Matthew Portice BIM/CAD Designer // MArch Student Rockford MI 49341 989.640.2661 matt.portice@gmail.com
2
Matthew Portice Portfolio
4
ARH 653 Introductory Design Studio 2 Spring 2018 - Ins. Simon Battisti
18
ARH 609 Advanced Design Studio I Fall 2019 - Ins. Jaime Daroca
34
ARH 608 Advanced Design Studio II Spring 2020 - Ins. Eric Reeder
58
ARH 619 Advanced Design Studio III Fall 2020 - Ins. Eric Lum
80
ARH 604 Materials and Methods of Construction Spring 2019 - Ins. Paul Rivers
106
3
Table of Contents
ARH 650 Foundational Design Studio I Fall 2017 Ins. Vasilena Vassilev
Matthew Portice Portfolio
ARH 650 Intro Design Studio I
The Platform House
Space Diagrams and Orientation to the Sun
The client wanted a house on the West coast (California) which would provide a pool and regulation diving platform for the husband to practice on. The wife requested a private office space for her to work at home from. The couple wanted a flowing floor plan with an open area for entertaining. They wanted this entertaining area to extend outward from the building into an exterior entertaining area. Requested Spaces: •Olympic Diving Platforms •Private Office •Open Entertaining Area •Private Bedroom Area The client requested the bedrooms be separated from the common spaces within the house. The common spaces naturally sat near each other and were tied back into the pool area.
4
To incorporate the diving platforms into the house, the spaces were developed as cubes and stacked together to form the diving tower.
Early Sketches of Shape Generation
ARH 650 Intro Design Studio I
First Level Design Progression
5
1/16” Scale Massing Model
Matthew Portice Portfolio
Site Location
Site Plan
6
1'
5'
10'
20'
The site for the house is located in Northern California directly on the ocean coast. The site slopes slightly towards the ocean from Highway 1 on the East edge of the property. The site drops off just before the ocean creating a beautiful viewing cliff.
ARH 650 Intro Design Studio I
Site: 11001 CA-1, Elk, CA 95432
7
The house was oriented to maximize the view towards the ocean. Smaller windows are placed on the East Facade to allow the morning sunlight inside.
Matthew Portice Portfolio
Site Location
Hot Tub Ladder 1
Ladder 1
Kitchen Bathroom
5 Meter Platform
Up Pool Living/ Seating Area
Up
Up
Ladder 2 Up
Entry
Boys Room
First Level
8
1'
5'
10'
Second Level 20'
1'
5'
10'
20'
ARH 650 Intro Design Studio I
The platforms are designed to be accessible without entering the living spaces of the house. This will result in the swimmers climbing the facade of the house to the platforms while the occupants can use the interior stairs to progress from level to level.
ai St La dd er s
The spaces of the house are designed to fit the needs of the client. Not oversized, and not simplified to a box. This idea of efficient space resulted in offset areas and creates interesting facades from every viewing angle.
rs
Connected to the platforms are the bathrooms. By design the bathrooms are accessible so the divers do not have to cross any living spaces to use the facilities while swimming.
9
The regulation diving platforms protrude from the West elevation and over the pool below. A rooftop terrace/office space provides panoramic views of the surrounding site.
Matthew Portice Portfolio
Green Roof
Master Bedroom
Up
Ladder 2
Up
10 Meter Platform
Rooftop Terrace Dn
Dn
7.5 Meter Platform
Dn
Rooftop Office
Ladder 3
Ladder 3
10
Third Level 1'
5'
10'
Roof Level 20'
1'
5'
10'
20'
Dn
ARH 650 Intro Design Studio I
The diving platforms are designed to be used as balconies to view the Sun setting along the Ocean towards the West. Green roofs were incorporated in areas of the house to reduce the absorption of hot California sunlight into the house. This vegetation also offsets the green space removed from the site with the house construction.
1'
5'
10'
20'
11
North/South Section
12
North Elevation
1' 5' 10' 20'
Matthew Portice Portfolio
1' 5' 10' 20' 13
West Elevation ARH 650 Intro Design Studio I
14
East Elevation
1' 5' 10' 20'
Matthew Portice Portfolio
1' 5' 10' 20' 15
South Elevation ARH 650 Intro Design Studio I
16
1/16” Scale Model
Matthew Portice Portfolio
17
East/West Section ARH 650 Intro Design Studio I
Matthew Portice Portfolio 18
ARH 653 Intro Design Studio II Corner Infill Project South/Corner Elevation
19
ARH 653 Intro Design Studio II
North/Courtyard Elevation
Matthew Portice Portfolio
Looking South East from the Site
Looking South West from the Site
Looking North West from the Site
Looking North East from the Site
20
West Elevation
East Elevation
Site Plan Within Berlin Sun Path 50’
Site Plan
The site is located just one block North from a public park which is visible when looking South from the West end of the building. The South/West end of the site received a good amount of sunlight through the day. The North side of the site is exposed to a small interior courtyard shared by adjacent buildings. This courtyard and North side of the site currently receive very limiting sunlight through the day due to the high buildings surrounding it, keeping it in shadow.
Linienstrasse 104 10115 Berlin, Germany
21
This site is located on an urban corner surrounded by multi-story buildings. Most of the immediate buildings are made of stone and are of a lighter color. These immediate buildings line the sidewalk with a flush facade; some have smaller gable roofs on the street facade. The lighter white/sandstone-colored facades help keep the narrow streets feeling light and do not weigh the street down with heavy colors/dark materials.
Matthew Portice Portfolio
= Live/Work Studios: 6@1000ft sq. = Child Care Center: 2100ft sq. = Comm. Arts and Education Center: 2100ft sq.
22
= Generic Office Space: 6500ft sq.
Child Care 2100’sq.
Private
Quiet Loud
Qualities: +Public Access +Sunlight (children) +Easy to find
Public
Qualities: +Private Access +Quiet spaces +Sunlight +Views -Public Access
Comm. Arts/Ed. Center 2100’sq.
Qualities: +Public Access +Sunlight (learning) +Easy to find
Generic Office Space 6500’sq.
Qualities: +Partial Public Access (employees)
ARH 653 Intro Design Studio II
Live/Work Studios 6@1000’sq.
Elevation Sketch
23
Matt Portice | Assignment 8.2 | ARH 653 OL1: Introductory Design Studio 2 | Instructor: Simon Battisti | Spring 2018 | Academy of Art University
24
Matthew Portice Portfolio
Aerial View
ARH 653 Intro Design Studio II
Exterior Materials Application
EAST ELEVATION
25
WEST ELEVATION
26
Matthew Portice Portfolio
Site Plan
Second Floor
Fourth Floor
ARH 653 Intro Design Studio II
Third Floor
27
First Floor
Matthew Portice Portfolio 28
Fifth Floor
Seventh Floor
Sixth Floor
Roof Plan
29
ARH 653 Intro Design Studio II
Building Sections
Matthew Portice Portfolio
Elevations
East Elevation
30
West Elevation
31
Facade Flattened ARH 653 Intro Design Studio II
Matthew Portice Portfolio
Model Images
Rooftop Courtyard
32
Exterior
Courtyard Behind Building
ARH 653 Intro Design Studio II
Looking into Main Level Space with Level Above
33
Main Level Outdoor Plaza
Matthew Portice Portfolio
ARH 609 Advanced Design Studio I Project Compliation: A New Education Educational Manifesto: Active Learning There are many ways to teach students and all have their benefits, but one is most effective: active learning. learning The idea of active learning is to get kids involved within the lesson with hands-on activities. The idea of letting kids work with physical things and solve the problem themselves or in groups are excellent for engaging the brain and body within the learning process. Active learning produces different experiences and reactions for the students: emotional, sensory, single or group involvement, what they learned, and if the experience and lesson can be replicated. The involvement of sensory engagement works closely with emotional experiences. Students need engaging spaces that can be used for multiple activities. Architecture lends its design properties to benefit students by creating the most optimal space for the best learning experience students can have.
Designing for a New Experience The aim is to create a new grade school experience based on the students understanding on the subject, and not divided by age groups. The school will have multiple areas that can be utilized by the public after school hours to create facilities to better not only the youth, but the community as a whole. A set of “traditional” spaces are included such as an office area, restrooms, cafeteria, auditorium, library, and a music space. An inclusion of a virtual area (virtual reality) for augmented learning, a technology lab to teach electronics, and a flexible hands-on lab (woodworking, experiments, etc.) are included with this experience approach. An adaptable art space and a garden for students to grow their own plants. A series of longer projects will span the school year so the students are engaged over a long period of time with a similar task in mind as their classmates. Master Diagram
The school will have classroom areas with different heights for students to be comfortable to learn in and will help cultivate creativity. A large ramp connects every space through this structure to create unique learning areas. This school will utilize unique interior and exterior flexible spaces to create engaging experiences for every student.
A C A D E M Y of A R T
34
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
01
ARH 609 Advanced Design Studio I
Project Compliation: A New Education Space Size & Layout Outdoor Garden/Play Area
Virtual Area Flex Hands-On Lab
Flex Art Space Classroom
Classroom
Technology Lab
Classroom
Classroom
Music Space
BR
Stage
BR
Library Classroom Classroom
Auditorium
Cafeteria/Kitchen KEY Accessible to the Public
Office BR
Important Access Route Access to Outdoor Space Administration Classroom Open Interaction Support Space Performance/Assembly Green Space/outdoor
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
02 35
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education Neighborhood Location The project location is located on the East side of the San Francisco peninsula. The site is within the Dogpatch Neighborhood which is a part of the Central Waterfront, adjacent to Potrero Hill and Mission Bay. Potrero Hill is mostly residential houses and small businesses. The Central Waterfront is heavily industrial usage and a small port for ships. The Dogpatch neighborhood is evolving from old industrial buildings to updated apartment buildings and small businesses.
