Work Samples - Liam Moore
Cardiac Cath Labs
Cardiac
Cath
Labs
project was an existing hospital
in
General
maternity
Challenges were
Lowell Hospital, building.
encountered
dealing
with
existing columns, meeting
the right clearances and space large
needed
Cardaic
to be installed.
JACA Architects Tony Cavallaro 2007-2009 Responsibilities: Going to the site
yrs.
My for site measurements, to illustrate
existing conditions. and producing
2
CAD
Designing
small parts of projects
drawings for clients to view.
CAD
drafting of sections; interior elevations; floor plans; window door schedules; electrical plans; and design options.
Contacting
SKA drawings;
contractors to let
them know of drawing completion, and shipment to their location.
Converting AutoCAD
files to
so that
clients and contractors can view them onscreen through e-mail.
role in the project
consisted of, producing construction
documents
with guidance from the
associate on the project.
Tasks plans,
interior
RCP’s,
included enlarged
floor
plans,
elevations, millwork
sections, wall sections, head and jamb details.
for
the
equipment
Dr Roberts Office
Dr Roberts Office
project was
an existing building, the client was taking up a portion of the
building for his private practice.
Challenges dealing
encountered
with
existing
were column
structure and attempt to reduce the
amount
of
space
taken
Option 1
to
decrease client
Option 2
cost,
leasing
My
while still have all
program
role in the project
consisted
of,
taking
elements needed
sketches drawn by an
for
associate
practice.
client
them within in
and
into
making reality
CAD. Keeping ADA codes
mind
and
square
footage
needed by each space, draw out each option and if the option did
Option 3
not
Option 4
work
propose
a
solution to the option
that would work.
with transferred into
Later this project Revit as one of the
first to set up a company standard that
the office would use for future projects.
The BIM
CD’s Revit to look like CAD. It served as a
model was created and
were recreated within
CD’s
created in
starting ground for the office template later
revised
and
improved
upon
to
increase productivity for all employees within the firm.
Option 5
Option 5A
Concord Hillside
Concord Hillside Medical Center project was a remodel
of
an
existing
into a new doctors suite.
Challenges
encountered
were dealing with existing column
structure
building limitations.
and
My the
role
in
project
consisted of, creating
schematic design
a
Revit document with 3D
cartoon images for client to understand space, and design intent.
Visual Design
Visual Design Surgical Specialties project was a remodel of an existing into a new doctors suite. Challenges encountered were dealing with existing column structure and building limitations.
My
role in the project consisted of, reproducing existing
Revit. 3D modeling of new reception desk. JACA’s interior design project manager. Applying material to model, and render final product for client understanding and approval. conditions into
Importing
materials selected by
UCONN University
of
Connecticut, Young Building
project was an
existing building, the client was updating the ventialtion in the school.
The
budget for the project primary went to
this updating ventalation system, with very little to new architectural elements.
Challenges encountered were updating bathrooms up to code; new handrail and gaurdrail for the existing staircase; locating new louvers so that new HVAC units could be placed within the building; and design options for location of new chiller unit.
Design Partnership of Cambridge David Finney
2011
Responsibilities: Push production
on project to complete construction
documents by deadline.
3
Coordination
and conflicting areas to disciplines.
mos.
of model transfer,
My
role in the project consisted of, coming on board
the project in the middle of construction documents and complete the project for its deadline. structural and changes.
Help
MEP,
Coordinate
with
update model according to their
others using
Revit
for the first time, and
create several details in all areas of the project.
Pepper Hamilton
Packard Design Susan Packard
2011
2
mos.
Responsibilities: Finish production of construction documents for deadline. Design Development, and production of renderings, and 3D modeling of spaces for client review.
Pepper Hamilton project was an existing building, the client was leasing half the 8th floor, and all of the 9th. It was for a lawyer firm, and needed to have a high end look about it.
Challenges
encountered were producing the construction
documents as fast as possible.
I
came on board with the
firm to work on this project alone, and get it to completion with a month deadline.
My
role in the project consisted of, coming on board the
project with design development being just completed,
I
needed to take every piece of the project up to construction documents level. and
Details,
Floor plans, RCP’s, Sections, Elevations,
all worked on by myself.
Cambridge Cambridge was
an
Associates
project
building,
existing
the
client was taking two floors in the building.
The
client wanted
an open lobby coming out of the elevator,
with
a
grand
stair
leading down to connect the two floors.
Challenges
encountered
were creating a staircase within existing
structural
grid
that
appeared to be grand, with low
Option 1
height ceilings due to mechanical systems.
Having
enough
Option 2
My
space
to have both a reception that
is
role in the project
consisted of, several important
desk
design.
easily
rolls
Starting
in with
several design options
approachable
for
and maintain a
the
client
to
choose from in sketch
large space for
form.
a wait area.
design
From which two were
choose
Revit. Both floor plan and 3D perspective were to produce in
needed to represent to
Option 3
Option 4
the client.
One design
was choosen for the stair case, well two more options were created for the
looby, and reception/waiting Both options were to be developed floor plan, elevation, and perspective
elevator area. in
with some materials choosen by the client
imported and rendered for presentation.
Later
one
design
was
choosen,
and
construction documents were made from the
Revit
model.
I
was the lead project
designer on this and every step from design to construction documents were
100% Option 5
Option 6
produced by myself entirely.
4
TOILET ROOM FLOORING & DRAINAGE TRANSITIONS
Inpatient Oncology
SCALE 1/2" = 1'-0"
RG 6 RG 2
3 10' - 10"
GENE SEE P SEE P
6' - 10"
3' - 3 7/8"
SV-3 3' - 4"
FLOO 1. 2. 3. 4. 5.
12' - 9"
1' - 0"
CENTER TILE PATTERN FOR SLOPE ON DRAIN LOCATION, TYP
1' - 6"
SV-2
11 3/4"
SLOPE
6. 7. 8. 9. 10. 11.
