the brief is to provide a two bedroom residence . The design is eventually expected to provide privacy to the residence from the office space . The challenge is to balance the harmony and the flow between the private space and the semi private space .
02
Landscaped area
DESIGN STUDIO
Toilet
10'-9"
CREDENZA
5'-0"
Utility
Kitchen
Landscaped area
3'-1½"
8'-10" X 9'-6"
11'-0" X 12'-6" X 9'-6"
12 Sq.Mt
60'-0"
60'-0"
Bed room
12'-0" X 10'-9"
FRIDGE
18 Sq.Mt
T.V.UNIT
STUDY
A
A
Toilet
12'-9"
Landscaped area
5'-0"
8'-7½" X 4'-9" Sit out
Dining
Fibre Sheet Roof
12'-1" R O A D
Toilet
4'-0"
8'-7½" X 5'-0"
Terrace
Terrace
Parapet Wall
10'-0"
WARDROBE
M.Bed
5'-0" 12'-0" X 12'-7½"
Verandah
20 Sq.Mt
Roof Slab & Beam Parking
5'-0"
T.V.UNIT
17'-0"
T.V.UNIT
5'-0"
12'-6"
12'-121"
Toilet
Dining
22 Sq.Mt
STUDY
1'-6"
Formed G.L
5'-0"
Landscaped area
5'-0"
Compound Wall Landscaped area
5'-0"
Sit out
20'-0" X 12'-0"
60'-0"
R O A D
SECTION Section -AAA
SITE PLAN CUM FLOOR PLAN
MONEESHA KUMAR 04
CONCEPT
03
The kids are pampered and being controlled to vast extend as a measure of safety . hence the concept was to design a nursery school which would resemble a city or a town to give them the feeling and liberty and make them experience the outdoor life before they enter the actual world outside . for instance few of the pubic bodies are integrated in the design in a customised way as follows universities and school - classrooms police station - staff room park - play area hospitals - 1st aid room theatres - AV room hotels - canteen
INSTITUTIONAL DESIGN NURSERY SCHOOL A
1.97
70.00 3 M W I D E D R I V E WAY
SECURITY
PEDESTRIAN WALK WAY
UP SER.RM
+ 0.90 M LVL
URINAL W.B
URINAL
2 M WIDE
UP
CORRIDOR
SER.RM
2.0 M x 3 M
2 M WIDE
+ 0.60 M LVL
± 0.00 LVL
9.20
VAN
CAR
CAR
5.00
WATER BODY
13.93
+ 0.53 M LVL
+ 0.90 M LVL WAITING
LANDSCAPED AREA RECEPTION
± 0.00 LVL W.C.
4.00
A
4.00
W.C.
70.00 R
05 MONEESHA KUMAR
O
A
D
SITE CUM GROUND FLOOR PLAN
16.12
W.B URINAL
STAFF ROOM
W.B
W.B URINAL
12.50 M x 8.23 M CLASS ROOM 12.50 M x 6.0 M
ENTRY
CORRIDOR
TWO WHEELER PARKING
3 M W I D E D R I V E WAY
2 M WIDE
W.C.
CAR
CHILDREN AND PARENTS WAITING HALL 6.0 M x 12.50 M
PEDESTRIAN WALK WAY
PEDESTRIAN WALK WAY
CLASS ROOM 6.0 M x 12.50 M
3.00
STORE ROOM 6.0 M x 4.20 M
VAN
CAR
3 M W I D E D R I V E WAY
OPEN PRAYER HALL
PEDESTRIAN WALK WAY
PEDESTRIAN WALK WAY
PEDESTRIAN WALK WAY
3 M W I D E D R I V E WAY
PEDESTRIAN WALK WAY
PEDESTRIAN WALK WAY
25.81 CORRIDOR
± 0.00 LVL
2 M WIDE
3.00
3 M W I D E D R I V E WAY
45.00
D A O R
PLAY AREA
B
D
± 0.00 LVL
TOILET
12.38
3.00
+ 0.53 M LVL
R
B
CORRIDOR
LANDSCAPED AREA
CLASS ROOM 6.0 M x 12.50 M
PROJECT :
2.0 M x 3 M
45.00 O A
3.00
CLASS ROOM 12.50 M x 6.0 M
EXIT
DAY CARE 10.65 M x 10.62 M
CLASS ROOM 12.50 M x 6.0 M
4.49
W.C.
W.B
3 M W I D E D R I V E WAY
W.C.
To design a NURSERY SCHOOL to study the intensity and quality f natural light under various circumstances . to analysis how space such as corridor , lobbies , and courtyard can be designed to foster interaction .
PROJECT HIGHLIGHTS
A
1.97
70.00
CLASS ROOM 12.50 M x 6.0 M
EXIT
URINAL
W.B
CLASS ROOM 12.50 M x 6.0 M
4.49
W.C.
W.B
URINAL
W.C.
OPEN TERRACE
UP
3.00
2 M WIDE
UP
CORRIDOR
DN
DN
2 M WIDE
PEDESTRIAN WALK WAY
URINAL
B
W.B
VAN
VAN
URINAL
+ 0.60 M LVL
D 45.00 O A
CAR CLASS ROOM 6.0 M x 12.50 M
CAR
R
OPEN PRAYER HALL
PEDESTRIAN WALK WAY
BELOW
12.38
CAR
PEDESTRIAN WALK WAY
25.81 PEDESTRIAN WALK WAY
45.00
PLAY AREA
PEDESTRIAN WALK WAY
R
O
A
D
PLAY AREA
W.B
W.C.
3.00
CORRIDOR
B
W.C.
CAR
3.00
5.00
9.20 13.93
V.P ROOM 4.14 M x 2.06 M
P.A.ROOM CONFERENCE 5.14 M x 8.23 M
STORE ROOM 4.14 M x 2.06 M
16.12
OPEN TERRACE
TWO WHEELER PARKING
PEDESTRIAN WALK WAY
PEDESTRIAN WALK WAY
3.00 PRINCIPAL RM 5.14 M x 4.0 M
2.00
ENTRY
W.B W.C.
A
4.00
CLASSROOM - 7 NOS - EACH 75 M . SQ PLAY AREA - 1 NOS - 250 M. SQ SEMI OPEN PRAYER AREA 1 NOS 200 M .SQ DAY CARE CENTRE - 1 NOS 100 M.SQ AV ROOM - 1NOS - 50 M .SQ DINNING - 2NOS -EACH 75 M.SQ ADMIN AREA - 200 M.SQ CAR PARK - 5 NOS VAN - 2 NOS BIKE PARK - 10 NOS CONCEPTUAL SITE PEDESTRIAN - 3 M - 4M WIDE CORRIDORS - 2 M WIDE
SECURITY
PEDESTRIAN WALK WAY
70.00
R
O
A
D
HEAD ROOM
SITE CUM FIRST FLOOR PLAN
TERRACE FLOOR LVL TEXTURE PAINT FIRST FLOOR IN ELEVATION FIXED GLASS FIXED GLASS
FIXED GLASS
PARAPET WALL
PERGOLA
KEY ASPECTS
4.00
FIXED GLASS
FIRST FLOOR LVL - 4. 90 M LVL
DAY CARE
BRICK CLADDING WITH OPENING
BRICK CLADDING WITH OPENING 0.53 M LVL
0.90 M LVL
0.90 M LVL
0.53 M LVL
0.53 M LVL
± 0.00 M LVL
GROUND FLOOR LVL - 0.90 M LVL ± 0.00 M LVL
SECTION - A A PARAPET WALL
HEAD ROOM
PARAPET WALL
HEAD ROOM TERRACE FLOOR LVL
CORRIDOR
CORRIDOR FIXED GLASS
FIXED GLASS
PARAPET WALL FIRST FLOOR LVL - 4. 90 M LVL
TEXTURE PAINT
CORRIDOR
BRICKWORK WITH CIRCULAR OPENING
OPENING
SERVANT ROOM
SERVANT ROOM 0.90 M LVL
± 0.00 M LVL
0.53 M LVL
BRICK CLADDING WITH OPENING PLAY AREA - 0.00 M LVL
SECTION - B B
To create an interesting space SEMI OPEN ASSEMBLE SPACE WITH PERGOLAS AND LANDSCAPE WATER BODIES INCORPORATED
GROUND FLOOR LVL - 0.90 M LVL 0.53 M LVL ± 0.00 M LVL
MONEESHA KUMAR 06
INSTITUTIONAL
PROJECT : To design a library which a part of and institution , college campus . The design is intended to study how the the spaces such has lobbies , corridor , courtyards etc can be designed to foster interaction .
Em
er
ge
nc
yE
xit
04
LIBRARY DESIGN
C
Em
erg
B
en
cy
Ex
it
DU
Reading area Partially covered . W.C
B
. W.C
. W.C
. W.C
Urina
. W.C
CT
. W.C
ls
G.Toilet Down
.B W
Book shelfs
Jan
+ 0.90 M LVL
+ 1.05 M LVL
Book shelfs
W.B
L.Toilet
Chief Librarian
+ 0.75 M LV L
itor
Up
Do
Staff Seating
Do
A
Do
Reading area + 0.65 M LVL
M
+ 0.55 M LVL
ep ap
n
gr
ow
ch
ro
D
ou
KEY ASPECTS
R
lc
L LV
ua
U
p
A
y
Open Reading area
75 0.
id
iv
M
wa
wn
+
d In
+
05 1.
