MINE DEWATERING IN PAPUA NEW GUINEA

A project to expand the Lihir Gold mine, located on volcanic Lihir Island in Papua New Guinea’s north-east, proved to be a challenge due to a high water table. To reduce the water level in the pit to allow for expansion, experts were brought in to design and provide a dewatering solution. Crusader Hose was one of the equipment manufacturers that was involved in the project, supplying flexible layflat hose.

T

he Lihir Gold mine is an open-pit mine located within one of the island’s large volcanic calderas, the Luise Caldera, which borders the sea. While the volcano is considered extinct, it is still geothermally active, evidenced by fumaroles – smoke emanating from the rocks within the pit. Due to the pooling of rainfall and regular seepage of seawater through the crater rim into the pit, the pit needed to be pumped out in order for the mine expansion plans to go ahead.

Designing the dewatering system

The prime contractor for the project was a large pumping company from NSW, who are experts in designing mine dewatering systems. The company was brought in to provide a solution to lower the water table, so that mining could be expanded. The final design included a dewatering system that used 3 x 350kW submersible bore pumps inside an angled poly-pipe casing suspended from flexible hose. Each pump was driven by a separate generator and connected to a platform, which cantilevered over the pit wall. In order to construct the angled bore casing, 900mm diameter poly-pipe

22

sections were welded together to form an insulation sleeve, which rested at an angle along the pit slope. The length of poly-pipe into the pit was 175m long and the water level was about 45m below the headworks. The bore casing was then securely anchored from the headworks, which incorporated a concrete-padded, steel-framed platform, which was surrounded with safety rails. Once the bore casing had been secured, installation of the submersible pumps commenced. Each 350kW stainless steel submersible pump was mounted on a skate which slid within the casing, allowing the pumps to be let down inside the poly-pipe, plus acting as a centraliser. The pumps were connected to Flexibore, the flexible layflat hose supplied by Crusader Hose, which suspended each pump under its own weight, as it was lowered 175m into the pit.

The hose of choice for the system

Flexibore was chosen for the project as it allowed for easy installation of the pumps over a roller while clamped from a crane.

“As the hose is manufactured from woven fabric that acts like a lifting sling, a high tensile load of up to 16 tonnes can be suspended from it,” said Francois Steverlynck, Managing Director of Crusader Hose. “The hose is also supplied in one continuous length.” “The 8” Flexibore also has a burst pressure of 440m, which was well within the design pressure for the project.”

A successful installation

With the submersible pumps safely lowered inside the poly-pipe casing, they were then connected to the diesel generators via the power cables attached to the Flexibore hose. Settings and flow rates were controlled until each pump attained a flow rate of 168 litres per sec. The CAT diesel generators were supplied by Taranis Power of WA. Gabriel Hoascar, the engineer from Taranis who connected the pump cables and fired up the generators, said, “I was impressed at how efficiently the system worked. “Our company will look to supply more systems using Flexibore hose.”

For more information about Flexibore, visit crusaderhose.com.au.


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

PUMP SCHOOL

1min
pages 52-53

Ask an expert

3min
pages 50-51

the right pump coupling

3min
pages 48-49

Drive Systems expands locally-stocked ESCO API 610 and non-sparking disc couplings Considerations for selecting

3min
pages 46-47

Pump Genius

2min
page 45

SMART PUMPS

6min
pages 40-44

Not just motors: the high-reliability TECO MV510 VSD range

3min
pages 38-39

The automatic recirculation check valve

4min
pages 36-37

An accurate phosphorus metering and storage system for feedstock fortification

2min
pages 30-31

Innovation in self-cleaning pump intake screens

2min
page 27

The key to finding the right positive displacement pump

2min
pages 28-29

Improving pumping system efficiency to reduce power costs on Queensland farms

11min
pages 32-35

Mine dewatering in Papua New Guinea

3min
pages 24-25

Longer life verticals suitable for any pump brand

1min
page 26

Here comes the story of the Shurricane

2min
pages 22-23

PIA NEWS

2min
pages 20-21

New consultant to accelerate Granite Belt irrigation planning

2min
page 17

for regional drought support

2min
page 16

NEWS

2min
pages 8-9

Rottnest Island to undergo water infrastructure overhaul

2min
pages 18-19

guilty to ‘avoidable’ fatal accident

5min
pages 12-13

Bryn Estyn WTP upgrade progresses to next phase of works

2min
pages 14-15

Contractor selected for Wodonga pumping station upgrade Dreamworld parent company pleads

2min
pages 10-11
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.