7' - 0"
FLOOR MAX HEIGHT AT +3/4" TO T.O.S. TO CREATE SLOPE TO DRAIN. SLOPE 1/4" TO 1' - 0" MAXIMUM; EVENLY FEATHER BACK TO MEET SHEET VINYL AT DOOR.
PV 12 RG E
SV-3 6' - 10"
141 SF
2' - 6"
TOILET 6608A
70 SF
69 SF
68 SF
CT-1 STAFF LOUNGE 6605 133 SF
12' - 9"
SV-2
11 3/4"
63 SF
SV-WD
275 SF
2 RG 5
271 SF
57 SF CT-1
FD
RG B RG 5.5
RG 5.5
TOILET 6609A 58 SF
SV-WD
SV-3
ANTE ROOM 6608B
46 SF SV-WD
46 SF SV-WD
SV-2 BORDER, TYP
SV-WD
CT-1
FD
FD
TOILET 6617A
CT-1
64 SF
281 SF SV-WD
299 SF SV-WD
PV 8
AI106a
PV 9
FD
PV 11
PATIENT BEDROOM 6616
FD
OBSERVATION
TOILET 6619A
4
CLEAN UTILITY 6610
E EL
88 SF
76
SV-2
881 SF
INFUSION 6618
SV-WD
PV L
CORRIDOR 6603
SV-1 FIELD, TYP
36 SF
50 SF
268 SF
264 SF
EQUIP 6620
EQUIP 6618A
FD
PATIENT BEDROOM 6609
ISOLATION ROOM 6608
1' - 0"
SV-2
53 SF
RG 6.25
FD
ANTE ROOM 6607B
PARKVIEW NURSE STATION - FLOOR PATTERN DETAILS SCALE 1/4" = 1'-0"
PV 13
8' - 8" ISOLATION ROOM 6607
SV-WD
10 SF
NOURISHMENT 6621
SV-1
INFUSION 6606 277 SF
ELEC 6604
1' - 0"
RG C
ATION - FLOOR PATTERN DETAIL
FD
STAFF TOILET 6605A
1' - 0" 1' - 6"
7' - 0"
RG D
MULTIPURPOSE ROOM 6619
RG 4
TOILET 6607A
1' - 7"
SV-3
2' - 0 1/2"
RG 3
TOILET 6606A
SCALE 1/4"
1' - 3 1/8"
ROGERS STAIR 667
Bariatric unit - Renovation - 9,500sf 7' - 6" 3' - 4" Schematic Design through Construction 1' - 0" Administration of 4th floor inpatient renovation. Remodel existing patient rooms with modification to layout for new bariatic rooms and ADA accessible bathrooms. Coordination with MEP to improve SV-2 air quality of area as well as future renovation projects. 1' - 3 1/2" 9"
8' - 8"
7"
3' - 3 7/8"
1' - 0"
1' - 6 7/8"
Responsibilities: RG Inpatient Oncology - Renovation - 15,000sf 6 Production of project from Design Development to Construction Administration. Creation of multiple - 10" renderings using Revit with 10'materials selected by interior designer for client meetings.
6' - 10"
mos.
RG 5
7' - 0"
5
RG 4
1' - 0"
yr.
RG 3
1' - 0"
1
RG 2
1' - 0"
2012-2014
RG 1
FLOO PARKV
2
SCALE 1/4" = 1'-0"
3' - 2"
David Paarz
3
ROGERS NURSE STATION - FLOOR PATTERN DETAIL
1' - 0"
Shepley Bulfinch
1' - 0"
1' - 3 1/2" 2' - 0 1/2"
ORING & DRAINAGE TRANSITIONS
SV-1
GENE
7' - 6"
SLOPE
SLOPE
SLOPE
RG C
9"
SLOPE
DRAIN PLACED -1/4" FROM T.O.S.; CHIP OUT AREA INDICATED FOR 1/4" DEPRESSION
1' - 0"
SV-1
1' - 6 7/8"
A950
TOILET 6616A
CT-1
64 SF
284 SF
STAFF PASSAGEWAY 6602
OFFICE 6614
55 SF
96 SF
SV-2
CPT
OFFICE 6615
SV-WD
115 SF CPT
PV 12
COLLAB WO SPA 66
314
MEDS 6613 118 SF CPT
PV 13
8' - 8"
SHOWER DRAIN PATTERN
1' - 3 1/8"
1' - 0"
1' - 7"
SV-1
PV L
6' - 10"
2' - 6"
FLOORING PATTERN DIRECTION
SV-3
12' - 9"
7"
3' - 4"
1' - 0"
8' - 8"
1' - 0"
6' - 10"
7' - 6"
SV-3
3' - 2"
SV-3
3' - 3 7/8"
1' - 0"
9"
RG C
1' - 6 7/8"
10' - 10"
SV-1
1' - 0"
7' - 0" 1' - 0"
1' - 0"
1' - 3 1/2" 2' - 0 1/2"
1' - 0"
7' - 0"
11 3/4"
SV-2
1' - 0"
SV-2
1' - 6"
3
ROGERS NURSE STATION - FLOOR PATTERN DETAIL RG 1
RG 2
RG 3
141 SF
133 SF SV-2
RG D
TOILET 6608A
TOILET 6609A
69 SF
68 SF
58 SF
FD
277 SF STAFF TOILET 6605A 57 SF CT-1
ELEC 6604
NOURISHMENT 6621 63 SF
SV-WD MULTIPURPOSE ROOM 6619 275 SF
RG B
INFUSION 6606
SV-WD
SV-2 BORDER, TYP
ISOLATION ROOM 6607 FD
SV-WD
ANTE ROOM 6607B
ANTE ROOM 6608B
46 SF SV-WD
46 SF SV-WD
SV-WD
FD
TOILET 6619A 53 SF
ELEV ELEV1
ELEV ELEV2
88 SF
76 SF
