Work samples

Page 1

Work Samples - Liam Moore


Cardiac Cath Labs

Cardiac

Cath

Labs

project was an existing hospital

in

General

maternity

Challenges were

Lowell Hospital, building.

encountered

dealing

with

existing columns, meeting

the right clearances and space large

needed

Cardaic

to be installed.

JACA Architects Tony Cavallaro 2007-2009 Responsibilities: Going to the site

yrs.

My for site measurements, to illustrate

existing conditions. and producing

2

CAD

Designing

small parts of projects

drawings for clients to view.

CAD

drafting of sections; interior elevations; floor plans; window door schedules; electrical plans; and design options.

Contacting

SKA drawings;

contractors to let

them know of drawing completion, and shipment to their location.

Converting AutoCAD

files to

PDF

so that

clients and contractors can view them onscreen through e-mail.

role in the project

consisted of, producing construction

documents

with guidance from the

associate on the project.

Tasks plans,

interior

RCP’s,

included enlarged

floor

plans,

elevations, millwork

sections, wall sections, head and jamb details.

for

the

equipment







Dr Roberts Office

Dr Roberts Office

project was

an existing building, the client was taking up a portion of the

building for his private practice.

Challenges dealing

encountered

with

existing

were column

structure and attempt to reduce the

amount

of

space

taken

Option 1

to

decrease client

Option 2

cost,

leasing

My

while still have all

program

role in the project

consisted

of,

taking

elements needed

sketches drawn by an

for

associate

practice.

client

them within in

and

into

making reality

CAD. Keeping ADA codes

mind

and

square

footage

needed by each space, draw out each option and if the option did

Option 3

not

Option 4

work

propose

a

solution to the option

that would work.

with transferred into

Later this project Revit as one of the

first to set up a company standard that

the office would use for future projects.

The BIM

CD’s Revit to look like CAD. It served as a

model was created and

were recreated within

CD’s

created in

starting ground for the office template later

revised

and

improved

upon

to

increase productivity for all employees within the firm.

Option 5

Option 5A



Concord Hillside


Concord Hillside Medical Center project was a remodel

of

an

existing

into a new doctors suite.

Challenges

encountered

were dealing with existing column

structure

building limitations.

and

My the

role

in

project

consisted of, creating

schematic design

a

Revit document with 3D

cartoon images for client to understand space, and design intent.


Visual Design

Visual Design Surgical Specialties project was a remodel of an existing into a new doctors suite. Challenges encountered were dealing with existing column structure and building limitations.

My

role in the project consisted of, reproducing existing

Revit. 3D modeling of new reception desk. JACA’s interior design project manager. Applying material to model, and render final product for client understanding and approval. conditions into

Importing

materials selected by



UCONN University

of

Connecticut, Young Building

project was an

existing building, the client was updating the ventialtion in the school.

The

budget for the project primary went to

this updating ventalation system, with very little to new architectural elements.

Challenges encountered were updating bathrooms up to code; new handrail and gaurdrail for the existing staircase; locating new louvers so that new HVAC units could be placed within the building; and design options for location of new chiller unit.

Design Partnership of Cambridge David Finney

2011

Responsibilities: Push production

on project to complete construction

documents by deadline.

3

Coordination

and conflicting areas to disciplines.

mos.

of model transfer,

My

role in the project consisted of, coming on board

the project in the middle of construction documents and complete the project for its deadline. structural and changes.

Help

MEP,

Coordinate

with

update model according to their

others using

Revit

for the first time, and

create several details in all areas of the project.









Pepper Hamilton

Packard Design Susan Packard

2011

2

mos.

Responsibilities: Finish production of construction documents for deadline. Design Development, and production of renderings, and 3D modeling of spaces for client review.


Pepper Hamilton project was an existing building, the client was leasing half the 8th floor, and all of the 9th. It was for a lawyer firm, and needed to have a high end look about it.

Challenges

encountered were producing the construction

documents as fast as possible.

I

came on board with the

firm to work on this project alone, and get it to completion with a month deadline.

My

role in the project consisted of, coming on board the

project with design development being just completed,

I

needed to take every piece of the project up to construction documents level. and

Details,

Floor plans, RCP’s, Sections, Elevations,

all worked on by myself.




Cambridge Cambridge was

an

Associates

project

building,

existing

the

client was taking two floors in the building.

The

client wanted

an open lobby coming out of the elevator,

with

a

grand

stair

leading down to connect the two floors.

Challenges

encountered

were creating a staircase within existing

structural

grid

that

appeared to be grand, with low

Option 1

height ceilings due to mechanical systems.

Having

enough

Option 2

My

space

to have both a reception that

is

role in the project

consisted of, several important

desk

design.

easily

rolls

Starting

in with

several design options

approachable

for

and maintain a

the

client

to

choose from in sketch

large space for

form.

a wait area.

design

From which two were

choose

Revit. Both floor plan and 3D perspective were to produce in

needed to represent to

Option 3

Option 4

the client.

One design

was choosen for the stair case, well two more options were created for the

looby, and reception/waiting Both options were to be developed floor plan, elevation, and perspective

elevator area. in

with some materials choosen by the client

imported and rendered for presentation.

Later

one

design

was

choosen,

and

construction documents were made from the

Revit

model.

I

was the lead project

designer on this and every step from design to construction documents were

100% Option 5

Option 6

produced by myself entirely.



4

TOILET ROOM FLOORING & DRAINAGE TRANSITIONS

Inpatient Oncology

SCALE 1/2" = 1'-0"

RG 6 RG 2

3 10' - 10"

GENE SEE P SEE P

6' - 10"

3' - 3 7/8"

SV-3 3' - 4"

FLOO 1. 2. 3. 4. 5.

12' - 9"

1' - 0"

CENTER TILE PATTERN FOR SLOPE ON DRAIN LOCATION, TYP

1' - 6"

SV-2

11 3/4"

SLOPE

6. 7. 8. 9. 10. 11.

