Norwalk Comprehensive Plan

Page 1

Norwalk 2042 Comprehensive Plan Stronger Together
Iowa
Norwalk,

Acknowledgments

With special thanks to: The participants who provided feedback to help define the final recommendations of this document.

Prepared for:

City of Norwalk

City Hall

705 North Ave

Norwalk, IA 50211

Prepared by:

MSA Professional Services, Inc.

1555 SE Delaware Ave

Suite F

Ankeny, Iowa

50021

Confluence | Landscape Architecture, Planning + Urban Design

525 17th Street

Des Moines, IA 50309

MSA Project Team

Chris Janson, AICP

Shannon Gapp, AICP

Shawn Oshea, AICP

Claire Michelson

Lauren Dietz

Confluence Project Team

Chris Shires, AICP

Jane Reasoner, AICP

City Council

Tom Phillips - Mayor

Jaki Livingston - Mayor Pro Tem

Stephanie Riva - Council Member

Ed Kuhl - Council Member

David Lester - Council Member

Brian Baker - Council Member

City Staff

Luke Nelson - City Manager

Luke Parris - Community Development Director

Elliot Klimowski - City Planner

Steering Committee

Chad Smith

Jeanna Dankle

Jason Brown

Duane (D.T.) Magee

Josh DeBower

David Albrecht

Andy Boerjan

Brian Baker

Michael Foss

Eric Simon

Judy McConnell

Katherine Thorson

Jim Lane

Kate Baldwin

Travis Stanley

Table of Contents

01 Introduction and Overview 7 02 Plan Process and Engagement 17 03 Community Elements - Vision, Goals, and Objectives 39 04 Land Use and Growth Management 59 05 Implementation and Action Plan 77 Appendices A Community Profile 103 B Survey Results 135 C Maps 149 D Priority Matrix 155
Stronger Together Norwalk 2042 Comprehensive Plan Norwalk, Iowa

Norwalk, Iowa

Chapter 1 Introduction

Plan Overview

Norwalk is a well-planned, safe, prosperous, and growing community built by citizens and businesses who value education, health, and public safety. People enjoy its natural beauty, rural character, and location in the region. As residents and businesses come and go, and economic trends rise and fall, changes will occur. Norwalk continues to place value on long-range planning to ensure the community of today effectively evolves to meet the anticipated needs of the future.

The purpose of this 2042 Comprehensive Plan is to establish a shared vision for the community, to guide future decisions and actions, and to assist in projecting and managing growth, change, public improvements, and development in the community. This guidance provides predictability and consistency over time to help encourage investment. We plan so that we can act and react in a changing world with a confident understanding of our common values and goals.

The difference between this Comprehensive Plan and a zoning ordinance is that the former sets forth the objectives and goals of the community with respect to land use, while the latter is a regulatory device through which the plan’s goals and policies are carried out or achieved. Other ordinances, such as subdivision regulations, are also utilized to carry out the goals of a Comprehensive Plan.

This plan will address annexation. Annexation is the act of adding to something larger, especially the incorporation of new territory into the domain of a city, country, or state. Annexation is not eminent domain - the power of the state to take private property for public use with payment of compensation to the owner. The consideration of annexation is to accommodate City services to future growth. The City of Norwalk has no intent for involuntary annexation of any property.

The City’s future growth, to be guided by this Comprehensive Plan, will be driven by the City’s reputation as a leader in K-12 education as well as its proximity to services, higher education, commerce, innovation and the Des Moines Metro Area. The region’s abundance of quality recreation and business growth opportunities also adds to the quality of life experienced by residents.

This plan is an active part of the community’s efforts to attract people and businesses to the City’s unique small town feel and development opportunities. The content within this plan sets to create the best version of the City for future generations to live, work, play, and learn.

The organization of the plan is based on the planning process described in Chapter 2, and is divided into five chapters plus relevant appendices.

1-8 | Chapter 1 -Norwalk Comprehensive Plan

Plan Organization

Chapter 1: Introduction and Overview

This chapter examines the role of the plan, the planning area boundaries, regional context and key community indicators.

Chapter 2: Plan Process and Engagement

This chapter provides an outline of the planning process, a description of public participation methods and a summary of feedback from all engagement activities. Public engagement is a key component of the comprehensive planning process.

Chapter 3: Community Elements - Vision, Goals, and Objectives

This chapter presents a vision for the future of the City of Norwalk and describes the goals and strategies to achieve that vision. The elements of community infrastructure, housing, recreation, transportation, employment & economy, agricultural & natural resources, and intergovernmental collaboration are all addressed.

Chapter 4: Land Use and Growth Management

This chapter considers the City of Norwalk’s future growth forecast, existing land use, land use goals and strategies, the future land use map, how to amend the future land use map, design recommendations, and guidelines for buildings and sites.

Chapter 5: Implementation and Action Plan

This chapter outlines how the vision and goals of the plan are implemented in everyday decisions and annual goal setting and budgeting, and how the Plan should be amended when necessary.

Appendix A: Community Profile

This appendix incorporates a summary of current conditions and recent trends in the City of Norwalk.