Potrero Hill
Dogpatch
Central Waterfront
Mission Bay
Potrero Hill
San Francisco, California
Dogpatch
Central Waterfront
Mission Bay
Images from Google Maps. A C A D E M Y of A R T
36
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
03
ARH 609 Advanced Design Studio I
Project Compliation: A New Education Overall Context The proposed site is located an 8 minute walk from San Francisco’s East shore and an 8 minute drive North to Academy of Art University (downtown San Francisco). Proposed Site
Downtown San Francisco
Image from Google Maps.
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
04 37
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education Proposed Site
Site Analysis
Sun an
d Wind
Esprit Park
5m te
inu lk
wa
Public
4
1
Traffic D
2
ensity
3 Pre
vail
Train Route/Stop
Bus Route/Stop
City Bike Route/Rental
Heavy Traffic
Medium Traffic
Light Traffic
2
1
Transit
3
ing
Win
ds
Natura
l Spac
Car/Truck Sharing Spots
es
4 Drawn by Matt Portice. Images from Google Earth.
A C A D E M Y of A R T
38
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
05
ARH 609 Advanced Design Studio I
Project Compliation: A New Education A
Proposed Site
B
B
50’
A Overall Site Plan Scale: 1”=64’-0”
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
06 39
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education
Proposed Site
50’ Section A-A Scale: 1”=64’-0”
Proposed Site
50’ Section B-B Scale: 1”=64’-0”
A C A D E M Y of A R T
40
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
07
ARH 609 Advanced Design Studio I
Project Compliation: A New Education Design Iterations INIT
IA
ES LD
IGN I
DEA
First Floor - Module 7
First Floor - Module 8
First Floor - Module 9
First Floor - Module 10
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
08 41
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education Site Plan
Esprit Park
Site Plan Scale: 1”=20’-0”
A C A D E M Y of A R T
42
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
09
Project Compliation: A New Education First Floor Plan
A
Mech Room B
Auditorium
Kitchen
B
Cafeteria Office
First Floor Plan Scale: 1”=32’-0” A
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
10 43
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education North Rooms Floor Plan
Auditorium Balcony
Prog RmProg Rm Prog Rm Music Room
Open Class
Open Class
North Rooms Floor Plan Scale: 1”=32’-0”
A C A D E M Y of A R T
44
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
11
Project Compliation: A New Education South Rooms Floor Plan
LIBRARY
OPEN CLASS
South Rooms Floor Plan Scale: 1”=32’-0”
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
12 45
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education Roof Plan
Roof Plan Scale: 1”=32’-0”
A C A D E M Y of A R T
46
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
13
ARH 609 Advanced Design Studio I
Project Compliation: A New Education Building Sections
Section A-A
Section B-B
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
14 47
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education Context Sections
Rooftop Walkway Entrance 53' - 0" South Rooms 22' - 0" Central Classrooms 14' - 0" Grade Level 0' - 0"
Context Section A-A
Rooftop Walkway Entrance 53' - 0" North Roof 35' - 0"
Grade Level 0' - 0"
Context Section B-B
A C A D E M Y of A R T
48
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
15
Rooftop Walkway Entrance 53' - 0"
Rooftop Walkway Entrance 53' - 0" North Roof 35' - 0" South Rooms 22' - 0" North Rooms 10' - 0" Grade Level 0' - 0"
South Rooms 22' - 0" North Rooms 10' - 0" Grade Level 0' - 0"
South Elevation Scale: 1”=32’-0”
ARH 609 Advanced Design Studio I
Project Compliation: A New Education
North Elevation Scale: 1”=32’-0”
Rooftop Walkway Entrance 53' - 0"
South Rooms 22' - 0" North Rooms 10' - 0" Grade Level 0' - 0"
East Elevation Scale: 1”=32’-0”
Rooftop Walkway Entrance 53' - 0"
South Rooms 22' - 0" North Rooms 10' - 0" Grade Level 0' - 0"
West Elevation Scale: 1”=32’-0”
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
16 49
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education Overall Circulation/Access
Roof/G
arden
OPEN
CLAS
LIBRA
S
Level
RY
South Library Classroom/ Level
Audito
rium B
alcon y
Open
Class Music
Open
Audito
50
North rog R
m Pro g
Classro
Rm
om Le
vel
rium
Office
UNIVERSITY
RmP
Class
Mech
A C A D E M Y of A R T
Prog
Ro om
Design for Learning: The New Spaces of Education
Cafet
Ro om
eria
ARCHITECTURE FALL 2019 ARH609OL2
Grade Kitch
en
INSTRUCTOR Jaime Daroca
Level
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
17
Project Compliation: A New Education Exploded Axonometric Structural Diagram
r g fo ncin wth e f o h r Mes ation g et g e v Wood truss roof with 1’-0” of soil for planting
Timber Columns
Wood truss floor
for nels n a p ing latio Slid al venti lazing r u t nt g na r efro g fo Stor ncin wth e f h ro Mes ation g t e g ve
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
18 51
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education Environmental Ideas - Site and Building Integration
FSC CERTIFIED WOOD FROM SAN FRANCISCO LUMBER YARD WATERSENSE PLUMBING FIXTURES (LOW FLOW)
2:00 PM
ENERGY STAR APPLIANCES U T ILL LIGH DAY RIORS INTE
CRADLE TO CRADLE CERTIFIED INTERIOR FINISHES
S ATE MIN 7:33 PM
W
N RAINWATER COLLECTION FOR SITE IRRIGATION
VISUAL CONNECTION TO VEGETATION AROUND SITE ROOFTOP GARDEN/PARK
GEOTHERMAL COOLING/ HEATING
S
A C A D E M Y of A R T
52
UNIVERSITY
June 21
E REEZ R IO SS B CRO S INTER L COO
STRUCTURE CREATES NATURAL SHADING
4:49 AM
E
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
19
Project Compliation: A New Education Enlarged Wall Section CARPET/CORK CRADLE2CRADLE CERTIFIED FLOORING North Rooms 10' - 0"
GLULAM BEAMS WITH FSC WOOD (OPEN CEILING)
LIVING WALL SCREEN
STOREFRONT WALL SYSTEM
SLIDING WALL PANEL (ALIGNS WITH LIVING WALL)
WOOD COLUMN (BEYOND)
POLISHED CONCRETE
Grade Level 0' - 0"
Wall Section Scale: 3/4” = 1’-0”
UNIVERSITY
Design for Learning: The New Spaces of Education 2
X_Exterior Section Rendering 3/4" = 1'-0"
ARCHITECTURE FALL 2019 ARH609OL2
STUDENT
INSTRUCTOR Jaime Daroca
1
Matt Portice x_Wall Section #04701666 3/4" = 1'-0"
MODULE 14 Assignment 14.1 2019.12.17
20 53
A C A D E M Y of A R T
Matthew Portice Portfolio
Project Compliation: A New Education
A C A D E M Y of A R T
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR
Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
21
54
UNIVERSITY
A C A D E M Y of A R T
UNIVERSITY
Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
24
ARH 609 Advanced Design Studio I
Project Compliation: A New Education
A C A D E M Y of A R T
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
22
55
UNIVERSITY
A C A D E M Y of A R T
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
23
Matthew Portice Portfolio
Project Compliation: A New Education Project Model
A C A D E M Y of A R T
56
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
25
Project Compliation: A New Education Project Model
UNIVERSITY
Design for Learning: The New Spaces of Education
ARCHITECTURE FALL 2019 ARH609OL2
