PROJECT INFORMATION Project Name:

The Browning School

Location

New York, NY

Project Summary:

The Browning school project was a multi-phase renovation across adjacent structures built from 4 different time periods.

Project Type

Institutional - Education

Project Square Footage

56,500 SF

Project Budget:

$25 Million

Completion Date

December 2015

Zoning Constraints

N/A


The Browning School - New York, NY

PROJECT NARRATIVE The Browning School is 56,500 sf K-12 college preparatory school for boys, located on East 62nd Street in New York City. It occupies three adjacent buildings on 12 levels: the original school building from 1922 on the east side, a carriage house in the center, and the lower five floors of an apartment building on the west side. Over the years enrollment in the school increased significantly. Because of this incremental growth, the school occupied multiple levels, and the spaces within it were dark, cramped, and difficult to navigate.

A comprehensive Master Plan was prepared to address code and ADA issues, and completely reorganize the public circulation space for the school. The central core of the building was completely transformed. The original stairs were kept on the east side of the building, and a new light-filled stair was constructed on the west side; in the center, a new south-facing atrium stair brings natural light deep inside the building. A new multi-stop elevator was installed to access the different levels and provide ADA access. At the basement level and on the first floor, a new public zone was created with an expanded lobby, a gymnasium, a dining room, and a library. The upper levels include four new science laboratories, two new art studios, and additional classrooms. Transparency between these spaces heightens the sense of spaciousness and activity.

Project Goals for the Browning School included: • Provide clear circulation throughout the school by using a new central stair and elevator; • Consolidate and re-organize large public spaces (gym, library, cafeteria) by moving them closer to the new enlarged main lobby. • Incorporate natural light through the use of skylights and doors with large glass panels • Provide uniform and consistent finishes throughout the building


The Browning School - New York, NY

Existing Existing

Proposed Proposed

READING TERRACE READING TERRACE

COMP COMP LAB LAB

UPPER UPPER DINING DINING

GYMGYM BELOW BELOW

UPPER UPPER LIBRARY LIBRARY

GYMGYM BELOW BELOW

FAC.FAC. ROOM ROOM

LOWER LOWER SCHOOL SCHOOL

LOWER LOWER LIBRARY LIBRARY

CENTRAL CENTRAL STAIR STAIR

WEST WEST STAIR STAIR

LOBBY LOBBY

SERVERY SERVERY

T

LOBBY LOBBY

KITCHEN KITCHEN

LOWER LOWER DINING DINING

T

T

NURSE NURSE

RECEPTION RECEPTION

Existing First Floor

T

MAKER MAKER SPACE SPACE

RECEPTION RECEPTION

Reconstructed First FloorFirst Floor First Floor

First Floor First Floor

LEGEND LEGEND Existing

Existing

CIRCULATION CIRCULATION

Proposed Proposed

ATHLETICS / RECREATION ATHLETICS / RECREATION

LIBRARY LIBRARY

ADMINISTRATION ADMINISTRATION

CAFETERIA CAFETERIA

BUILDING SERVICES BUILDING SERVICES

CLASSROOM CLASSROOM

OUTDOOR SPACE OUTDOOR SPACE

North North

OUTDOOR SPACE OUTDOOR SPACE

LEGEND

Outdoor Space

THE THEBROWNING BROWNINGSCHOOL SCHOOL CAFETERIA CAFETERIA

Administration

P EPTEETRE R G IG SO A ITAETSE S I SLOFLI FAI SAS SOSCOI C GYM GYM

MULTI-PURPOSE MULTI-PURPOSE ROOM ROOM LOCKER LOCKER ROOM ROOM

FITNESS FITNESS ROOM ROOM

GYMGYM

LOCKER LOCKER ROOM ROOM

Architects Architects Architects ArchitectsLandscape Landscape ArchitectsInterior Interior Architects

Library Classroom

KITCHEN KITCHEN

WESTWEST STAIRSTAIR

Cafeteria Circulation

LOCKER LOCKER ROOM ROOM

LOCKER LOCKER ROOM ROOM

Existing First Floor

Building Services

Existing First Floor

Athletics/Recreation Existing Basement

Cellar Cellar

LEGEND LEGEND CIRCULATION CIRCULATION

ATHLETICS / RECREATION ATHLETICS / RECREATION

Reconstructed Basement

Cellar Cellar


The Browning School - New York, NY

New central stair ties together three existing buildings.


The Browning School - New York, NY

Transformed lobby overlooks gymnasium (lobby before in inset).


The Browning School - New York, NY

Lower gymnasium (gymnasium before in inset).


The Browning School - New York, NY

Central stair.


The Browning School - New York, NY

New library with view to the connector stair.


The Browning School - New York, NY

Rendering of the upper level flexible library space overlooking the reading terrace and lower school area.


The Browning School - New York, NY

Lower school library and reading space.


The Browning School - New York, NY

Flexible Library Space (before in inset).


The Browning School - New York, NY

New outdoor reading terrace.


The Browning School - New York, NY

Maker space and technology lab.


The Browning School - New York, NY

Dining hall gallery with skylights .


The Browning School - New York, NY

The new dining hall below reading terrace.


The Browning School - New York, NY

Central dining hall space.


The Browning School - New York, NY

Typical corridor


The Browning School - New York, NY

Art instruction classroom (before in inset).


The Browning School - New York, NY

Daylit lower school classroom (typical classroom before in inset).


The Browning School - New York, NY

Upper school science classroom and laboratory - (typical science classroom before in inset).



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.