7' - 0"

FLOOR MAX HEIGHT AT +3/4" TO T.O.S. TO CREATE SLOPE TO DRAIN. SLOPE 1/4" TO 1' - 0" MAXIMUM; EVENLY FEATHER BACK TO MEET SHEET VINYL AT DOOR.

PV 12 RG E

SV-3 6' - 10"

141 SF

2' - 6"

TOILET 6608A

70 SF

69 SF

68 SF

CT-1 STAFF LOUNGE 6605 133 SF

12' - 9"

SV-2

11 3/4"

63 SF

SV-WD

275 SF

2 RG 5

271 SF

57 SF CT-1

FD

RG B RG 5.5

RG 5.5

TOILET 6609A 58 SF

SV-WD

SV-3

ANTE ROOM 6608B

46 SF SV-WD

46 SF SV-WD

SV-2 BORDER, TYP

SV-WD

CT-1

FD

FD

TOILET 6617A

CT-1

64 SF

281 SF SV-WD

299 SF SV-WD

PV 8

AI106a

PV 9

FD

PV 11

PATIENT BEDROOM 6616

FD

OBSERVATION

TOILET 6619A

4

CLEAN UTILITY 6610

E EL

88 SF

76

SV-2

881 SF

INFUSION 6618

SV-WD

PV L

CORRIDOR 6603

SV-1 FIELD, TYP

36 SF

50 SF

268 SF

264 SF

EQUIP 6620

EQUIP 6618A

FD

PATIENT BEDROOM 6609

ISOLATION ROOM 6608

1' - 0"

SV-2

53 SF

RG 6.25

FD

ANTE ROOM 6607B

PARKVIEW NURSE STATION - FLOOR PATTERN DETAILS SCALE 1/4" = 1'-0"

PV 13

8' - 8" ISOLATION ROOM 6607

SV-WD

10 SF

NOURISHMENT 6621

SV-1

INFUSION 6606 277 SF

ELEC 6604

1' - 0"

RG C

ATION - FLOOR PATTERN DETAIL

FD

STAFF TOILET 6605A

1' - 0" 1' - 6"

7' - 0"

RG D

MULTIPURPOSE ROOM 6619

RG 4

TOILET 6607A

1' - 7"

SV-3

2' - 0 1/2"

RG 3

TOILET 6606A

SCALE 1/4"

1' - 3 1/8"

ROGERS STAIR 667

Bariatric unit - Renovation - 9,500sf 7' - 6" 3' - 4" Schematic Design through Construction 1' - 0" Administration of 4th floor inpatient renovation. Remodel existing patient rooms with modification to layout for new bariatic rooms and ADA accessible bathrooms. Coordination with MEP to improve SV-2 air quality of area as well as future renovation projects. 1' - 3 1/2" 9"

8' - 8"

7"

3' - 3 7/8"

1' - 0"

1' - 6 7/8"

Responsibilities: RG Inpatient Oncology - Renovation - 15,000sf 6 Production of project from Design Development to Construction Administration. Creation of multiple - 10" renderings using Revit with 10'materials selected by interior designer for client meetings.

6' - 10"

mos.

RG 5

7' - 0"

5

RG 4

1' - 0"

yr.

RG 3

1' - 0"

1

RG 2

1' - 0"

2012-2014

RG 1

FLOO PARKV

2

SCALE 1/4" = 1'-0"

3' - 2"

David Paarz

3

ROGERS NURSE STATION - FLOOR PATTERN DETAIL

1' - 0"

Shepley Bulfinch

1' - 0"

1' - 3 1/2" 2' - 0 1/2"

ORING & DRAINAGE TRANSITIONS

SV-1

GENE

7' - 6"

SLOPE

SLOPE

SLOPE

RG C

9"

SLOPE

DRAIN PLACED -1/4" FROM T.O.S.; CHIP OUT AREA INDICATED FOR 1/4" DEPRESSION

1' - 0"

SV-1

1' - 6 7/8"

A950

TOILET 6616A

CT-1

64 SF

284 SF

STAFF PASSAGEWAY 6602

OFFICE 6614

55 SF

96 SF

SV-2

CPT

OFFICE 6615

SV-WD

115 SF CPT

PV 12

COLLAB WO SPA 66

314

MEDS 6613 118 SF CPT

PV 13


8' - 8"

SHOWER DRAIN PATTERN

1' - 3 1/8"

1' - 0"

1' - 7"

SV-1

PV L

6' - 10"

2' - 6"

FLOORING PATTERN DIRECTION

SV-3

12' - 9"

7"

3' - 4"

1' - 0"

8' - 8"

1' - 0"

6' - 10"

7' - 6"

SV-3

3' - 2"

SV-3

3' - 3 7/8"

1' - 0"

9"

RG C

1' - 6 7/8"

10' - 10"

SV-1

1' - 0"

7' - 0" 1' - 0"

1' - 0"

1' - 3 1/2" 2' - 0 1/2"

1' - 0"

7' - 0"

11 3/4"

SV-2

1' - 0"

SV-2

1' - 6"