INSTRUCTOR Jaime Daroca
STUDENT Matt Portice #04701666
MODULE 14 Assignment 14.1 2019.12.17
26 57
A C A D E M Y of A R T
Matthew Portice | 04701666
ARH 608-Spring 2020
1.0 - Site Plan
58
Matthew Portice Portfolio
ARH 608 Advanced Design Studio II
138
Module 13 - 15
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
1.1 - Floor Plans
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
B
C
D
E
F A R C HI V E S T O RA G E 2128 SF
A R C HI V E S 1054 SF
C O NS E R V A T I O N/ R E S T O RA T I O N 1054 SF
H AN D L I N G 424 SF
G BR 138 SF
BR 146 SF
A D D I T I O NA L M E C H AN I C A L / E L E C T R I C AL 2015 SF
H
I
Lower Level
8'
16'
32'
64'
59
0'
Part 1. DRAWINGS
Module 13 - 15
139
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
1
2
3
4
5
6
7
8
9
10
11
12
3
13
14
2
A MUSEUM E D U C AT I O N F AC . 1554 SF
B
RE S T RO O M ( F ) 1085 SF
T R AV E L I NG E X HI B I T I O N S 1 6565 SF E D U . S P AC E S EDU. SPACES143 SF 144 SF
C
T IC KE T S / S H O P 1563 SF C L O AK R O O M L O C K E RS 169 SF
R E S T RO O M ( M ) 1065 SF
D
FOY ER 3001 SF
S H O P S T O RA G E 295 SF
C L O AK R O O M 580 SF
S T AF F 399 SF
E R E S T . S T O RA G E 438 SF
F
PRE P KI TC H E N 907 SF
G RE S T AU RA NT / K I T C HE N 5613 SF
H
I
BR 467 SF
BR 426 SF
PRO P. C O NT ROL 254 SF L O C A L S T O RA G E 295 SF S E RV I C E E Q U I P . S T O RA G E 256 SF C L E A N I NG C E N T E R 303 SF
U NP A C K I N G 656 SF
1
W AS T E R O O M 268 SF
D E L IV E RY 1198 SF
D E L . T RA S H S T O RA G E 429 SF
First Level
8'
16'
32'
64'
60
0'
140
Module 13 - 15
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
T R AV E L I NG E X HI B I T I O N S 1 10288 SF
B
C HA I R S T O RA G E 279 SF
C
AS S E M B L Y H AL L 5620 SF
D
E
F A U X . RO O M S 415 SF
G
H C O LLEC TI O N 27851 SF
I
Second Level
8'
16'
32'
64'
61
0'
Part 1. DRAWINGS
Module 13 - 15
141
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A
B
C
D
E
F S T AF F 653 SF
G
L O U NG E / L I B RA R Y 931 SF
O F FI C E A D M I N . 1203 SF
O PE N OF F I C E 647 SF D I R / C H I E F C O PY / PR I N T S T O R A G E 284 SF 174 SF C U R AT O R 489 SF
R E S T RO O M (F / M /H) 353 SF
H
I
Second Level
8'
16'
32'
64'
62
0'
142
Module 13 - 15
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
1.2 - Sections
Roof Line 45' - 0"
Third Level 30' - 0"
Second Level 15' - 0"
First Level 0' - 0"
Lower Level -15' - 0"
Section 1
Roof Line 45' - 0"
Third Level 30' - 0"
Second Level 15' - 0"
First Level 0' - 0"
Lower Level -15' - 0"
Section 2
Roof Line 45' - 0"
Third Level 30' - 0"
Second Level 15' - 0"
First Level 0' - 0"
Lower Level -15' - 0"
63
Section 3
Part 1. DRAWINGS
Module 13 - 15
143
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
1.3 - Elevations
North Elevation
South Elevation
East Elevation
64
West Elevation
144
Module 13 - 15
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
1.3 - Accessibility Plan
3
4
3' - 0"
1' - 6"
5' - 7 29/32"
1' - 6"
5' - 0"
BR 467 SF
3' - 0" 0' - 4"
65
BR 429 SF
Part 1. DRAWINGS
Module 13 - 15
145
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
1.5 - Wall Section / 1.6 - Partial Elevation
Roof Line 45' - 0"
CLT ROOF PLANELING W/WHITE ROOF MEMBRANE
16" WIDE GLASS PANELING W/1" MULLIONS (PAINTED BLACK)
Third Level 30' - 0"
8" WOOD PLANKS (VERTICAL)
8"x8" TIMBER COLUMN
1 1/2" RIGID INSULATION
6" STEEL STUDS W/BLOWN INSULATION
1/2" GYP BOARD PAINTED MATTE WHITE
Second Level 15' - 0"
CLT FLOOR PLANELING
VERTICAL BOARDFORMED 8" CONCRETE
1/2" GYP BOARD PAINTED MATTE WHITE
1 1/2" RIGID INSULATION
2"x4" STEEL STUDS W/BLOWN INSULATION
First Level 0' - 0"
66
6" SLAB ON GRADE (POLISHED)
146
Module 13 - 15
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
67
1.7 - Exterior Perspective
Part 1. DRAWINGS
Module 13 - 15
147
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
68
1.7 - Exterior Perspective / 1.8 - Interior Perspective
148
Module 13 - 15
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
69
2.1 - Presentation Model
Part 1. DRAWINGS
Module 13 - 15
149
70
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
ARH 608-Spring 2020
Module 13 - 15
151
71
Matthew Portice | 04701666
72
Matthew Portice Portfolio
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
73
3.1 - Design Process Sketches
Part 1. DRAWINGS
Module 13 - 15
153
Matthew Portice | 04701666
74
Matthew Portice Portfolio
ARH 608-Spring 2020
154
Module 13 - 15
Part 1. DRAWINGS
Matthew Portice | 04701666
75
ARH 608 Advanced Design Studio II
ARH 608-Spring 2020
Part 1. DRAWINGS
Module 13 - 15
155
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
76
3.3 - Massing Models
156
Module 13 - 15
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
77
ARH 608-Spring 2020
Part 1. DRAWINGS
Module 13 - 15
157
Matthew Portice Portfolio
Matthew Portice | 04701666
ARH 608-Spring 2020
4.2 - Circulation Diagram
Pedestrian Gallery Visitor
78
Artist/Staff 158
Module 13 - 15
Staff
Part 1. DRAWINGS
ARH 608 Advanced Design Studio II
Matthew Portice | 04701666
ARH 608-Spring 2020
79
4.3 - Structural Diagram
Part 1. DRAWINGS
Module 13 - 15
159
Matthew Portice Portfolio
ARH 619 Advanced Design Studio III Site Location
Hunters Point Market 10 Hunters Point Blvd, San Francisco, California
Required Plumbing Fixtures
Occupancy Calculations
Project Information
Building Program Spaces
BUILDING ADDRESS: 10 HUNTERS POINT BOULEVARD, SAN FRANCISCO, CA 94124 PARCEL: 4646 ZONING: MIXED USE - M-1 MERCANTILE, NC-2 NEIGHBORHOOD/LIGHT INDUSTRIAL HEIGHT DISTRICT: 40-X SPECIAL USE DISTRICT: ADJACENT TO RESIDENTIAL/LIGHT INDUSTRY/INDIA BASIN SHORELINE PARK PRESERVATION: NO SPECIAL SIGNAGE: SCENIC STREETS AND HUDSON POINT NAVAL YARD
Marketplace Checkout & Service Office & Staff Receiving Storage Waste Management Community Resource Center Service & Equipment Exterior Public Space
CODES: CALIFORNIA BUILDING CODE (2019) WITH LOCAL AMENDMENTS AND SUPPLEMENTS. CALIFORNIA ELECTRICAL CODE 2019 (NEC/NFPA) CALIFORNIA MECHANICAL CODE 2019 (UMC/IAPMO) CALIFORNIA PLUMBING CODE 2019 (UPC/IAPM0) CALIFORNIA FIRE CODE 2019 (IFC/ICC) CALIFORNIA ENERGY CODE 2019 (CEC) ACCESSIBILITY: FULLY ACCESSIBLE, TO COMPLY WITH CALIFORNIA BUILDING CODE 2010 AND THE AMERICANS WITH DISABILITIES ACT. CONSTRUCTION TYPE: TYPE IV-HT SPRINKLER: AUTOMATIC SPRINKLER SYSTEM OCCUPANCY TYPE: B BUSINESS, M MERCANTILE BUILDING HEIGHT: 3 STORIES - 50 FT LOT AREA: 302.5' (HUDSON AVENUE) X 200' (PERPENDICULAR TO INNES AVENUE) - 40,800 SF BUILDING SQUARE FOOTAGE:30,388 SF GROSS AREA: 37,377 SF (FACTOR = 1.23) TOTAL LOWER LEVEL 9,574 SF TOTAL MAIN LEVEL 16,140 SF TOTAL SECOND LEVEL 4,674 SF PARKING PROVIDED: 3 STALLS (1 VAN HANDICAPPED ACCESSIBLE) BIKE PARKING PROVIDED: 50 STALLS
80
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
COVER - SITE LOCATION/DETAILS
10,000 sq. ft. 1,500 sq. ft. 750 sq. ft. 1,000 sq. ft. 3,000 sq. ft. 1,000 sq. ft. 6,250 sq. ft. 1,000 sq. ft. 20,000 sq. ft.
Net Program Area 24,500 sq. ft. Grossing Factor 1.23 Total Building Area 30,135 sq.ft. Open Space Program 20,000 sq. ft. -----------------------------------------------------------------Total Site Area 40,800 sq. ft.
