Chien,
Hsin Cheng
P o r t f o l i o L a n d s c a p e
2 0 2 2
A r c h i t e c t u r e
scchien11@gmail.com
HSINCHENG CHIEN 1 9 9 5 . 1 1 . 1 7
886-0989478271 scchien11@gmail.com Shilin Dist., Taipei, Taiwan
Education
Honor & Awards
2016.09 - current
園藝暨景觀學系
2020.06
中部地區大專院校特色公園競圖佳作
2018.10
106-2 書卷獎
2014.09 - 2016.09
機械工程學系
2019.12
台泥和平開放工廠概念設計競賽 學生組決選資格
2017.10
2019.06
畢業設計特優獎 畢業生榮譽獎
旱溪排水規劃競圖 優選 / 人氣獎
2019.05
第五屆景觀新秀展 11 校聯評佳作
Digital Skills Illustrator Photoshop Indesign Autocad Sketchup Lumion Word Powerpoint
Language
Work Experience 2020.09-2020.12
中文
English
母語
精熟
日本語 熟練
基礎
2021.03 - 2022
Military Service LEF. Laboratory for Environment & Form
Contents 01
Flowing into the future ·····································································································
02
(Graduation Project)
02
A Circular journey in the Cement Park·······································································
10
(Compitition held by private sector)
03
Oasis in the City ····················································································································
18
(Compitition held by public sector)
04
Meilum Park Renew & Design ······················································································
20
(Landscape Design Studio (III)
05
Bakery Yard ···························································································································
22
(Landscape Design Studio (I)
06
National Scenic Road ········································································································
24
Professional work
07
Eighteen-Peak Mountain Tourist Attraction Project ········································.
25
Professional work
08
Art / Craftswork ···················································································································
26
09
Workshops ·························································································································
27
10
Drawings / Sketchings ······································································································
30
11
Photography ·························································································································
31 1
2
01 Flowing into the future Sulfur Creek waterfront reconstruction and green space integration project
Individual work
Graduation Design, 2018.08 - 2019.05 Taiwan,Taipei Advisor:Lin,Bau-Show
After lots of construction of levee by Big Taipei Flood Control Project,and the Yuanshanzi Floodway of the Entire Keelung River Basin Governace Plan, etc. There is almost no risk of severe floods in Taipei City. However, blindly building dikes based on the flood level of the 200-year return period is treating the symptom, not the cause, and that caused serious damages to the creek environment and urban landscape. In the future, the appearance of the water landscape should be improved in a gradual way. Therefore, this project takes the Sulfur Creek with better potential as an example, re-examining the conditions of the Sulfur Creek basin, planning the urban site and designing the corridor space. It eventually making water enter the scope of people's daily life, so that our society will relearn to appreciate and value the beautiful environment of water.
3
creek water
Environment diagnos
undeveloped area
batture riparian vegetation
Yu Chi Bridge
Riparian ve
revetment
Stone in the
No Name Bridge
embankment
Creek edge
park/green space bridge Yong He Bridge
developed area
Riparian ve Low-water
Base Analysis
Water quali
Downstream Area Developability Evaluation
本計畫首對磺溪整體流域進行健康狀態之診斷,
There are s
Sulfur Creek Bridge
將環境性質用不同色塊標示,而藉由色塊之分布可 將磺溪分為高、中、低度開發三種狀態。堉琪橋以
Leucaena l
北溪流健康狀態良好,呈現原始野溪之樣貌,以南
Inner conve
至磺溪橋大致上溪流仍保持完整,僅有部分段落之 護岸,磺溪橋以南至建德橋完全被堤防包圍,而堤 防與周邊公園又被水防道路切割,使得綠地系統看
Park beside
似充足實際上卻是破碎的。
Tien Mu Bridge
Cherry blos
其中位於高度開發之中下游段,為高度都市開發
Levee road
m Ta RT
M
之區域,關切到人類居住安全與水環境保育之拉扯 與衝突,現況看似雙贏實而是雙輸的局面,故將此 段列為本計畫規劃標的範圍,將深入研究與探討透
i-X su
過景觀手法之解決方案。而作為後續規畫參考,也
iny
將磺溪的 25 年重現期水位與兩岸差值呈現在溪流
iL
各段,並與現有兩岸可向外延伸之腹地進行統整分
Concrete ri
Ming De Bridge
Low water
ine
析。
Creek wate overdeveloped area
Creek is red
There is on
Shih Pai Bridge
The revetm
Wun De Bridge
The emban 5m
4
Wai
g Hsi Shuan
River
Jian De Bridge
The creek a
Landside b
se
1.