Appendix B: Survey Results

This appendix consists of the full results of two community-wide surveys included in the community engagement step of the planning process and contains the crowdsource map application results and information from community input workshops.

Appendix C: Maps

This appendix includes several maps created during the planning process for the 2040 Norwalk Comprehensive Plan.

Appendix D: Priority Matrix

This appendix includes action items from the implementation matrix in Chapter 5. These action items were identified as urgent, immediate, or both.

Chapter 1 - Introduction | 1-9

Plan as a Living Guide

This Comprehensive Plan update is an effort to reinforce the long-standing planning priorities of the City, while recognizing changing conditions, trends, and new issues. The City’s Comprehensive Plan reflects a shared vision for the future of Norwalk.

Comprehensive Plans are a general and broad analysis of the interconnections between cultural, geographical, and natural components within the City. They also provide guidelines for continued development. Technology, economic drivers, and demographic changes affect how land is managed and utilized in the City. Although this Comprehensive Plan attempts to address many possible future uses, it may not capture all of them.

As new land uses are introduced, the City will be in a great position to better review land use proposals. This plan will help citizens and local leaders work together more efficiently to facilitate future growth and development within the City by providing broad recommendations that guide and manage growth and development. These recommendations come in the form of goals and objectives which express the community’s aspirations for the future.

This planning document is a “living” guide for growth and change in Norwalk. It is intended that the plan will grow and change with the community. Therefore, it should be reviewed and updated regularly. The plan provides specific recommendations that directly manage community growth and development. To utilize the full potential of the plan, it should be used to:

Guide City officials and staff to assist with a variety of land use planning and growth planning tasks.

Guide businesses, property owners, and residents in determining potential property use, understanding future land use changes in the surrounding area, and understanding infrastructure improvements.

Assist developers interested in property acquisition in coordinating development plans with City goals, regulations, and infrastructure plans.

Assist in coordinating with neighboring jurisdictions on issues and topics of mutual interest.

1-10 | Chapter 1 -Norwalk Comprehensive Plan

History of Norwalk

Early History

In approximately 1846, the first settlers arrived in Norwalk. Among the settlers, Samuel Crow established a homestead near the North River. The community that is now known as Norwalk began with the construction of a log cabin built by Samuel Snyder. In the coming years more families settled in the town, called Pyra, and by 1856 a post office was established. George W. Swan laid out the town, established a hotel, and changed the town’s name to Norwalk—after his hometown of Norwalk, Connecticut. The first railroad to be built in Norwalk, Iowa was a narrow-gauge line between Des Moines and Cainsville, Missouri, constructed in 1882. By the 1890s the railroad was acquired and widened by Burlington Railroad. The line was initially used for shipping livestock; however it was abandoned in 1947 due to flood damage at the North River Bridge.

20th Century

In 1900 Norwalk, Iowa was incorporated and served by its first mayor, Adam Stiffler. Initially, the town was one square mile in size. Phone service was introduced in 1903. Over time many additions through land acquisitions have contributed to Norwalk’s overall growth. Two major triangles shaped Norwalk’s growth patterns. The first was the intersections of Highway 28, High Road, and Cherry Parkway in November of 1969. The second took place in a location that now contains the Norwalk United Methodist Church and Regency Nursing Home. A number of farm annexations in the 70s and 80s contributed to the growth of the city’s development footprint. Presently, Norwalk is regionally notable for its golf courses, school district, proximity to the Des Moines Metro, and the bountiful opportunities for housing, parks and recreation, and new business development.

Chapter 1 - Introduction | 1-11
Source: City of Norwalk Website

Community Overview

Background

The City of Norwalk is located in Warren County, IA. It is situated just south of Des Moines and West Des Moines, IA.

Norwalk is in a great location for residents who want a rural feel and an easy commute to nearby larger communities for work, leisure, entertainment, and services. Norwalk strives to provide a high quality of life and remain a safe and attractive community.

The community will continue to be a vibrant, safe, and healthy environment that evokes community pride and supports a prosperous life for those who chose to make Norwalk their home.

The planning area for this Comprehensive Plan includes all lands in the City and is outlined on the map to the right.

1-12 Chapter 1 -Norwalk Comprehensive Plan
Norwalk School District New Business Development Proximity to Metro

Regional Context

Norwalk is located in central Iowa at the northern part of Warren County, Iowa, immediately south of Des Moines. It is in a great location for residents to reside in a small town and easily commute to the nearby Metro area for work, leisure, entertainment, and professional services. Norwalk strives to provide a high quality of life and remain a great location to live and do business within the greater Des Moines Metro Area. Norwalk borders the City of Des Moines which has a population of approximately 215,000.

Regional Location and Proximity:

Chapter 1 - Introduction | 1-13

Key Community Indicators

Population

A careful examination of population trends in Norwalk provides a foundation for the land use planning process and implementation of the plan. Understanding past and future population growth is an important step towards appropriate resource allocation. The City’s population and number of households are projected to continue growing through 2024 as shown in the chart below.