SHEET LIST SHEET NUMBER A100 A101 A102 A103 A201 A202 A203 AC01 AD01 AE01 AP01 AP02 AP03 APS1 APS2 APS3.1 APS3.2 APS4.1 APS4.2 AS01 C01 ED01 ED02 EG00 EG01 EG02 EV01 EV02 FA01 M100 M101 M102 M201 MT01 P01 PM01 PV01 PV02 SD01
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
SHEET NAME LOWER LEVEL FLOOR PLAN MAIN LEVEL FLOOR PLAN SECOND LEVEL FLOOR PLAN ROOF PLAN AND SOLAR CALCULATIONS BUILDING SECTIONS BUILDING SECTIONS BUILDING SECTIONS MAIN LEVEL CEILING PLAN ACOUSTICAL SPACE DIAGRAM MAIN LEVEL ELECTRICAL PLAN PRELIMINARY SPACE PROGRAMMING - OPTION 1 PRELIMINARY SPACE PROGRAMMING - OPTION 2 PRELIMINARY SPACE PROGRAMMING - OPTION 3 SHADOW STUDY SUSTAINABLE CONCEPTS CONCEPTUAL OPTIONS QUICK STUDY MODELS STRUCTURAL DIAGRAM STRUCTURAL CONCEPT - FLOOR PLANS SITE PLAN COVER - SITE LOCATION/DETAILS ENLARGED DETAILS ELEVATOR DETAIL LOWER LEVEL PATH OF EGRESS MAIN LEVEL PATH OF EGRESS SECOND LEVEL PATH OF EGRESS ELEVATIONS ELEVATIONS SITE PLAN - FIRE ACCESS DIAGRAM PRELIMINARY MECHANICAL PLAN - LOWER FLOOR PRELIMINARY MECHANICAL PLAN - FIRST FLOOR PRELIMINARY MECHANICAL PLAN - SECOND FLOOR MECHANICAL DIAGRAMS INITIAL MATERIAL TAKEOFF / LIFECYCLE COST PLUMBING RISER DIAGRAM PRESENTATION MODEL INTERIOR PERSPECTIVES EXTERIOR PERSPECTIVES MAIN LEVEL - SECURITY DIAGRAM
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
C01
ev el tru
cti on
ARH 619 Advanced Design Studio III P Co hysi nv cal en ac ien ce t ti ss O me Vie pen a Ea win cc Co tery g a ess rea to -E mm pu - n un bli Re Arti terta ity cs so sts inm Ne pa -L ur s e d ce e -L oca ce A pac nt s s oc l f v e p ac al oo ail es se d ab ilit rvi y ce s
A H ppe Ad istor alin ap ica g/i tab lly nvi le se tin sp ns g ac iti es ve
RESOURCE DESERT = INEQUALITY
81 e om inc al loc ods ses ing go es rat le in ne ab bus Ge fford cal A ll lo A rk Pa t to y en Ba jac to Ad ews pen cks ge Vi t/O tba nta Fla o se Fro N ide W
S To tack o l ed arg sp e f ace or s sin gle l )
ies
Site Benefits
t en em n ls ag tio re) ria an era atu ate M n M ater y ge ld e (n W rg Go ug e En ED ref LE rban U
Economy G U entr Ri nequ ifica s i Lo n al tio U ss g H Rep n Cr nem of lo ous res Po ime plo cal ing enta ym B Co tio or ho en usi sts n (m us t ne ss ing ino es rit
s) ian
ws str n? vie e de tio ng ng l pe rs/ dia cti ha hil Ra stri te c f a ht (ca Re lima m o eig affic C to t h tr t Bo foo ased 40 cre In
s ile s rce 2 m ry e de ou 1. ce rid ri es ry gro s us o r ce o bu e b t e t gro s te ut nc st bu inu in sta re ct m 0 m n Di Nea dire 30 re 6 tio - o ary ca rta -N br t n i po y -L rge iet ans -U t f var ic tr s l Co ck o pub La or Po
Program
Site Restrictions
FALL 2020 - ACADEMY OF ART UNIVERSITY MODULE 1 - 13 SEPTEMBER 2020
Unequal Access
ARH 619 ADVANCED DESIGN STUDIO II MATT PORTICE, ARTHUR STRAHIN JR. & KATHERINE WILLIAMS
Accessibility
INST: ERIC LUM GROUP 4
Program
Sustainability
ARCHITECTURE = EQUALITY Form
ARCHITECTURAL ISSUES SITE/SOCIAL ISSUES
Social Issues O Ti ld s Ve me- tore nti int fro lat en nts ion siv ec on s
SPACE & PROGRAM ANALYSIS
Form
Matthew Portice Portfolio 82
Academy of Art University ARH 605 OL1: Environmental Controls Instructor: Jennifer Asselstine/Jesse Agosta Fall 2020
SUSTAINABLE CONCEPTS
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
APS2
f Art University L1: Advanced Design Studio 2 Eric Lum
Organic shapes can play from the curved site plan and the adjacency to the curving waterfront property. This can result in unique forms and break apart from the typical rectangular commercial properties.
Solid/Void The existing neighborhood has it’s strength’s and weakensses. This is the idea for solids and voids to create a building. By utilizing building masses (solids) and open site areas (voids) then the building can give back to the community. Open spaces will allow the comunity to utilize the buildings open spaces no matter the time of day.
ARH 619 Advanced Design Studio III
The idea of the open site is to give back as much of the site as possible to the occupants. This is also to maximize the views available onsite towards the surrounding park and San Francisco Bay.
Organic Shapes
83
Open Site/Elevated Structures
CONCEPTUAL OPTIONS
HUNTER'S POINT MARKET 10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
APS3.1
Matthew Portice Portfolio
Open Site/Elevated Structures This model is designed with the lower space being set into the ground. This would allow the roof of that space to be level with the existing grade and would keep a large chunk of the site open for the community. The grade level would be open with the second floor starting twenty feet above grade.
Organic Shapes This conceptual model may be hard to decipher at first. The idea is to create a large facade overlay on the structures within. This skin would be organic in shape and would be translucent/transparent in areas. The entire interior would be able to be illuminated with indirect lighting as this skin would diffuse the direct daylight. The masses would follow the program layout of the interior and the skin would waterfall down the building and blend into the ground level.
Solid/Void This form would push some program down into the lower level, or create a sunken two-story space within. The circular void would be stretching outward like a hug towards the neighborhood. The spaces on the top are cut to mimic the forms of the first level but are optimized for views towards the adjacent park and San Francisco Bay.
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1
84
QUICK STUDY MODELS
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
HUNTER'S POINT MARKET 10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Project Number Date
S20002 2020.12.19
APS3.2
ARH 619 Advanced Design Studio III
ROOF ASSEMBLY
GLULAM GRIDSHELL STRUCTURE
SECOND FLOOR MEZZANINE (CLT PANELS WITH CONCRETE TOPPING)
SECOND FLOOR FRAMING
MAIN LEVEL STRUCTURE (CLT PANELS WITH CONCRETE TOPPING)
WALL FOUNDATIONS AND FOOTINGS ENERGY PIERS (INCORPORATING GEOTHERMAL PIPE LOOPS)
EXPLODED ISOMETRIC DIAGRAM
STRUCTURAL DIAGRAM
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
APS4.1 85
Academy of Art University ARH 605 OL1: Environmental Controls Instructor: Jennifer Asselstine/Jesse Agosta Fall 2020
Matthew Portice Portfolio
Multi-Category Material Takeoff Category
Family and Type
Multi-Category Material Takeoff Material: Area
Ceilings Ceilings Ceilings Ceilings
Compound Ceiling: 2' x 2' ACT System Compound Ceiling: 2' x 2' ACT System Compound Ceiling: GWB on Mtl. Stud Compound Ceiling: GWB on Mtl. Stud
Acoustic Ceiling Tile 24 x 24 Default Gypsum Wall Board Metal Stud Layer
1109 SF 1118 SF 180 SF 180 SF
Curtain Panels Curtain Panels Curtain Panels
System Panel: Frosted Glass System Panel: Glazed System Panel: Insulation
Glass, Frosted Glass Rock Wool
331 SF 7515 SF 54 SF
Doors Doors Doors Doors
Door-Curtain-Wall-Single-Glass: Door-Curtain-Wall-Single-Glass Door-Curtain-Wall-Single-Glass: Door-Curtain-Wall-Single-Glass Door-Double-Flush_Panel-Double-Acting: 72" x 84" Door-Double-Flush_Panel-Double-Acting: 72" x 84"
17 SF 1129 SF 192 SF 618 SF
Doors Doors Doors
Door-Double-Glass: 72" x 84" Door-Double-Glass: 72" x 84" Door-Double-Glass: 72" x 84"
Doors Doors Doors
Door-Double-Sliding: 72" x 84" Door-Double-Sliding: 72" x 84" Door-Double-Sliding: 72" x 84"
Doors Doors Doors Doors Doors Doors Doors Doors Doors Doors Doors
Door-Overhead-Rolling: 96" x 96" Door-Passage-Single-Full_Lite: 36" x 84" Door-Passage-Single-Full_Lite: 36" x 84" Door-Passage-Single-Full_Lite: 36" x 84" Door-Passage-Single-Full_Lite: 36" x 84" Single-Flush: 30" x 84" Single-Flush: 30" x 84" Single-Flush: 32" x 84" Single-Flush: 32" x 84" Single-Flush: 36" x 84" Single-Flush: 36" x 84"
Aluminum - Black Glass Paint - Sienna Wood - Birch - Solid Stained Light Low Gloss Glass Paint - Sienna Wood - Birch - Solid Stained Light Low Gloss Glass Paint - Sienna Wood - Birch - Solid Stained Light Low Gloss Steel, Paint Finish, Ivory, Matte Aluminum Glass Metal - Paint Finish - Grey Wood - Birch Door - Frame Door - Panel Door - Frame Door - Panel Door - Frame Door - Panel
Electrical Equipment Main Distribution Panel: Main Distribution Panel Electrical Equipment Solar Panel1: Solar Panel Electrical Equipment Transformer: Transformer
86
Material: Name
Metal - Painted - Grey Aluminum - Black Metal - Painted - Grey
60 SF 27 SF 37 SF 296 SF 110 SF 104 SF 209 SF 1 SF 46 SF 69 SF 49 SF 159 SF 267 SF 138 SF 243 SF 117 SF 227 SF 61 SF 39 SF 96 SF
Electrical Fixtures Electrical Fixtures Electrical Fixtures Electrical Fixtures Electrical Fixtures
Outlet-Duplex: Single Outlet-GFI: Single Outlet-GFI: Single, Weatherproof Switch-Dimmer: Dimmer Switch-Single: Single
Plastic, Opaque White Plastic, Opaque White Plastic, Opaque White Plastic, Opaque White Plastic, Opaque White
4 SF 2 SF 1 SF 1 SF 0 SF
Floors Floors Floors Floors Floors Floors Floors Floors Floors Floors Floors Floors Floors Floors Floors
Floor: 1' Concrete - Exterior Floor: 6" Concrete Floor: 6" Concrete - Exterior Floor: 6" Concrete - Exterior Pattern Floor: 6" CONCRETE SLAB - POLISHED Floor: 6" Concrete w/Wood Floor Floor: 6" Concrete w/Wood Floor Floor: CLT w/ 3" Conc. Topping Floor: CLT w/ 3" Conc. Topping Floor: CLT w/ 3" Conc. Topping Floor: CROSS-LAMINATED PANEL - 12" Floor: Dirt Fill Floor: Exterior Brick Floor Floor: Generic - 12" Floor: Grass
