Roads
Fortune Landmark
Road Hierarchy
(referred to URDPFI, 2015) • S.P. Stadium
University Ground
ROW • Sub Arterial • Collector • Local
Gujaraj University
500
250 0
500
1000
1500
2000 Meters
16km / 1 sq. m
L.D. College
Road Hierarchy
(referred to URDPFI, 2015)
250 0
500
1000
1500
2000 Meters
21%
500
ROW • Sub Arterial 30-50m • Collector • Local
16km / 1 sq. m
•
Road Hierarchy (referred to URDPFI, 2015)
250 0
500
1000
1500
2000 Meters
11% 21%
500
ROW • Sub Arterial • Collector 12-30m • Local
16km / 1 sq. m
•
Road Hierarchy (referred to URDPFI, 2015)
500
1000
1500
2000 Meters
11%
68%
250 0
The road density on our site is 16.2km/km sq . It should be 10 km/ sq km as quoted by Shivanand Swami. Hence the density of roads is very high.
21%
500
ROW • Sub Arterial • Collector • Local 12-20m
16km / 1 sq. m
•
Hierarchical Issue The yellow patches indicate thorough sub arterial roads which have a high traffic volume but low capacity. This indicates weak link.
Vulnerable Patch
500
250 0
500
1000
1500
2000 Meters
Section – Sub arterial
2
5
9
9
5
2
Section Collector
1
4.7
4.7
1
Section Local
5
Fortune Landmark
Major Junctions Referred to CDEEP, IIT Bombay
S.P. Stadium
University Ground
1
4
8
Types of Junctions Y and T Junction
9
Gujaraj University
6
L.D. College
2
Four Legged
5 Five Legged 3 7
Six Legged 500
250 0
500
1000
1500
2000 Meters
Major Junctions Referred to CDEEP, IIT Bombay
1
4
8
Name 1.Commerce six roads
9 6 2
Residential and Government official buildings. Peak time: 6-7 pm
3.Panchvati
Surrounded by malls and commercial buildings. Peak time: 68 pm
4.Cept
Unmanned Junction. Heavy chaos due to surrounding college. Peak time: 9-11 am, 6-8 pm
5.Panjrapole
Heavy traffic almost the entire day due to IIM flyover.
6.Bata
7
500
250 0
500
1000
1500
2000 Meters
Peak time: 6-8 pm
2.Mithakali
5
3
Description
Controlled traffic due to Government buildings.
7.Parimal
Manned controlled traffic. Peak time: 9-11 am, 6-8 pm
8.SP
Commercial nature of junction.
9.Swastik
Commercial junction similar to SP cross road.
Journey-time Observation
Spots where journey time is increasing due to land use, illegal parking and informal sector Spots where journey time is increasing due to land use, illegal parking and informal sector
Traffic Volume Analysis of Swastik Cross Roads (referred to URDPFI guidelines)
PCU- 1800 V/Vd Ratio-0.95
PCU- 1564 V/Vd Ratio-0.82
b d a c PCU- 1814 V/Vd Ratio-0.95
PCU- 1086 V/Vd Ratio- 0.91
Traffic Volume Analysis of Mithakali 6 Roads (referred to URDPFI guidelines)
PCU- 1162 V/Vd Ratio-0.97 PCU-1972 V/Vd Ratio-1.04
PCU- 848 V/Vd Ratio-0.71
b
a
c
d PCU- 1982 V/Vd Ratio-1.04
f e
PCU- 926 V/Vd Ratio-0.77
PCU- 1326 V/Vd Ratio-0.95
Spot Speed (Swastik cross Roads ) (referred to UTTIPEC guidelines)
b d
High………… Delay Time
a
c
Low
Design Speed (guidelines) Local Roads
70
70
60
60
50
40 30
b
20
c
10
d
Speed (km/hr)
Speed (km/hr)
Sub-Arterial Roads
50 40 30 20
a
10
0
0 Towards Junction
Away Towards Away Towards Away from Junction from Junction from junction junction junction
Car
Auto
2-Wheeler
Towards Junction
Away Towards Away Towards Away from Junction from Junction from junction junction junction
Car
Auto
2-Wheeler
Fortune Landmark
Conflict Points
S.P. Stadium
University Ground
Gujaraj University
L.D. College
Hierarchical conflicts Hierarchical conflicts (Causing Congestions)
500
250 0
500
1000
1500
2000 Meters
A
B B A
C
C
500
250 0
500
1000
1500
2000 Meters
Conflict Points
Fortune Landmark
Conflicts -Street Vendors
S.P. Stadium
University Ground
Gujaraj University
L.D. College
500
250 0
500
1000
1500
2000 Meters
Street Vendors
Conflicts - Street Vendors
Vendors Vendor placement is a very big issue. It causes conflict by stopping the floating vehicular population especially on the busy main roads such as CG road and the University, HL roads.