3

ROGERS NURSE STATION - FLOOR PATTERN DETAIL RG 1

RG 2

RG 3

141 SF

133 SF SV-2

RG D

TOILET 6608A

TOILET 6609A

69 SF

68 SF

58 SF

FD

277 SF STAFF TOILET 6605A 57 SF CT-1

ELEC 6604

NOURISHMENT 6621 63 SF

SV-WD MULTIPURPOSE ROOM 6619 275 SF

RG B

INFUSION 6606

SV-WD

SV-2 BORDER, TYP

ISOLATION ROOM 6607 FD

SV-WD

ANTE ROOM 6607B

ANTE ROOM 6608B

46 SF SV-WD

46 SF SV-WD

SV-WD

FD

TOILET 6619A 53 SF

ELEV ELEV1

ELEV ELEV2

88 SF

76 SF

81 SF

45 SF

SV-WD

PV 11

75 SF

TRASH CHUTE 6631A

3 AI106a

ELEVATOR LOBBY 6630

TOILET 6656A

TOILET 6657A

63 SF

60 SF

60 SF

FD

CT-1

103 SF

21 SF

CORRIDOR 6603

TOILET 6655A

FD

NOURISHMENT 6653

25 SF

CT-1

SV-WD PATIENT BEDROOM 6655

14 SF

EX. MECH 6636

PV 14

TOILET 6658A

FD

FD

PATIENT BEDROOM 6658

CT-1

ANTE ROOM 6658B

PATIENT BEDROOM 6657

CT-1

64 SF INFUSION 6618 299 SF SV-WD

OBSERVATION 281 SF SV-WD

PATIENT BEDROOM 6616

FD

FD

TOILET 6616A

CT-1

64 SF

284 SF

SV-WD

OFFICE 6614

55 SF

96 SF

SV-2

CPT

OFFICE 6615 115 SF CPT

COLLABORATIVE WORK SPACE 6611

PV M

17 SF 2 AI106a

118 SF CPT

ELEC 6637

PHYS WORK AREA 6612

24 SF

ELEV ELEV5

ELEV ELEV6

ELEV ELEV7

94 SF

94 SF

90 SF

PUBLIC ELEV ELEV3

PUBLIC ELEV ELEV4

57 SF

57 SF

SV-2

COLLABORATIVE WORK SPACE SV-2 6651 404 SF

ELEC 6638

131 SF

23 SF

SV-2 BORDER, TYP DATA CLOSET 6676

SV-1 FIELD, TYP

SV-1 FIELD, TYP CONSULT ROOM 6639

SV-2 BORDER, TYP

PUBLIC TOILET 6641

CORRIDOR 6675

FD

195 SF

54 SF

CT-1 TOILET 6672A

87 SF

CPT PEDS WAITING 6643 90 SF

PATIENT BEDROOM 6672 341 SF

SV-WD

PATIENT BEDROOM 6671 341 SF

95 SF SV-WD FD

312 SF TOILET 6670A

CPT

EQUIPMENT 6674

SV-WD

FAMILY KITCHEN 6642A

SV-WD

75 SF

CT-1

272 SF

PATIENT BEDROOM 6670

CT-1

SV-WD

90 SF WAITING ROOM 6642

PV K

ANTE ROOM 6670B

55 SF

4 AI106a

PV L

PARKVIEW STAIR 615 615

CORRIDOR 6652 595 SF

100 SF

RG 6

MEDS 6659 140 SF

SV-2

314 SF

MEDS 6613

PV N

SV-WD

SV-1 FIELD, TYP

STAFF PASSAGEWAY 6602

SV-WD

115 SF

262 SF

262 SF

ALIGN

283 SF

SV-WD

SV-WD

400 SF

TOILET 6617A

PV P

78 SF

PATIENT BEDROOM 6656

265 SF EX. STOR. 6635

PV 13

CT-1

97 SF EVS 6633

CORRIDOR 6600

PV 12

CLEAN UTILITY 6654

SOILED 6634

178 SF STAIR VESTIBULE 637

881 SF

36 SF

FD

TRASH ROOM 6631

179 SF

CLEAN UTILITY 6610

SV-2

EQUIP 6620

CT-1

PV 9

514 SF

SV-1 FIELD, TYP

EQUIP 6618A 50 SF

268 SF

264 SF

FD

PV 8

ROGERS STAIR 638 638

FD

PATIENT BEDROOM 6609

ISOLATION ROOM 6608

271 SF

RG 6.25

RG 5.5

TOILET 6607A

10 SF

RG C

SCALE 1/4" = 1'-0"

RG 5

70 SF

CT-1 STAFF LOUNGE 6605

RG 4

TOILET 6606A

RG E ROGERS STAIR 667

PARKVIEW NURSE STATION - FLOOR PATTERN DETAILS

2

SCALE 1/4" = 1'-0"

145 SF

SV-2

PATIENT BEDROOM 6673

SV-WD

CT-1

FD

TOILET 6673A

194 SF

CT-1

80 SF

TOILET 6671A 64 SF

FD

PV J

42 SF

1

FLOORING FINISHES SCALE 1/8" = 1'-0"

THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER


TYPICAL DOOR TRANSITION DETAILS.

RG 1

RG 2

RG 3

RG 4

RG 5

RG 5.5

RG 6.25

?

# 2

3

A903 MIN 7' - 6"

13' - 9"

E

S

13' - 8 1/2" G

G

A903

5' - 6"

G

G

5' - 6"

E

13' - 2"

E

G

13' - 8 1/2" G

G

REFER TO INTERIOR ELEVATIONS AND TYP HEIGHT SHEET A800 FOR LOCATIONS OF P

7.

IN CONJUNCTION WITH THIS FLOOR PLAN, ELEVATIONS AND WALL PROTECTION DETA PROTECTION INFORMATION.

8.

PATCH & MATCH EXISTING FIREPROOFING RATING WHERE REQUIRED.

9.

PATCH & REPAIR EXISTING EXTERIOR WEA WHERE REQUIRED.

10.

ALL COUNTER SINKS SHALL HAVE SOLID SU SOLID SURFACE BACKSPLASH, AND INTEGR SINK, UNLESS NOTED OTHERWISE.

11.

ALL NURSE STATIONS SHALL HAVE SOLID S TRANSACTION TOPS, PLASTIC LAMINATE W RESIN VERTICAL PANELS, CUSTOM FABRIC AND LED LIGHTING.

12.

ALL SWING DOORS SHALL BE LAMINATE-FA NOTED OTHERWISE. REFER TO SPECIFICA ALUMINUM BREAKAWAY DOORS.

13.

REFER TO WINDOW SCHEDULE FOR GLAZIN

14.

PROVIDE METAL PARTITION CLOSURE TRIM EXTERIOR GLAZING MULLION AND END OF PARTITION.