Concrete, Cast-in-Place, Gray Concrete, Cast-in-Place gray Concrete, Cast-in-Place, Gray Concrete, Walkway Concrete, Cast-in-Place gray - Polished Concrete, Cast-in-Place gray Oak Flooring Concrete, Lightweight Default Floor Glue-Laminated Timber - Rotated Glue-Laminated Timber Earth Brick, Pavers Default Floor Grass
384 SF 4258 SF 12947 SF 8087 SF 3798 SF 2645 SF 2645 SF 21028 SF 21028 SF 21028 SF 348 SF 885 SF 821 SF 1114 SF 9267 SF
Lighting Fixtures Lighting Fixtures Lighting Fixtures Lighting Fixtures Lighting Fixtures Lighting Fixtures
Pendant Light - Hemisphere: 100W - 120V Pendant Light - Hemisphere: 100W - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V Troffer Light - 2x2 Parabolic: 2'x2'(2 Lamp) - 120V
Glass, Frosted Steel, Chrome Plated Default Light Source Glass, White, High Luminance Steel, Chrome Plated Steel, Paint Finish, Dark Gray, Matte
70 SF 11 SF 420 SF 143 SF 188 SF 11 SF
Category
Family and Type
Parts Parts
Material: Name
LIFE-CYCLE COST ASSESSMENT Material: Area
Concrete, Cast-in-Place gray Rock Wool
85 SF 108 SF
Plumbing Fixtures Plumbing Fixtures Plumbing Fixtures Plumbing Fixtures
Toilet-Commercial-Wall-3D: 15" Seat Height Toilet-Commercial-Wall-3D: 15" Seat Height Toilet-Commercial-Wall-3D: 15" Seat Height Toilet-Wall_Hung-Kohler-Veil-6299: Vitreous_China-0-White
Laminate, Ivory, Matte Porcelain, Ivory Steel, Polished Vitreous China-Kohler-0-White
19 SF 74 SF 6 SF 218 SF
Roofs Roofs Roofs
Basic Roof: CLT Panels - 1' 03/8" Basic Roof: CLT Panels - 1' 03/8" Basic Roof: Concrete - 8"
Laminated Veneer Lumber Roofing, EPDM Membrane Concrete, Cast-in-Place, Gray
1039 SF 1039 SF 57 SF
Site Site
Dumpster: 72" x 60" Dumpster: 72" x 60"
Metal - Paint Finish - Green, Glossy Steel, Paint Finish, Dark Gray, Matte
193 SF 69 SF
Specialty Equipment KONE_Car: KONE_Car Specialty Equipment KONE_Car: KONE_Car Specialty Equipment KONE_EcoSpaceENA_LOD-200_C497562: KONE_EcoSpaceENA_LOD-200_C497562 Specialty Equipment KONE_EcoSpaceENA_LOD-200_C497562: KONE_EcoSpaceENA_LOD-200_C497562 Specialty Equipment Single Carrel: Single Carrel Specialty Equipment Single Carrel: Single Carrel
Stainless Steel-KONE-KONE Blue Stainless Steel-KONE-Stainless Steel Default
2 SF 5 SF 528 SF
Void
2298 SF
Cherry Laminate, Ivory, Matte
66 SF 200 SF
Stairs Stairs Stairs
Assembled Stair: 7" max riser 11" tread Assembled Stair: 7" max riser 11" tread Cast-In-Place Stair: Monolithic Stair
Laminated Veneer Lumber Steel, Paint Finish, Black, Matte Concrete, Cast-in-Place gray
2500 SF 778 SF 2742 SF
Structural Columns Structural Columns
Glulam-Southern Pine-Column: 5x12.375 Glulam-Western Species-Column: 8.75x18
Softwood, Lumber Softwood, Lumber
1134 SF 281 SF
Structural Foundations Structural Foundations Structural Foundations
Pile Cap-1 Pile: 39"x39"x35"
Concrete, Cast-in-Place gray
1122 SF
Pile-Steel Pipe: 24" Diameter
Steel ASTM A572
2507 SF
Wall Foundation: Bearing Footing - 36" x 12"
Concrete, Cast-in-Place gray
3769 SF
Structural Framing Structural Framing Structural Framing Structural Framing
Glulam-Southern Pine: 8.5x11 Glulam-Southern Pine: 8.5x16.5 Square Bars: RV 1 W-Wide Flange: W8X10
Softwood, Lumber Softwood, Lumber Steel ASTM A36 Steel ASTM A992
4537 SF 860 SF 156 SF 23 SF
Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls Walls
Basic Wall: 12" Conc Retaining w/Ext Insul Basic Wall: 12" Conc Retaining w/Ext Insul Basic Wall: 12" Conc Retaining w/Ext Insul Basic Wall: 12" Conc Retaining w/Ext Insul - Interior Stud Basic Wall: 12" Conc Retaining w/Ext Insul - Interior Stud Basic Wall: 12" Conc Retaining w/Ext Insul - Interior Stud Basic Wall: 12" Conc Retaining w/Ext Insul - Interior Stud Basic Wall: 12" Conc Retaining w/Ext Insul - Interior Stud Basic Wall: 12" Conc Retaining w/Ext Insul - Interior Stud Basic Wall: Concrete - 8" w/Furring & Drywall Basic Wall: Concrete - 8" w/Furring & Drywall Basic Wall: Concrete - 8" w/Furring & Drywall Basic Wall: Ext. Wall, Aluminum Paneling - 5 1/2" Basic Wall: Ext. Wall, Aluminum Paneling - 5 1/2" Basic Wall: Ext. Wall, Aluminum Paneling - 5 1/2" Basic Wall: Ext. Wall, Aluminum Paneling - 5 1/2" Basic Wall: Ext. Wall, Aluminum Paneling - 5 1/2" Basic Wall: Fencing Basic Wall: Foundation - 12" Concrete Basic Wall: Generic - 4" Brick Basic Wall: Generic - 6" Masonry Basic Wall: Interior - 3 1/8" Partition (1-hr) Basic Wall: Interior - 3 1/8" Partition (1-hr) Basic Wall: Interior - 4 7/8" Partition (1-hr) Basic Wall: Interior - 4 7/8" Partition (1-hr) Basic Wall: Interior - 5" Partition (2-hr) Basic Wall: Interior - 5" Partition (2-hr) Basic Wall: Roof Structure Basic Wall: Roof Structure Basic Wall: Roof Structure
Concrete, Cast-in-Place gray Rock Wool Vapor Retarder Concrete, Board Formed Glue-Laminated Timber - Rotated Gypsum Wall Board Rigid insulation Rock Wool Vapor Retarder Concrete, Cast-in-Place gray Gypsum Wall Board Pine Air Infiltration Barrier Cladding, Vertical Ribbed Plywood, Sheathing Rigid insulation Vapor Retarder Living Wall Mesh Concrete, Cast-in-Place gray Brick, Common Concrete Masonry Units Gypsum Wall Board Metal Stud Layer Gypsum Wall Board Metal Stud Layer Gypsum Wall Board Metal Stud Layer Plywood, Sheathing Rock Wool Roofing, EPDM Membrane
4601 SF 4609 SF 4616 SF 1692 SF 1674 SF 1669 SF 1676 SF 1696 SF 3392 SF 3006 SF 2926 SF 2931 SF 5079 SF 5074 SF 10119 SF 5113 SF 5140 SF 2055 SF 1006 SF 933 SF 3519 SF 12994 SF 3251 SF 6930 SF 3466 SF 30793 SF 7706 SF 55510 SF 27846 SF 27876 SF
Windows Windows Windows Windows Windows Windows
Fixed: 48" x 48" Fixed: 48" x 48" Skylight-Top-Hung: 36" x 36" Skylight-Top-Hung: 36" x 36" Skylight-Top-Hung: 40" x 40" Skylight-Top-Hung: 40" x 40"
Glass Sash Aluminum - Black Glass Aluminum - Black Glass
79 SF 85 SF 126 SF 74 SF 84 SF 56 SF 401749 SF
This project aims for LEED Gold Certification which is beneficial to the performance of the building. The occupants will benefit from materials chosen for their natural properties, such as wood and cork. The materials are chosen for the benefit of the occupants (health, asthetics, atmosphere, etc.) as well as their environmental impact. The materials and products are Cradle-to-Cradle Certified when available as well as all wood products are Forest Stewardship Council (FSC) Certified to verify the wood is from responsibly harvested forests with ethical processing. The building uses geothermal heating/cooling to reduce energy consumption for occupant comfort. An air handling unit pumps fresh, filtered air around the building when natural, cross-ventilation is not enough to ventilate the spaces. An abundance of daylighting is used to reduce the need for artificial lighting. All plumbing fixtures are WaterSense label fixtures for reduced water use. Appliances are Energy Star labelled when available for reduced energy consumption. OPERATION The operation of the building should not be interrupted with the passive environmental controls implimented within the building. The building is contrilled with a Building Management System with a series of sensors to allow the optimal ventilation, heating/cooling, and light levels throughout the building. The BMS can dim the lights when enough natural lighting is illuminating the interior and louvers/windows are motor-operated to open and close to allow natural ventilation through the structure. A larger up front cost is needed for the geothermal heating/cooling system but will be partially offset as the ground piping can be paired with the required structural piles embedded in the ground below the building.This energy system will also pay itself off over time via traditional energy bills as all heating/cooling needed is produced naturally and only minimal electricity is needed to run the system. WOOD/CLT PANELS The main material for this project is wood formed into cross-laminated timber members which can be prefabricated and assembled on site. As stated on Associated Construction Publications, "CLT also has a lighter carbon footprint as wood products continue to store carbon absorbed by the trees while growing, and engineered wood manufacturing requires significantly less energy to produce than concrete and steel." ACP also outlines the life cycle analysis stating "CLT buildings are easily altered and remodeled and are also fully recyclable once they reach the end of their useful life." CLT panels are a natural building material which introduce no harmful chemicals to the building occupants and can biodegrade at their end of life. CLT panels are also competitively proces against concrete, masonry, and other common materials. https://www.acppubs.com/articles/509-benefits-of-building-with-cross-laminated-timber CONCRETE The use of concrete in this project was meant to be minimal as concrete production creates large amounts of atmosphereharming pollutants. Incorporating fly-ash, typically an industrial waste product, into the concrete production will lessen the carbon footprint of the concrete. Concrete also has lery limited after-life use, such as aggregate or possibly ground into landscaping cover. Concrete is a very common building material so installation is straightforward and pricing is competitive. OTHER MATERIALS All windows and door frames are made from aluminum and can be recycled if the unit has reached its end of life. The windows are unitized units and can be assembled off-site reducing the labor cost on site. The insulation found within the walls and roof structure is cork and can naturally biodegrade at the end of it's life, or be repurposed. The solar panels selected for this project are Cradle-to-Cradle Certified so they can be reused into other panels/parts once unusable.