2.
Site analysis 1.Land use and Location
egetation protect the riverbank
e is irregular shape
The green areas next to the middle and lower reaches of the Sulfur Creek are scattered on both sides of the embankment, which have the potential for integration. Crucial buildings from north to south, ranging from cultural,educational agency, hospitals, commercial and art institutions, to technological park display the diversity and the complexity of the region.
egetation grow well
2. Users
e midle of creek creates different flow rate
revetment
The users in the region of the Sulfur Creek basically consist of 4 types of groups,including hospital(patients),Residential area (residents), schools (students), Park/ Commercial area (commuters,consumers). Hospital is located in the north, while parks/ institutions are located in the south. The surrounding sport grounds and children's playgrounds are numerous. However, the playgrounds are dominated by the standard playground equipment, and there is no proper planning of public parks in this linear space as a whole.
ity is quite good
some Herbaceous plants on the embankment
leucocephala(alien species) grows dominantly
ex bank form within the embankment
e to the embarkment
ssoms planted on landside slope don’t grow well
d break the green connection between park and creek
ib revetment where plants can barely grow revetment
er is diluted by drainage
duced to a channel only for flood drainage
nly pebble and garbage in the creek
ment constrain the meander of creek
nkment is raised to a prodigious height
and people are completely seperated by the embankment
banquette
3. Riverside buildings
3.
4.
Due to the high-level development along the Sulfur Creek, there are numerous buildings on both sides of the river, most of which are old apartments over 30 years old. Urban development affected the width of the river channel. Therefore, it was necessary to build high-strength dikes to prevent water damage at the expense of the water environment. In order to improve the environment of the Creek, it is recommended for some old buildings to cooperate with future urban planning by renewing the residential area.
4. Traffic and Accessibility Sulfur Creek leads to YangMing Mountain in the north and Shilin in the south.There are many bridges in the middle,including the MR T red line crossing. Because Sulfur Creek is located in an urban area, the density of Youbike stations and bus stops are quite high, so it is a creek with high public transport accessibility. There are levee roads outside the embankment on both sides, which are the access for some residents and the minor access road between the east-west roads.
5
Creek corridor expansion
01 Exchange roads for corridor space
02 Exchange buildings for corridor space
03 Corridor expansion
01 Parks integration
02 User plan
03 Planting plan
01 Parks plan
02 Circulation
This plan integrate with the surrounding space of the waterfront, and strive for the expansion of the stream corridor. Therefore, the levee roadsr are first be replaced while ensuring that the traffic circulation can be adjusted.Second,the partial building space can be replaced by the space of the stream corridor through the urban renewal of the old and abandoned buildings.
Blue-Green Belt integration After the expansion of the creek corridor, based on the aforementioned analysis, the parks and open green spaces on both sides were integrated into the stream blue-green belt. According to the ecological conditions.I rearrange the use behavior of each segment, and plan the ecological restoration and greening about plants.
Linear recreational plan After creek corridor expansion and bluegreen Belt integration,we can put the different activities into each park , and according to the needs of car drivers, bikers, pedestrians, etc., the overall circulation system is planned to make the sulfur creek an easy-to-reach urban water belt.