15.

PROVIDE NEW GWB AT ALL COLUMN ENCLO 7G, U.N.O.

KEYED GENERAL NOT NOTE

1 CURTAIN TRACK, ABOVE

7' - 6"

G

1' - 3"

RG E

1 / A106b

6.

1

WP-7 FD

TOILET 6619A

8 A806 6

6' - 10"

3E1-0

7

G

WP-1

G

E

E

3' - 10"

4' - 6"

2' - 0"

1

WP-1

G

ALIGN

G

10' - 0"

4' - 3 1/2"

ALIGN CG

1' - 11 3/4"

7F2-0

1A6-0

CG 7F2-0

WP-1

WP-1 7F2-0

G

1

3E1-0

1

18

5

23 A803 21

6616A

CG

E

G

7C0-0

G

7F2-0 7C0-0

7C0-0

G

WP-1

G

7C0-0

WP-1

7F3-0

7E3-0

4C4-2

6

7C0-0

G

7F2-0

A815 5

14 A803 12 13

WP-1 7C0-0

PHYS WORK AREA 6612

1A6-0

11

OMNICELLS

WP-1

CG

CG

MEDS CART

MEDS 6613

OMNICELLS

22

WP-1

7C0-0

CG

CG

3

6613A

6613

8 A804 6

WP-1

4 A815 2

2' - 7 1/8"

OFFICE 6615

3

COLLABORATIVE WORK SPACE TELEMETRY MONITOR 6611

19 A803 17

20

7

E

1

WP-1

7F2-0

WP-7 ?

4 A804 2

CG

CORRIDOR 6600

7F2-0

CG

16

1 A920 5' - 6"

7F2-0

P-TUBE

OFFICE 6614

PATIENT BEDROOM 6616 1A6-0

CG

7F2-0

7F2-0

6615

TOILET 6616A

WP-5

WP-1 ?

WP-3

1A6-0

7F2-0

G

5' - 0" CLEAR A803 15

FD

7C0-0

WP-3 STAFF PASSAGEWAY 6602

1A6-0

CG

FD

15

7F2-0

CG

6614

11

16 A804 14

3

1

1' - 3"

9

7F2-0

WP-1

WP-5

2' - 6"

CG

WP-5

5' - 6"

2' - 2"

CG

1' - 4"

WP-3

6616 WP-1

3E1-0

12 A804 10

1

7C0-0

TOILET 6617A

13

4 A805 2

5

6619A

OBSERVATION 6617

6617A

CG

CG

7F2-0

INFUSION 6618

FD

2' - 0 1/2"

1

WP-2

FEC CG

CG

7F2-0

WP-5

HVC

CG

1' - 4"1' - 4"

WP-5 WP-5

WP-1 ?

3A3-0

4' - 5"

WP-2

WP-1

ALIGN CUBICAL CURTAIN TO HEADWALL CL

1A6-0

PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS

A807

WP-5

1' - 6"

1A6-0

WP-5

2' - 0"

WP-7 ?

3

WP-5

2' - 0"

2' - 3 3/4"

7

4' - 2"

1

CG CG

2' - 6"

1

6618A

5

WP-2

4 A806 2

WP-2

WP-7

8 A805 6

5' - 0"

1' - 5 7/8"

WP-2

6617

6' - 10 7/8" NURSE WORK 6603A

11

EQUIP 6618A

2' - 0 7/8"

10' - 1 1/2"

MULTIPURPOSE ROOM 6619

7F3-0

CG WP-1

WP-1

WORKSTATION

2' - 1 1/2" CG

7F2-0

WP-1

1

7F2-0

12 A805 10

3E1-0 7' - 1 3/4"

3' - 4"

6618

WP-1 WP-1

9

WP-7 WP-7 ?

WP-2

7F2-0

CG CG

EQUIP 6620

CG

WP-2

3' - 0"

CG 7F2-0

2

WP-5

WP-5

3

WP-5

WP-5

8' - 2 3/8"

WP-3 WP-3

11

REF

4

WP-5

7A2-0

WP-5 CG

WP-5

WP-5

CORRIDOR 6603

2' - 5"

WP-7

7A2-0

CG

G

7F2-0

G

7E3-0

EXISTING FIRE RATED PARTITION. PATCH AND REPAIR AS REQUIRED

7F2-0

G

29' - 11 3/4"

7' - 10"

14' - 6"

12' - 7"

1 / A106b

ALIGN

4C4-2 6' - 11"

WOOD WALL. SEE ELEVATIONS AND DETAILS

WP-5

CG

ALIGN

WP-5

WP-7 6610

WP-5

7F2-0

8' - 3 1/4"

CG

WP-7 CG

6619 4' - 11 1/4"

CG

1' - 8 1/2"

CG

7F2-0

NOURISHMENT 9 6621 A806 10 WP-3 ?

WP-5

10

7F2-0

6609

WP-5

A803

8' - 0" CLEAR

WP-5

6608

CG

5 A807

10' - 0"

8' - 0" CLEAR

WP-5

1' - 6" MIN

1' - 6" MIN

WP-1

CG 7F2-0

WP-1

7F2-0

CG

6608B

WP-5

WP-1

CG

CG WP-5

1

WP-1

9

6' - 0"

WP-5

1

WP-1

637

STAIR VESTIBULE 637

CLEAN UTILITY 6610

1A6-0

ALIGN

2' - 0"

6607B CG WP-5

6608C

WP-1

WP-7

1' - 6 1/2"

1' - 4"1' - 3"

6604

WP-5

6

3A3-0

ELEV ELEV2

1' - 0" CLEAR

7F2-0

WP-5

A802 7

1A6-0

CG

WP-1

6607

5

7 A802

ANTE ROOM 6608B

ALIGN

WP-5

6606

7F2-0

WP-5 ELEV ELEV1

BLANKET WARMER

1

WP-1 5

6

3E1-0

FD

2' - 3 5/8"