Employment

Employment information is an important indicator of current economic conditions and potential economic growth opportunities for the residents and businesses of Norwalk. The majority of Norwalk’s residents have jobs classified as white collar positions, followed by blue collar and services. The unemployment rate is estimated to be a modest 12%. The largest labor force category is Business/Financial followed by Sales. The chart below shows a comparison with Warren County, and there are many categories that show high variability such as Construction/Extraction and Education. It is also known that many workers commute to the surrounding region for work.

Labor Force By Occupation

1-14 | Chapter 1 -Norwalk Comprehensive Plan
Forecasted Annual Growth Rate:
Trending Up Families Households Population 2.53% 2.01% 2.76% 2.12% 2.49% 1.98% Employment in Norwalk 76% White Collar 14% Blue Collar 10% Services Unemployment Rate
Historical Trends: Population
12%

Norwalk, Iowa

Chapter 2 Public Participation

Norwalk’s Planning Process

A transparent public participation process is the foundation to a successful plan. The planning process for the development of the 2042 Norwalk Comprehensive Plan included seeking the involvement of residents, business owners, and other stakeholders across the community to create a vision and set goals for growth and improvement. Great engagement is essential to creating a plan and gathering support for successful implementation of a plan’s goals and actions.

The development of the 2042 Norwalk Comprehensive Plan included the following engagement activities to help develop a vision, establish goals, and develop actions for implementation:

• Comprehensive Plan Steering Committee

• Public Workshop with SWOT (Strengths Weaknesses Opportunities Threats) Analysis

• SWOT Community Survey

• Pop-Up Meeting At National Night Out

• Feedback Session at Senior Luncheon

• Key Stakeholder Interviews

• Draft Plan Review Open House

• Draft Plan Review Survey

Community Engagement

1

Soliciting input over the planning process via online and traditional engagement activities.

Input will be gathered from: Public Planning & Zoning Commission City Council & Staff Other Stakeholders

Summary of analysis of existing conditions to establish an overall vision for Norwalk.

Existing plans, conditions and goals will be reviewed and analyzed for use in Steps 3 and 4.

Community Profile, Vision, and Framework 3

Creation of New Norwalk Comprehensive Plan 2 4

Establish a “Vision” for Norwalk to provide focus for the creation of the Comprehensive Plan.

Vision and associated goals will be developed through the feedback received in Step 1 & 2.

Plan will include all information developed in Steps 1, 2 & 3.

The newly created Comprehensive Plan and its Action Plan for Implementation will serve as a tool and guide for future development.

Chapter 2 - Public Participation | 2-19
STEP 1 STEP 2 Existing Conditions Analysis STEP 4 STEP 3

Public Engagement Methods

The public engagement process is integral to the results of the plan and guides future implementation of the goals and policies recommended in this document. Although the Covid-19 Pandemic created an nontraditional situation with limited in person meetings, we were still able to gather feedback. Various engagement methods were performed to provide multiple opportunities for stakeholders to provide quality feedback online. The methods ranged from an online community survey, hybrid in-person/ virtual community meetings via Zoom, a pop-up meeting at a socially distanced football game, media postings, and online stakeholder focused group interviews. In the beginning word of the project was spread to create awareness and excitement. From that momentum feedback was gathered in various types to help form the Plan’s goals and policies

Comprehensive Plan Steering Committee

The Comprehensive Plan Steering Committee was the primary review and advisory body throughout the planning process, tasked with ensuring that the established goals and objectives were being accomplished. Four meetings of the Committee were held during the planning process and all were open to the public. All presentation materials were posted on the project website for public access.

Project Website

A project website was developed to share relevant project information such as the project schedule, draft documents, meeting notices and copies of presentation materials. The website also provided a venue for the public to share comments throughout the planning process and contact the project team with questions. This aspect of the communication and participation strategy was important for transparency, as well as sharing information with stakeholders.

2-20 | Chapter 2 -Norwalk Comprehensive Plan

Public Engagement Methods (Continued)

Community Survey

A community survey was created and available to community members. This was a gathering tool in the form of a SWOT (Strength, Weaknesses, Opportunities, and Threats) analysis. The broad questions allowed the project team to collect community members’ views and thoughts on Norwalk in the three categories of beautification, development and mobility. This was administered through ESRI’s Survey123, which is formatted to allow users to take via computer, tablet or smartphone. Participants were invited to respond via a link through the project website as well as flyers that were distributed via City social media sites.

Interactive Mapping Application

An interactive map is unique mapping application that allows a community to collaboratively map assets, issues, opportunities and questions related to the community and growth. This application helped the project team identify potential expansion areas as Norwalk’s population and housing demand grows. Many residents offered suggestions for new development locations within the community.

Chapter 2 - Public Participation | 2-21

Public Engagement Methods (Continued)

Comprehensive Planning Overview

The project website included a section that provided an overview of the following:

What is Comprehensive Planning?

https://norwalk2040plan.com/blog/comprehensive-planning-101/

Why

A B C D

Essentially, the comprehensive plan, also known as a general plan, master plan or land use plan, is a document designed to guide the future actions of a community. It presents a vision for the future; with long-range goals and objectives. Planning helps to ensure that future land use and growth is consistent with the vision the citizens of the township have on important issues. Furthermore, it is not a Zoning Ordinance or Subdivision Regulations.