Courtyard
hy
Sh el
+
f
LV L
C
M
Ground floor plan
4.00
0.15
Lexon sheet covering
Pergola
Open Reading area
Book shelfs
Book shelfs
Reading area
Individual couch
Pergola
0.15
ain en 0. 45 tran ce M LV L
4.00
+
Reading area Partially covered
Individual couch
Book shelfs
Book shelfs
Reading area Open Reading area
1.05
open reading 200 sq.m stalk area 400 sq.m semi open reading 100 sq.m staff reading 40 sq.m carrels 50 sq.m
M
INTERESTING FORM USER FRIENDLY CENTRAL COURTTYARD ALL SPACES NATURALLY VENTILATED
n tio om ep ro k s ec k R loc di C sue is
Ground floor :
0. 90
SITE AREA 3589 SQ.M BUILT UP AREA - 1400 SQ.M G +1 FLOOR
wn
Wa lk
L LV
PROJECT HIGHLIGHTS
wn
+ 1.05 M LVL
07 MONEESHA KUMAR
+ 0.75 M LVL
+ 1.05 M LVL
0.15
Section - A A Pergola
L.Toilet
G.Toilet
+ 0.65 M LVL
+ 0.55 M LVL
+ 0.45 M LVL
CONCEPT A flower has an organic shape which is a gift of nature in the form of petals . These petals falls off in random pattern and the pattern formed is also found to be organic . The challenge of transforming the the resultant organic shape architecturally functional was the start to the design . The basic concept was combined with a major concept “SUSTAINABILITY” to give rise to a design which is naturally ventilated and consumes natural lighting at every nook and corner .
SUSTAINABILITY
C B
DU
Open Reading area . W.C
CT
. W.C
. W.C
B
. W.C
Urina
. W.C
. W.C
ls
G.Toilet Down
.B W
Book shelfs
Book shelfs
W.B
L.Toilet Jan
itor
UP
Computer
A
A
UP
Reading area
Courtyard d In id
iv ua R ep ap
gr
ch
wn
ro
ou
lc
Do
hy
Sh el f
C
Pergola
4.00
Book shelfs
4.00
Reading area Partially covered
Book shelfs
L.Toilet
L.Toilet
G.Toilet
G.Toilet
Book shelfs
Book shelfs
Chief Librarian
First floor plan
1st floor : open reading 200 sq.m stalk area 400 sq.m semi open reading 100 sq.m E-Book 40 sq.m carrels 50 sq.m
0.90
4.15
0.15
4.00
0.15
Green Roof - less run off water water body around all sides open - cross ventilation Open Reading area
n tio om ep ro k s ec k R loc di C sue is
KEY ASPECTS
UP
+ 0.90 M LVL
+ 0.75 M LVL
+ 1.05 M LVL
+ 0.75 M LVL
+ 0.75 M LVL
Section - B B Lexon sheet covering
MONEESHA KUMAR 08
SHOPPING MALL
PROJECT :
Study of the architecture expression that imbue in a building with certain image 0f posh , extravagant , luxury unmark , downtown , hitech ,ethnic eat . . The design is intended to understand the circulation pattern and the service required for a commercial building .
6.00
05
COMMERCIAL DESIGN
2.40
6 95.7
8
EM
BAS
6.00
RAM
RAM
PU
UND RO OG PT
PD
EN
T LIN
.00
E
EN T
EM
AS OB NT
EL
LEV
PROJECT HIGHLIGHTS
72.07
T EXI 6.0
10
1
.39
PLOT AREA
FSI AREA SQ.M
AREA STATEMENT
.14 113
10M .09 22
E WID 8
.96
79.9
.00
20
DR
54
D
IV
A E W
Y
ROA SK
DE
6
.00
276
276
LOWER GROUND FLOOR AREA
3749
210
3959
GROUND FLOOR AREA
2839
210
3049
FIRST FLOOR AREA
3225
210
3435
SECOND FLOOR AREA
3225
210
3435
THIRD FLOOR AREA
3225
210
3435
FOURTH FOOR AREA
3214
221
3435
FIFTH FLOOR AREA
3214
221
3435
23034
1768
24802
EM
0 0.0
6.0
16.42
10.63
1
PARKING AREA ( BASEMENT FLOOR ) - 6414 SQ.M
BAS
DROP OFF
.R O.S
0
6.00
BASEMENT LINE FOR CE SPA VICES SER
106.24
ENTRY
106.25
22.7M WIDE RD
09 MONEESHA KUMAR LAN
EP
TOTAL AREA SQ.M
-
TOTAL AREA
EN
AY E HW PAT RANIT IN G
INE
ED OS MALL OP PR PING OP SH
NON FSI AREA SQ.M
TL
.03
TOWARDS KATHIPARA
9450 SQ.M
BASEMENT FLOOR AREA
ED OS MALL OP PR PING OP H S
6
-
TOWARDS PORUR
FSI ACHIEVED
-
23034 / 9450 = 2.44
PLOT COVERAGE ACHIEVED
-
3749 / 9450 = 39.67 %
KEY ASPECTS Unique form A large central landscape - transition between two units
1 4.4 1.50
R
O
0 1.0
0.2 1 8.0
53
6 FG
SHOP 11 .53
6.16
6.16
4.49
6
4.05
5 9.4
0 1.0
FG
FG
0
0.2
0 0.3
11 .15
1.00
HANDRAIL
0.20
FG
DD
0 9.1
5
STEPS IN GRANITE
14
.24
10
.11
0.3
ANCHOR SHOP
AS PER STRU DRG
0.7
1.00
AS PER STRU DRG
5
0 1.0
COLUMN SIZE
DN 5
3
17
.43 17 .71
1 0 2.0
0.77
7
S ON
3
9
t
0
11
0.2
14
0
2.4
1
2.4
Lif
18
PATHWAY IN GRANITE
10
PE
LD
0
8.50
R
20
KEY ASPECT
2.4
LD
27 26
24 22
RAMP FOR PHYSICALLY CHALLENGED PERSON
3
9.0
t LifSONS
.46
2
.40
ENTRY
ANCHOR SHOP
COLUMN SIZE
.16
7.63 1.00
FIR EX E IT
20
RS
20
PE
2.6
3
1
6.39
UP
1.00
7.45
0.27
4.74
1.00
12.45
1.00
7.94
0.13
4.37
1.00
10.15
2.00 COLUMN SIZE
AS PER STRU DRG
1.00
12.45
1.00
12.45
1.00
12.45
1.00
10.15
2.00
12.28
0.27
14.84
0.27
72.43
72.43
C
A LOWER GROUND FLOOR PLAN
27.26
17.52
A
GROUND FLOOR PLAN
FIRST FLOOR PROJECTION
C
16.94
1.20
PROJECT HIGHLIGHTS INDIVIDUAL AREA
SHOP CORRIDOR
SHOP
CORRIDOR
SHOP
ATRIUM
SHOP
RESTAURANT
RESTAURANT
SHOP
ADMIN OFFICE
SHOP
CAR PARK
EARTH FILLING
SECTION - BB
SHOP
638 1613
TOTAL AREA
3959
1040
ANCHOR SHOP
784
SHOP 4.05
CORRIDOR
4.50
HYPER MARKET
SHOP
174
CORRIDOR / LIFT / TOILET / STAIR ATRIUM LOBBY
0.45
0.45 R A M P
ADMIN OFFICE
GROUND FLOOR AREA
SHOP SHOP
CORRIDOR
4.50
SHOP
RESTAURANT
1534
4.50
4.50
SHOP
SHOP SHOP
CORRIDOR
HYPER MARKET
4.50
4.50 4.50
SHOP
4.50
CORRIDOR
KITCHEN
RESTAURANT
5.00
LOWER GROUND FLOOR AREA FOOD FOOD COURT STALL
4.50
10.00
CORRIDOR
CORE
AREA SQ.M
5.00
FUNCITY
SCREEN - 4
SHOP
1.5
0
1.54
6
D
0.2
.00 10
A C S E
11 .31
5.27
.85
R
O T A
I R
R O
R
T
O
A L
C
5.50
11 .77
.07 72
.99
R O D
0 1.0
L
2.00
4.54