6
section index
Waterfront reconstruction strategies
01
Study the potentials and limitations of the seven waterfront sections within the planning area. With the expansion of the creeek corridor and the integration of surrounding spaces, the range of creek corridors can be expanded to varying degrees. After estimated based on the cross-section area to ensure the flood control, the height of the 25-year return period flood level drop in each section.Therefore, the creek environment can be improved while maintaining the safety of the inhabitants.
02 03
04
05
06
07
Environment Recovery
Embankment Reconstruction
Before
After
Before
01 Levee road
Greening
Concrete drainage channel
Pedestrian bicycle shared road Concrete frame stone infill and vegetated revetment
After Bridge
Digital Arts Waterfront environment recovery
05
Wooden walkway
20~25m
7.5m 40~45m
15m
Caissons Removal
Bridge is lower than the flood line Pebbles Vertical drop between the road and the parks
Vertical revetment
Creekside walkway
Tall Grasses
06
02
40~50m
15m
Shrubs
Bridge rebuilding
20~25m
21m
Leisure waterfront space
Flowering Trees
Masonry revetment
Riverbed recovery
03
Trees 07
40~50m
13m
Land grading
04
6.5m
25~30m
Original 25-year return flood level Renew 25-year return flood level 7.5m
40~45m
7
Before
After
Master Plan
A. After the integration of green spaces, This waterfront belt is closely in harmony with the
Tienm u
different user characteristics of the surrounding
Tienmu N Rd
A
W Rd
Tienmu E Rd
environment. The plan forms an urban waterfront recreational belt with continuity of circulation and
Barrier-free boardwalk
gradual changes in the atmosphere.
Healing sunshine hill
connected to the promenade along the creek.There
Cheng Hsin Village Rebuilding
is a relatively complete water environment. People will walk along the creek, listen to the sounds of
6, Z hon gsh an
After
Barrier-free boardwalk
animals, watch the creek flowing, and enjoy a
Sec tion
Before
NR d
Secondary forest restoration
B. The sunny and grassy hills in Cheng Hsin Park are
B
A
comfortable walking experience among the trees.
C. In this plan, the stereotyped playground originally scattered in various parks is cancelled, and with
C
Before
After
utilizing the land of Keqiang Park, a natural forest playground is created to make children play with
Mi
ng
de
Rd
the nature of the place.
D. To the south of Mingde Bridge was originally a two-
Nature playground
story vertical dike wall. When the creek corridor is
hu
Fu
expanded, the Shipai Bridge will be reconstructed
After
d
Before
aR
at the same time. Box culverts will be removed, and
D
B
the waterway will be unblocked.
Green gallery of Digital Art
C
E. Low water revetment will be constructed to Wen create green space between the creek and the
lin
N
embankment. After the construction of the Beitou
Greening creek side of Embankment
Rd
Shilin Technology Park in the southern area, the D
elevation will be raised to a height of the existed
E
Before
After
gW
n exi
D
Rd
embankment. The recreational embankment
Rebuilding Place
8
E
W en
in Beitou Shil y Park Technolog
Embankment green slope
ch
an
gR
d
Fuguo Rd
Lane 5, Wenlin
N Rd
Five-meter one-way road remains
N 0 50 100
250 m
Ecological Water Area Design
11 10
This project selects the ecological water area as the highlight of design. Because the hinterland and environmental conditions of this area can best play the role of coexisting urban space and water environment in this project. This is a plan closely connecting the surrounding residential and transportation spaces with waterfront space. The series of recreational waterfront areas with dynamic and static activities ranging from ecological exploration, education, rest, play , etc. It is expected that through this design, the vision of a green belt that is prosperous with the water environment will be achieved. The life style of residents will be redefined, and the society's perception of waterscape will be renovated.