Plan? Planning is important and makes a positive impact on quality of life.

Planning is an organized way to anticipate and shape changes for the benefit of the community. A well planned community is attractive, has reasonable taxes/fees, adequate public services, and is a good place to live and work.

To form a good basis for plan implementation – design guidelines, funding and capital improvements programming.

2-22 | Chapter 2 -Norwalk Comprehensive
Plan

Public Engagement Methods (Continued)

Announcements and Engagement Tools

Adaptation with Digital Engagement Opportunities

Public Engagement is crucial for planning processes, and the need for effective engagement was critical even with social distancing practices in effect. Throughout the project, the team successfully made adjustments to comply with public health restrictions on face-to-face meetings. Overall, digital engagement provided equally robust responses to that completed fully in-person. The hybrid approach proved to be beneficial to capturing a broad range of community feedback.

Chapter 2 - Public Participation | 2-23

Public Engagement Methods (Continued)

Youth Survey

A youth survey was also administered to obtain meaningful feedback from Norwalk’s younger residents and students. The survey focused on a variety of subjects pertaining to the creation of the Plan but focused more on likes and dislikes, how they perceive the community, how they describe the community to others, and if it has been a good place to grow up. Full survey results can be found in Appendix B, however, a summary of key findings is provided within this section as well.

The youth survey also provided the opportunity for a younger demographic to weigh in on strengths and weaknesses relating to beautification, development, and mobility. This provided a different perspective and outlet for many generations to provide feedback on what they currently value, as well as would like to see change in the future for Norwalk.

Strengths, Weaknesses, Opportunities, & Threats (SWOT) Analysis

This Plan is grounded in opportunities for positive change which was identified by citizens, staff, and stakeholders. The Plan seeks to address citizens’percieved deficiencies and capitalize on opportunities for positive change. A SWOT analysis exercise was used to gather this information from the Planning and Zoning Commission, Project Team, Steering Committee and from the general public at each community engagement and visioning session.

Strengths - characteristics that give the community an advantage over others.

Weaknesses - characteristics that place the community at a disadvantage relative to others. Opportunities - elements the community could leverage to advantage the community.

Threats - elements in the environment that could cause trouble for the community in the future.

2-24 | Chapter 2 -Norwalk Comprehensive Plan
STRENGTHS WEAKNESSES OPPORTUNITIES THREATS harmful helpful internal external

Public Engagement Methods (Continued)

Online (SWOT) Analysis Opportunities

Summaries from Website, Survey, Meetings, and Interviews

Participants considered the following questions that relate to the comprehensive planning process:

• Which areas of Norwalk do you see growing in 20 years and how and what are the challenges to that growth?

• Which areas of Norwalk provide an opportunity for redevelopment?

• What do you envision the community character will be in 20 years?

• What will be great about Norwalk in 20 years? What obstacles will it have to overcome?

• In 20 years what will attract families to the area?

• What needs to be protected as Norwalk grows?

The following pages summarize the feedback received relating to the three categories:

Chapter 2 - Public Participation | 2-25
Mobility Development Beautification

SWOT Analysis | Beautification

Summary of comments relating to BEAUTIFICATION

Strengths / Opportunities

• Elizabeth Holland Park

• Continue updating existing parks

• Mature trees around the city

• Natural landscape

• The parks are in good condition and up-kept

• Golf courses

• Opportunity-Improve the downtown area

• Opportunity-Add attractive signage as you enter Norwalk

• Opportunity-Increase trails and connections

Weaknesses / Threats

• Development has taken away the rural landscape of Norwalk

• Not a welcoming entrance to the city

• Not a priority for residents

• Outdated and people are resistant to change

• Apartment complexes

• No consistent “theme” to the city

• Threat – Over-expansion before setting aside land for parks and trails

2-26 | Chapter 2 -Norwalk Comprehensive Plan

Summary of comments relating to DEVELOPMENT

Strengths / Opportunities Weaknesses / Threats

• Gained and continue to gain new businesses

• Good schools and housing that attract people

• Current business and economic development efforts

• Room for development

• Opportunity-There are a lot of options for new businesses

• Opportunity-Create a town square or main street

• Opportunity – Available land on Highway 28

• Need more businesses

• No uniformity in new commercial buildings

• Growth seems slow

• Need more growth

• High Density Residential

• Growing too much

• Low rent or subsidized housing

• No community center or pool

• Only one corridor for development

Chapter 2 - Public Participation | 2-27
SWOT Analysis | Development

SWOT Analysis | Mobility

Summary of comments relating to MOBILITY

Strengths / Opportunities

• Location/Proximity to the Metro

• Light traffic/easy to get around town

• Great access to I-35

• Existing bike and walking trails

• Opportunity - more bike trails and connections

• Opportunity - focus on walkability

• Opportunity – wider sidewalks to connect neighborhoods

• Opportunity - through streets in new developments

Weaknesses / Threats

• Many intersections are difficult for ped/bike crossing

• Highway 28 “splitting” the city

• No large network of trails… limited connections

• Infrastructure is not ready for the increased volume

• Many sidewalks are in poor condition

• As growth continues traffic congestion will grow

• No bus service to DM Metro

2-28 | Chapter 2 -Norwalk Comprehensive Plan

Survey Results |

Summary of What We Heard:

How many people are in your household?