6 0.2
1 8.0
.00 54
2 0.2 11 .35
I
1.72
2.17
2.40
0 2.0 8 7.7
D
L
I R R O
C
R
1 4.4 1.50
R
R
O T
O
A
.00 10
A C
6.16
6.16
0 9.1
0 1.0
4.00
9 9.4
0.30 0.30
8
4.23
1.0
9 6.3
5.54
5.54
R O T A L
E
R O D I
A C
S
2.40
2.00
R R .00
O C
10
S E
.68 .21
38
5 9.4 0 1.0
22.61
12 MM THK TOUGHENED GLASS
17
1
7
WALK WAY IN GRANITE
0.2
9.0
7
FG
DD
4.0
C O R R I D O R
0.27 DD
1.00
16
2.00
B
FG
FG
0
0
0
SHOP
12.09
2.4
2.0
3.0
6
2
5.82
S ON
UP
6.3
1.00
RS
2
0
7
3.6
0
16
t
E 0P
FIR EX E IT
3.0
S ON
S ER 0P
FG
10.00
3
0
Lif
2.4
2.4
D3
5
0.2
P
D3
WC
t Lif
26
6.3
12.45
o L.T
STAIRCASE TO DETAIL
19 1.55 21 23
D2
FG
FG
12 MM THK TOUGHENED GLASS
SHOP
7.11
FG
2.8
.88
20
LD
3
R
1.00
0
17 1.72
t ile
DD
E S C A L A T O R
COLUMN CLADDED WITH ACP OR GRANITE
22.46
12.09
21
LD
27 26 24
5
O
12.45
2.4
t
uc
6.3
D
1.00
R PE
cd
DD
FG
ESCALATOR 30 DEGREE SLOPE
SHOP
FG
t LEiRfSONS
22 20
7
I
C O R R I D O R
FIR EX E IT
18
9
R
12.45
WC
NS SO
SHOP
DD
KIOSK
8.94
1
1.00
3.0
DD
0
DD
5.25
COLUMN SIZE
KIOSK
4.2
12.07
DN
11
R
FG
0 2.4
14
.00
0
HYPER MARKET 0.32
AS PER STRU DRG
DESK
35.75
D2
SHOP
ATRIUM COVERED WITH LIGHT ROOFING
AS PER STRU DRG
FULL HEIGHT WALL WITH SINAGE
FG
4.0
12 MM THK TOUGHENED GLASS UP TO BEAM BOTTOM
0
6
DD1
13
FG TOUGHENED GLASS
FULL HEIGHT WALL WITH MALL ROUTINGS
FG
9 11
FG
10
SHOP
7
AS PER STRU DRG
12 MM THK
FG
4.0
ESCALATOR 30 DEGREE SLOPE
12 MM THK TOUGHENED GLASS
R
3.0
20
8
ESCALATOR 30 DEGREE SLOPE
FG
DD
12.09
10.00
FG
FG
5.25
FG
E S C A L A T O R
COLUMN CLADDED WITH ACP OR GRANITE
DD
5
DD
FG
4
FG
5.7
FG
0
SHOP
FG
2
3.0
FG
DD
.82
5.5
DD
FG
FG
FG
SHOP
ATRIUM COVERED WITH LIGHT ROOFING
24
SHOP
LD
FG
SHOP
LD
5
COLUMN SIZE
FG
O
5
R
6.2
O
5.2 DD
Lift
LD
14.07
WC D3
t Li2f.40
2
T
D FG
D3
0
ABOVE AT 1 ST FLOOR LVL
SHOP
WC D3
20.96
3.0
2.40
Lift
Ele
D2
FG
HANDRAIL IN 12 MM THK TOUGHENED GLASS
3
FG
5.25
OPEN TO SKY
B
DD
6.1
.24
SHOP
E FIR XIT E
O
I
5
5
28
1.20
C
6
WC
1.20
A
B
D3
LD
L
5.4
WC
1.20
A
SHOP
FG
12 MM THK TOUGHENED GLASS
SHOP FG
1.0
WC
1.20
DD
6 5
WC
1.20
C O R R I D O R
SHOP
5.25
FG
KIOSK
WC
1.20
2.40
FG
0
DD
6.3
DD
ATRIUM COVERED WITH LIGHT ROOFING
4.0
FG
DD
D3
WC
Electrical
C O R R I D O R
C
R
5.7
SHOP
FG
0
DD
ESCALATOR 30 DEGREE SLOPE
FG
SHOP
L.Toi D3 D3
D3
DD
FG
FG
12 MM THK TOUGHENED GLASS
8
R
R
5 5.77
12 MM THK TOUGHENED GLASS UP TO BEAM BOTTOM
G.Toi D3
D3
DD
FG
FG
WC
3.4
.01
5.5
O
O
0
22
FU W LL MA ALL HEIG H LL RO WITH T UTI NG S
11 .94
WAFULL LL HE WIT IGH HS T INA GE
9 9.4
0.30 0.30
1.72
8 1.0 9 6.3
2.40
0 2.0
D3
WC
AS PER STRU DRG
0
DD
FG
5.52
D3
1
D2
15
WC
FG
3
6
SHOP
S
T
8 FG
5.25
FG
D2
DD
FG
WALK WAY IN GRANITE
3.0
2.51
D2
SHOP
COLUMN SIZE
0.30
E
.00
A
C
DD
SHOP
e ffic
1.0
0
7
10
L
5.5
no
SHOP
DD
25
D2
A
FG
mi
FG
23
0.23
6.3
0
C
3.0
Ad
11 .77
NS SO ER 0P
FG
S
FG
.82
.07
3.0
E
1
ATRIUM COVERED WITH LIGHT ROOFING
DD
SHOP
2.82
7
7
SHOP
LD
2.3
5
6.3
72
FIR EX E IT
t Lif 2
3.0
21
3
26
D3
SHOP
G.Toilet
0.30
0.30
FF
0
KIOSK
WC
19
1
D3
COLUMN SIZE
FG
.13
24
0
PE
17
5.7
VOID
FG
4.6
20
15
5
1.96
DD
3.0
R
LD
13
11 9
7
26
D3
WC
H.K
2.4
20.96
KIOSK
WC NS SO
LD
5.25
14.09
B
4
t
19 1.55 21
23
D2
SHOP
STAIRCASE TO DETAIL
17 1.72
t ile
7.99
.ch Ph ilet To D
0
SHOP
5.7
Lift
LD
3.9
0
.37
D2
C O R R I D O R
Lif
t
uc
o L.T
WC D3
FG
HANDRAIL IN 12 MM THK TOUGHENED GLASS HANDRAIL IN 12 MM THK TOUGHENED GLASS
cd
11.35
WC
2.4
DD
FG
3.0
E FIR XIT E
10
Lift
DD
FG
FG
FG
2.40
Electrical
DD
FG
FG
12 MM THK TOUGHENED GLASS
D2
D3
WC
WC
WC D3
8
5.61
WC
DD
FG
STAIRCASE TO DETAIL
5
WC
FG
05
13
5.6
L.Toi D3 D3
D3
WC
Ele
D2
D3 DD
FG
3.
9 11
6.6
D2
0
5
WC
WC WC
5.6
G.Toi D3
D3
D3
D3
7
0.30
25
1 3.0
WC
SHOP
5
0.30
.26
23 26
D2
SHOP
3
0.23
5.40
AS PER STRU DRG
0.30
3
3.0
14
0.30
21
1
D2
0.23
5.40
COLUMN SIZE
0.30
15
D3
19
1
SHOP
8
17
SHOP
6.6
0.30
15
G.Toilet
0.23
5.40
R
5
0.30
13
11 9
7 5
WC
0.23
7.94
2.40
D3
STAIRCASE TO DETAIL
8.11
SLAB SUNK BY 10" FOR TOILET PLUMBING LINE
0.30
0.30
FF
H.K
.35
2.3
.ch Ph ilet To D
1.54
WC
1.50
STEPS IN GRANITE
20
12.00
C
A
7.95
1.29 0.12 1.30 0.12 1.30 0.12 1.30 0.23
4.05
SLAB SUNK BY 10" FOR TOILET PLUMBING LINE
O
0.13 2.32 0.13
4.72
C
0.23
5.54
5.40
.00
0.23
10
5.40
A
0.23
C
5.40
S
0.23
E
7.80
5.54
0.35
4.00
7.89
6.16
1.50
66.00
C
53.96
A
CORRIDOR / LIFT / TOILET / STAIR
1225
TOTAL AREA
3049
FIRST , SECOND & THIRD FLOOR AREA
ANCHOR SHOP SHOP
917 MONEESHA KUMAR 10
1056
COMMERCIAL DESIGN
05
SHOPPING MALL 0.23
7.94
0.23
5.40
0.23
5.40
11.35
5.40
25
3.0
D2
1
5.25
SHOP
.00
A L
9 4
PROJECTOR SHOP
SHOP
DD
FG
FG
1534
SHOP
DD
FG
SHOP
FG
174
EXIT
0.23
13.15
0.23
5.77
0.23
7.68
1613
TOTAL AREA
3959
CORRIDOR
FG DD1
4.0
0
ENTRY
638
CORRIDOR / LIFT / TOILET / STAIR ATRIUM LOBBY
EXIT LEVEL CORRIDOR
0.40
ANCHOR SHOP
5.00
FG
FG
FULL HEIGHT WALL WITH MALL ROUTINGS
5.00
FG
THEATRE LOBBY CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
4.50
0.18
DD
0
FULL HEIGHT WALL WITH SINAGE
3.20
1.42
FG
6.05
8.1
R
4.0
ESCALATOR 30 DEGREE SLOPE
SHOP
2.6
3 6.39
GROUND FLOOR AREA
1.00
12.45
1.00
12.45
1.00
12.45
10.15
4.50
4.50 1.00
ATRIUM
SHOP
CORRIDOR
CORRIDOR
2.00
784 1225
FIRST , SECOND & THIRD FLOOR AREA
SHOP RESTAURANT AREA
4.50 4.50
CORRIDOR
917
1056
CAR PARKING
CAR PARKING
162 1300
TOTAL AREA