81 SF
45 SF
SV-WD
PV 11
75 SF
TRASH CHUTE 6631A
3 AI106a
ELEVATOR LOBBY 6630
TOILET 6656A
TOILET 6657A
63 SF
60 SF
60 SF
FD
CT-1
103 SF
21 SF
CORRIDOR 6603
TOILET 6655A
FD
NOURISHMENT 6653
25 SF
CT-1
SV-WD PATIENT BEDROOM 6655
14 SF
EX. MECH 6636
PV 14
TOILET 6658A
FD
FD
PATIENT BEDROOM 6658
CT-1
ANTE ROOM 6658B
PATIENT BEDROOM 6657
CT-1
64 SF INFUSION 6618 299 SF SV-WD
OBSERVATION 281 SF SV-WD
PATIENT BEDROOM 6616
FD
FD
TOILET 6616A
CT-1
64 SF
284 SF
SV-WD
OFFICE 6614
55 SF
96 SF
SV-2
CPT
OFFICE 6615 115 SF CPT
COLLABORATIVE WORK SPACE 6611
PV M
17 SF 2 AI106a
118 SF CPT
ELEC 6637
PHYS WORK AREA 6612
24 SF
ELEV ELEV5
ELEV ELEV6
ELEV ELEV7
94 SF
94 SF
90 SF
PUBLIC ELEV ELEV3
PUBLIC ELEV ELEV4
57 SF
57 SF
SV-2
COLLABORATIVE WORK SPACE SV-2 6651 404 SF
ELEC 6638
131 SF
23 SF
SV-2 BORDER, TYP DATA CLOSET 6676
SV-1 FIELD, TYP
SV-1 FIELD, TYP CONSULT ROOM 6639
SV-2 BORDER, TYP
PUBLIC TOILET 6641
CORRIDOR 6675
FD
195 SF
54 SF
CT-1 TOILET 6672A
87 SF
CPT PEDS WAITING 6643 90 SF
PATIENT BEDROOM 6672 341 SF
SV-WD
PATIENT BEDROOM 6671 341 SF
95 SF SV-WD FD
312 SF TOILET 6670A
CPT
EQUIPMENT 6674
SV-WD
FAMILY KITCHEN 6642A
SV-WD
75 SF
CT-1
272 SF
PATIENT BEDROOM 6670
CT-1
SV-WD
90 SF WAITING ROOM 6642
PV K
ANTE ROOM 6670B
55 SF
4 AI106a
PV L
PARKVIEW STAIR 615 615
CORRIDOR 6652 595 SF
100 SF
RG 6
MEDS 6659 140 SF
SV-2
314 SF
MEDS 6613
PV N
SV-WD
SV-1 FIELD, TYP
STAFF PASSAGEWAY 6602
SV-WD
115 SF
262 SF
262 SF
ALIGN
283 SF
SV-WD
SV-WD
400 SF
TOILET 6617A
PV P
78 SF
PATIENT BEDROOM 6656
265 SF EX. STOR. 6635
PV 13
CT-1
97 SF EVS 6633
CORRIDOR 6600
PV 12
CLEAN UTILITY 6654
SOILED 6634
178 SF STAIR VESTIBULE 637
881 SF
36 SF
FD
TRASH ROOM 6631
179 SF
CLEAN UTILITY 6610
SV-2
EQUIP 6620
CT-1
PV 9
514 SF
SV-1 FIELD, TYP
EQUIP 6618A 50 SF
268 SF
264 SF
FD
PV 8
ROGERS STAIR 638 638
FD
PATIENT BEDROOM 6609
ISOLATION ROOM 6608
271 SF
RG 6.25
RG 5.5
TOILET 6607A
10 SF
RG C
SCALE 1/4" = 1'-0"
RG 5
70 SF
CT-1 STAFF LOUNGE 6605
RG 4
TOILET 6606A
RG E ROGERS STAIR 667
PARKVIEW NURSE STATION - FLOOR PATTERN DETAILS
2
SCALE 1/4" = 1'-0"
145 SF
SV-2
PATIENT BEDROOM 6673
SV-WD
CT-1
FD
TOILET 6673A
194 SF
CT-1
80 SF
TOILET 6671A 64 SF
FD
PV J
42 SF
1
FLOORING FINISHES SCALE 1/8" = 1'-0"
THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER
TYPICAL DOOR TRANSITION DETAILS.
RG 1
RG 2
RG 3
RG 4
RG 5
RG 5.5
RG 6.25
?
# 2
3
A903 MIN 7' - 6"
13' - 9"
E
S
13' - 8 1/2" G
G
A903
5' - 6"
G
G
5' - 6"
E
13' - 2"
E
G
13' - 8 1/2" G
G
REFER TO INTERIOR ELEVATIONS AND TYP HEIGHT SHEET A800 FOR LOCATIONS OF P
7.
IN CONJUNCTION WITH THIS FLOOR PLAN, ELEVATIONS AND WALL PROTECTION DETA PROTECTION INFORMATION.
8.
PATCH & MATCH EXISTING FIREPROOFING RATING WHERE REQUIRED.
9.
PATCH & REPAIR EXISTING EXTERIOR WEA WHERE REQUIRED.
10.
ALL COUNTER SINKS SHALL HAVE SOLID SU SOLID SURFACE BACKSPLASH, AND INTEGR SINK, UNLESS NOTED OTHERWISE.
11.
ALL NURSE STATIONS SHALL HAVE SOLID S TRANSACTION TOPS, PLASTIC LAMINATE W RESIN VERTICAL PANELS, CUSTOM FABRIC AND LED LIGHTING.
12.
ALL SWING DOORS SHALL BE LAMINATE-FA NOTED OTHERWISE. REFER TO SPECIFICA ALUMINUM BREAKAWAY DOORS.
13.
REFER TO WINDOW SCHEDULE FOR GLAZIN
14.
PROVIDE METAL PARTITION CLOSURE TRIM EXTERIOR GLAZING MULLION AND END OF PARTITION.
15.
PROVIDE NEW GWB AT ALL COLUMN ENCLO 7G, U.N.O.