Highest percentage had 4 people in their household

How many years have you lived in the City of Norwalk?

Many either new to the community or long-time residents

(Full survey results can be found in Appendix B)

Chapter 2 - Public Participation | 2-29
1 2 3 4 5 6 7+ 0 100 200 0-5 6-10 11-15 16-20 20+ n/a
Demographics

Survey Results | Quality of Life

How would you rate the quality of life in Norwalk?

Most

What would have the greatest impact on quality of life?

What

2-30 | Chapter 2 -Norwalk Comprehensive Plan
0 100 200 Excellent Good Fair Poor
Summary of What We Heard:
Increase Employment Opportunities Expand Retail Shopping Parks and Recreation Upgrades Expand Housing Affordability Expand Community Services Decrease Taxes and Fees Improve Public Safety 300 Jobs, Retail & Parks Less Fees/ Taxes
feel that Norwalk’s quality of life is good, perhaps even excellent
&
we heard:

Survey Results | Lifestyle

Summary of What We Heard:

What is the approximate distance of your commute to work (each way)?

What are the most important aspects of housing improvement for the City of Norwalk?

(Full survey results can be found in Appendix B)

Chapter 2 - Public Participation | 2-31
0 <5 5-10 11-15 >15 0 50 100 150 200
0 100 200 300 400 Supply Cost Quality Diversity Availability Other

Summary of What We Heard:

What are the primary factors that influenced where you chose to live where you do?

2-32 | Chapter 2 -Norwalk Comprehensive Plan Survey Results | Lifestyle
Privacy/ Seclusion Access to Recreation Affordability Safety/Low Crime Schools and Activities 0 200 300 400 100 500 Close to Employment Close to Family Low Traffic People/ Neighbors

Survey Results | Norwalk is Great Because...

Location

85% of respondents indicated that location is a primary quality that makes the City of Norwalk a great place to live.

School District

78% of respondents identified the school district as a primary quality that makes the City of Norwalk a great place to live.

Friendly and Welcoming Community

47% of respondents designated the friendly and welcoming nature of the community as a primary quality that makes the City of Norwalk a great place to live.

Chapter 2 - Public Participation | 2-33

Community Input Mapping

What We Heard:

• Several Community Assets (Heart Icon)

- Echo Valley Golf Club

- Lake and Surrounding Neighborhood

- Warrior Park

- McAninch Ball fields

- Warrior Run Golf Course

- Norwalk School Campus

- Legacy Area

• Great Ideas

- Lakefront Restaurant

- Pedestrian and Bicycle Improvements

- Preserve Old Town Area

- Housing Opportunities

• Concerns:

- Road Improvements Needed

- Flooding Concerns

- Desire for More Developed Parks

- Housing Density and Land Use Transitions

- Traffic and Speed Concerns

Chapter 2 - Public Participation | A-35

Future Land Use Input Mapping

What We Heard:

• Likes:

- Parks and Golf Courses

- Opportunities for medium density

- Appropriately located higher density

• Dislikes:

- Certain intersections

- Land use categories that could be left as green space

- Potential for higher density and traffic

• Ideas:

- Park enhancements

- Roundabouts

- Commercial opportunities

• Questions:

- Concerns relating to existing uses and how things might change

• Other:

- Ways to highlight the scenery in the North Shore area

• 1 idea leads to several

2-36 Chapter 2 - Norwalk Comprehensive
Plan

Pop-Up Events

MSA hosted booths at local community events to engage the public and gather feedback to create the 2042 Comprehensive Plan.

Where We Went:

Chapter 2 - Public Participation | 2-37

Norwalk, Iowa

Chapter 3 Goals & Strategies

Norwalk’s Goals for a Better Future

This chapter contains goals and strategies established through the planning process, public engagement activities, Steering Committee input, and the Community Profile. The goals and strategies have been divided into the following categories: community facilities and services, transportation, parks and recreation, agriculture and natural resources, housing, economy and employment, intergovernmental cooperation, and resilience.

This section defines goals and strategies as follows:

Goals:

A long term target that states what the community wants to accomplish. Written in general terms, the statement offers a desired condition through implementation.

Strategies:

A strategy is a statement that identifies a course of action to achieve a goal. They are more specific than goals and are usually attainable through planning and implementation through direct action.

An overview of the goals are listed on the following page. Each goal has at least two strategies for achieving the goal, these are listed throughout this chapter. For action items that can be used to implement these goals and strategies, please refer to Chapter 5.

These goals and strategies are designed to facilitate the implementation of Norwalk’s vision statement:

3-40 | Chapter 3 - Norwalk Comprehensive Plan
and improve why people want to
and work in Norwalk.” dsmpartnership.com
“Preserve
live

Goals

Community Facilities & Services

1. Maintain reliable, quality services, utilities, and facilities to encourage growth and reinvestment.

2. Ensure that public facilities and City provided services meet the needs of residents and businesses, especially as new development increases demand for those facilities and services.