WP-1 WP-1 CG

CG

WP-1

7F2-0

CG

6607C

6600

WP-1

1' - 10"

1 CG

7F3-0

ALIGN

WP-1

3

ROGERS STAIR 638 638

1

FD

7

4' - 4 1/2" 1' - 3"

1' - 6" 1' - 3" MIN

1' - 3"

1

1 4 A803 2

14

3' - 0" 2" 2' - 0 3/8"

2' - 0"

FD

ANTE ROOM 6607B

12 15 A802 13

5 8 A803 6

2' - 2"

1' - 6"

1A3-2

PROVIDE FIRE RATED ASSEMBLY AS INDICATE IN WALL TYPE. WP-5 6621

RG B

5' - 1"

10' - 0 3/4"

7' - 8"

1A3-2

18

PATIENT BEDROOM 6609

1A6-0

WP-1 WP-1

7F2-0

WP-1

6609A

WP-1

19 A802 17

7C0-0 TOILET 6609A

CG

WP-1

ISOLATION ROOM 6608

1

7C0-0

IDPH-A301 A301 4

WP-1 CG

CG

CG 7F3-0

2' - 2"

ELEC 6604

ALIGN

WP-5

RG C

1A6-0

7

6605A

WP-5

10

3A3-0

5 8 A801 6

CG

16

11 A802 9

1A6-0

WP-1

6608A

TOILET 6608A

8

WP-1

WP-1

CG

3E1-0

2' - 0"

STAFF TOILET 6605A

3E1-0

6605 HVC

3

FD

1

3

7F2-0

RG D

1 4 A802 2

11

7C0-0

TOILET 6607A

1A6-0

1

STAFF LOUNGE 6605

9 12 A801 10

15

4 A801 2

UP

7F2-0

7C0-0 6607A

ISOLATION ROOM 6607

1' - 6" 1' - 3" MIN

8' - 8 7/8"

16 A801 14

WP-1

2' - 0"

6" MIN

13

7F2-0

INFUSION 6606

WP-1

7C0-0

CG

WP-1 WP-1

1' - 8 3/8"

6' - 0"

DN

7C0-0

WP-1

1

7F2-0

3' - 10"

ROGERS STAIR 667

TOILET 6606A 6606A

1' - 6" MIN

1' - 3"

5' - 4 7/8"

7F2-0

4C4-2

1' - 6" MIN

7C0-0 PROVIDE FILLER PANELS

S

PV K

4 A903 S 4C4-2

3

12

A925

A903 G

WP-2

WP-2

6639

CONSULT ROOM 6639

1' - 0" MIN

7E3-0 6642A

6 9 A813 7 8

G

WP-2

13

WP-2

A903

DECORATIVE GLASS WALL. SEE ELEVATIONS AND SPECIFICATION.

G

WP-2

PEDS WAITING 6643

WORKSTATION, SEE DETAIL

G 7F3-0

G

G

G

G

PV J

2

10/1/2013 4:05:22 PM

Sixth Floor Inpatient Oncology Unit

C:\2013 Revit Locals\CARLE4590_ARCH_CENTRAL_KPeppard.rvt

IDPH-A301 A301

PV 7

1

SIXTH FLOOR PLAN - ENLARGED PLAN (WEST) SCALE 1/4" = 1'-0"

THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER


TYPES, TYPICAL DOOR & INTERIOR WINDOW E DOOR & INTERIOR WINDOW HEAD & JAMB DET TYPICAL DOOR TRANSITION DETAILS.

RG 6

RG 6.25

PV 8

PV 9

PV 11

PV 12

PV 13

PV 14

PV 7

WP-5

WP-5

CG

ALIGN

CG CG WP-5

WP-5

1' - 0" MIN.

6658

20

CGCG

CG

WP-1

WP-3

7C0-0 CG WP-5

WP-5

WP-3

7C0-0 WP-5

7C0-0

1

7

A921

P-TUBE

CORRIDOR 6652

WP-5

CG

PARKVIEW STAIR 615 615

WP-2

12 A812 10 11

1A6-1

3E1-0

G

A813 3

G

G

G

G

10/1/2013 4:05:27 PM

1 4 A811 2

3A3-0

1' - 0"

ANTE ROOM 6670B

16 13 A810 14

WP-1

A810

1' - 3"1' - 3"

1' - 2 1/4" 2' - 7 3/8"

WP-1

FD

1A6-0

6670A

9

1' - 6" MIN

1' - 10"

S

12 A810 10

1

CG

1

TOILET 6670A

3

2' - 6"

WP-1 WP-1

1' - 3" 1A6-0

PV K

7F2-0

WP-1

6670B

15

1' - 3" 2' - 3 1/2" 1' - 3"

PATIENT BEDROOM 6671

9

3' - 0"

1' - 0" 1' - 6" 1' - 3"1' - 3"

1' - 4 1/2"

3' - 0"

WP-1

12 A811 10 11

3E1-0

PATIENT BEDROOM 6673

S PATIENT BEDROOM 6670

8 A810

4 7 A810 5

1' - 3"

11

6

S

FD

4 A812 2

1A6-0

3

6673A

TOILET 6673A

WP-7

G

G

WP-1

2' - 0"

1

G

G

G

G

ALIGN

CENTER WALL ON MULLION 14

Sixth Floor Inpatient Oncology Unit

6672A

1A6-0

WP-1

6671

7C0-0

1' - 6"

8' - 0" CLEAR

1A6-1

A903

C:\2013 Revit Locals\CARLE4590_ARCH_CENTRAL_KPeppard.rvt

15

1' - 3"

1

CENTER WALL ON MULLION

1

16 A811 14

EQUIPMENT 6674

FAMILY KITCHEN 6642A

7F3-0

1

6673 WP-1

1A3-1

WP-2

WORKSTATION, SEE DETAIL

7F3-0

G

WP-7 WP-7

1

4

WP-5

WP-1 ?