9
9 8 7 6
1
7
11 8
A
2
3
6
7
5
7
12 Cherry Blossom Grass Slope
3 Educational Platform
13 Fu-You Temple
4 Swamp Habitat
14 Creek-Exploration Area
5 Urban Renewal Building
15 Multi-function Lawn
6 Observatory Platform
16 Fu-An Temple
7 Creekside Stone Walkway
17 Tree House Rest Area
9 Butterflies Promenade 10 Arch bridge N
B
0
20
50
100 m
8
C 8 7
6 5
12
5 6 7
15
8
13
B’
9
4
14
8
2 Open Ecological Pond
10 9
9
A’
5
11 Forest Terrace
8 Plaza
6
4
11
9
10
1 Non-open Ecological Pond
8
16
9
7
C’
17
Section C-C'
C’
C
9 Road
Leisure green area
Plant buffer
Cherry blossom slope
Viewing platform
Creek-exploring area
Multi-function lawn
Plant buffer
Green area
Residential area
異境 郊遊
10
02 A Circular journey in the Cement Park TCC Heping Industrial Eco Park Construction Project Conceptual Design Competition
Collaborative work
2019.09 - 2019.11 Taiwan,Hualien Partner:Tay,Jie-Gi Contribution:site analysis, Concept diagram, master plan, modeling, rendering
In 2019, TCC’s Heping Factory is about to enter its 20th year of operation, achieving a new milestone. At this point, TCC has also discovered a new opportunity for Heping Factory: The Suhua Highway will soon be open to traffic, and the first entrance in Hualien is at Heping. Thus, TCC decided to open the factory gate and establish a three-in-one industrial eco park in Heping, which will become the first “open factory” in Taiwan. The world will witness the ecological and environmental assets that we dedicated efforts to develop as well as the Truku tribe’s culture preserved by villagers in Heping. TCC operate this competition to welcome architectects to help restructure the community and factory and support Heping to become a new hub for factories and communities to co-exist and share prosperity. 11
Central Mountain Range (limestone quarry)
Improved Suhua Highway
Pacific Ocean
Cement Factory The improved Suhua Highway will be opened in 2020, and this highway is connected to the Heping factory as a relay station for transportation, which will attract more tourists to this factory.
Topography
Cement Factory Looked at from the ground, the cement factory is like a giant beast and quietly located here. It has a strong heterogeneity with the natural landscape of mountains and seas, which definitely arouses curiosity of the public.
tone
limes
In the original design, the seemingly useless topography in the planting area, after several years of growth, the green spreading and covering the earth have made the landscape of the cement plant completely different.
ipe
ing p
ey conv
Plants
Observatory est
one
e1
con
vey
ing
pip
e DAKA Market
pipe 2
Dormitory area
Train Station
12
Railway
Preblend Dome
pip
e3
Embankment The embankment can play a good role as a buffer between the factory and the town area, but the plant-covered embankment may also be a high wall separating the public from the factory area in the future.
Although the existing plants in the factory are not planted for a long time, the variety is sufficient, and it is also quite natural to merge with the huge conveying pipe, forming a major feature here. As time goes by, the plants will also reach a state of lushness.
pip
ay
lim
Railw
Taking a minibus, you can arrive the observatory on the quarry mountain. From top to bottom, green to blue, the scenery shows the unique characteristics of the Taiwan Cement Factory.
N
Heping station are not a popualr station, the railway here is not only an transportation route for passengers, but also an important transmit channel for raw materials of cement. Thus the railway is inseparable from the cement factory.
Site Area
3. Adding new entrance
4. Expansion of site area
th
Rd
Rd th
g5 He go n
th g5
g5 He go n
ay
ay
w igh aH
He go n
g5
u Suh
w igh aH
ay
ay
w igh aH
w igh aH
u Suh
u Suh
th
Rd
Rd
2. Circulation adjustment
u Suh
Since this competition adopts an open attitude, we boldly made an adjustment of the site area. Our project is to consider the overall park planning, rather than just designing for the officially set buildings. Therefore, adjustments were first made to the inner circulation to solve the fragmentation of the space, and the second is connect the line to the train station to improve the convenience and complete the entirety of the park.