Ventilation
Lighting Strategies
Water Use/Treatment
The heating/cooling system used for the Hunters Point Market in San Francisco, California is a geothermal heat pump system. The geothermal system loops will be embedded within the site below the building integrated with the structural piers. This system will create even heating/cooling within the interior spaces with little to no visible equipment. The system is slow to adjust to quick temperature changes, but can be programmed to pre-heat/cool spaces for predicted exterior temperature changes.
In addition to the geothermal radiant heat pumps, a commercial air handling unit (AHU) with an integrated heat recovery ventilator will be implemented to help heat/cool the incoming exterior air. This will also filter the air with almost continuous circulation. Overhead fans and operable windows will also be installed for occupant control to circulate air.
The main shell of the building has skylights built into the gridshell. The exterior are composed of storefront window systems and the rooftop gridshell reaching down to the ground with additional windows. The abundance of windows will allow the interior spaces to be illuminated naturally. When natural sunlight isn’t enough, LED light fixtures with dimming and integrated occupancy sensors will illuminate each space. Fixtures will be Energy Star labeled when applicable.
The shape of the building will direct rainwater to the base of the structure to be collected for reuse. Site landscaping will be integrated around the building for natural filtration of rainwater and street runoff. Any water to be collected from rain/runoff will be re-used for either landscape irrigation, garden watering, or accessible to the public for home gardening/irrigation.
Motorized louvers and window panels will adjust automatically for optimal interior temperatures. The louvers and panels will open/close to allow natural ventilation to flow through the interior spaces. A series of louvers is set into a light well on the roof so the hot air can rise and exit the building. This warmer air can then be taken in to the air handling unit so the unit uses less energy to condition the air before circulating it.
Thermal massing will also be used to absorb sunlight during the day and can radiate that heat outward during the evening. The floor of the market is a 3” fly-ash concrete topping embedded with the radiant heating/cooling piping and will absorb direct sunlight.
All plumbing fixtures will be WaterSense fixtures to reduce the water usage as much as possible. A grey water system may be used to filter waste sink water and add to the irrigation water supply.
In addition to the storefront systems, a heliostat will be used to reflect sunlight down a shaft to the lower level for natural sunlight illumination.
ARH 619 Advanced Design Studio III
Heating/Cooling
Passive Design Integration
EAST
WEST
MER
SUM
BUILDING SERVICES
HUNTER'S POINT MARKET 10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
EC01 87
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
Matthew Portice Portfolio
HUDSON AVENUE S 37° 00' 00" E 302.50'
Sloped Sidewalk for Park Access Parking (3) Park Performance Area
Tru ck Do ck
Balcony with Cafe Tables
RECEIVING 1026 SF
Bleacher-style stairs to park below
r ste mp Du
HAWES STREET
WASTE MANAGEMENT 932 SF
Curbside Loading/Unloading
Tiered Green Wall
S 53° 00' 00" W 200.00'
MARKET ENTRANCE 2264 SF
Large Open Area for Community Gatherings
Wooden 'block' benches
Raised Garden Demo Area
Redeveloped Intersection for public garden/green space
Projection Wall
Enlarged sidewalk for Food Truck serving
BIKE LOCKERS 714 SF
INNES AVENUE
0'
8'
16'
32'
64'
SITE PLAN 1/16" = 1'-0"
88
Academy of Art University ARH 605 OL1: Environmental Controls Instructor: Jennifer Asselstine/Jesse Agosta Fall 2020
SITE PLAN
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
AS01
ARH 619 Advanced Design Studio III
4 A202
NORTH STAIRS 561 SF
OPEN OFFICE 1782 SF 1 ED01
STORAGE 1009 SF
MECHANICAL ACCESS SPACE 259 SF
STAFF ROOM 322 SF
LOCKERS 83 SF
LOWER VESTIBULE 193 SF
OFFICE REST ROOM 156 SF
REFRIGERATED STORAGE 1020 SF
PUBLIC SHOWERS
MECHANICAL ROOM 1494 SF
PUBLIC REST ROOM 1009 SF
RADIANT HEAT PUMP
LOWER PUBLIC CORRIDOR 979 SF
1 ED02
2
WATER MANAGEMENT ROOM 331 SF
ED02
2 A202
1 A203 1 A201
0'
4'
8'
16'
32'
LOWER LEVEL FLOOR PLAN 1/8" = 1'-0"
LOWER LEVEL FLOOR PLAN
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
A100 89
Academy of Art University ARH 605 OL1: Environmental Controls Instructor: Jennifer Asselstine/Jesse Agosta Fall 2020
Matthew Portice Portfolio
4 A202
VESTIBULE 120 SF
FREIGHT ELEVATOR 86 SF
NORTH STAIRS 561 SF
REFRIGERATED GOODS 1088 SF DRY GOODS 1904 SF
1 ED01
RECEIVING 1026 SF
CAFE 773 SF
WASTE MANAGEMENT 932 SF ELECTRICAL ROOM 100 SF
CHECKOUT AISLES 1123 SF
MARKET RESTROOM 339 SF PRODUCE 2716 SF
2 ED02
MARKET ENTRANCE 2264 SF
2 A202
1 A203 1 A201
BIKE LOCKERS 714 SF
0'
4'
8'
16'
32'
MAIN FLOOR PLAN 1/8" = 1'-0"
90
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
MAIN LEVEL FLOOR PLAN
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
A101
ARH 619 Advanced Design Studio III
4 A202
1
TOOL RENTAL 1734 SF
ED01
SEED BANK 419 SF RESTROOMS 640 SF
LIBRARY 1086 SF INFORMATION DESK 231 SF
2 ED02
2 A202
1 A203 1 A201
0'
4'
8'
16'
32'
SECOND LEVEL FLOOR PLAN 1/8" = 1'-0"
SECOND LEVEL FLOOR PLAN
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
A102 91
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
Matthew Portice Portfolio
1 ED01
SunPower 450W A-Series Panel (typ)
2 ED02
1 A203
SOLAR PANEL POTENTIAL OUTPUT SunPower 450 W Commercial A-Series Panels. These specific panels were selected for their market performance and the panels are Cradle to Cradle Certified Bronze. https://us.sunpower.com/solar-panels-technology/a-series-solar-panels 450W x 5.4 peak solar hours = 2,430 Watts per panel (daily) 2,430 W/day x 135 Panels = 328,050 total Watts a day (328,050 total Watts a day /1000 Watts) / 24 hours = 13.66875 kWh
POSSIBLE BUILDING USAGE Calculated with figures found from the U.S Energy information Administration. https://www.eia.gov/consumption/commercial/data/2012/c&e/cfm/pba4.php Marketplace - 44.2 kWh/sqft x 11,500 sqft = 508,300 kWh Office - 16.9 kWh/sqft x 750 sqft = 12,675 kWh Storage/Waste/Receiving/Service - 5.8 kWh/sqft x 6,000 sqft = 34,800 kWh Community Resource Center - 15.2 kWh/sqft x 6,250 sqft = 95,000 kWh TOTAL: 650,775 kWh / 365 days a year = 1,783 kWh per day
0'
SOLAR OFFSET 1,783 kWh per day / 13.66875 kWh from Solar Power = 0.0766 x 100 = 7 . 6 6 % t o t al e ne rg y o f f se t by ph o t o v o l t a ic p an e l p ro d uc t i o n
92
Academy of Art University ARH 605 OL1: Environmental Controls Instructor: Jennifer Asselstine/Jesse Agosta Fall 2020
ROOF PLAN AND SOLAR CALCULATIONS
4'
8'
16'
32'
ROOF PLAN AND SOLAR CALCULATIONS 1/8" = 1'-0"
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
A103
ARH 619 Advanced Design Studio III
VESTIBULE 120 SF OS OS
EV01
NORTH STAIRS 561 SF
FREIGHT ELEVATOR 86 SF
1
OS
Track lighting mounted along ceiling grid for merchants to adjust heads manually (typ)
OS
RECEIVING 1026 SF
OS
OS
WASTE MANAGEMENT 932 SF OS
OS
OS
OS
OS
MARKET ENTRANCE 2264 SF
OS
6 A202
2 EV02
1 EV02
OS
2 A203
BIKE LOCKERS 714 SF OS
Luminaire Symbol Legend 4 Head Track, LED, Black Track and Heads, 4000K Surface-mounted Linear, LED, 4000K Wall-wash, LED, direct/indirect, Tunable White (~2700K-6000K) Suspended High-Bay, LED, 4000K, Direct/Indirect 2x2 Troffer, LED, 4000K Notes: Secure all pendant fixtures with appropriate earthquake safety equipment.