KEYED GENERAL NOT NOTE
1 CURTAIN TRACK, ABOVE
7' - 6"
G
1' - 3"
RG E
1 / A106b
6.
1
WP-7 FD
TOILET 6619A
8 A806 6
6' - 10"
3E1-0
7
G
WP-1
G
E
E
3' - 10"
4' - 6"
2' - 0"
1
WP-1
G
ALIGN
G
10' - 0"
4' - 3 1/2"
ALIGN CG
1' - 11 3/4"
7F2-0
1A6-0
CG 7F2-0
WP-1
WP-1 7F2-0
G
1
3E1-0
1
18
5
23 A803 21
6616A
CG
E
G
7C0-0
G
7F2-0 7C0-0
7C0-0
G
WP-1
G
7C0-0
WP-1
7F3-0
7E3-0
4C4-2
6
7C0-0
G
7F2-0
A815 5
14 A803 12 13
WP-1 7C0-0
PHYS WORK AREA 6612
1A6-0
11
OMNICELLS
WP-1
CG
CG
MEDS CART
MEDS 6613
OMNICELLS
22
WP-1
7C0-0
CG
CG
3
6613A
6613
8 A804 6
WP-1
4 A815 2
2' - 7 1/8"
OFFICE 6615
3
COLLABORATIVE WORK SPACE TELEMETRY MONITOR 6611
19 A803 17
20
7
E
1
WP-1
7F2-0
WP-7 ?
4 A804 2
CG
CORRIDOR 6600
7F2-0
CG
16
1 A920 5' - 6"
7F2-0
P-TUBE
OFFICE 6614
PATIENT BEDROOM 6616 1A6-0
CG
7F2-0
7F2-0
6615
TOILET 6616A
WP-5
WP-1 ?
WP-3
1A6-0
7F2-0
G
5' - 0" CLEAR A803 15
FD
7C0-0
WP-3 STAFF PASSAGEWAY 6602
1A6-0
CG
FD
15
7F2-0
CG
6614
11
16 A804 14
3
1
1' - 3"
9
7F2-0
WP-1
WP-5
2' - 6"
CG
WP-5
5' - 6"
2' - 2"
CG
1' - 4"
WP-3
6616 WP-1
3E1-0
12 A804 10
1
7C0-0
TOILET 6617A
13
4 A805 2
5
6619A
OBSERVATION 6617
6617A
CG
CG
7F2-0
INFUSION 6618
FD
2' - 0 1/2"
1
WP-2
FEC CG
CG
7F2-0
WP-5
HVC
CG
1' - 4"1' - 4"
WP-5 WP-5
WP-1 ?
3A3-0
4' - 5"
WP-2
WP-1
ALIGN CUBICAL CURTAIN TO HEADWALL CL
1A6-0
PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS
A807
WP-5
1' - 6"
1A6-0
WP-5
2' - 0"
WP-7 ?
3
WP-5
2' - 0"
2' - 3 3/4"
7
4' - 2"
1
CG CG
2' - 6"
1
6618A
5
WP-2
4 A806 2
WP-2
WP-7
8 A805 6
5' - 0"
1' - 5 7/8"
WP-2
6617
6' - 10 7/8" NURSE WORK 6603A
11
EQUIP 6618A
2' - 0 7/8"
10' - 1 1/2"
MULTIPURPOSE ROOM 6619
7F3-0
CG WP-1
WP-1
WORKSTATION
2' - 1 1/2" CG
7F2-0
WP-1
1
7F2-0
12 A805 10
3E1-0 7' - 1 3/4"
3' - 4"
6618
WP-1 WP-1
9
WP-7 WP-7 ?
WP-2
7F2-0
CG CG
EQUIP 6620
CG
WP-2
3' - 0"
CG 7F2-0
2
WP-5
WP-5
3
WP-5
WP-5
8' - 2 3/8"
WP-3 WP-3
11
REF
4
WP-5
7A2-0
WP-5 CG
WP-5
WP-5
CORRIDOR 6603
2' - 5"
WP-7
7A2-0
CG
G
7F2-0
G
7E3-0
EXISTING FIRE RATED PARTITION. PATCH AND REPAIR AS REQUIRED
7F2-0
G
29' - 11 3/4"
7' - 10"
14' - 6"
12' - 7"
1 / A106b
ALIGN
4C4-2 6' - 11"
WOOD WALL. SEE ELEVATIONS AND DETAILS
WP-5
CG
ALIGN
WP-5
WP-7 6610
WP-5
7F2-0
8' - 3 1/4"
CG
WP-7 CG
6619 4' - 11 1/4"
CG
1' - 8 1/2"
CG
7F2-0
NOURISHMENT 9 6621 A806 10 WP-3 ?