3435
EARTH FILLING
SECTION - A A
FOURTH FLOOR AREA
FOOD COURT
KIOSK CORRIDOR
HYPER MARKET
CORRIDOR / LIFT / TOILET / STAIR
11 MONEESHA THEATERKUMAR
ANCHOR SHOP
1.62 0.93
ANCHOR SHOP
CORRIDOR
CORRIDOR
4.50
PROJECT HIGHLIGHTS 3049 TOTAL AREA CORRIDOR / LIFT / TOILET / STAIR
SHOP
5.67
FIRST / SECOND & THIRD FLOOR PLAN
ANCHOR SHOP
1548 1253
4.20
A
4.05
SHOP
1040
59.89 72.43
4.50
ANCHOR SHOP
0.45
0.27
4.50
0.77 0.23
UP
ANCHOR SHOP
C
2
S ON
8.50
1 9.0 0
8.3
10
A C S O FG
DD
12.09
3
12.28
1
0
3
RS
E 0P
0.2
5
2.4
7
t
0
2.0
2.4
0
Lif
16
9
2.4
3
P
LD
17.59
0.2
20
4
FG
0
t LEiRfSONS
24
11
2.4
LD
27 26
0
22 20
6.80
Restaurant
4.85
E S C A L A T O R
1.00
3
2.4
18
0.23
5.5
4.50
0 1.0
0.2
FIR EX E IT
DN
8.12
2.17 0.23
0 9.1
SHOP 0.40
14
SHOP
SHOP
B
D
I
O
E
AREA SQ.M
10.00
3.00
DD
SHOP
FG
DD
C
A
.00
C
10
S 5.27
11.04
6
ADMIN OFFICE
P
DD
FG
FG
0
E
R O D I O T
R O C
5.50
R
R .07 72
0 0 1.0
DD
FG
FIR EX E IT
3.0
S ON
S ER
FG
0
R
7.7 0 1.0 11 .77
R
1.0
O
5
D
DD1
FG
D3
2 3.0
I
9.4
R DD
C O R R I D O R
FG
WC
SHOP
LOWER GROUND FLOOR AREA FG
D3
SHOP ATRIUM COVERED WITH LIGHT ROOFING
HYPER MARKET
oi L.T
26
.48
R
R
.82
SHOP
0
COLUMN CLADDED WITH ACP OR GRANITE
FG
t Lif
STAIRCASE TO DETAIL
23
D2
DD
4.0
ESCALATOR 30 DEGREE SLOPE
12 MM THK TOUGHENED GLASS UP TO BEAM BOTTOM
FG
4.6
O
O
PERGOLA ABOVE AT 1 ST FLOOR LVL
DD
4.79
T
SHOP
OPEN TO SKY
INDIVIDUAL AREA CAFE
A
C DD
24
FG
SHOP
R PE
WC NS SO
let
17
L
8
A
FG
3.0
13
17
19 1.55 21
1 10
C
SHOP
5.97
9 11
FG
S
0
FG
DD
7
1.50
ATRIUM COVERED WITH LIGHT ROOFING
DD
3.0
FG
20
t
20
4.4
SHOP
LD
DD
SHOP
1.29 0.12 1.30 0.12 1.30 0.12 1.30
20.96
14.09
B
5
E
C O R R I D O R
LD
5.25
2.40
Lift
LD
3
1.72
R
2.0
E FIR XIT E
2.00
0
2.40
WC D3
Lif
R
1.20
D2
D3
t
uc
O
WC
1.20
WC D3
cd
T
WC
1.20
D2
FG
A
WC
1.20
Lift
D3
Ele
LD
.00
WC
1.20
1
D2
15
WC
D3
WC
1.20
Electrical
DD
0.30
10.00
L.Toi D3 D3
WC
G.Toilet
0.30
0.30
FF
L
D3
DD
FG
FG
D3
H.K
WC
21.75
2.40
9 6.3
G.Toi D3
D3
DD
FG
FG
0
3
D3
WC 1.96
DD
FG
FG
HANDRAIL IN 12 MM THK TOUGHENED GLASS
5.7
3.0
DD
FG
WAFULL LL HE WIT IGH HS T INA GE
1.72
26
.ch Ph ilet To D
D3
WC
4.00
23
1
8
FU W LL MA ALL HEIG H LL RO WITH T UTI NG S
21
3
0.30
0.30
19
D2
SHOP
7
0.30
17
SHOP
8.2
9 7
SHOP
5.54
15
0.30
9.4
13
5
1.0
SHOP
0.30
9
STAIRCASE TO DETAIL
11
7.99
SLAB SUNK BY 10" FOR TOILET PLUMBING LINE
WC
1.54
8.11
0.23
1.50
C
66.00
A
12.00
C
66.00 0.35
4.16
0.12
3.00
0.12
3.00
0.12
3.00
0.12 2.67 0.12 2.67 0.12 2.67 0.12 2.69
0.23
SLAB SUNK BY 6" FOR KITCHEN WASTE
4
WC
DUCT
S ON
PE
20.96
D3 FIR EX E IT
t Lif 20
PE
et
D3
WC
RS
20
3.0
S ON RS
0
VOID
D1 COLUMN SIZE
0
1.5
12 MM THK TOUGHENED GLASS
1.20
CASH COUNTER
A
.00
L
10
O
A C S
1
I
KIT CH
D3
EN
D3
F.S
TA L
L
D3
FO OD 32 CO " H UN EIG TE HT R
L
R R O
D3 D3
O
I D
D3
D3
R
FO OD 32 CO " H UN EIG TE HT R
C
A
5 WC
WC
EN
-4
UPPER EXIT
4.00
1.54
DN
1.50
R
.07
D1
DD
4.2
KEY ASPECTS
1
0
P
0 2.0
9
7
5
11.20
3
1
2.4
0
Lif
20
1.07
t
R PE
MALL MANAGEMENT OFFICE
0
LD
2.4
11
1.07
t LEiRfSONS
22
16
SCREEN - 3
SCREEN - 2
NS SO
UP 0.12
8.01
0.23
13.29
0.23
13.14 72.43
FIFTH FLOOR PLAN
A
0.23
13.08
C
9.0
0
20
SCREEN - 1
1.07
18.67 LD
20
14
1.07
1.07
13
.77
1.07
9.1 0 1.0
1
2.4
DN
18
TOTAL AREA
O
UPPER EXIT
DD
12.09
ADMIN OFFICE
24
634
T
23
FULL HEIGHT WALL WITH MALL ROUTINGS
6.16
C O R R I D O R
6.16
6.16
DD
3.40 0 1.0
FULL HEIGHT WALL WITH SINAGE
2
FIR EX E IT
FIFTH FLOOR AREA
CORRIDOR / LIFT / TOILET / STAIR
A
12.09
1.43
E S C A L A T O R
EX IT
DD
D1
3.73
3.6
27 26
1253
.00
COLUMN SIZE AS PER STRU DRG
5 9.4
PE R
3435
FUN CITY
L
10
A C S
C S E
ATRIUM COVERED WITH LIGHT ROOFING
ESCALATOR 30 DEGREE SLOPE
UP
634
1548
17.59
10.00
UPPER EXIT
THEATER
B
FUN CITY
.88
TOTAL AREA
COLUMN SIZE AS PER STRU DRG
ESCALATOR 30 DEGREE SLOPE
21
CORRIDOR / LIFT / TOILET / STAIR
0
1
L A
O C
OPEN TO SKY
6
COLUMN CLADDED WITH ACP OR GRANITE
FOURTH FLOOR AREA
1253
FIR EX E IT
3.0
COLUMN SIZE
AREA
FOOD COURT
R
PE
NS SO
D3
AS PER STRU DRG
1300
1548
ift
01
162
THEATER
WC
0
.04
4.6
PROJECT HIGHLIGHTS 3435 TOTAL CORRIDOR / LIFT / TOILET / STAIR
7
12 MM THK TOUGHENED GLASS UP TO BEAM BOTTOM
1.0
RESTAURANT AREA
0
72
.07
3.0
1056
SHOP
A
R
A
917
T
R
72.43
FOURTH FLOOR PLAN
NS SO
2.4
26
E
WC
WC
RE
12.67
0.23
R PE
et
R
SC
D3
.00
WC
D3
20
oil L.T D3
O
WC
D3
O
WC
D3
.52
WC
D3
20
2.02 13.08
D3
I
0.23
D3
R
35 MM FLOOR DROP
D3
t Li2f.40
STAIRCASE TO DETAIL
23
D2
4.4
7
.93 D3
D3
7.7
10
1.50
3.81
0.30
31
0.60
0.30
0.30
13.14
D3
WALLS UP TO FALSE CEILING HEIGHT
D
ENTRY TO SCREEN - 2
ENTRY TO SCREEN - 1
ANCHOR SHOP
0.23
D3
B
1.20
C
0.66 1.20 1.20 1.20 0.12 0.12 0.12 0.12
.18 10
0 2.0
ENTRY TO SCREEN - 3
3
2.6
2
0.1
13.29
D3
WC
13
17 19 1.55 21
.82
1.33 1.50 2.10 1.50 0.27 0.12 0.12 0.12 0.23
1.20
1.30 0.12 1.20 0.12 1.20 0.12 1.20 0.12 1.20 0.12 1.20 0.12 1.20 0.12 1.20
PROJECTOR SCREEN
VOID
FIRST , SECOND & THIRD FLOOR AREA
WC
1.20
9 11
.48
PROJECTOR SCREEN
PROJECTOR SCREEN
WC
1.20
7
17
WC
WC
1.20
R
D3
WC
.00
3049
WC
D3
0
D2 FIXED GLASS IN ELEVATION
24
10.28
D3
2.93
0.30
3.0
10
WC
SCREEN - 3
LD
5
1.72
7
O
WC
D3
HOUSE KEEPING
UP
7.7
0
T
PE
D2
1225
3.0
ATRIUM COVERED WITH LIGHT ROOFING
LD
SLAB SUNK BY 10" FOR TOILET PLUMBING LINE
L.TOILET