Parks & Recreation

1. Develop and support a comprehensive system of safe, aesthetically pleasing, and useful open spaces and trails that serve the entire community.

2. Provide a robust recreation system for all residents and visitors.

Housing

1. Retain and attract residents including young professionals, families, and retirees by supporting a range of housing options.

2. Maintain quality housing and community character by encouraging the maintenance and improvement of the existing housing stock and properties throughout the community.

Intergovernmental Cooperation

1. Coordinate with Warren County, neighboring counties, and neighboring municipalities to optimize regional planning efforts.

2. Partner with local, state, and federal agencies to enhance the culture and resources of Norwalk.

Transportation

1. Develop a comprehensive system that provide accessibility to traditional and alternative modes of transportation effectively throughout Norwalk.

2. Provide guidance for safe, efficient, coordinated, and convenient multi-modal transportation system that is integrated with land use and development plans, and that protects and enhances natural resources.

Agriculture & Natural Resources

1. Manage, enhance and preserve land and water resources and the natural environment by avoiding development on high value wetlands and floodplains.

2. Protect and enhance the natural settings unique to the character of Norwalk.

Economy & Employment

1. Strengthen the local economy of Norwalk.

2. Prioritize development of the physical environment that supports local businesses and increases accessibility to local businesses.

Resilience

1. Encourage sustainable practices throughout the community including development and infrastructure practices.

2. Establish and promote a unique and welcoming community culture.

Chapter 3 - Goals & Strategies | 3-41

Community Facilities & Services

Public and private utilities are a fundamental need for growing and sustaining a community, and important to the residents of Norwalk. Without comprehensive public and private infrastructure, facilities, and services, the continued suburban growth of the community would stall. Below are some goals and strategies to help overcome these challenges and others related to the community’s infrastructure.

Goal #1 Maintain reliable, quality services, utilities, and facilities to encourage growth and reinvestment.

Strategies:

1. Support policies that enhance natural areas through the development process.

2. Develop design guidelines for community gateways and wayfinding signage that welcomes visitors and coheres future and existing aesthetics.

3. Encourage connectivity among new and existing developments through pedestrian and bicycle facilities.

4. Explore development incentives that prioritize infill development/redevelopment and utilize existing public infrastructure.

3-42 | Chapter 3 - Norwalk Comprehensive Plan

Goal #2 Ensure that public facilities and services meet the needs of residents and businesses, especially as new development increases demand for those facilities and ser vices.

Strategies:

1. Develop a first responders and essential services expansion plan to accommodate anticipated growth.

2. Maintain maintenance and replacement schedule.

3. Adopt community engagement procedures into City Code.

Chapter 3 - Goals & Strategies | 3-43

A community’s mobility network is a vital community feature and should be able to facilitate all modes of movement. Transportation is about the ability to readily and safely gain access to work, school, shopping, recreation, medical care and social gatherings. Norwalk is fortunate to have easy access to Interstate 35, Highway 5, and the greater Des Moines Metro region. The City’s future transportation network should anticipate the needs of users of different types of transportation methods and ensure efficiency and safety across the system.

Goal #1 Develop a comprehensive system that provides accessibility to traditional and alternative modes of transportation effectively throughout Norwalk.

Strategies:

1. Prioritize maintenance and improvement of transportation infrastructure to support business and employment growth.

2. Maintain and utilize pavement repair/replacement schedule.

3. Maximize traffic efficiency along Iowa 28 corridor.

4. Coordinate transportation plans with other city and regional plans.

Transportation

Goal #2 Provide guidance for a safe, efficient, coordinated, and convenient multi-modal transportation system that is integrated with anticipated land use and development plans, and that protects and enhances natural resources.

Strategies:

1. Encourage development of environmentally-friendly multi-modal transportation facilities.

2. Encourage non-vehicular transportation options and overall connectivity.

3. Prioritize safety in multi-modal transportation development.

4. Explore alternative parking space requirements that reduce the need for large parking lots.

5. Explore opportunities for more comprehensive multi-modal transportation within the City and throughout the region.

Chapter 3 - Goals & Strategies | 3-45

Parks & Recreation

Norwalk’s easy access to recreation ranks very high on the list of contributions towards an improved quality of life. These recreational amenities provide residents and visitors with a higher quality of life and will help keep the community growing and thriving. Additionally, recreational opportunities add economic value and positively affect property value, tourism, and commerce. Below are some goals and strategies to support recreation, parks, and trails in Norwalk.

Goal #1 Develop and support a comprehensive system of safe, aesthetically pleasing, and useful open spaces and trails that serve the entire community.

Strategies:

1. Increase accessibility to trails, parks, and open spaces.

2. Prioritize distribution of adequate green space in future development.

3. Collaborate with regional governments, agencies, and organizations to connect Norwalk’s recreational trails to the Central Iowa Trails system.

4. Establish a trail system which enhances the community’s walkabilty, and provides safe access to community parks, schools, and regional trail systems.