WP-5
10
7F2-0
6609
WP-5
A803
8' - 0" CLEAR
WP-5
6608
CG
5 A807
10' - 0"
8' - 0" CLEAR
WP-5
1' - 6" MIN
1' - 6" MIN
WP-1
CG 7F2-0
WP-1
7F2-0
CG
6608B
WP-5
WP-1
CG
CG WP-5
1
WP-1
9
6' - 0"
WP-5
1
WP-1
637
STAIR VESTIBULE 637
CLEAN UTILITY 6610
1A6-0
ALIGN
2' - 0"
6607B CG WP-5
6608C
WP-1
WP-7
1' - 6 1/2"
1' - 4"1' - 3"
6604
WP-5
6
3A3-0
ELEV ELEV2
1' - 0" CLEAR
7F2-0
WP-5
A802 7
1A6-0
CG
WP-1
6607
5
7 A802
ANTE ROOM 6608B
ALIGN
WP-5
6606
7F2-0
WP-5 ELEV ELEV1
BLANKET WARMER
1
WP-1 5
6
3E1-0
FD
2' - 3 5/8"
WP-1 WP-1 CG
CG
WP-1
7F2-0
CG
6607C
6600
WP-1
1' - 10"
1 CG
7F3-0
ALIGN
WP-1
3
ROGERS STAIR 638 638
1
FD
7
4' - 4 1/2" 1' - 3"
1' - 6" 1' - 3" MIN
1' - 3"
1
1 4 A803 2
14
3' - 0" 2" 2' - 0 3/8"
2' - 0"
FD
ANTE ROOM 6607B
12 15 A802 13
5 8 A803 6
2' - 2"
1' - 6"
1A3-2
PROVIDE FIRE RATED ASSEMBLY AS INDICATE IN WALL TYPE. WP-5 6621
RG B
5' - 1"
10' - 0 3/4"
7' - 8"
1A3-2
18
PATIENT BEDROOM 6609
1A6-0
WP-1 WP-1
7F2-0
WP-1
6609A
WP-1
19 A802 17
7C0-0 TOILET 6609A
CG
WP-1
ISOLATION ROOM 6608
1
7C0-0
IDPH-A301 A301 4
WP-1 CG
CG
CG 7F3-0
2' - 2"
ELEC 6604
ALIGN
WP-5
RG C
1A6-0
7
6605A
WP-5
10
3A3-0
5 8 A801 6
CG
16
11 A802 9
1A6-0
WP-1
6608A
TOILET 6608A
8
WP-1
WP-1
CG
3E1-0
2' - 0"
STAFF TOILET 6605A
3E1-0
6605 HVC
3
FD
1
3
7F2-0
RG D
1 4 A802 2
11
7C0-0
TOILET 6607A
1A6-0
1
STAFF LOUNGE 6605
9 12 A801 10
15
4 A801 2
UP
7F2-0
7C0-0 6607A
ISOLATION ROOM 6607
1' - 6" 1' - 3" MIN
8' - 8 7/8"
16 A801 14
WP-1
2' - 0"
6" MIN
13
7F2-0
INFUSION 6606
WP-1
7C0-0
CG
WP-1 WP-1
1' - 8 3/8"
6' - 0"
DN
7C0-0
WP-1
1
7F2-0
3' - 10"
ROGERS STAIR 667
TOILET 6606A 6606A
1' - 6" MIN
1' - 3"
5' - 4 7/8"
7F2-0
4C4-2
1' - 6" MIN
7C0-0 PROVIDE FILLER PANELS
S
PV K
4 A903 S 4C4-2
3
12
A925
A903 G
WP-2
WP-2
6639
CONSULT ROOM 6639
1' - 0" MIN
7E3-0 6642A
6 9 A813 7 8
G
WP-2
13
WP-2
A903
DECORATIVE GLASS WALL. SEE ELEVATIONS AND SPECIFICATION.
G
WP-2
PEDS WAITING 6643
WORKSTATION, SEE DETAIL
G 7F3-0
G
G
G
G
PV J
2
10/1/2013 4:05:22 PM
Sixth Floor Inpatient Oncology Unit
C:\2013 Revit Locals\CARLE4590_ARCH_CENTRAL_KPeppard.rvt
IDPH-A301 A301
PV 7
1
SIXTH FLOOR PLAN - ENLARGED PLAN (WEST) SCALE 1/4" = 1'-0"
THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER
TYPES, TYPICAL DOOR & INTERIOR WINDOW E DOOR & INTERIOR WINDOW HEAD & JAMB DET TYPICAL DOOR TRANSITION DETAILS.
RG 6
RG 6.25
PV 8
PV 9
PV 11
PV 12
PV 13
PV 14
PV 7
WP-5
WP-5
CG
ALIGN
CG CG WP-5
WP-5
1' - 0" MIN.
6658
20
CGCG
CG
WP-1
WP-3
7C0-0 CG WP-5
WP-5
WP-3
7C0-0 WP-5
7C0-0
1
7
A921
P-TUBE
CORRIDOR 6652
WP-5
CG
PARKVIEW STAIR 615 615
WP-2
12 A812 10 11
1A6-1
3E1-0
G
A813 3
G
G
G
G
10/1/2013 4:05:27 PM
1 4 A811 2
3A3-0
1' - 0"
ANTE ROOM 6670B
16 13 A810 14
WP-1
A810
1' - 3"1' - 3"
1' - 2 1/4" 2' - 7 3/8"
WP-1
FD
1A6-0
6670A
9
1' - 6" MIN
1' - 10"
S
12 A810 10
1
CG
1
TOILET 6670A
3
2' - 6"
WP-1 WP-1
1' - 3" 1A6-0
PV K
7F2-0
WP-1
6670B
15
1' - 3" 2' - 3 1/2" 1' - 3"
PATIENT BEDROOM 6671
9
3' - 0"
1' - 0" 1' - 6" 1' - 3"1' - 3"
1' - 4 1/2"
3' - 0"
WP-1
12 A811 10 11
3E1-0
PATIENT BEDROOM 6673
S PATIENT BEDROOM 6670
8 A810
4 7 A810 5
1' - 3"
11
6
S
FD
4 A812 2
1A6-0
3
6673A
TOILET 6673A
WP-7
G
G
WP-1
2' - 0"
1
G
G
G
G
ALIGN
CENTER WALL ON MULLION 14
Sixth Floor Inpatient Oncology Unit
6672A
1A6-0
WP-1
6671
7C0-0
1' - 6"
8' - 0" CLEAR
1A6-1
A903
C:\2013 Revit Locals\CARLE4590_ARCH_CENTRAL_KPeppard.rvt
15
1' - 3"
1
CENTER WALL ON MULLION
1
16 A811 14
EQUIPMENT 6674
FAMILY KITCHEN 6642A
7F3-0
1
6673 WP-1
1A3-1
WP-2
WORKSTATION, SEE DETAIL
7F3-0
G
WP-7 WP-7
1
4
WP-5
WP-1 ?