1. Current composition
He go n
Site Area Adjustment
Traffic flow Building
Traffic flow Building
Traffic flow Building
Traffic flow Building
Parking lot
Parking lot
Parking lot
Parking lot
Planning area
Planning area
Planning area
Entrance
Entrance
Entrance
Expanded planning area
Heping Station
Entrance
Heping Station
Planning Concept The site is now basically landscape of green and gray. As the green part,although it is the result of abandoned constructed area several years ago, it shows a green scenery where plants grow arbitrarily. As the gray part, includes the parking lot and basketball court, these two places can become the scheduled sites for the new building, making the current green landform an unique part of TCC cement plant. Then the premises space required for the open factory are introduced to the base, and the key recreational functions of the outdoor space are arranged in the remaining space. Finally, as a tourist factory, it is important to be wellequipped. Therefore, it is necessary to ensure the connection between various areas and entrances. In addition, the biggest highlight of this proposal, the air bridge promenade, can provide visitors with a smooth flow of visiting between places. The air bridge can also take advantage of its elevated characteristics, by whcih it can make tourist walking freely in the park,while conserving the existing landfrom. Exploring among the diverse landscapes, visitors will be attracted by the uniqueness of this site.
I. Current situation
Basketball court
II. Landform preservation
III. Functional buildings import
V. Circulation
VI Elevated pedestrian system
Gift shop Restaurant Multi-purpose Venues Plant conservation Center
Parking lot
IV. Outdoor space plan
Nature Playground
Parking lot Garden
Plaza
Entrance
Ob De servat ck ion
13
F
E
D
B
C
A
A
B C
I
G
D E F
J
K
H
G
H I
J
K L
L M
M
Plant Conservation Center Greenhouse Restaurant Multi-pupose Venus Forest Playground Waste Recycling Center Test Factory of Carbon Capture Parking Lot Gift Shop Activity Plaza Plaza Grenn Buffer Flower Promenade Park Entrance
N 0
14
20
40
80
100
120m
Greenhouse Cafeteria
Floor plan
At the center of the entire park, this cafeteria is a crucial rest place for tourists. The concept of the dining area is come up with the concentric circles of embracing nature because it is not only a place for food, but also for interaction with environment. Therefore, a dome greenhouse is built to create a dreamlike dining area.
1st floor Food Market
Dumbwaiter
B[101] Cafeteria
B[105] Men's toilet
B[104] Women's toilet
B[102] drink stall B[103] food stall
2nd floor Central Kitchen Cooking Area
Refrigerators and Freezers
Green Rooftop
Dumbwaiter Dishwashing Area
Central Kitchen
Food Selling House Table and Chair Area Bar Seat Area
Food Sellers
Preparation Area
Garden Native Plants Area Surrounding Pool
Dining Area
0
2
4
6
8
10m
示意圖
Section A
0
2
4
6
8
10m
15
4F Green Rooftop
Multi-purpose Venues 多功能體驗館是一個以循環作為主題的館,利用打 破傳統建築的封閉盒子般的構造,讓陽光、空氣、 水,能藉由空間的形塑來在建築中流動,內外兩道 同心圓的牆將採用玻璃,具有採光、視線通透的作 用,且在建築中心植樹,象徵和平廠的開放與循環 之意象主體,於是人們在建築中的穿梭彷彿也是在 樹林間的遊走,不以張揚的構造,而是讓建築與環 境的對話讓人們心神領會。
Floor plan 2F
1F
移動軌道
3F Muti-function Space
展牆
4F
3F
2F Mobile Gallery
C[304] 教室2 C[305] 中控室
C[303] 教室1 C[302] 女廁 C[301] 男廁
C[306] 視聽室
Energy efficient
General
C[306-2] 控制室
1F Green Entrance
2F Exhibition wall arrangement concept Surrounding mode
C[306-1] 準備室
Scattered mode
Concentrated mode 0
3F
Section
0
16
1
2
3
4
5m
5
10
15
20
25m
Forest Playground 作為整個園區的中心所在,也是一大休 憩節點,以同心圓的概念將餐飲區的概 念向上提升,不僅是吃飯的所在,更是 要融入開放與環境的特色,以圓頂溫室 打造一個如夢似幻的開放式用餐區。
而餐食也非傳統的美食街,而是提供現 做的健康自助餐當作主打,二樓層為中 央廚房,一樓則是自助式的餐點,另外 也提供健康飲料及輕食讓遊客有多樣的 選擇。