3-46 | Chapter 3 - Norwalk Comprehensive Plan

Goal #2 Provide a robust recreation system for all residents and visitors.

Strategies:

1. Collaborate with adjacent municipalities and agencies for recreation facilities and programs.

2. Improve accessibility of recreation facilities and programs for residents and visitors.

3. Diversify recreational facilities to expand opportunities for numerous activities.

Chapter 3 - Goals & Strategies | 3-47

Agriculture & Natural Resources

Norwalk has many natural areas that are vital to the well being of the community and the health of the regional ecosystems. There is also productive agriculture surrounding the community that provides current and future economic growth and wealth. This section outlines the goals and strategies for preserving, protecting and restoring natural and agricultural resources. These systems are often interconnected and these strategies address water, land, wildlife, air, vegetation, food systems, and the welfare of the City’s resources.

Goal #1 Manage, enhance, and preserve land and water resources and the natural environment by avoiding development on high value wetlands and floodplains.

Strategies:

1. Protect wetlands from unmitigated negative impacts.

2. Support healthy watersheds.

3. Enhance existing natural areas.

3-48 | Chapter 3 - Norwalk Comprehensive Plan

Goal #2 Protect and enhance the natural settings unique to the character of Norwalk.

Strategies:

1. Encourage use of greens pace in new developments.

2. Conserve and restore natural features such as trees and natural waterways.

3. Support community gardens, farmers markets, and other similar community based food projects.

Chapter 3 - Goals & Strategies | 3-49

Housing

Successful and economically vital communities are built from collaborative efforts among the City, local school district, businesses, and organizations. They also form relationships with regional organizations, for example Warren County, the nearby cities, the State of Iowa, and federal agencies. This section helps inform the City’s strategy on collaboration with those entities and provides guidance on reaching out to new partners and maintaining existing relationships.

Goal #1 Retain and attract residents including young professionals, families, and retirees by supporting a range of housing options.

Strategies:

1. Encourage development and redevelopment of mixed-density neighborhoods.

2. Produce and maintain community facilities, utilities, and infrastructure that are attractive to developers, current residents, and future residents.

3. Support the development of homes that serve a diverse population.

4. Reduce barriers to housing development opportunities.

3-50 | Chapter 3 - Norwalk Comprehensive Plan

Goal #2 Maintain quality housing and community character by encouraging the maintenance and improvement of the existing housing stock and properties throughout the community.

Strategies:

1. Reduce barriers to housing opportunities for current and future residents.

2. Pursue opportunities to improve existing housing stock.

3. Improve the local rental process for both renters and tenants.

Chapter 3 - Goals & Strategies | 3-51

Economy & Employment

Economic development is realized through the growth and retention of jobs, a diversity of business types, and subsequent increases in buying power, investment in the built environment, and a general improvement in the community’s quality of life. Creating economic prosperity requires the collaborative efforts of public and private entities and the support of the community overall.

Norwalk recognizes the economic success and a focus on workforce development requires extensive collaboration with other public entities - the City will be an active partner in these efforts and will avoid duplication of services for efficiency purposes. Support for these efforts may include staff time, funding, policies, endorsement and promotion of projects.

Goal #1 Strengthen the local economy of Norwalk.

Strategies:

1. Support the development of public and private partnerships that aid existing and potential businesses.

2. Provide guidance for future economic growth.

3. Coordinate exisitng community plans to direct development incentives, annual budgets, and capital improvement planning

4. Improve neighborhood resilience and market Norwalk as a premier place to grow families and businesses.

3-52 | Chapter 3 - Norwalk Comprehensive Plan

Goal #2 Prioritize development of the physical environment that supports local businesses and increases accessibility to local businesses.

Strategies:

1. Improve visibility of and access to businesses in Norwalk.

2. Create walkable, people-centered places that are enjoyable to inhabit and that enable people to walk between businesses.

3. Focus on revitalization and accessibility of business districts.

Chapter 3 - Goals & Strategies | 3-53

Successful and economically vital communities are built from collaborative efforts among the City, local school district, businesses, and organizations. They also form relationships with regional organizations like Warren County, nearby cities, the State of Iowa, and federal agencies. This section helps inform the City’s strategy on collaboration with those entities and provides guidance on reaching out to new partners and maintaining existing relationships.

Goal #1 Coordinate with Warren County, neighboring counties, and neighboring municipalities to optimize regional planning efforts.

Strategies:

1. Coordinate with Warren County and surrounding municipalities to develop mutually beneficial land use plans.

2. Coordinate with local partners to develop a cohesive, convenient transportation system.

3. Communicate and coordinate any changes that may impact Norwalk and its 28E agreements.

3-54 | Chapter 3 - Norwalk Comprehensive Plan
Intergovernmental Cooperation
Shive-Hattery

indianola-ia.com

Goal #2 Partner with local, state, and federal agencies to enhance the culture and resources of Norwalk.

Strategies:

1. Support the Norwalk Community School District in their growth and community engagement activities.

2. Partner with the Norwalk Community School District on land use, utility, and transportation improvement planning.

3. Partner with the Iowa Department of Natural Resources to advance planning efforts for natural resources, green space, and trail development.