500
250 0
500
1000
1500
2000 Meters
Street Vendors
Conflicts - Street Vendors HH survey Comments On Street Vendors Comments
62%
38%
Negative Positive
500
250 0
500
1000
1500
2000 Meters
Street Vendors
Accident Rate (Referred to CDP Ahmedabad)
Annually, accidents take place in these rates on the roads. High number of accidents take on the two roads since a large number of local roads are ending on a single long stretch. On the low and medium accident roads, the stretches with local roads ending on them is low.
Low (5-10) Medium (10-20) High (>20) 500
250 0
500
1000
1500
2000 Meters
Interventions
INTERVENTION ELEMENT WHAT HOW WHERE
conflict points manage the chaos manage chaos on the junctions caused by informal sector giving them a fixed remove illegal parking make all signals manned assigned place and close to junctions, tow during peak hours at least license them them turn of the links on CG all junctions on CG CEPT cross road road road
Fortune Landmark
Parking Legal On Street Parking
S.P. Stadium
University Ground
Gujaraj University
L.D. College
500
250 0
500
1000
1500
2000 Meters
There is no relation between parking provision and land use in our ward. Legal parking is far less as compared to illegal parking throughout the day, not just in the peak hours. This creates chaos and problems making several conflict areas sensitive.
Parking Legal On Street Parking
The legal parking is evidently existing mainly on the periphery of the gardens i.e. Law garden and Parimal garden. CG road has no legal parking which is a grave problem. It sees high traffic due to commercial use whereas no parking provision. This is a planning flaw. 500
250 0
500
1000
1500
2000 Meters
Parking CEPT
A
HL
INSTITUTIONAL
A
C B B RESIDENTIAL
RESIDENTIAL
500
250 0
500
1000
1500
2000 Meters
COMMERCIAL
MM
C
Parking
A A C B B
C 500
250 0
500
1000
1500
2000 Meters
Parking Design Carriage way
CG Road
The carriage width of CG road is eaten by the illegal parking. Whereas the parking on Ashram road is planned in a much better manner. However, the speed of vehicles on CG road is faster than Ashram road. This indicates management limitations as even the decreased carriage width is not able to decrease the speed of the vehicles.
Ashram Road
Parking Serviceable carriage Way
Design Carriage way
CG Road
The carriage width of CG road is eaten by the illegal parking. Whereas the parking on Ashram road is planned in a much better manner. However, the speed of vehicles on CG road is faster than Ashram road. This indicates management limitations as even the decreased carriage width is not able to decrease the speed of the vehicles.
Ashram Road
CG Road Observational Details - Parking Demand And Capacity
Traffic Speed Built Up Area Along CG Road
8,73,056.73 sq m
Parking Required For This Current Built Use
20,969.65 sq. m.
On Street Parking Allotted 500
250 0
500
1000
1500
2000 Meters
16 km / hr.
Left Out Parking
12,000 Sq. m. (approx.) 8,969 sq. m.
Ashram Road Observational Details - Parking Demand And Capacity
Traffic Speed
12 km / hr.
Built Up Area Along CG Road
5,98,340 sq. m.
Parking Required For This Current Built Use
17569.65 sq. m.