COUNTER TOP AT 32 " FROM FFL
8
WC
20
A
UP
20
0.60
UP
WC D3
LD
20.96
L
SCREEN - 2
WC
TOTAL AREA VOID
2.00
D3
UP
0
A
1
D3
UP
WC D3
L
Lift
LD
D2
3.4
3
15
t
uc
E
D3
HANDRAIL IN 12 MM THK TOUGHENED GLASS
C
3
WC
UP
1.85
5
0
7
S ON RS
DUST BIN
1.77
Lift
1
d lec
WC
D3 E FIR XIT E
Electrical
COLUMN SIZE
UP
D2
AS PER STRU DRG
S
0
UP
COUNTER TOP AT 32 " FROM FFL
H.K
0.30
E
2.4
1.50
.88
CORRIDOR / LIFT / TOILET / STAIR SCREEN - 1 ft 1.50
2.4
9
784
0
20
LD
18 16
11
0
t LPifERSONS
Li
24 22
20
14
G.TOILET SHOP
L.Toi D3 D3
D3
3.0
0.2
6.20
DD
0.2
0.121.76 0.23
4.11
11.20
DD
4.2
LD
27 26
5.9
5.40 0.121.80 0.23
21
1040
11.23
DD
1.50
2
4.4
6 0.2
0.121.80 0.23
VOID
2.4
DN
G.Toi D3
D3
G.Toilet
0
2.87
8.6
6
D2
1 3.0
D3
11.37
7.99
0.30
0.30
FF
2.4
GROUND FLOOR AREA D2
C
4.78 11 .94
25
9.77
23 26
1.72
FU W LL MA ALL HEIG H LL RO WITH T UTI NG S
0.30
0.30
21
3 1
D2
D3
WAFULL LL HE WIT IGH HS T INA GE
6 9.3
1
0
3.12
4.2
COUNTER
75 MM THK PARTITION
WC
D3
19
5
3
COUNTER
17
.26
2
6.50
.ch Ph ilet To D
WC
14
1 COUNTER
9 7
2.71
3.78
3.75
3.59
12.09
15
0.30
MD
11
13
0.30
TICKET COUNTER
D3
STAIRCASE TO DETAIL
FULL HEIGHT WALL WITH MALL ROUTINGS
0.2
6.16
C O R R I D O R
4.58
2.50 0.23
0.13
5
1613
3959
ANCHOR SHOP
FIR EX E IT
4.72
SLAB SUNK BY 10" FOR TOILET PLUMBING LINE
0.30
ENTRY
TOTAL AREA 2
0.23
WC
2.43
3.6
32.93
.83
FULL HEIGHT WALL WITH SINAGE
HANDRAIL IN 12 MM THK TOUGHENED GLASS
12 MM THK TOUGHENED GLASS
1.50
13
ESCALATOR 30 DEGREE SLOPE
2.3
7.57
54.00
12.09
.06
AC
638
23
KS
E S C A L A T O R
COLUMN CLADDED WITH ACP OR GRANITE
SN
TA L
10.00
AS PER STRU DRG
CORRIDOR / LIFT / TOILET / STAIR ATRIUM LOBBY
0
F.S
174
6
D3
4.6
KIT CH
.23
COLUMN SIZE
17.59
6.16
FOOD COUNTER 32 " HEIGHT
ADMIN OFFICE
1.0
.00
E
ATRIUM COVERED WITH LIGHT ROOFING
1534
DD
00
EN
R T A C S
7 1.0
7
1.0
1.0
2
21 .8
FOOD COURT
0
E SC NTRY RE EN TO -4
1.0
0.1
CO UN
.69
TE R
HYPER MARKET 19
3.0
7
.24
72
.07
10
ESCALATOR 30 DEGREE SLOPE
HANDRAIL IN 12 MM THK TOUGHENED GLASS
OPEN TO SKY
12 MM THK TOUGHENED GLASS UP TO BEAM BOTTOM
10
1.0
7
A
L
C
0.1 1
STAIRCASE TO DETAIL
4.70
AREA SQ.M
.82
3
LOWER GROUND FLOOR AREA
SHOP
O
R
-4
O
EN
R
RE
RESTAURANT
24
0.2
B
KITCHEN
E
R
D
D1 RAISED SEATING AREA + 6" LVL
5.6
O
12
T
INDIVIDUAL AREA
FIXED GLASS IN ELEVATION
.48
A
6
D1
0
17
L
R
T
.00
A
D2
10
C
O
S
1.6
2.5
DD1
RY NT
LD
0
EE
ATRIUM COVERED WITH LIGHT ROOFING
DUCT
E
SC
STAIRCASE TO DETAIL
23 26
IC RV SE
Lift
PROJECTOR SCREEN
.20
WC
LD
E FIR XIT E
1.2
B
13
17
19 1.55
1
WC
LD
9 11
D2
AS PER STRU DRG
Lift
Electrical
0.2
WC
LD
D3
D3
7
4.4
WC
WC
D3
5
2
21
0
WC
FU W LL MA ALL HEIG H LL RO WITH T UT ING S
L.Toi D3
D3
HANDRAIL IN 12 MM THK TOUGHENED GLASS
1.7
oil L.T
WC D3
t Lif
t uc
1.5
WC
0
WC D3 D3
COLUMN SIZE
3
15
cd
R
G.Toi D3
D3
3.0
D2
AS PER STRU DRG
0.30
1
D2
Ele
WC
F.STALL
GE
11 .94
D2
1 3.0
D3
F.STALL
H.K
WC
D3
FOOD COUNTER 32 " HEIGHT
WAFULL LL HE WIT IGH HS T INA
D2 SLAB SUNK BY 10" FOR TOILET PLUMBING LINE
D3
D3
F.STALL
11 .88
0 0.3 0 0.3
17
1.72
.71
25
D3
G.Toilet
D3
7.99
0.30
0.30
FF 0
.26
23 26
F.STALL
WC
KITCHEN
4.05
.ch Ph ilet To D
D3
D3
D3
KITCHEN D3
D3
2.58 SLAB SUNK BY 10" FOR TOILET PLUMBING LINE
1.5
14
21
3
1
L
0
5
0.3
19
D3
D3
KITCHEN D3
AL ST
0
17
D3
KITCHEN
M EA
TER T UN CO HEIGH " 32
0.3
9 7
CR
0
15
D3
D3
ICE
5
0.3
13
11
A
3.10
WC
C O R R I D O R
2.3
STAIRCASE TO DETAIL
1.50 0.12
1.54
7.93
.83
1.50
13
12.00
0.23
10.67
2.00
4 SCREENS The food court , theatre and play well defines and articulated from each other
3435
MONEESHA KUMAR 12
STAGE 1 STAGE 2 STAGE 3
06
The analyses from case studies inferred that levels in the a factory design was a hindrance to easy and positive working routine . Hence the challenge was taken to incorporate levels in a design yet making the work process easy and lively
STAGE 4
INDUSTRIAL DESIGN GARMENT FACTORY
TRUCK ENTRY
6.00
95.01 RAW MATERIAL UP
PROJECT :
PRODUCTION DN
To Design a garment factory , hence understand the functional aspects and experiment with external form to assume significance .
CAR EXIT 6. 00 9. 00
FE AF ST
5.
00
63.00 O A
D
RY NT
PROPOSED FACTORY
AR RP
G KIN
CA
PROJECT HIGHLIGHTS
R
56.27
6.00
5.14
AD RY NT NE MI
ED T ISH UC K N I F ROD UC P TR TO
CAR ENTRY
6.00
6.01
TRUCK EXIT
NORTH
95.15 e
SITE PLAN
KEY ASPECTS
13 MONEESHA KUMAR
1.95 8.00
Separate service and vehicular entry courtyards incorporated Asymmetrical form
NORTH LIGHT ROOFING
6.00
s
plot area 5670 sq.m built up area 2650 sq.m 2 car parking 4 truck parking plot coverage 46 %
CUTTING AND SEWING
RAILING LEVEL 6 + 1.15 M LVL
LEVEL 5 + 1.30 M LVL
LEVEL 4 + 1.45 M LVL
LEVEL 3 + 1.60 M LVL
LEVEL 1 + 2M LVL
LEVEL 2 + 1.85 M LVL
LEVEL 1 + 2M LVL
GROUND FLOOR 1.40
w
CONCEPT
BASEMENT - 1.85 M LVL
SECTION - 2
BASEMENT - 1.85 M LVL
F.G.L EX.G.L
BASEMENT FLOOR
9
UP
PRODUCTION
LEVEL 2 150 MM DOWN FROM LEVEL - 1
34.00
LEVEL 3 150 MM DOWN FROM LEVEL - 2 17.00
10.71
9.96
LEVEL 5 150 MM DOWN FROM LEVEL - 4
10.84
12.35
10.84
9.70 19
10.79
7.18
SEWING SECTION
SEWING SECTION
16.92
11.14
STAFF STAFF 19SQ.M SQ.M 19
5.00
9.70
5.00
CLOCK ROOM CLOCK ROOM 30 SQ.M 30 SQ.M
3.75 3.75
28
.7
0
EMBROIDARY
5.76
STAFF CABIN 41 SQ.M
7.30
6.16
ACCOUNTS 75 SQ.M
1
2.