Rainwater Collecting
Air Bridge Promenade labyrinth Outdoor Chatroom
Bouncing bed
Interactive Installation
Climing Net
Forest Hills
D
Detention Basin
E
C B
I G
nter e C n vatio r e s n Co rant u Plant a t s Re A e s u o h Green nus e V B e pos u p i t l Mu und o C r g y t Pla s e r nter o e F C g D yclin c ture e p a R C e t rbon Was a C f E ory o t c a F Test F Lot g n i k r Pa G hop S t f i G H laza P y t i v cti I A
18
Softball field
Tennis court
Veiwing platform
Tranquil corridor
Children Libratory
Tropical snadpit
Forest playground
Meander g
age 7 - 60
age 9 - 99
age 0 - 99
age 12 - 99
age 3 - 18
age 4 - 15
age 9 - 18
age 6 - 99
Resting place
Open Plaza
Roaming hill
Shrub playground
Waterfr
age 0 - 99
age 0 - 99
age 0 - 99
age 6 - 15
age 9 - 9
03
PLAYGROUND CONCEPT
garden
Forest
Play in nature
Purification
Garden
Desert The old blocks with pavements between the trees are replaced with soil surface to create a playscape in the forest. On the base of the bark, children can explore as much as they desire.
Oasis in the City College and university students Competition for Characteristic Parks in Taichung City Honor mentioned Collaborative work
Retaining the existing circular space and transforming it into a playground with a desert image, the small oasis in the midst of desert expand children’s imagination of the natural scenery.
The garden with leisure vibe gives the children a break time among the exciting playscapes. A meander path in the bushes, providing adults and children with enjoyment of the tranquility scenery.
Hill Wilderness
2020.04 - 2020.06 Taiwan,Taichung Partner:Tay,Jie-Gi Contribution:site analysis, concept diagram, master plan, axometric diagram
Use a large number of dismantled old pavilions, bridges, facilities, etc., to pile their fragments on the original lawn area and cover with soil to form grass hill. This will be an important topographical landscape in the park, breaking the boring plain surface of the park, and providing an ascending visual experience.
Using the plants that appear in the wilderness in Taiwan and creating various types of walking make children appreciate the inordinary urban landscape among the plants and regain their knowledge about the local species of plants .
WATER ENVIRONMENT CONCEPT Explore in nature
Interaction
Purification
互動⸺濕地花園探索 連結遊憩區,將遊憩活動的帶入 更自然的環境裡,實現自然玩、 玩自然。
Water Inlet
Water purification zone The masonry method and selected plants are used in the long and curved flow to purify the water and improve ecological environtment.
Wetland Garden This place links the recreational area and the pond, and brings recreational activities into a more natural environment, making children realize how to explore biodiversity in nature.
Conservation
Observation
Bei-Tun Park was a multifunctional park built in 1980s with children as the main users. The renewal plan proposal is closely connected to the major features of the park itself, the pond and the playground. In this project, we hope that the water is no longer just a pond for viewing, and that the playground is no longer just a field for playing. The functions of the old park are scattered on the site, and disrepaired facilities are unconfortable to use. By re-wovening all the elements with the main concept of the natural playing area and the ecological pool to form a changing green system, which is like an oasis in the future city.
ront exploration
99
observation zone To make people enjoy the lake view and observe the birds at close range, this project uses the surrounding wooden plank to create a viewing platform.