? WP-1

WP-1

9

5 A813 2

G

G

1A6-0

6674

6672

PATIENT BEDROOM 6672

13

WP-5

WP-5

5 8 A812 6 7

E

15 A903

WP-1

WP-1

WP-1

E

G

G

G

6671A

16 A903

2' - 0"

S 18 A903

5 8 A811 6

G

7F2-0 1

TOILET 6671A

7

G

1A6-0

3E1-0 1' - 3"

7C0-0

1' - 3"

PEDS WAITING 6643

WP-1

1

S

4C4-2

7F2-0

FEC

G

E

FD

G

2' - 0"

DECORATIVE GLASS WALL. SEE ELEVATIONS AND SPECIFICATION.

G

2' - 10 1/2" TOILET 6672A

1

7F2-0

WP-1

WP-5

S

G 17

CENTER WALL ON MULLION

A903

G

G

PV J

CENTER WALL ON MULLION

ALIGN

WAITING ROOM 6642

FD

CG

1' - 6" MIN CLR

WP-2

WP-2

5' - 3 5/8"

A903

1

15

1A3-1

6641

PUBLIC TOILET 6641

CG

ALIGN

3E1-0

WP-5

13 16 A812 14

WP-3

WP-3

2' - 0 1/8"

WP-2 WP-2

WP-5

8' - 0" CLEAR

6640

CG

WP-5

1' - 0" MIN

9' - 4 1/2"

WP-3 WP-3

6642

8

WP-5

CORRIDOR 6675

4' - 0" CG CG

6

13

WP-2

WP-5

WP-3

1A6-0

7F2-0

6670

2' - 6" EG

CGCG

CG

1' - 0"

15

1' - 5 1/2" 1' - 9 3/8"

1' - 0" MIN

1' - 2" 6642A

WP-5 CG

FEC ALIGN

1A3-0

8' - 0"

WP-5

PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS

14

9 A813 7

G

ALIGN

WP-5

ELEVATOR LOBBY 6640

7A3-0

6676

CG

1' - 3"

CG

1' - 3"

WP-2

CG

A808 13

6639

CONSULT ROOM 6639

7C0-0

7C0-0

S

135°

"

WP-2

2' - 6" 7C0-0

2' - 6"

7F2-0 CG

7C0-0

2

WP-5

WP-5

UP

HVC

CG

-2

PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS

7E3-0 G

CG CG

4 A814 3

S

3'

CG

CG WP-5 ?

4C4-2 12

10

WP-5

WP-5

CG

A903

EQUIP ALCOVE 6671B

WP-6

4C4-2

S

CORRIDOR 6652 A814

DATA CLOSET 6676

7F2-0

" 1/8

S

ELEC 6638

PUBLIC ELEV ELEV4

1' - 6"

4C4-2

ALIGN

G 1 / A106a

PUBLIC ELEV ELEV3

TELEMETRY MONITOR

G

10

WOOD WALL. SEE ELEVATIONS AND DETAILS

RG B

WP-5

WP-7

DN

8 A814 5

CG

7F3-0

PV L

4' - 1" OMNICELLS

IDPH-A301 3 A301

5' - 0" CLEAR

WP-5

6638

G

2

6" MIN

6 A814 9

1 3 A810

WP-5

EQUIP ALCOVE 6673B

A922 WP-5

ALIGN

7

5' - 0" CLEAR CG

G

MEDS 6659 6659A

WP-5 COLLABORATIVE WORK SPACE 6651

1' - 7 7/8"

2' - 5 1/2" CLEAR 6659

CG CG

9

ELEV ELEV7

WP-7

1A6-0

1 A814

PV M

MEDS CART

WP-5

CG

ALIGN

CG

7A3-0

6 A807

PV N

S

6658B

WP-3

CG

WP-5

EXISTING FIRE RATED PARTITION. PATCH AND REPAIR AS REQUIRED

S

1A6-0

WP-1

6657

WP-5

CG

A808 12

9' - 4 1/8"

1' - 0"1' - 3"

4C4-2

7F2-0

5' - 4 7/8"

3' - 10"

1' - 6"

21 A809

8' - 0" CLEAR

CORRIDOR 6650

CG

6637

7E3-0

6' - 1"

OPP

1' - 5 1/2"

1

WP-3

10 A815 8

ELEV ELEV6

7F2-0

WP-1 WP-1

WP-5

ELEV ELEV5

S

A809

1' - 6"

7A3-0

WP-5

13

1

13

ELEC 6637

S

CG

1A6-0

WP-3

WP-5

PROVIDE NEW GWB AT ALL COLUMN ENCLOSU 7G, U.N.O.

15 A809 12

14

ANTE ROOM 6658B

WP-5

1' - 0" CLEAR

1' - 10"

OPP

7C0-0

7C0-0

1A6-0

2' - 6"

4C4-2

7E3-0

OPP

1' - 3" TYP.

1' - 3"

6655 CG CG

2' - 6"

7C0-0 CG

CG 7F3-0

WP-1

WP-1 ?

1

6656

PROVIDE METAL PARTITION CLOSURE TRIM BE EXTERIOR GLAZING MULLION AND END OF INT PARTITION.

15.

19

WP-1

? WP-1

REFER TO WINDOW SCHEDULE FOR GLAZING

14.

A903

WP-1 WP-1

ALL SWING DOORS SHALL BE LAMINATE-FACE NOTED OTHERWISE. REFER TO SPECIFICATIO ALUMINUM BREAKAWAY DOORS.

13.

G

WP-1

3A3-0

1

12.

11

7C0-0

WP-5

CG

CG

1A6-0

CG

ALL NURSE STATIONS SHALL HAVE SOLID SUR TRANSACTION TOPS, PLASTIC LAMINATE WOR RESIN VERTICAL PANELS, CUSTOM FABRICATE AND LED LIGHTING.

OPP A809

3' - 0"

CG

1A6-0

ALL COUNTER SINKS SHALL HAVE SOLID SURF SOLID SURFACE BACKSPLASH, AND INTEGRAL SINK, UNLESS NOTED OTHERWISE.