0'
4'
8'
16'
32'
MAIN FLOOR CEILING PLAN 1/8" = 1'-0"
MAIN LEVEL CEILING PLAN
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
AC01 93
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
Matthew Portice Portfolio
UP
NORTH STAIRS 561 SF
OPEN OFFICE 1782 SF
STORAGE 1009 SF
58' - 2" 13 sec
BUILDING DIAGONA L: 183'-0"
61' - 2" 14 sec
/ 3 = 61'0" BETWEE
UP
N EXITS
OFFICE REST ROOM 156 SF
REFRIGERATED STORAGE 1020 SF
71' - 3" 16 sec
99' - 9" 23 sec
MECHANICAL ROOM 1494 SF
PUBLIC REST ROOM 1009 SF
56' - 11" 13 sec
42' - 10" 10 sec
UP
29' - 6" 7 sec
Egress Path of Travel Distances Level Lower Level Lower Level Lower Level Lower Level Lower Level Lower Level Lower Level Main Level Main Level Main Level Main Level Main Level Main Level Main Level Main Level Main Level Second Level Second Level Second Level Second Level
From Room MECHANICAL ROOM 8 PUBLIC REST ROOM 9 PUBLIC REST ROOM 9 REFRIGERATED STORAGE 27 STAFF ROOM 36 STORAGE 11 WATER MANAGEMENT ROOM 26 MARKET ENTRANCE 1 MARKET ENTRANCE 1 MARKET RESTROOM 28 PRODUCE 29 RECEIVING 3 REFRIGERATED PRODUCE 30 REFRIGERATED PRODUCE 30 REFRIGERATED PRODUCE 30 WASTE MANAGEMENT 2 LIBRARY 15 RESTROOMS 21 SEED BANK 22 TOOL RENTAL 16
Length 99' - 8 3/4" 42' - 9 3/4" 56' - 10 13/16" 71' - 2 15/16" 61' - 1 5/8" 58' - 1 11/16" 29' - 6 1/16"
Time 22.7 s 9.7 s 12.9 s 16.2 s 13.9 s 13.2 s 6.7 s
Speed 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph
19' - 9 13/16" 23' - 2 1/8" 48' - 0" 73' - 4 1/2" 28' - 11 15/16" 65' - 4 15/16" 80' - 2" 81' - 2 5/16" 54' - 5 9/16" 94' - 8 1/2" 93' - 8 1/8" 59' - 8 3/16" 100' - 4 11/16"
4.5 s 5.3 s 10.9 s 16.7 s 6.6 s 14.9 s 18.2 s 18.5 s 12.4 s 21.5 s 21.3 s 13.6 s 22.8 s
3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph
WATER MANAGEMENT ROOM 331 SF
Occupancy per Floor: Lower Level Main Level Second Level
21 233 73
Maximum Occupancy Load of Space <49 1 Exit >49 and <501 2 Exits Maximum Common Path of Egress Travel from Space with One Exit (Table 1006.2.1 - California Building Code 2019) Assembly 75'-0" Sprinklered Business 100'-0" Sprinklered Mercantile 75'-0" Sprinklered Storage 100'-0" Sprinklered Egress Width Requirements -Stairways :Occupancy x .3" w/min. 44" -Doorways: Occupancy x .2" w/min. 36" Lower Level 44", 36" Main Level 70", 47" Second Level 44", 36" Areas of Refuge (Floor Occupancy / 200) Lower Level 21 / 200 = 1 Main Level 233 / 200 = 2 Second Level 73 / 200 = 1
0'
1
94
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
LOWER LEVEL PATH OF EGRESS
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
4'
8'
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
16'
32'
LOWER LEVEL PATH OF EGRESS 1/8" = 1'-0"
S20002 2020.12.19
EG00
FREIGHT ELEVATOR 86 SF
ARH 619 Advanced Design Studio III
VESTIBULE 120 SF
UP
NORTH STAIRS 561 SF
REFRIGERATED GOODS 1088 SF
DN
DRY GOODS 1904 SF STAFF ROOM 322 SF
RECEIVING 1026 SF 29' - 0" 7 sec
54' - 6" 12 sec
81' - 2" 18 sec
LOCKERS 83 SF
REFRIGERATED PRODUCE 2388 SF 65' - 5" 15 sec
BUILDING DIAGONAL: 194'-3" / 3 = 65'-0" BETWEEN EXITS
CAFE 773 SF
WASTE MANAGEMENT 932 SF ELECTRICAL ROOM 100 SF
CHECKOUT AISLES 1123 SF
DN
48' - 0" 11 sec
MARKET RESTROOM 339 SF
PRODUCE 2716 SF
DN
19' - 10" 5 sec
Egress Path of Travel Distances
Main Level Main Level Main Level Main Level Main Level Main Level Main Level Main Level Main Level Second Level Second Level Second Level Second Level
From Room MECHANICAL ROOM 8 PUBLIC REST ROOM 9 PUBLIC REST ROOM 9 REFRIGERATED STORAGE 27 STAFF ROOM 36 STORAGE 11 WATER MANAGEMENT ROOM 26 MARKET ENTRANCE 1 MARKET ENTRANCE 1 MARKET RESTROOM 28 PRODUCE 29 RECEIVING 3 REFRIGERATED PRODUCE 30 REFRIGERATED PRODUCE 30 REFRIGERATED PRODUCE 30 WASTE MANAGEMENT 2 LIBRARY 15 RESTROOMS 21 SEED BANK 22 TOOL RENTAL 16
Length 99' - 8 3/4" 42' - 9 3/4" 56' - 10 13/16" 71' - 2 15/16" 61' - 1 5/8" 58' - 1 11/16" 29' - 6 1/16"
Time 22.7 s 9.7 s 12.9 s 16.2 s 13.9 s 13.2 s 6.7 s
Speed 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph
19' - 9 13/16" 23' - 2 1/8" 48' - 0" 73' - 4 1/2" 28' - 11 15/16" 65' - 4 15/16" 80' - 2" 81' - 2 5/16" 54' - 5 9/16" 94' - 8 1/2" 93' - 8 1/8" 59' - 8 3/16" 100' - 4 11/16"
4.5 s 5.3 s 10.9 s 16.7 s 6.6 s 14.9 s 18.2 s 18.5 s 12.4 s 21.5 s 21.3 s 13.6 s 22.8 s
3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph 3.0 mph
73' - 5" 17 sec
UP
80' - 2" 18 sec
23' - 2" 5 sec
MARKET ENTRANCE 2264 SF
Occupancy per Floor: Lower Level Main Level Second Level
21 233 73
BIKE LOCKERS 714 SF
Maximum Occupancy Load of Space <49 1 Exit >49 and <501 2 Exits Maximum Common Path of Egress Travel from Space with One Exit (Table 1006.2.1 - California Building Code 2019) Assembly 75'-0" Sprinklered Business 100'-0" Sprinklered Mercantile 75'-0" Sprinklered Storage 100'-0" Sprinklered Egress Width Requirements -Stairways :Occupancy x .3" w/min. 44" -Doorways: Occupancy x .2" w/min. 36" Lower Level 44", 36" Main Level 70", 47" Second Level 44", 36" Areas of Refuge (Floor Occupancy / 200) Lower Level 21 / 200 = 1 Main Level 233 / 200 = 2 Second Level 73 / 200 = 1
0'
4'
8'
16'
32'
MAIN FLOOR PLAN - EGRESS 1/8" = 1'-0"
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
MAIN LEVEL PATH OF EGRESS
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
EG01 95
Level Lower Level Lower Level Lower Level Lower Level Lower Level Lower Level Lower Level
Matthew Portice Portfolio
1
North Elevation 1/8" = 1'-0"
2
East Elevation 1/8" = 1'-0"
96
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
ELEVATIONS
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
EV01
ARH 619 Advanced Design Studio III South Elevation 1/8" = 1'-0"
2
West Elevation 1/8" = 1'-0"
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
ELEVATIONS
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
EV02 97
1
Matthew Portice Portfolio
Roof Line 65' - 0"
Second Level 45' - 0"
WASTE MANAGEMENT 932 SF
ELECTRICAL ROOM 100 SF
REFRIGERATED PRODUCE 2388 SF
MARKET ENTRANCE 2264 SF PRODUCE 2716 SF
Main Level 25' - 0"
1
5
BUILDING SECTION - LOOKING WEST 1/8" = 1'-0"
Perspective Section
Academy of Art University ARH 605 OL1: Environmental Controls Instructor: Jennifer Asselstine/Jesse Agosta Fall 2020
98
Key Plan NOT TO SCALE
BUILDING SECTIONS
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
A201
ARH 619 Advanced Design Studio III
1 A202
7 A202
Roof Line 65' - 0"
Key Plan NOT TO SCALE
Second Level 45' - 0"
Main Level 25' - 0"
OPEN OFFICE 1782 SF
Lower Level 13' - 0"
BUILDING SECTION - LOOKING NORTH 1/8" = 1'-0"
Second Level 45' - 0"
VINYL ROOFING MEMBRANE, WHITE (COOL ROOF) 1/2" PLYWOOD SHEATHING 4" CORK INSULATION 1/2" PLYWOOD SHEATHING 5 A202
GLULAM GRIDSHELL STRUCTURE
Second Level 45' - 0"
HIDDEN GUTTER/DRAIN PIPE TO STORMWATER SYSTEM
CLT EXTERIOR WALL W/1/2" SHEATHING, CLAD IN VERTICAL WOOD PANELS
WALL TO ROOF DETAIL 1/2" = 1'-0"
Main Level 25' - 0"
Lower Level 13' - 0"
Main Level 25' - 0"