? WP-1
WP-1
9
5 A813 2
G
G
1A6-0
6674
6672
PATIENT BEDROOM 6672
13
WP-5
WP-5
5 8 A812 6 7
E
15 A903
WP-1
WP-1
WP-1
E
G
G
G
6671A
16 A903
2' - 0"
S 18 A903
5 8 A811 6
G
7F2-0 1
TOILET 6671A
7
G
1A6-0
3E1-0 1' - 3"
7C0-0
1' - 3"
PEDS WAITING 6643
WP-1
1
S
4C4-2
7F2-0
FEC
G
E
FD
G
2' - 0"
DECORATIVE GLASS WALL. SEE ELEVATIONS AND SPECIFICATION.
G
2' - 10 1/2" TOILET 6672A
1
7F2-0
WP-1
WP-5
S
G 17
CENTER WALL ON MULLION
A903
G
G
PV J
CENTER WALL ON MULLION
ALIGN
WAITING ROOM 6642
FD
CG
1' - 6" MIN CLR
WP-2
WP-2
5' - 3 5/8"
A903
1
15
1A3-1
6641
PUBLIC TOILET 6641
CG
ALIGN
3E1-0
WP-5
13 16 A812 14
WP-3
WP-3
2' - 0 1/8"
WP-2 WP-2
WP-5
8' - 0" CLEAR
6640
CG
WP-5
1' - 0" MIN
9' - 4 1/2"
WP-3 WP-3
6642
8
WP-5
CORRIDOR 6675
4' - 0" CG CG
6
13
WP-2
WP-5
WP-3
1A6-0
7F2-0
6670
2' - 6" EG
CGCG
CG
1' - 0"
15
1' - 5 1/2" 1' - 9 3/8"
1' - 0" MIN
1' - 2" 6642A
WP-5 CG
FEC ALIGN
1A3-0
8' - 0"
WP-5
PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS
14
9 A813 7
G
ALIGN
WP-5
ELEVATOR LOBBY 6640
7A3-0
6676
CG
1' - 3"
CG
1' - 3"
WP-2
CG
A808 13
6639
CONSULT ROOM 6639
7C0-0
7C0-0
S
135°
"
WP-2
2' - 6" 7C0-0
2' - 6"
7F2-0 CG
7C0-0
2
WP-5
WP-5
UP
HVC
CG
-2
PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS
7E3-0 G
CG CG
4 A814 3
S
3'
CG
CG WP-5 ?
4C4-2 12
10
WP-5
WP-5
CG
A903
EQUIP ALCOVE 6671B
WP-6
4C4-2
S
CORRIDOR 6652 A814
DATA CLOSET 6676
7F2-0
" 1/8
S
ELEC 6638
PUBLIC ELEV ELEV4
1' - 6"
4C4-2
ALIGN
G 1 / A106a
PUBLIC ELEV ELEV3
TELEMETRY MONITOR
G
10
WOOD WALL. SEE ELEVATIONS AND DETAILS
RG B
WP-5
WP-7
DN
8 A814 5
CG
7F3-0
PV L
4' - 1" OMNICELLS
IDPH-A301 3 A301
5' - 0" CLEAR
WP-5
6638
G
2
6" MIN
6 A814 9
1 3 A810
WP-5
EQUIP ALCOVE 6673B
A922 WP-5
ALIGN
7
5' - 0" CLEAR CG
G
MEDS 6659 6659A
WP-5 COLLABORATIVE WORK SPACE 6651
1' - 7 7/8"
2' - 5 1/2" CLEAR 6659
CG CG
9
ELEV ELEV7
WP-7
1A6-0
1 A814
PV M
MEDS CART
WP-5
CG
ALIGN
CG
7A3-0
6 A807
PV N
S
6658B
WP-3
CG
WP-5
EXISTING FIRE RATED PARTITION. PATCH AND REPAIR AS REQUIRED
S
1A6-0
WP-1
6657
WP-5
CG
A808 12
9' - 4 1/8"
1' - 0"1' - 3"
4C4-2
7F2-0
5' - 4 7/8"
3' - 10"
1' - 6"
21 A809
8' - 0" CLEAR
CORRIDOR 6650
CG
6637
7E3-0
6' - 1"
OPP
1' - 5 1/2"
1
WP-3
10 A815 8
ELEV ELEV6
7F2-0
WP-1 WP-1
WP-5
ELEV ELEV5
S
A809
1' - 6"
7A3-0
WP-5
13
1
13
ELEC 6637
S
CG
1A6-0
WP-3
WP-5
PROVIDE NEW GWB AT ALL COLUMN ENCLOSU 7G, U.N.O.
15 A809 12
14
ANTE ROOM 6658B
WP-5
1' - 0" CLEAR
1' - 10"
OPP
7C0-0
7C0-0
1A6-0
2' - 6"
4C4-2
7E3-0
OPP
1' - 3" TYP.
1' - 3"
6655 CG CG
2' - 6"
7C0-0 CG
CG 7F3-0
WP-1
WP-1 ?
1
6656
PROVIDE METAL PARTITION CLOSURE TRIM BE EXTERIOR GLAZING MULLION AND END OF INT PARTITION.
15.
19
WP-1
? WP-1
REFER TO WINDOW SCHEDULE FOR GLAZING
14.
A903
WP-1 WP-1
ALL SWING DOORS SHALL BE LAMINATE-FACE NOTED OTHERWISE. REFER TO SPECIFICATIO ALUMINUM BREAKAWAY DOORS.
13.
G
WP-1
3A3-0
1
12.
11
7C0-0
WP-5
CG
CG
1A6-0
CG
ALL NURSE STATIONS SHALL HAVE SOLID SUR TRANSACTION TOPS, PLASTIC LAMINATE WOR RESIN VERTICAL PANELS, CUSTOM FABRICATE AND LED LIGHTING.
OPP A809
3' - 0"
CG
1A6-0
ALL COUNTER SINKS SHALL HAVE SOLID SURF SOLID SURFACE BACKSPLASH, AND INTEGRAL SINK, UNLESS NOTED OTHERWISE.
11.
PV P
PATIENT BEDROOM 6658
9 5/8"
WP-1
4' - 0"
7C0-0
CG
3' - 8 5/8"
1' - 3" TYP.
