Pump Industry Spring 2020 Digital Edition

Page 10

NEWS

CONTRACTOR SELECTED FOR

WODONGA PUMPING STATION UPGRADE

N

orth East Water has chosen its preferred contractor to deliver a major upgrade to a pumping station in Wodonga to future-proof the city’s water supply system. CCB Envico has been awarded the contract for the upgrade and will use local companies throughout the project, meaning a large portion of North East Water investment will stay within the region. North East Water has invested $5 million into the station, which draws water from Wodonga Creek and pumps it to the water treatment plant at Huon Hill. Some of the existing infrastructure was installed as far back as the 1960s, and North East Water has engineered the new upgrade to serve a growing Wodonga for decades to come. The refurbishment is underway to support the predicted growth of the area over the next 40 years, and will include several new pumps along with upgrades to electrical and security systems.

It will allow larger volumes of water to be pumped to the treatment plant more efficiently, helping to reduce the utility’s carbon footprint. The new pumps will transfer 1,000L per second on peak days, with capacity for higher flows as the community grows. North East Water Senior Project Engineer, Dean Jones, said real-time

monitoring of water flow rates and power consumption would also lead to greater energy efficiencies and cost savings. “The project includes a permanent on-site generator that will give greater security to the city’s water supply during power failures,” Mr Jones said. The construction work is expected to be completed over the next 12 months.

Process Automation Solutions for Pressure, Level, Flow and Temperature

INSERTION ELECTROMAGNETIC FLOW TRANSMITTER SERIES IEF

PADDLEWHEEL FLOW SENSOR SERIES PFT

SUBMERSIBLE LEVEL TRANSMITTER SERIES PBLT2

SMART PRESSURE TRANSMITTER SERIES 3400

+61 (0) 2 4272 2055 | dwyer-inst.com.au

8

pump industry | Spring 2020 | Issue 33

www.pumpindustry.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

PUMP SCHOOL

1min
pages 52-53

Ask an expert

3min
pages 50-51

the right pump coupling

3min
pages 48-49

Drive Systems expands locally-stocked ESCO API 610 and non-sparking disc couplings Considerations for selecting

3min
pages 46-47

Pump Genius

2min
page 45

SMART PUMPS

6min
pages 40-44

Not just motors: the high-reliability TECO MV510 VSD range

3min
pages 38-39

The automatic recirculation check valve

4min
pages 36-37

An accurate phosphorus metering and storage system for feedstock fortification

2min
pages 30-31

Innovation in self-cleaning pump intake screens

2min
page 27

The key to finding the right positive displacement pump

2min
pages 28-29

Improving pumping system efficiency to reduce power costs on Queensland farms

11min
pages 32-35

Mine dewatering in Papua New Guinea

3min
pages 24-25

Longer life verticals suitable for any pump brand

1min
page 26

Here comes the story of the Shurricane

2min
pages 22-23

PIA NEWS

2min
pages 20-21

New consultant to accelerate Granite Belt irrigation planning

2min
page 17

for regional drought support

2min
page 16

NEWS

2min
pages 8-9

Rottnest Island to undergo water infrastructure overhaul

2min
pages 18-19

guilty to ‘avoidable’ fatal accident

5min
pages 12-13

Bryn Estyn WTP upgrade progresses to next phase of works

2min
pages 14-15

Contractor selected for Wodonga pumping station upgrade Dreamworld parent company pleads

2min
pages 10-11
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.