Ecological Conservation Island The purified water flow into this area, and make the creatures to live in a better habitats. For small-scale environmental education and observation here, people can take a detour from the side to prevent from disturb the quiet habitats.
19
N 0
20
40
60
80
1
入口廣場
2
天文館縫合廊道
3
滑行探索遊樂場
4
兒童互動遊戲場
5
自然藝術漫步林
6
景觀滯留池
7
陽光草坪
8
特色籃球場
9
林蔭交流休憩區
100m
Age:3~10
Mirror channel
Tunnel Park lot Rollers
Rollers
Berm Berm
Age:8~15
Berm Berm
20
Peakier Roller
Rollers
Camel
Berm Double
04 Meilum Park Renew Design Collaborative work Landscape Design Studio (III), 2018 Taiwan,Taipei Studio advisor:Chen,Zong-Min Partner:Li,Pei-Yu Contribution:site analysis, concept diagram, master plan, rendering
為配合共構「臺北科學藝術園區」,美崙公園需再 次提高位階重新定位,除滿足原本周邊居民之活動所 需的空間配置使用外,重塑與臺北市立天文教育館、 國立科學教育館、兒童新樂園及整體環境的鏈結空間, 以彰顯其輔助周邊科學教育場域的大型開放空間之價 值,成為提供民眾兼具教育、趣味、休閒與休憩場所, 達成本更新計畫之目標。 主題定位: 配和三館形成一日遊景 點,設計戶外的寓教於樂 遊戲公園,期望以遊戲吸 引孩童,進一步擴大親子 家庭來此遊樂。
使用者定位: 吸引周遭三館的使用 者, 以 兒 童、 青 少 年 為 主,約在 3-15 歲的年齡 區間,此外滿足周遭居民 的基本休憩需求。
Section A
A
wooden arbor
s
en
Ch Section B
A
A’
dining table
B
B’
Section C
brick oven
A’ 0
22
20
40
60
80
100cm
um
di o p o
o m r o f
ur
i Trit
t m u c
Ro
um n a s
cu
a rbit
Cu
m
on
m s li
ru Cit
v.
c ima
ax
05 is Vit
a ifer
vin
L.
Bakery Yard Individual work
.
L m u d
rgi
ff
o nus
ari
osm
inn
L sis
den
a
an ac
h
nt e M
Landscape Design Studio (I), 2017 Studio advisor:CHEN,JIAN-MING
is
al n i ic
P
la eril
s
en c s e
f
rut
m
O
u cim
cum
li
i bas
So
l
m anu
m
u rsic
l
pe o c y
. oxb
cv. ru
in ms
S
ha c c a
e
sR i s n
is Vit
m Ipo
oe
at ab
a
v tas
in
a ifer
L.
Imagine the senario of an edible garden in a site of 40m2
Starting from my interest in baking, I aim to create a garden full of bakery elements. The bakery industry is booming in Taiwan nowadays, and it has become the prevailing hobby among the public, and even an important part of some people's lives. However, people usually buy ingredients in supermarkets or bakery material shops. Few people could see the whole process of how these delicacies become a food from the earth. So I hope that the users of this yard enjoy planting, When taking care of the plants they choose, they will have a picture of baking in their minds, and experience the wonderful imagination of the ingredients growing from the soil to melting in the mouth.