.6
0.55 M ABOVE EX.G.L
0.55 M ABOVE EX.G.L
9
LEVEL 2 150 MM DOWN FROM LEVEL - 1
DN
STAFF 19 SQ.M
3
PRODUCTION BLOCK
3.75
- 1.85 M LVL
24.29
20.92
10.00
10.03
UP
G.TOI L.TOI
ADMIN 1ST FLOOR
21.07
BASEMENT
3.00
FALSE CEILING
BASEMENT FLOOR PLAN
RAILING
LEVEL 4 + 1.45 M LVL
LEVEL 1 + 2M LVL
LEVEL 2 + 1.85 M LVL
LEVEL 3 + 1.60 M LVL
GROUND FLOOR 2.00
LEVEL 5 + 1.30 M LVL
CUTTING AND SEWING
3.00
TOILETS
35
.7
6
DISPLAY
0.55 M ABOVE EX.G.L
GROUND FLOOR
PROJECT HIGHLIGHTS
2.00
NORTH LIGHT ROOFING
ADMIN ENTRY
RECEPTION CUM LOUNGE
Play of Levels which is gradual Ramps to provide barrier free design Natural lighting through courtyard and sky light
5.03
The admin articulated from the working area Basements staff recreation View point from admin to inspect
23.85
M.D ROOM 50 SQ.M
1.7 M ABOVE EX.G.L
GROUND FLOOR KEYPLAN ASPECTS
37.15
5.43
KEY ASPECTS
MANAGER ROOM
UP
23.29
23.29
6
CLOCK ROOM 30 SQ.M
10.08
10.48
.7
11.91
35
STAFF ENTRY
0.55 M ABOVE EX.G.L
RAW MATERIAL
11.49
88
19
9.40
10.00
OTS LANDSCAPED AREA
8.00
9.50
UP
CAD / SAMPLING 50 SQ.M 12.20
5.10
DN
L.TOI G.TOI
15.93
6.99
10.08
CUTTING SECTION
14.01
2.89
2.89
VIEWING GALARY VIEWING GALARY
LEVEL 1 2M ABOVE EX.G.L
37.00
16 SQ.M
5.00
15.93
BOILER 0.55 M ABOVE EX.G.L ROOM
9.24
STORE 123 SQ.M
5.00
15.93
10.86
STAIN REMOVER 76 SQ.M
STAFF ENTRY
14.08
PRODUCTION
LEVEL 4 150 MM DOWN FROM LEVEL - 3
IRONING 67 SQ.M
0.55 M ABOVE EX.G.L
0.55 M ABOVE EX.G.L
24.29
19.41
5.00
DN
10.00
14.08
RAW MATERIAL
1 .6 9.6 9 9
UP
24.29
37.00
14.01
CAD / SAMPLING 10.00 50 SQ.M
LEVEL 6 150 MM DOWN FROM LEVEL - 5
0.55 M ABOVE EX.G.L
CAD / SAMPLING 50 SQ.M
12.20
AREA
PACKING 98 SQ.M
10.86
LEVEL 1 2M ABOVE EX.G.L
LEVEL 3 150 MM DOWN FROM LEVEL - 2
M ABOVE EX.G.L
12.20
G.TOILET
L.TOILET
123 SQ.M
LEVEL 3 CUTTING AND 150 MM DOWNSEWING FROM LEVEL - 2
OTS 12.20 LANDSCAPED OTS LANDSCAPED AREA
STORE 65 SQ.M
LEVEL 1 2M ABOVE EX.G.L STORE
37.00
CUTTING AND SEWING
STORE 123 SQ.M
5.00
LEVEL 4 150 MM DOWN FROM LEVEL - 3
10.79
8.08
LEVEL 2 150 MM DOWN FROM LEVEL - 1
6.00
LEVEL 4 150 MM DOWN FROM LEVEL - 3
DN
Working area 2095 sq.m Admin 314sq.m / flr Staff recreation 600 sq.m
F.G.L BASEMENT - 1.85 M LVL
BASEMENT - 1.85 M LVL
SECTION - 1
RAFT FOUNDATION
BASEMENT FLOOR
MONEESHA KUMAR 14
view
FOLDING AND UNFOLDING OF SPACES The basic concept was to give the students varied experience integrating different types of spaces as in open spaces semi open spaces and closed spaces. These variations in spaces give variety in the quality of light and the ambient air . This intern keep the student fresh and active through out the working period .
CONCEPT CLOSED OPEN CLOSED
INSTITUTIONAL DESIGN
07
CLOSED CLOSED
OPEN OPEN
RESIDENTIAL CAMPUS -
CLOSED
ARCHITECTURE , ARTS AND INTERIOR DESIGN
25
.8
4
1
FINE ARTS DEPARTMENT
2
ARCHITECTURE DEPARTMENT
3
INTERIOR DEPARTMENT
15.21
1238.50 SQ.M
5.79
5.92
PLAN GIRLS HOSTEL
.76
.0
5
515.00 SQ.M
HOSTEL
6
ADMINISTARTIVE DEPARTMENT
380.00 SQ.M
7
STAFF QUATERS
660.00 SQ.M
SECTION
BOYS HOSTEL
CLOSED
D
5
5
PLAY COURT
27
37
A
CANTEEN
1203.00 SQ.M
O R 1.69 11
4
1937.00 SQ.M
OPEN
5
1315.00 SQ.M
ARCHITECTURE DEPARTMENT
BR LI
Y AR
CLOSED
OPEN CLOSED
2
CREATED LANDSCAPE AND SEATING
OPEN
CLOSED
CK O BL
OPEN
FORMED GREEN POCKETS
34
.1
CLOSED
OPEN
8
.72
VEHICULAR ACCESS
3
.2 7
169
16
INTERIOR DESIGNING
CA BL
CO VE
RE
CK O
D
4
9.77
N
EE NT
PEDESTRIAN ACCESS
MP
35.0
.53
EN
TR Y
OAT
1
D 169
US
RO AD
CA
R. EN
2
SE
6 09
7
FINE ARTS DEPARTMENT
AD BLOMIN CK
23.
STAFF QUATERS
TR Y
CONSTRUCTION YARD
R
IV
E
W
A
MULTI PURPOSE HALL
Y
primary open space secondary open space
CAR PARKING
SPACE FOR D.G & TRANSFORMER
R
O
secondary axis
65.64
A
D
primary axis
15 MONEESHA KUMAR
W1
W1
ARCHITECTURE AND ARTS DEPARTMENTS FIRST FLOOR W1
D1
V
V
D1 D1
UP
D1 D1
D1 D1
W3
9.30 X 4.77
LADIES TOILET
W3
PLB.DUCT
9.30 X 4.77
PLB.DUCT
V
V
V
D1 D1
LADIES TOILET 5.12 X 4.73
D1
LADIES TOILET
D1
D1 D1
GALLERY 14.5 X16.05
LECTURE HALL 14.50 X 11.00
D1
LECTURE HALL 14.50 X 11.00
MECH. VENT
D1 D1
MECH. VENT
D1 D1
GENTS TOILET 5.12 X 4.73
V
STUDIO
W3
W3
DD
D1
W3
STUDIO 8.19 x 6.15
STUDIO 8.19 x 6.15
W3
13.33 X 12.00
DD
W3
DD
W3
DD
DD
W3
W3
MODEL 10.48 X 12.00
D1
W3
MODEL 8.10 X 12.00
STUDIO 13.33 X 12.00
W3
W3
W3
D1
DD
DD
DD
STUDIO 8.00 X 12.00
W1
W1
DD
DD
D1
8.00 X 6.00 STUDIO
D1
6 M WIDE CORRIDOR
Terrace garden
W2
6 M WIDE CORRIDOR
8.00 X 6.00 STUDIO
W1
W1
8.00 X 12.00
Terrace garden
UP
STUDIO
6 M WIDE CORRIDOR
UP
12.10
V
W1
Terrace garden
Terrace garden
LECTURE HALL 7.00 X 9.00
DD
DD
LECTURE HALL 7.00 X 9.00
W2
W2
W2
FG
FG
LOBBY
MD
FG
7.00
DD
FG
W2
LECTURE HALL 7.00 X 9.00
UP
DN
W1
19.46 X 9.00
CLIMATOLOGY LAB
W1
DD
DD
LECTURE HALL 7.00 X 9.00
W2
W1
Terrace garden
Terrace garden
W2
FIRST FLOOR PLAN
W1
6.00 X 9.00
PLOTTING / PRINTING
CUTOUT
UP
W1
MAIN ENTRY
FG
5.00 X 4.67
UP
6.00
GROUND FLOOR 2.77
V
FG
W2
D1
D1
8.00 X 6.00 STUDIO
W1
W1
STUDIO 8.00 X 12.00
UP
UP
Terrace garden
6 M WIDE CORRIDOR
Terrace garden
W1
8.00 X 6.00 STUDIO
6 M WIDE CORRIDOR
DD
6 M WIDE CORRIDOR
DD
STUDIO 8.00 X 12.00