11.

PV P

PATIENT BEDROOM 6658

9 5/8"

WP-1

4' - 0"

7C0-0

CG

3' - 8 5/8"

1' - 3" TYP.

5

WP-1 5' - 0"

OPP

1A6-0

CG CG

1' - 3"

18

3E1-0

3

6630

WP-5

CG

19 A809 17

3' - 11"

7C0-0

CG

2 A809 4

G

CG

1

CG

5' - 0"

FD

16

OPP

3E1-0

CG

3' - 0"

PATCH & REPAIR EXISTING EXTERIOR WEATHE WHERE REQUIRED.

10.

3/4 "

WP-5

CG

6657A

G

6658A 2' - 9 5/8"

TOILET 6658A

PATIENT BEDROOM 6657

CG

8

PATCH & MATCH EXISTING FIREPROOFING TO RATING WHERE REQUIRED.

9.

8

7C0-0

6 7 A809 10

50°

1' - 5 1/2" OPP

1 4 A809 2

7F2-0

WP-1

G

8' - 9 5/8"

6' - 0"

ALIGN

WP-5

CG

1

WP-1

3

WP-1

5

E

1A6-0 TOILET 6657A

OPP

1A6-0

6

S

7' - 6"

5' - 6"

WP-5

3' - 8 5/8"

3' - 8 5/8"

ALIGN

8' - 2 1/8"

6' - 10 1/2"

1' - 3"

CG 1A3-1

11

FD

10 A809 7

9

CG

CG

A809

A808 10

7F2-0

WP-1

3A3-0

1 2 A809 4

CG

PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS

7F2-0

WP-1

WP-5

ALIGN

CG

TELEMETRY MONITOR

1A3-1 CG

2' - 3 5/8"

IN CONJUNCTION WITH THIS FLOOR PLAN, REF ELEVATIONS AND WALL PROTECTION DETAILS PROTECTION INFORMATION.

8.

11

G

WP-1

CG

ELEVATOR LOBBY 6630

7F2-0

WP-1

WP-5 1A3-1

CORRIDOR 6600

5' - 6"

WP-5

WP-5

A809

E

1

2' - 0 3/8"

3E1-0

8' - 0" CLEAR

7F2-0

WP-5

9

1

FD

REFER TO INTERIOR ELEVATIONS AND TYPICA HEIGHT SHEET A800 FOR LOCATIONS OF PLUM

7.

A903

S

2' - 10 1/2"

PROVIDE NEW EXPANSION JOINT COVER

CG

3

6653

6630A WP-5

TOILET 6656A

WP-1

PATIENT BEDROOM 6656

A809

OPP

3' - 7"

PATIENT BEDROOM 6655

2' - 1" TYP.

WP-5

CG

WP-1

5

WP-1

WP-4

S

OPP

5' - 2 5/8"

1' - 6" MIN

7E2-0

WP-1

15' - 1 3/8"

A903

CENTER WALL ON MULLION

8

CG

1A6-0

1' - 0"

ALIGN

CG

WP-4 NOURISHMENT 6653

E

6655A

WP-4

CG

ALIGN

7 A809 10 8

WP-5

CG

CG

OPP

6 A808

EX. MECH 6636

EX. STOR. 6635

WP-1

TOILET 6655A

6

G

3E1-0

1A3-0

6631A

CG

OPP

5

WP-3 ?

G

6654

4C2-2

WP-7 TRASH CHUTE 6631A

7

8A3-1 2' - 0"

2' - 0"

WP-5

8' - 0" CLEAR

ALIGN

CG

WP-7

2

FD

E

CENTER WALL ON MULLION

155°

A808 1

6633

HVC

1' - 4"1' - 4" WP-5

ALIGN WITH EXISTING SHAFT ABOVE AND BELOW

1 2' - 0"

1A6-0

8 A808

WP-7

1' - 6"

7F2-0

7A2-0 WP-5

RG C

6" MIN

6634

WP-5

8A3-1 BLANKET WARMER

WP-7

EVS 6633

S

WP-7 ?

CLEAN UTILITY 6654

CG

WP-7

637

WP-5

RG D.1

4C2-2

3

6631

S

WP-7

A808 4

ELEV ELEV2

STAIR VESTIBULE 637

G

OPP

SOILED 6634 TRASH ROOM 6631

WP-5

S

OPP

WP-7

6600

WP-5

RG D.5

E

9 A903

OPP

G

5' - 0"

ROGERS STAIR 638 638

G

7 1/4"

10

8 A903

2 1/2" TYP.

G

1' - 3"

RG E

15' - 1 3/8" 7 A903

8' - 5"

A903

1' - 3"

6

5 A903

OPP

SHOWER CAP WARMER PROVIDE CART OR SHELF BELOW.

1 / A106a

6.

SIXTH FLOOR PLAN - ENLARGED PLAN (EAST) SCALE 1/4" = 1'-0"

THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER SIZ


Shepley Bulfinch Richardson & Abbott Architecture / Planning / Interiors / Est. 1874 2 Seaport Lane Boston, MA 02210 T:617.423.1700 F:617.451.2420 www.ShepleyBulfinch.com

ASSOCIATE ARCHITECT

12 A922

11

11

12

A922

A922

A922

STRUCTURAL ENGINEER

12

PV SOUTH WORKSTATION - EAST

11

SCALE 1/2" = 1'-0"

PV SOUTH WORKSTATION - NORTH

10

SCALE 1/2" = 1'-0"

PV SOUTH WORKSTATION - SOUTH

M.E.P./FP ENGINEER

SCALE 1/2" = 1'-0"

CIVIL ENGINEER

LANDSCAPE ARCHITECT

LIFE SAFETY & FIRE PROTECTION CODE CONSULTANT

11 A922

9

PV WORKSTATION - WEST

8

SCALE 1/2" = 1'-0"

12

12

A922

A922

PV NORTH WORKSTATION - NORTH

7

SCALE 1/2" = 1'-0"

PV NORTH WORKSTATION - SOUTH SCALE 1/2" = 1'-0"

A921 7

A926

A926

6' - 2"

5' - 0"

2' - 2 1/4"

7 3/4"

7 3/4"

A926

5' - 0"

3' - 9"

4

EQ

5

7 3/4"

2' - 11" 5

HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE

HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE CONTINUOUS LED LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS.