5
WP-1 5' - 0"
OPP
1A6-0
CG CG
1' - 3"
18
3E1-0
3
6630
WP-5
CG
19 A809 17
3' - 11"
7C0-0
CG
2 A809 4
G
CG
1
CG
5' - 0"
FD
16
OPP
3E1-0
CG
3' - 0"
PATCH & REPAIR EXISTING EXTERIOR WEATHE WHERE REQUIRED.
10.
3/4 "
WP-5
CG
6657A
G
6658A 2' - 9 5/8"
TOILET 6658A
PATIENT BEDROOM 6657
CG
8
PATCH & MATCH EXISTING FIREPROOFING TO RATING WHERE REQUIRED.
9.
8
7C0-0
6 7 A809 10
50°
1' - 5 1/2" OPP
1 4 A809 2
7F2-0
WP-1
G
8' - 9 5/8"
6' - 0"
ALIGN
WP-5
CG
1
WP-1
3
WP-1
5
E
1A6-0 TOILET 6657A
OPP
1A6-0
6
S
7' - 6"
5' - 6"
WP-5
3' - 8 5/8"
3' - 8 5/8"
ALIGN
8' - 2 1/8"
6' - 10 1/2"
1' - 3"
CG 1A3-1
11
FD
10 A809 7
9
CG
CG
A809
A808 10
7F2-0
WP-1
3A3-0
1 2 A809 4
CG
PATCH AND REPAIR EXISTING GWB AS REQUIRED AT ELEVATORS
7F2-0
WP-1
WP-5
ALIGN
CG
TELEMETRY MONITOR
1A3-1 CG
2' - 3 5/8"
IN CONJUNCTION WITH THIS FLOOR PLAN, REF ELEVATIONS AND WALL PROTECTION DETAILS PROTECTION INFORMATION.
8.
11
G
WP-1
CG
ELEVATOR LOBBY 6630
7F2-0
WP-1
WP-5 1A3-1
CORRIDOR 6600
5' - 6"
WP-5
WP-5
A809
E
1
2' - 0 3/8"
3E1-0
8' - 0" CLEAR
7F2-0
WP-5
9
1
FD
REFER TO INTERIOR ELEVATIONS AND TYPICA HEIGHT SHEET A800 FOR LOCATIONS OF PLUM
7.
A903
S
2' - 10 1/2"
PROVIDE NEW EXPANSION JOINT COVER
CG
3
6653
6630A WP-5
TOILET 6656A
WP-1
PATIENT BEDROOM 6656
A809
OPP
3' - 7"
PATIENT BEDROOM 6655
2' - 1" TYP.
WP-5
CG
WP-1
5
WP-1
WP-4
S
OPP
5' - 2 5/8"
1' - 6" MIN
7E2-0
WP-1
15' - 1 3/8"
A903
CENTER WALL ON MULLION
8
CG
1A6-0
1' - 0"
ALIGN
CG
WP-4 NOURISHMENT 6653
E
6655A
WP-4
CG
ALIGN
7 A809 10 8
WP-5
CG
CG
OPP
6 A808
EX. MECH 6636
EX. STOR. 6635
WP-1
TOILET 6655A
6
G
3E1-0
1A3-0
6631A
CG
OPP
5
WP-3 ?
G
6654
4C2-2
WP-7 TRASH CHUTE 6631A
7
8A3-1 2' - 0"
2' - 0"
WP-5
8' - 0" CLEAR
ALIGN
CG
WP-7
2
FD
E
CENTER WALL ON MULLION
155°
A808 1
6633
HVC
1' - 4"1' - 4" WP-5
ALIGN WITH EXISTING SHAFT ABOVE AND BELOW
1 2' - 0"
1A6-0
8 A808
WP-7
1' - 6"
7F2-0
7A2-0 WP-5
RG C
6" MIN
6634
WP-5
8A3-1 BLANKET WARMER
WP-7
EVS 6633
S
WP-7 ?
CLEAN UTILITY 6654
CG
WP-7
637
WP-5
RG D.1
4C2-2
3
6631
S
WP-7
A808 4
ELEV ELEV2
STAIR VESTIBULE 637
G
OPP
SOILED 6634 TRASH ROOM 6631
WP-5
S
OPP
WP-7
6600
WP-5
RG D.5
E
9 A903
OPP
G
5' - 0"
ROGERS STAIR 638 638
G
7 1/4"
10
8 A903
2 1/2" TYP.
G
1' - 3"
RG E
15' - 1 3/8" 7 A903
8' - 5"
A903
1' - 3"
6
5 A903
OPP
SHOWER CAP WARMER PROVIDE CART OR SHELF BELOW.
1 / A106a
6.
SIXTH FLOOR PLAN - ENLARGED PLAN (EAST) SCALE 1/4" = 1'-0"
THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER SIZ
Shepley Bulfinch Richardson & Abbott Architecture / Planning / Interiors / Est. 1874 2 Seaport Lane Boston, MA 02210 T:617.423.1700 F:617.451.2420 www.ShepleyBulfinch.com
ASSOCIATE ARCHITECT
12 A922
11
11
12
A922
A922
A922
STRUCTURAL ENGINEER
12
PV SOUTH WORKSTATION - EAST
11
SCALE 1/2" = 1'-0"
PV SOUTH WORKSTATION - NORTH
10
SCALE 1/2" = 1'-0"
PV SOUTH WORKSTATION - SOUTH
M.E.P./FP ENGINEER
SCALE 1/2" = 1'-0"
CIVIL ENGINEER
LANDSCAPE ARCHITECT
LIFE SAFETY & FIRE PROTECTION CODE CONSULTANT
11 A922
9
PV WORKSTATION - WEST
8
SCALE 1/2" = 1'-0"
12
12
A922
A922
PV NORTH WORKSTATION - NORTH
7
SCALE 1/2" = 1'-0"
PV NORTH WORKSTATION - SOUTH SCALE 1/2" = 1'-0"
A921 7
A926
A926
6' - 2"
5' - 0"
2' - 2 1/4"
7 3/4"
7 3/4"
A926
5' - 0"
3' - 9"
4
EQ
5
7 3/4"
2' - 11" 5
HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE
HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE CONTINUOUS LED LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS.