On Street Parking Allotted
NA
Left Out Parking
NA
Interventions
INTERVENTION ELEMEN parking T WHAT HOW WHERE
removal of illegal parking heavy fine, towing and better footpaths
lack of parking space
paid metered and timed parking identify parking requirement on road and free basement according to peripheral landuse parking
CG road and 120 feet road
CG road and 120 ft road
Fortune Landmark
S.P. Stadium
University Ground
Streetlights - Main Roads (UTTPEC) Approx. 30 lux level is suitable for non-shopping areas and 20-25 lux-level for shopping areas.
Gujaraj University
But on our site the existing Lux reading are interchanged. (Surveyed)
L.D. College
Commercial Zone With 30+ Lux Residential Zone With 25- Lux
Dim Light ( LUX Range 18-25) 500
250 0
500
1000
1500
2000 Meters
Bright Light (LUX Range 26-55)
Streetlights -Local 10%
90%
Working Lights Non working Lights
0
50 100
200 m.
Interventions
INTERVENTION ELEMENT
streetlights
WHAT
increase local streetlights
increase luminance of the lights
HOW
install new streetlights and maintain regularly
by planning height according to road width and landuse
WHERE
in the spots where streetlights missing
on the road periphery
Signage
Fortune Landmark
S.P. Stadium
University Ground
Number of Signage 208
Gujaraj University
L.D. College Cautionary
124
Informatory Regulatory
27
500
250 0
500
1000
1500
2000 Meters Cautionary Informatory Regulatory
Signage
Number of Signage 208
Cautionary
124
Informatory Regulatory
27
500
250 0
500
1000
1500
2000 Meters Cautionary Informatory Regulatory
Signage without reflector
Informatory sign
Regulatory sign
Signage with reflector
Cautionary sign
Interventions
INTERVENTION ELEMENT
signage
WHAT
removal of outdated signage
use of reflector and other appropriate materials
removal of signage with vernacular language
HOW
regular survey of regular survey of utilities signages
regular survey and maintainance of signage
WHERE
120 feet ring road
Bata crossroads
Bata crossroads
smart and detailed signage
put up improved and compact signage which are detailed minimally places with all standalone signage, other than junctions
Footpath
Fortune Landmark
S.P. Stadium
University Ground
1m 1.5 m
Gujaraj University
2m L.D. College
500
250 0
500
1000
1500
2000 Meters
According to UTTIPEC guidelines, the width of the footpath should be (since the pedestrian flow is determined by land use): 1. Residential-1.8m 2. Commercial-Mixed use-2.5m 3. Commercial nodes-4m
Footpath -Intervention
1m 1.5 m 2m Insufficient Width Insufficient but can’t be upgraded
500
250 0
500
1000
1500
2000 Meters
According to UTTIPEC guidelines, the width of the footpath should be (since the pedestrian flow is determined by land use): 1. Residential-1.8m 2. Commercial-Mixed use-2.5m 3. Commercial nodes-4m
Interventions
INTERVENTION ELEMENT
footpath
WHAT
increase width of footpath
removal of any form of hindrance
HOW
on the basis of landuse and accessibility
remove hoardings, fine illegal parking, remove informal sector
WHERE
Netaji road and CG road
CG road and Ashram road
Fortune Landmark
S.P. Stadium
University Ground
Gujaraj University
L.D. College
500
250 0
500
1000
1500
2000 Meters
Bus Stops -AMTS and BRTS There are a lot many AMTS stops occurring way too frequently on regular intervals. These many number of bus stops are not required.
Bus Stops - AMTS and BRTS There are a lot many AMTS stops occurring way too frequently on regular intervals. These many number of bus stops are not required.
These are buffers indicating service reach of the bus stops. Only the area in the north is not serviced adequately by the AMTS and BRTS service.
500 m. Buffer 250 m. Buffer 500
250 0
500
1000
1500
2000 Meters
Interventions
INTERVENTION ELEMENT WHAT HOW WHERE
bus stops removing too many stops with no proper infrasturcture surveying user profile and placing stops accordingly in spots with AMTS signage only and no seat-shade facility
facility of washrooms and drinking water facility
placing public washrooms nearby on the popular spots accessed frequently by users eg university bus stop