Illustrative Drawings

Page 1

ILLUSTRATIVE DRAWINGS Project: Various Location: Multiple Artist: Morgan Raman

Over the years, I have compiled a number of sketches, drawings, and models that I created in various fields of work, locations, and hobbies. I have presented a few of them that encompass fashion, buildings, interior design, typography, and abstract work.


Architectural Program | Exploded Sectional Isometric Projectional Views


3


Sectional Oblique Axonometric Projection | Military View


5

Artistic Rendition | Light and its purpose


Longitudinal Section | Artistic perspective, 10:00am


7


Isometric Projection of Structure | WTC Transportation Hub, New York - Santiago Calatrava


9

1

2

3

4 5 6

1. Purlin 2. Transition 3. Rafter 4. Arch 5. Upper Portal 6. Lower Portal


Plan Perspective Projection of Structure | WTC Transportation Hub, New York - Santiago Calatrava | Visions


11

of Structural form as a lantern in space


Isometric Projection of Exterior Structure| WTC Transportation Hub, New York - Santiago Calatrava


13


Bird-eye Perspective Projection | Proposed Transportation Hub at the Cincinnati Uptown Innovation Corrido


or

15


1

4 5 2

2 3

varies 1. Upper Flange 2. Cantilever 3. Girder

4. Tension Connector (to cables) 5. Stiffener (handrail mount) 6. Brace (handrail)

6


17

N

A RAM



19

N

A RAM


Very Large Tunnel Boring Machines | Artistic Rendition


21


PUGET SOUND

LAKE WSHNGTN

Surface projection of tunnel alignment Tunnel Portal locations

PERSPECTIVE VIEW OF THE BRIGHTWATER CONVEYANCE SYSTEM ALIGNMENT IN KING/SNOHOMISH COUNTIES, WASHINGTON STATE

600

600

5

405

400 D E P T 200 H

400

0 FT

0 FT

200

-200

10,000 0

1 MILE

20,000

30,000

3 MILE

5 MILE

40,000 7 MILE

50,000 9 MILE

60,000 11 MILE

67,000

-200

13 MILE

GROUND PROFILE AND GROUND WATER TABLE ALONG PROPOSED TUNNEL ALIGNMENT

600

600

400 D E P T 200 H

400

0 FT

0 FT

200

-200

10,000 0

1 MILE

20,000

30,000

3 MILE

5 MILE

40,000 7 MILE

Fill and Alluvial deposits Older Non-glacial deposits

Alluvial and Non-glacial deposits: Generally sands, silty sands, and gravel

50,000 9 MILE

60,000 11 MILE

67,000

-200

13 MILE

Voshon Glacial deposits Older Glacial deposits

Glacial deposits: Generally till, lacustrine and outwash

GEOLOGIC SECTION ALONG PROPOSED TUNNEL ALIGNMENT

600

600 E X C A V A T I O N

5

405

400 D E P 200 T H

400

0 FT

0 FT

200

-200

10,000 0

1 MILE

20,000 3 MILE

Sand, Gravel (outwash) Silt/Silty sand (till/alluvium)

30,000 5 MILE

Hard Clay

40,000 7 MILE

Tunnel Hydraulic Grade Line

50,000 9 MILE

60,000 11 MILE

Surface water bodies Ground water table line

SIMPLIFIED GEOLOGIC SECTION AND TUNNEL VERTICAL ALIGNMENT

Illustrative Graphs | Geological Profile along a Horizontal Pipeline Alignment

Tunnel Portals

67,000

-200

13 MILE


23

1 Bothell

SNOHOMISH COUNTY KING COUNTY

Sou n d

Woodinville

Alki

is h

am

Pug

et

Seattle

Bellevue

L a k e Sa m m

2

L a k e W a sh in gt o n

Carkeek

Issaquah WA

4

Renton

3

Vashon Island

Effluent Pipeline Network Urban Growth Area Boundary Flow Transfer Area CSO Treatment Plant