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
WALL SECTION - WEST SIDE 1/4" = 1'-0"
BUILDING SECTIONS
Summer position at 1:00pm on Winter Solstice
WALL SECTION - EAST SIDE 1/4" = 1'-0"
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
A202 99
Summer position at 1:00pm on Summer Solstice WEST ELEVATION - PARTIAL 1/4" = 1'-0"
Matthew Portice Portfolio
Second Level 45' - 0"
Main Level 25' - 0"
ENTRANCE ELEVATION 3/4" = 1'-0"
ENTRANCE WALL SECTION 3/4" = 1'-0"
100
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
BUILDING SECTIONS
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
A203
1/2" PLYWOOD SHEATHING W/MOISTURE BARRIER, TAPED AT SEAMS
ALUMINUM FRAME PVC MEMBRANE TO WRAP AROUND SKYLIGHT COMPLETELY FOR WATERPROOFING
RIGID INSULATION CANT STRIP
SKYLIGHT ASSEMBLY
4" POLYSTYRENE RIGID INSULATION SKYLIGHT ASSEMBLY 1/2" PLYWOOD SHEATHING SEAL WITH CLEAR MATTE FINISH
ROOF ASSEMBLY
PREFABRICATED GLULAM GRIDSHELL STRUCTURE 36" x 6" ALIGNED TO A 4' x 4' GRID
2 ED01
ARH 619 Advanced Design Studio III
PVC MEMBRANE FULLY ADHERED TO SHEATHING, COOL-ROOF WHITE COLOR
Second Level 45' - 0"
SURFACE MOUNTED LINEAR LIGHT FIXTURE GRIDSHELL STRUCTURE
3 ED01
2
ENLARGED ROOF MEMBER AT SKYLIGHT 3" = 1'-0"
Main Level 25' - 0"
LIGHT FIXTURE
CONTINUOUS FLEXIBLE SEALANT BEAD, BLACK
1/2" PLYWOOD WALL CAP, SEALED/PAINTED TO MATCH INTERIOR WALL
PREFABRICATED GLULAM GRIDSHELL STRUCTURE EXTERIOR MEMBER, 36" x 12"
Lower Level 13' - 0"
1/2" PLYWOOD SEALED WITH WHITE, MATTE SEALANT
EXTERIOR WALL SECTION 1/4" = 1'-0" ALUMINUM PANELING 1/2" AIR BARRIER 1/2" PLYWOOD SHEATHING COVERED WITH A MOISTURE BARRIER AND CONTINUOUSLY TAPED AT SEAMS
4" RIGID CORK INSULATION BLOCKS
3
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
ENLARGED DETAILS
ENLARGED WALL TO GRIDSHELL 3" = 1'-0"
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
ED01 101
1
Matthew Portice Portfolio
CAFE AREA
MARKET AREA
102
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
INTERIOR PERSPECTIVES
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
PV01
ARH 619 Advanced Design Studio III LOWER PLAZA AREA
EXTERIOR DUSK STREET VIEW
GARDEN AREA
EXTERIOR PERSPECTIVES
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1 Project Number Date
S20002 2020.12.19
PV02 103
Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
104
Matthew Portice Portfolio
ARH 619 Advanced Design Studio III Academy of Art University ARH 619 OL1: Advanced Design Studio 2 Instructor: Eric Lum Fall 2020
PRESENTATION MODEL
PRESENTATION MODEL
HUNTER'S POINT MARKET
Designer: Matt Portice | #04701666 Module 15 | Assignment 15.1
HUNTER'S POINT MARKET
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Project Number Date
PM01
S20002 Designer: Matt | 2020.12.19 Module 15
10 HUNTER'S POINT BLVD, SAN FRANCISCO, CALIFORNIA 94124
Portice | #04701666 Assignment 15.1
Project Number Date
S20002 2020.12.19
PM0 105
my of Art University 19 OL1: Advanced Design Studio 2 tor: Eric Lum 20
Matthew Portice Portfolio
ARH 604 Materials & Methods of Construction ARC 604-OL1
MATERIALS AND METHODS OF CONSTRUCTION: BUILDING DETAILING
ARC 6
MATERIALS A OF CONS BUILDING
MATTHEW PORTICE #04701666 5/22/2019
Date:
Description
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Cover Sheet
106
Sheet Number:
Aluminum Composite Panel System For this new project I am proposing to use an aluminum composite panel system. This system will be made up of aluminum panels and glazing which will alternate de pending on the programming of the interior spaces. The panels will incorporate some type of design element within them (color, etching, undulating shapes, etc.).
https://www.architectural-review.com/today/warp-factor-les-turbulences-at-orleans-frac-centre-by-jakob-macfarlane/8654514.article
ARH 604 Materials and Methods of Construction
PECEDENTS
ARC 6
MATERIALS A OF CONS BUILDING
https://www.alucobondusa.com/blog/colossal-mall-in-russia-invites-shoppers-with-three-dimensional-alucobond-spectra-facade/#.XGDwI1xKgUE
Aluminum Composite Panel detail.
http://damsinc.wpengine.com/wp-content/uploads/2015/08/rainscreen-panel-2.pngv
Date:
Description
Student:
https://www.alucobondusa.com/blog/colossal-mall-in-russia-invites-shoppers-with-three-dimensional-alucobond-spectra-facade/#.XGDwI1xKgUE
Matt Portice - #0
https://www.architectural-review.com/today/warp-factor-les-turbulences-at-orleans-frac-centre-by-jakob-macfarlane/8654514.article
Instructor:
Rivera Shopping Mall by 5+design
FRAC Centre by Jakob + MacFarlane
Paul Rivers
The Rivera Shopping and Entertainment Center in Podolsk, Russia is wrapped in different shapes of aluminum panels and incorporate glazing panels along with LED lighting to illuminate the facade. This building was chosen due to the variety of panel shapes and usage of each panel (visibility, lighting, etc.).
The FRAC Centre in Orleans, France utilizes aluminum composite panels to create unique shapes on this building. Parts of the exterior is perforated to allow light to shine through to create interesting designs. This building was chosen because of the unique shapes created from the aluminum composite panels.
SP 2019
Term:
Date:
Sheet Title:
Project Precede Sheet Number:
107
MATERIAL
5/22/2019
Matthew Portice Portfolio
GROUND FLOOR PLAN
ARC 6
MATERIALS OF CONS BUILDING
Date:
Descriptio
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Ground Floor P
108
Sheet Number:
ARH 604 Materials and Methods of Construction
ARC 6
MATERIALS OF CONS BUILDING
Date:
Descriptio
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Typical Floor P Sheet Number:
109
TYPICAL FLOOR PLAN
Matthew Portice Portfolio
TYPICAL STRUCTURAL FLOOR PLAN
ARC 6
MATERIALS OF CONS BUILDING
Date:
Descriptio
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Structural Plan
110
Sheet Number:
ARH 604 Materials and Methods of Construction
ARC 6
MATERIALS OF CONS BUILDING
Date:
Descriptio
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
South Elevation Sheet Number:
111
SOUTH ELEVATION
Matthew Portice Portfolio
PROJECT ROAD MAP
ARC 6
MATERIALS OF CONS BUILDING
Date:
Descriptio
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Project Road M
112
Sheet Number:
ARH 604 Materials and Methods of Construction
ARC 6
MATERIALS OF CONS BUILDING
Date:
Descriptio
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Building Wall S Sheet Number:
113
BUILDING WALL SECTION
Matthew Portice Portfolio
DETAILS
ARC 6
MATERIALS OF CONS BUILDING
Date:
Descriptio
Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Details
114
Sheet Number:
ARH 604 Materials and Methods of Construction
RENDERED DETAILS
ARC 6
MATERIALS OF CONS BUILDING
PEELED FACADE DETAIL
Date:
Descriptio
ENLARGED DETAIL OF FACADE Student:
Matt Portice - # Instructor:
Paul Rivers Term:
SP 2019 Date:
5/22/2019 Sheet Title:
Rendered Deta Sheet Number:
115
DETAIL OF FACADE EYEBROW