23
06 National Scenic Road - SuHua Highway Improvement Planning and Design Professional work Outstanding Awards - 2021 9th TAIWAN LANDSCAPE AWARDS 2021.03 - 2023.03 Taiwan,Yilan Project Leader:KUO,CHUNG-TWN Project Manager:HE,CHI-CHANG Position:Associate Designer Contribution:site analysis, concept diagram, master plan, renderings, construction drawing
24
07 Eighteen Peaks MountainGreen of Tourist Attraction Project in East Zone Professional work 2021.10 - 2022.08 Taiwan,HsinChu Project Leader:KUO,CHUNG-TWN Project Manager:HE,CHI-CHANG Position:Associate Designer Contribution:site analysis, concept diagram, master plan, renderings, construction drawing
25
08 Art Work / Craftswork Cloth/sewing
26
Crochet
Smithcraft
Pottery
09 Workshops
Analysis
Belong to Us Participatory workshops and Competition of Han-Xi Drainage
Collaborative work 2017.07 - 2017.09 Han-Xi Drainage, Taichung City Partmer:KUO,SHU-HUI、Chian,Jing-Hui、HSU,YI-LIN Contribution:site analysis、event concept、master plan、rendering 設計理念 經濟部水利署水利規劃試驗所 106 年辦理的「民 眾參與區域排水環境營造推動計畫 (2)- 增能工作坊 與水量水質檢討」,邀請具空間專業的景觀系同學 與主辦單位共同傾聽民眾需求,並與民眾共同擘劃 設計旱溪排水上游段環境。
從上游到下游的流域規劃,保護乾淨的水源及自然 溪流風貌,並且透過設置不同的淨水池,改善水質 來復原當地以往白鷺鷥群聚的景象,並且藉由走訪 在地,了解居民的需求,設置親水體驗區域以及河 岸之活動空間,滿足人與水親近之意念,將旱溪排 水打造成一條具有當地共感意識的溪流。
旱溪排水規劃分區
27
2018 Terra Flora: Plant's-Eye View of Taipei A Field Workshop for the 2018 Taipei Biennial Project Leads and Workshop Instructors: Jeffrey Hou (Landscape Architecture,University of Washington) Dorothy Tang(Doctoral student,MIT ;Adjunct Assistant Professor, University of Hong Kong) The main component of this project is an international student workshop to be held on July 9-14, 2018. Through a series of research exercises, students in this international workshop will examine the flora of a chosen urban community to understand the spatial practices and natural processes that shape the city and to conduct observations of urban spaces from the plant’s-eye-view. The workshop outcomes will provide the materials for installations as part of the Taipei Biennial beginning in November. Contribution: Investigation of physiology, history about Royal palm, drawing, filming and editing. Video Narrative: Erecting on the campus, Royal Palms can perceive the surrounding environment even if they can't move arbitrarily. The tall body allows them to see wider and farther, and they can not only overlook the tiny people walking on the ground, but also see the roofs of the campus buildings. In Taipei, where the urban heat island effect is severe in summer, people are hiding in air-conditioned rooms or walking fast with parasols in degree of 35 Celsius. However, Royal Palms, they are not just looking down to the cityscape, but yearning for a broader blue sky. At this moment, they feels at ease, swinging the leaves slowly with the blowing of the wind, and enjoying the scorching sun. This is the best season for Royal Palm. Royal Palm's character diagram
28
Installations in Taipei Biennial (taking pictures)
Re-ENVISIONING 1935
modeling process
Chung Hsing Paper Factory International Workshop and Exhibition 2019.07.31 - 08.09 Chung Hsing Cultural and Creative Park, Yilan Workshop Instructors:Lin,Chia-Ju(project director in OMA) In the summer of 2019, the Ministry of Economic Affairs, the Yilan County Government, and Chinese Institute of Urban Design invite 5 architects to lead 40 cross-disciplinary students to jointly organize the design. The workshop camp is looking forward to updating the operation mode of the cultural and creative park through design activities, further proposing innovative development plans and imaginations, and encouraging the public to participate in discussions with the results in the form of exhibitions. Contribution: Model making、site investigation、plants analysis、photography
To make a scale 1:30 model I try using the real plants
為了 嘗試
Presentation
29
10 Sketching and Drawing
30
11 Photography
31
Chien,
Hsin - Cheng
2 0 2 2
P o r t f o l i o
Landscape Architecture