Effluent Treatment Plants

1 City of Edmonds (exist., flow transfer) 2 West Point 133 MGD 3 Vashon Island 0.26 MGD 4 South 115 MGD

East Service Areas

TY TY UN UN CO CO NG E KI ERC PI

Federal Way

Pump stations

West Service Areas Regulator stations Pump stations 0 miles

Illustrative Maps | Demarcations of Land Areas and Infrastructure

2

4

N


Product description Product Engineering Team Project Management Team

Inputs Phases

INITIAL

Project Management Outputs

Scope Charter

INTERMEDIATE FINAL Production Acceptance Plan Prototype QA/QC

Project Deliverables

Approval Deliver

Product Transport Logistics

PROJECT LIFECYCLE PHASES FOR PIPE MANUFACTURING

INITIAL Planning: Vision, Product Protocols

Prototype Development Planning

INTERMEDIATE

AGILE

First Prototype

Second Prototype

Third Prototype

Project Retrospective

Project

Iteration

Iteration

Iteration

Prototype Retrospective

Prototype

Prototype Retrospective

Iteration

Daily work: Iteration Planning

FINAL

Design Simulate Produce Test

Daily work:

Design Simulate Produce Test

Daily work:

Design Simulate Produce Test

PHASES/SUBPHASES IN AGILE MANUFACTURING PROJECT LIFECYCLE

Project Management | Agile process for prototyping, manufacturing, and delivery


25

MANUFACTURING SCHEMATIC

Continuous Rovings Separator Combs Resin Bath

Nip Rollers Guide

Rotating Mandrel

Creel

A–A A psi A

TESTING SCHEMATIC

psi

Agile Manufacturing Environment

Start


Cross-sections | Urban scale and details


27

1 8

50 — 450

2

ft

3

4

7

6

5

1

0

1

Looking East

2


Rua

Riac

Feijó

hue

lo

Av. Br

igad

eiro

Luís

Ru a

Ant ôni

o

Rua

Sen.

o Do

ut

Dr.

João

Men

des

Rua

Con

selhe

iro F urta

do

Viad

Praç a

a aulin na P

SIT

rda d Libe Av. da

aia nd a Ja Ru

Rua J

acegu

uai

ai

Aerial Perspective Projection | The City of São Paulo, Brazil

Furtado

o Jaceg

Rua Conselheiro

Viadut

Rua da Glória

e

Av. 23 de M ai

Av. 23 de Maio

o

(-23.553


a An

ita G a r ib

a ldi

29

Av .d

oE

sta

Rua Tabatinguera

TE

de Sar

ério

zedas

Glic

ste-Oeste

ério / Viaduto Le

Viaduto do Glic

ste-Oeste

Teix e

ira L

eite

ério / Viaduto Le

Viaduto do Glic

Ru a

onde

Rua

Rua C

os Av. Pref. Pass

3, -46.633)

do

metres 0 10 20

50

100


Two Point Perspective Projection | The City of São Paulo, Brazil


31

One Point Perspective | Proposed Tall Building


Reaction Couple Mu2 Net Resistance Fu

Partially Restrained and Flexible Moment Connections

Fully Restrained Beam-Column Connections

Moment Connections | Typology, behavior, and mechanism


33

tf k

5k+N

N = tb 2.5 : 1

Puf

Fyc 

(left column from top) Web-seat angle connection, Flange-plated seat angle connection, Seated connection, and Web-T connection. (right column from top) T-stub connection, Flangeplated stiffened connection, End-plate connection, and Flange-plated stiffened connection with web angle.

(left to right) Four-bolt, unstiffened, extended end-plate connection, eight-bolt stiffened extended end-plate connection, pressure imprint on carbon paper positioned between the end plate and column flange (Surtees and Mann)

Column web panel-zone shear due to reaction moments (end connections not shown).