CONTINUOUS LED LIGHT FIXTURE. SEE ELECTRICAL DRAWINGS. PLAM ON 3/4" SUBSTRATE
SIM
SIM
1
6
A922
NO.
STEEL SUPPORT BRACKET. MAX 4'-0" O.C. UNO.
COUNTER ABOVE HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE
DATE
DESCRIPTION REVISION
ALIGN BRACKET TO TRANSACTION TOP SUPPORTS ABOVE, TYP. DIEWALL.
A921 12
7 3/4"
VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.
11' - 3" V.I.F.
EQ
SIM
A922
6 A921
COUNTER ABOVE HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE 7 3/4"
1 A922
11
ALIGN BRACKET TO TRANSACTION TOP SUPPORTS ABOVE, TYP. DIEWALL. EQ
SIM
STEEL SUPPORT BRACKET. MAX 4'-0" O.C. UNO. 9 A921 5
A921
3' - 9"
1' - 8"
6 A922 VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.
PLAM ON 3/4" SUBSTRATE
8
4 A921
STEEL SUPPORT BRACKET. MAX 4'-0" O.C. UNO.
2' - 6"
3' - 4"
10"
A921 3
3' - 9"
11' - 3" V.I.F.
1' - 0"
ALIGN
EQ
ALIGN
EQ
ALIGN
EQ
ALIGN
EQ
3' - 5"
6
PV EAST NURSE STATION - EAST
5
SCALE 1/2" = 1'-0"
10
PV EAST NURSE STATION - WEST
2
SCALE 1/2" = 1'-0"
PARKVIEW COLLABORATIVE WORKSTATION - COUNTER REMOVED A921
SCALE 1/2" = 1'-0"
KEY PLAN
3
14 6' - 2"
A921
A922
SIM
7
4' - 6"
10
A922
14
A922 10' - 1" ± V.I.F.
A922
SIM
5' - 0" CLEAR
INTERMEDIATE WD VNR ON 3/4" SUBSTRATE SUPPORT RIBS BELOW FOR TRANSACTION TOP
1' - 0"
9 3/4"
1' - 0"
SIM
6
A921
SSM TRANSACTION TOP
11
P TUBE
15
GLAZING ABOVE AS SPECIFIED
INTERMEDIATE WD VNR ON 3/4" SUBSTRATE SUPPORT RIBS BELOW FOR TRANSACTION TOP
A922
1
A922
A922
VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.
SIM
6
PV WEST NURSE STATION - EAST SCALE 1/2" = 1'-0"
EQ
2' - 10"
SCALE
A922 15
10 A922
SIM
A922
5' - 0" CLEAR
3' - 5"
4' - 6" CLEAR 11
1
10' - 1" ± V.I.F.
10 A921
12
20 A922
SIM
A922
A922
15
10
A922
A922
09/16/2013
CHECKED
SRS
A921
SIM
SIM
PARKVIEW COLLABORATIVE WORKSTATION - COUNTER MATERIALS SCALE 1/2" = 1'-0"
DATE
4590 WFM
CONSTRUCTION DOCUMENTS 5' - 0" CLEAR
10
1/2" = 1'-0"
JOB NUMBER
DRAWN
PV WEST NURSE STATION - WEST SCALE 1/2" = 1'-0"
SIM
SIM
VERTICAL REVEALS CENTERED TO TRANSACTION TOP SUPPORTS, TYP.
3
6 A922
SSM TRANSACTION TOP A921 12
A922
4
15 A922
1"
A922
1
DRAWING TITLE
6 A921
SSM TRANSACTION TOP
2' - 6"
2' - 6" 10/1/2013 4:09:40 PM
Sixth Floor Inpatient Oncology Unit
C:\2013 Revit Locals\CARLE4590_ARCH_CENTRAL_KPeppard.rvt
6
SIM
611 W. Park Street Urbana, IL 61801
MILLWORK PLANS AND ELEVATIONS
PLASTIC LAMINATE ON 3/4" SUBSTRATE WORK SURFACE
A922
SIM
9 A921 5
SOLID HARDWOOD NOSING
EQ
EQ
A922
8
BUILT-IN CABINET
4 A921
Sixth Floor Inpatient Oncology Unit PROJECT
FINISH END PANEL, WD VNR ON 3/4" SUBSTRATE, TYP. INTERMEDIATE WD VNR ON 3/4" SUBSTRATE SUPPORT RIBS BELOW FOR TRANSACTION TOP
15
EQ
EQ
A921 3
EQ
EQ
EQ
EQ
ON 3/4"
SOLID HARDWOOD NOSING HIGH IMPACT SHEET WALL COVERING ON 3/4" SUBSTRATE ELECTRICAL RECEPTACLE MOUNTED IN CABINET
11' - 3" V.I.F. EQ
1
PLASTIC LAMINATE SIMSUBSTRATE WORK SURFACE
A922
SOLID HARDWOOD NOSING FINISH END PANEL, WD VNR ON 3/4" SUBSTRATE, TYP.
11' - 3" V.I.F.
4 A924
EQ
SIM
1 A922
OWNER
2' - 10"
5 A926
ALIGN
5 A926
EQ
4 A926
SOLID HARDWOOD EDGE BANDING PLASTIC LAMINATE ON 3/4" SUBSTRATE WORK SURFACE
Carle Foundation Hospital
SOLID HARDWOOD EDGE BANDING
1"
5' - 0" CLEAR
12
19
A924
A922
DRAWING NUMBER
THE ORIGINAL OF THIS DRAWING IS 36" X 48". IF THIS COPY IS ANY OTHER SIZE, IT HAS EITHER BEEN REDUCED OR ENLARGED. TAKE APPROPRIATE PRECAUTIONS ACCORDINGLY.
Bariatric Unit