W1
DN
D1
D1
DD
DD
DD
DD
DD
DD
W3
W3
FG
W3
STUDIO 8.19 x 6.15
STUDIO 8.19 x 6.15
W3
W3
STUDIO 13.33 X 12.00
D1
DD
STUDIO 13.33 X 12.00
FG
MD
STAFF ROOM 13.33 X 12.00
W3
D1
DD
W3
W3
W3
W3
W3
W3
GALLERY
W1
PLB.DUCT
UP
D1 D1
19.30 X 4.77 D1 D1
D1
LECTURE HALL 14.50 X 11.00
D1 D1
LADIES TOILET
W3
UP
D1 D1
D1
LECTURE HALL 14.50 X 11.00
W1
LADIES TOILET 19.30 X 4.77
W3
UP
13.33 X 12.00
W3
W1
14.5 X16.05
COMPUTER LAB
W3
PLB.DUCT
D1
D1
D1
D1
MECH. VENT
MECH. VENT
W1
W1
0.45
SECTION
2.77
4.00
4.00
THE BLACK PORTION DENOTES HOW THE SPACE TRANSITS FROM BEING FOLDED AND THEN EVENTUALLY UNFOLDS AND AGAIN FOLDS 4.00
1.00
Terrace floor level
Terrace garden Terrace garden
Second floor level
STUDIO STUDIO
Terrace garden
STUDIO STUDIO First floor level
LECTURE HALL Ground floor level Formed ground level
KEY ASPECTS Variation is the experience of the space . Concept is implemented in a simplest way Every studio is given a terrace garden - with working facility simple and white facade showing elegance in appearance
PROJECT HIGHLIGHTS LECTURE HALL
7.00 X 9.00
63 SQ,M 4 NOS
STUDIO 8.00 X 12.00
96 SQ,M 4 NOS
UPPER STUDIO
8.19 x 6.15
50.30 SQ,M
COMPUTER LAB 13.33 X 12.00
MODEL MAKING ROOM 8.10 X 12.00
STAFF ROOM
63 SQ,M 1 NOS
159 SQ,M 2 NOS
13.33 X 12.00 63 SQ,M
1 NOS
INTERACTION SPACE 14.5 X16.05 232 SQ,M
2 NOS
LADIES TOILET
5.12 X 4.73 24.5 SQ,M
1 NOS
GENTS TOILET
5.12 X 4.73 24.5 SQ,M
1 NOS
SECOND FLOOR
MONEESHA KUMAR 16
GROUND FLOOR
17 MONEESHA KUMAR FIRST FLOOR
Terrace garden 6.00 X 9.00
STUDIO 7.50 X 12.00 DN
TOILET
0.45
4.00
Terrace garden
7.50 X 12.00 STUDIO
Terrace garden 6.00 X 9.00
UP
TOILET
COVERED
LECTURE HALL
UP
6 M WIDE CORRIDOR
6.00 X 9.00 6.00 X 9.00
DN Terrace garden
UP
LECTURE HALL 6.00 X 9.00
STUDIO 7.50 X 12.00
DN
TOILET
stairway
Terrace garden
LECTURE HALL 6.00 X 9.00
6.00 X 9.00
7.50 X 12.00
COMPUTER LAB
7.50 X 12.00 STUDIO
6 M WIDE CORRIDOR
6.00 X 9.00
DN
Terrace garden
UP
6.00 X 9.00
Terrace garden
6.00 X 9.00
6 M WIDE CORRIDOR
MACKING RM
MODEL
STUDIO 7.50 X 12.00
ARCHITECTURE , ARTS AND INTERIOR DESIGN
UP
STUDIO 7.50 X 12.00
6 M WIDE CORRIDOR
7.50 X 12.00 STUDIO
MODEL MACKING RM
DN
4.00
RESIDENTIAL CAMPUS -
6 M WIDE CORRIDOR
DN
7.50 X 12.00
STAFF ROOM
LOBBY
5.00 X 4.67
UP
LECTURE HALL 7.00 X 9.00
INSTITUTIONAL DESIGN
TOILET
TOILET
TOILET
STUDIO 7.50 X 12.00
LECTURE HALL 6.00 X 9.00
07
6 M WIDE CORRIDOR
UP
4.00
1.00
2.80
Parapet wall 0.90
1.65
Water tank
Head room
Handrail Terrace floor level
Terrace garden Terrace garden
STUDIO
STUDIO
STUDIO
Second floor level
STUDIO
Terrace garden LECTURE HALL
First floor level
stairway
Ground floor level Formed ground level
SECTION
SECOND FLOOR
INTERIOR DESIGNING DEPARTMENT
1.00
PROJECT HIGHLIGHTS
4.00
GROUND FLOOR
Terrace floor level
ARCHITECTURE
READING AREA
First floor level
4.00 x 5.00
20. SQ,M
2 NOS
8.19 x 6.15
50. SQ,M
2 NOS
STACK AREA
4.00 x 5.00
20. SQ,M
2 NOS
READING AREA
8.19 x 6.15
50. SQ,M
2 NOS
ISSUE DESK
3.00 x 6.50
19.5 SQ,M
1 NOS
TOILETS
3.00 x 2.50
19.5 SQ,M
4 NOS
READING AREA
ISSUE DESK
TOILETS
W2
20. SQ,M
2 NOS
8.19 x 6.15
50. SQ,M
2 NOS
3.00 x 6.50
20. SQ,M
1 NOS
3.00 x 2.50
20 SQ,M
4 NOS
4.00 x 5.00
W2
W2
RESTAURENT
RESTAURENT
9.00 X 9.00
9.00 X 9.00
SECTION
KEY ASPECTS FUNCTIONAL library central lobby - skylight INTERESTING FORM for canteen open dinning and closed dinning facility satellite kitchen
INTERIOR DESIGNING DEPARTMENT
STACK AREA
Ground floor level Formed ground level
0.45
ARTS DEPARTMENT
1ST FLOOR
SATLIGHT KITCHEN
3.60
STACK AREA
SATLIGHT KITCHEN
FIRST FLOOR PLAN
RESTAURENT
CANTEEN BLOCK
W2
W2
W2
W2
W2 9.00 X 9.00
3.00 INTERIOR DEPARTMENT 17.5 x 12.5
W1 W2
W2
FIRST FLOOR
ARCHITECTURE DEPARTMENT 8.19 x 6.15
ARCHITECTURE DEPARTMENT 8.19 x 6.15
G.TOILET 8.00 X 3.17
DINING HALL
KITCHEN
FOR OUTSIDE FOOD
9.00 X 9.00
UP
TOILET 2.98 X 1.69
9.00 X 9.00
TOILET 2.98 X 1.69
TOILET 2.98 X 1.69
TOILET 2.98 X 1.69
UP L.TOILET 8.00 X 3.17 5.10
UP
5.10
UP 2.43
2.43
SATLIGHT KITCHEN
ARTS DEPARTMENT 8.19 x 6.15
ARTS DEPARTMENT 8.19 x 6.15
W1
W1
W1
DINING HALL
W1 FOR OUTSIDE FOOD
MD
LANDSCAPED AREA 9.00 X 9.00
INTERIOR DEPARTMENT 17.5 x 12.5
W2
W2
GROUND FLOOR
W2
W2
LIBRARY AND CANTEEN BLOCK
W2
W2
FIRST FLOOR
W2
W2
GROUND FLOOR
MONEESHA KUMAR 18
19 MONEESHA KUMAR SECTION
PLAN OF O.A.T OAT
STAGE 2.18
BUFFER AREA + 5.50 LVL
+ 2.50 LVL
OAT 23.50 X 13.50 M
+ 3.80LVL +3.40 LVL
+ 1.4 LVL
+ 1.8 LVL
+ 2.2 LVL
+ 2.6 LVL
+ 3.00 LVL
STAGE + 0.30 LVL
4.50 X 5.00 M
G.TOILET
L.TOILETS
GREEN ROOM 5.00 X 6.00 M
+ 5.50 LVL
+ 5.50 LVL
MULTI PURPOSE HALL
+ 5.50 LVL
MULTI PURPOSE HALL
ARCHITECTURE , ARTS AND INTERIOR DESIGN
DISPLAY HALL 18.00 X 4.00 M
+ 3.80LVL
+3.40 LVL
+ 3.00 LVL
+ 2.6 LVL
+ 2.2 LVL
+ 1.8 LVL
+ 1.4 LVL
+ 1.00 LVL
DISPLAY HALL 18.00 X 4.00 M
23.50 X 13.50 M
STAGE 4.50 X 5.00 M
+ 0.30 LVL
1.00
2.00
RESIDENTIAL CAMPUS -
28.00 X 4.00 M
DISPLAY HALL
+ 5.50 LVL
OAT
+ 1.00 LVL
MULTI PURPOSE HALL 27.00 X 24.00 M
5.00
INSTITUTIONAL DESIGN
PLAN OF DISPLAY GALLERY
MULTI PURPOSE HALL 2.40
5.50
3.00