Load dispersion diagrams for web-yielding: (left) Flange-plated or directly welded connection to the beam (right) Extended end-plate connection (detail) Terminologies of an end-plate (Krishnamurthy and AISC)

tp k tf

6k+N+2tp

Puf

1:1 3:1

Mu1 db

Column Web End Plate Tension pe pf Flange wt


Condition for equilibrium of a plate element FY FX

MXY

MY

MX

MY + _____ ∂MY • ΔY ∂Y

z

MYX

MX + _____ ∂MX • ΔX ∂X

MYX + ______ ∂MYX • ΔY ∂Y

FY +______ ∂FY • ΔY ∂Y

FX +______ ∂FX • ΔX ∂X

MXY + ______ ∂MXY • ΔX ∂X

w∆x • ∆y + {Fy + (∂Fy/∂y) • ∆y – Fy)} • ∆x + {Fx + (∂Fx/∂x) • ∆x – Fx)} • ∆y = 0

∂²Mx + ∂²My – ∂²Mxy = – w _______ _______ ______ ∂x² ∂y² ∂x ∂y

Common shapes/support conditions for which code recommendations are unavailable/insufficient for design: unsupported/free simple support fixed/continuous +ve yield line -ve yield line column

Plate Analysis | Visualization of Concepts of Structural Behavior

x

y


35

Collapse Moment of a Polygonal Slab: an analysis

Computation of internal angles: For equilibrium of the whole plate, for plate part ,

∠M = arctangent(2) and, ∠N = 135 – ∠M

(m/) = 1/6 • Wu • L²

for plate part  and , (2m/k₂) = 2/6 • Wu • k₂ • L²

where k₂ is a f (L) expressed for the height of part 

for plate part  and , (1.65686m) = 2/6 • Wu • 1.2071 L² for plate part ,

[

]

m ______________ 2.4142 (1.7071 — )

= 1/6 • Wu • 2.4142 • (1.7071 — )L²

By adding and simplifying the above equations for conditions of equilibrium, the collapse moment of the plate,

[

]

m = 1/6 • Wu • L² • (6.53548 + 2k₂ — 1.4142) ________________________________ (1 + 2 + 3 + 4)

where,

1 = 1/

2 = 2/ k₂

3 = 1.65686, and

4 = ______________ 2.4142 (1.7071 — )

Representation of Hypothesis | Hand-drawn Illustration for proof of mathematical concept


Phenomenological Illustration | Product Design


37


Isometric Projectional Drawings | Product Design


39


Hand-drawn Product Conceptual Designs | Adidas - Innovate


41

Hand-drawn Imaginations | Finding Form in Architecture



43


Folding in Architecture | Finding form through typography and fashion


45


Folding in Architecture | Finding form through thoughts of projection and elevation


47

Medium: Pen on note paper

Clockwise from top: The Hindustan Lever Pavilion, New Delhi, India. My thoughts for an addition to a Catholic Church, Cincinnati, Ohio USA Sectional drawing with an embedded site image view taken with my cell phone for a Fossil Park, Cincinnati, Ohio, USA. Oporto Vodafone Building, Porto, Portugal. A conceptual sketch for a Fossil Park, Cincinnati, Ohio, USA.


Landscape Architecture | Exemplars of visual form | In the manner of Jens Jensen


49


Landscape Architecture | Exemplars of visual form | In the manner of Chip Sullivan



Cincinnati Music Hall | A case study of form of Samuel Hannaford’s work in Cincinnati


53


Interior Design Drawings | Exemplars of visual form | In the manner Paris Interiors


55


In the works | A contemporary kitchen inspired by Art Deco | Mixed Flat Reality drawings


57

Hand sketch of Art Deco-inspired fused glass window design (under fabrication)

Rendered exterior view showing stained proposed decorative hanging vines and lavendar (Lavendula angustifolia) bushes


Illustrative Art | Multiple copies sold as wall art for thematic visual anchor in Contemporary Style Interior Sp


paces

59


Illustrations | Representation of field mathematics


61



63

End of Document

Drawings of Morgan Raman Select Works.

Click here to go to the beginning of this Portfolio.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.