CONTINUOUS LED LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS. PLAM ON 3/4" SUBSTRATE

SIM

SIM

1

6

A922

NO.

STEEL SUPPORT BRACKET. MAX 4'-0" O.C. UNO.

COUNTER ABOVE HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE

DATE

DESCRIPTION REVISION

ALIGN BRACKET TO TRANSACTION TOP SUPPORTS ABOVE, TYP. DIEWALL.

A921 12

7 3/4"

VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.

11' - 3" V.I.F.

EQ

SIM

A922

6 A921

COUNTER ABOVE HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE 7 3/4"

1 A922

11

ALIGN BRACKET TO TRANSACTION TOP SUPPORTS ABOVE, TYP. DIEWALL. EQ

SIM

STEEL SUPPORT BRACKET. MAX 4'-0" O.C. UNO. 9 A921 5

A921

3' - 9"

1' - 8"

6 A922 VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.

PLAM ON 3/4" SUBSTRATE

8

4 A921

STEEL SUPPORT BRACKET. MAX 4'-0" O.C. UNO.

2' - 6"

3' - 4"

10"

A921 3

3' - 9"

11' - 3" V.I.F.

1' - 0"

ALIGN

EQ

ALIGN

EQ

ALIGN

EQ

ALIGN

EQ

3' - 5"

6

PV EAST NURSE STATION - EAST

5

SCALE 1/2" = 1'-0"

10

PV EAST NURSE STATION - WEST

2

SCALE 1/2" = 1'-0"

PARKVIEW COLLABORATIVE WORKSTATION - COUNTER REMOVED A921

SCALE 1/2" = 1'-0"

KEY PLAN

3

14 6' - 2"

A921

A922

SIM

7

4' - 6"

10

A922

14

A922 10' - 1" ± V.I.F.

A922

SIM

5' - 0" CLEAR

INTERMEDIATE WD VNR ON 3/4" SUBSTRATE SUPPORT RIBS BELOW FOR TRANSACTION TOP

1' - 0"

9 3/4"

1' - 0"

SIM

6

A921

SSM TRANSACTION TOP

11

P TUBE

15

GLAZING ABOVE AS SPECIFIED

INTERMEDIATE WD VNR ON 3/4" SUBSTRATE SUPPORT RIBS BELOW FOR TRANSACTION TOP

A922

1

A922

A922

VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.

SIM

6

PV WEST NURSE STATION - EAST SCALE 1/2" = 1'-0"

EQ

2' - 10"

SCALE

A922 15

10 A922

SIM

A922

5' - 0" CLEAR

3' - 5"

4' - 6" CLEAR 11

1

10' - 1" ± V.I.F.

10 A921

12

20 A922

SIM

A922

A922

15

10

A922

A922

09/16/2013

CHECKED

SRS

A921

SIM

SIM

PARKVIEW COLLABORATIVE WORKSTATION - COUNTER MATERIALS SCALE 1/2" = 1'-0"

DATE

4590 WFM

CONSTRUCTION DOCUMENTS 5' - 0" CLEAR

10

1/2" = 1'-0"

JOB NUMBER

DRAWN

PV WEST NURSE STATION - WEST SCALE 1/2" = 1'-0"

SIM

SIM

VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.

3

6 A922

SSM TRANSACTION TOP A921 12

A922

4

15 A922

1"

A922

1

DRAWING TITLE

6 A921

SSM TRANSACTION TOP

2' - 6"

2' - 6" 10/1/2013 4:09:40 PM

Sixth Floor Inpatient Oncology Unit

C:\2013 Revit Locals\CARLE4590_ARCH_CENTRAL_KPeppard.rvt

6

SIM

611 W. Park Street Urbana, IL 61801

MILLWORK PLANS AND ELEVATIONS

PLASTIC LAMINATE ON 3/4" SUBSTRATE WORK SURFACE

A922

SIM

9 A921 5

SOLID HARDWOOD NOSING

EQ

EQ

A922

8

BUILT-IN CABINET

4 A921

Sixth Floor Inpatient Oncology Unit PROJECT

FINISH END PANEL, WD VNR ON 3/4" SUBSTRATE, TYP. INTERMEDIATE WD VNR ON 3/4" SUBSTRATE SUPPORT RIBS BELOW FOR TRANSACTION TOP

15

EQ

EQ

A921 3

EQ

EQ

EQ

EQ

ON 3/4"

SOLID HARDWOOD NOSING HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE ELECTRICAL RECEPTACLE MOUNTED IN CABINET

11' - 3" V.I.F. EQ

1

PLASTIC LAMINATE SIMSUBSTRATE WORK SURFACE

A922

SOLID HARDWOOD NOSING FINISH END PANEL, WD VNR ON 3/4" SUBSTRATE, TYP.

11' - 3" V.I.F.

4 A924

EQ

SIM

1 A922

OWNER

2' - 10"

5 A926

ALIGN

5 A926

EQ

4 A926

SOLID HARDWOOD EDGE BANDING PLASTIC LAMINATE ON 3/4" SUBSTRATE WORK SURFACE

Carle Foundation Hospital

SOLID HARDWOOD EDGE BANDING

1"

5' - 0" CLEAR

12

19

A924

A922

DRAWING NUMBER

THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER SIZE, IT HAS EITHER BEEN REDUCED OR ENLARGED. TAKE APPROPRIATE PRECAUTIONS ACCORDINGLY.



Bariatric Unit





Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.