Infrastructure June 2020 Digital Edition

Page 78

BRIDGES

BRIDGING THE GAP AT HARWOOD

The road ahead is looking safer and more efficient for vehicles crossing the Clarence River at Harwood, NSW, with the completion of a new bridge. The 1.5km bridge, which is the highest and longest crossing in the Woolgoolga to Ballina upgrade project, will eliminate the stopping of main traffic flow that the existing 1966 liftspan bridge required for vessels to make their way up and down the river.

76

June 2020 // Issue 15

www.infrastructuremagazine.com.au


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.