PLAN OF MULTI PURPOSE HALL 5.50
+ 5.50 LVL
DISPLAY HALL
STAGE 4.50 X 5.00 M
5.00 X 6.00 M
07
2.50
MAIN ENTRY
OAT 23.50 X 13.50 M
L.TOILETS
GREEN ROOM
G.TOILET
GLASS
EMULSION PAIN
STAGE
ELEVATION
ROOF PLAN
0.85
O.A.T AND MULTIPURPOSE HALL WITH DISPLAY GALLERY
STUDY STUDY
STUDY
TOILET
TOILET
D1
TOILET
WC
WC
D1
W3
4.00 X 8.49
ROOM - 6
4.00 X 8.49
D1
BATH
BATH
BATH
D1
LADIES TOILET
W3
4.00 X 5.79
ROOM - 6
D1
2.09X2.59
D1
4.00 X 5.79
ROOM - 7
W3
W3
4.00 X 5.79
ROOM - 6
D1
D1
D1
2.09X2.59
2.09X2.59
WC
D1 2.09X2.59
TOILET
4.00 X 5.79
W3
D1
TOILET
2.09X2.59
ROOM - 8 4.00 X 8.49
W3
W3
4.00 X 5.79
ROOM - 5
D1
2.10 M WIDE CORRIDOR
TOILET
2.09X2.59
D1
4.00 X 5.79
W3
4.00 X 5.79
ROOM - 8
D1
D1
TOILET
2.09X2.59
ROOM - 5
D1
D1
ROOM - 5
W3
UP
4.00 X 8.49
ll
W3
wash
4.00 X 8.49
ROOM - 4
Store
UP
LOBBY
LOBBY
MD
UP
3.93
DN
Kitchen
TOILET
2.09X2.59
4.00 X 8.49
ROOM - 10
W3
W3
4.00 X 5.79
ROOM - 3
D1
TOILET
2.09X2.59
D1
4.00 X 5.79
ROOM - 10
W3
W3
4.00 X 5.79
D1
D1
D1
D1
D1
D1
D1
wash
ROOM - 3
W3
4.00 X 8.49
D1
D1
UP
4.00 X 8.49
ROOM - 12
W3
W3
4.00 X 5.79
Landscaped area with seating
BATH
BATH
BATH
D1
TOILET
2.09X2.59
TOILET
2.09X2.59
ROOM - 1
D1
D1
4.00 X 5.79
ROOM - 12
W3
4.00 X 5.79
W3
TOILET
2.09X2.59
D1
ROOM - 1
D1
TOILET
2.09X2.59
D1
4.00 X 8.49
GENTS TOILET
D1
WC
WC
WC
3.18
3.15
3.15 Second floor level
SICK ROOM
TV ROOM
INTERACTION SPACE
MEDITATION / PRAYER
LOBBY
WARDON ROOM
Dining Hall
W3
4.00 X 8.49
ROOM - 2
2.10 M WIDE CORRIDOR
D1
4.00 X 8.49
ROOM - 11
W3
W3
4.00 X 5.79
ROOM - 2
TOILET
2.09X2.59
2.10 M WIDE CORRIDOR
TOILET
4.00 X 5.79
ROOM - 11
W3
2.09X2.59
W3
4.00 X 5.79
ROOM - 2
TOILET
2.09X2.59
D1
4.00 X 5.79
ROOM - 12
W3
3.15
WARDON ROOM 9.28 X 10.64
BASEMENT FLOOR PLAN HOSTEL BLOCK
Pantry
3.21 X 5.49
TOILET
D1
TOILET
2.09X2.59
2.10 M WIDE CORRIDOR
2.09X2.59
ROOM - 3
D1
D1
TOILET
2.09X2.59
D1
4.00 X 5.79
ROOM - 11
W3
Ground floor level Formed ground level
Utility
GALLERY 9.28 X 10.64
D1
3.21 X 5.49
SICK ROOM
W3
ENTERTAINMENT ROOM
D1
D1
D1
GALLERY 9.28 X 10.64
D1
UP
4.00 X 5.79
ROOM - 10
W3
LOBBY
g Ha
D1
3.21 X 5.49
MEDITATION ROOM
3.21 X 5.49
SICK ROOM
W3
D1
3.21 X 5.49
WARDEN ROOM
VISITORS WAITING ROOM 3.21 X 5.49
W3
W3
First floor level
1.00
VISITORS WAITING ROOM
Dinin
ed scap Land with area g seatin
D1
2.10 M WIDE CORRIDOR
D1
ROOM - 9 4.00 X 8.49
W3
W3
4.00 X 5.79
ROOM - 4
D1
D1
D1
D1
TOILET
2.09X2.59
TOILET
2.09X2.59
4.00 X 5.79
ROOM - 9
W3
W3
4.00 X 5.79
ROOM - 4
D1
D1
D1
D1
2.09X2.59
TOILET
TOILET
4.00 X 5.79
ROOM - 9
2.09X2.59
2.10 M WIDE CORRIDOR
D1
TOILET
2.09X2.59
D1
4.00 X 5.79
ROOM - 8 STUDY
STUDY STUDY STUDY STUDY
ROOM - 7
WARDROBE STUDY STUDY STUDY
WARDROBE
STUDY
STUDY STUDY STUDY
WARDROBE
STUDY STUDY WARDROBE
WARDROBE
WARDROBE
STUDY
WARDROBE
STUDY STUDY STUDY STUDY STUDY STUDY
STUDY STUDY
WARDROBE STUDY
STUDY WARDROBE
WARDROBE STUDY STUDY WARDROBE STUDY
STUDY STUDY STUDY STUDY
STUDY
STUDY
STUDY STUDY
STUDY STUDY
STUDY STUDY
WARDROBE STUDY STUDY STUDY STUDY STUDY
STUDY
WARDROBE
STUDY
STUDY STUDY
STUDY STUDY
WARDROBE
WARDROBE STUDY
STUDY WARDROBE STUDY STUDY STUDY
STUDY
STUDY
W3
2.94
STUDY STUDY
W3
Terrace floor level
4.35
WARDROBE
WARDROBE STUDY
WARDROBE
W3
4.57
WARDROBE STUDY STUDY
STUDY STUDY STUDY STUDY STUDY
WARDROBE
WARDROBE
STUDY
STUDY STUDY STUDY
STUDY STUDY
STUDY STUDY
STUDY STUDY WARDROBE STUDY
STUDY STUDY
STUDY STUDY
WARDROBE STUDY STUDY WARDROBE
WARDROBE
STUDY
STUDY
STUDY
STUDY
STUDY
STUDY
STUDY
STUDY STUDY STUDY STUDY
WARDROBE
WARDROBE STUDY
STUDY
WARDROBE STUDY STUDY WARDROBE STUDY
STUDY STUDY STUDY STUDY
STUDY
STUDY
WARDROBE
WARDROBE
STUDY STUDY STUDY STUDY
STUDY
GIRLS AND BOYS HOSTEL BLOCK STUDY
FIRST FLOOR AND THIRD FLOOR
STUDY
GROUND FLOOR STUDY
KEY ASPECTS 2 TYPES - 3 SHARING AND 4 SHARING 3 SHARING WITH ATTACHED TOILET 4 SHARING WITH COMMON TOILETS BOY AND GIRLS HOSTEL - TYPICAL PLAN ALL AMENITIES LIKE GUEST ROOM TV ROOM PRAYER ROOM ETC PROVIDED 2.70
0.75 1.30
PROJECT HIGHLIGHTS 4 SHARING ROOM
GROUND FLOOR
4.00 X 8.49 33.5 SQ,M
COMMON TOILET 4.00 X 8.49
33.5 SQ,M
98.3 SQ,M
SECTION
SECOND FLOOR BASEMENT FLOOR
MONEESHA KUMAR 20
10 NOS
3.21 X 5.49 17.6 SQ,M 1 NOS
2 NOS
3.21 X 5.49
17.6 SQ,M 1 NOS
1ST FLOOR TIRD FLOOR
1 NOS
SECOND FLOOR
3 SHARING ROOM 4.00 X 8.49
33.5 SQ,M
ATTACHED TOILET
4.00 X 8.49
33.5 SQ,M
12 NOS
3.21 X 5.49 17.6 SQ,M 1 NOS
3.21 X 5.49
17.6 SQ,M
1 NOS
9.28 X 10.64
98.3 SQ,M 1 NOS
10 NOS
12 NOS
4 SHARING ROOM 4.00 X 8.49 33.5 SQ,M
COMMON TOILET
4.00 X 8.49
33.5 SQ,M 2 NOS
3.21 X 5.49 17.6 SQ,M
1 NOS
3.21 X 5.49
17.6 SQ,M 1 NOS
9.28 X 10.64
98.3 SQ,M 1 NOS
07
INSTITUTIONAL DESIGN
3
RESIDENTIAL CAMPUS -
8 4
2
INTERIOR DESIGNING HOSTEL BLOCK
PEDESTRIAN AXIS 19 MONEESHA KUMAR
CONSTRUCTION YARD
1. 2. 3. 4. 5.
ADMIN BLOCK O.A.T INTERIOR DEPT ARCHITECTURE DEPT ARTS DPT
5
8
7
6
AERIAL VIEW 6.CANTEEN 7.LIBRARY 8.HOSTEL
O.A.T AND DISPLAY GALLERY
08
SKETCHES .
Time is precious , utilising it to improve in any form of art is what I prefer . The strokes may not be perfect but would always love to improve on them .
21 MONEESHA KUMAR
THANK YOU