Case Study
Project scope - design proposal, supply and installation of 8 classrooms, 3 ICT suites and Learning Resource Centre
“Morleys provided us with a personal, professional service. From choosing chairs and tables for classrooms through to providing a design service for more sophisticated schemes, Morleys were informative and flexible. Crofton School are really pleased with the results, maximising the space available.�
Jonathan Hickey, Operations Director, Crofton School
INTERIORS