Chapter 3 - Goals & Strategies | 3-55

Resilience

Resilience is the ability of a system to respond to, adapt to, and recover from negative events. Resilience has three major components: social, economic, and environmental. Strong social networks, efficient economies and thoughtful government budgets, and the protection of vital natural resources all have a positive impact on a community’s ability to bounce back after unexpected disruptions like natural disasters.

Goal #1 Encourage sustainable practices throughout the community including development and infrastructure practices.

Strategies:

1. Promote environmental sustainability.

2. Engage in maintaining and advertising the Warren County Hazard Mitigation Plan.

3. Support economic sustainability.

3-56 | Chapter 3 - Norwalk Comprehensive Plan

Goal #2 Establish and promote a unique and welcoming community culture.

Strategies:

1. Collaborate with local leaders to improve residents’ connections to City departments, local nonprofit organizations, and each other.

2. Encourage interaction among residents through community-wide events and small-scale gatherings such as neighborhood block parties.

3. Encourage neighborhood involvement to increase safety through active participation of residents.

Chapter 3 - Goals & Strategies | 3-57
Norwalk Area Chamber of Commerce

Chapter 4

Norwalk, Iowa Land Use & Growth Management

Land Use & Growth Management

Chapter Purpose

The intent of the Land Use Chapter is to provide a guide to the growth and development of land uses within a community. Decisions over the future land use of a community take into consideration factors relating to the existing land use composition of a community, the location of natural features, the ability to provide adequate water and sanitary services to an area, the proposed alignment of future streets, and the desired character of the community.

The Future Land Use Plan included in this chapter lays out a future vision for Norwalk through the year 2040 and beyond. Land uses have been proposed for more area than is likely needed to create numerous options and provide flexibility for the city and development community. Land uses have been laid out to avoid conflict and promote a harmonious layout in the community.

Goals and strategies related to land use and growth management have been outlined at the end of the chapter.

Basis for Zoning

One of the most important purposes of the Future Land Use Plan is to serve as the basis for determining the appropriate zoning for property being developed or annexed into the City. Chapter 414 of the Code of Iowa, which grants cities the authority to enact city zoning regulations, requires that said zoning regulations, “…be made in accordance with a comprehensive plan…” Therefore, this Comprehensive Plan should be consulted whenever a city zoning code regulation is amended and every time a property is rezoned to ensure that the action is consistent with both the goals and policy recommendations of this plan and with the land use designations as proposed by the Future Land Use Map.

Included within this chapter is a Zoning Compatibility Matrix to provide assistance and guidance on zoning districts that are compatible or partially compatible with each of the future land use classifications.

Plan Amendment

While the Future Land Use Plan within this chapter represents Norwalk’s preferred future land use layout, the land use plan does not need to remain stagnant or unchanging. If circumstances create an environment in which a conflicting land use is best for the community, the Future Land Use Plan should be amended appropriately to reflect the updated conditions of the community. Should the City find it justified and appropriate to rezone a property in a manner that is not consistent with this plan, the Future Land Use Map (and any impacted policies) should be amended as a part of the rezoning action the ensure consistency with the Comprehensive Plan. Care should be taken to carefully document the justifications for an amendment to this plan and findings adopted as part of the official record.

4-60 | Chapter 4 - Norwalk Comprehensive Plan

Key Land Use Factors

Existing Land Use

The intent of the Future Land Use Plan is to build upon the existing community character that exists within Norwalk today. While the Future Land Use Plan does provide opportunity for expanded commercial, industrial, and multi-family growth, the proposed plan affirms the importance of the existing open space, low-density residential, and parks and recreation land throughout Norwalk today.

Housing Choice

While single-family homes play a dominant role in Norwalk’s built environment and will continue to do so in the future, areas for a more diverse set of housing types have been shown in the Future Land Use Plan. This will provide more choice to current and future residents and help create opportunities for additional tax base in the community.

Highway 5 & Interstate 35

Norwalk is conveniently located just south of Highway 5 and in near proximity to Interstate 35. Access to these major arterial roadways have and will continue to contribute to the growth pressures in Norwalk. The Future Land Use Plan takes strategic advantage of this access by expanding proposed areas of commercial, industrial, and residential growth.

Employment Land

The Future Land Use Plan shows a vision for the community with a significant increase in land available for employment land such as industrial, flex and commercial uses. These land uses will help continue to diversify the tax base for the community.

Open Space & Environmental Features

Norwalk has an excellent public and private recreation system available for residents and visitors. Open Space, parks, and recreation continue to be priorities within the community in the Future Land Use Plan. Natural features such as North Creek and its floodplain are preserved within the Future Land Use Plan.

Room to Grow

Even within the existing city limits, Norwalk has significant room for new growth and development. The Future Land Use Plan takes full advantage of this opportunity and provides proposed land uses throughout the Norwalk area.

Chapter 4 - Land Use & Growth Management | 4-61

Existing Land Use in Norwalk

Norwalk is a well-planned, safe, prosperous and growing community, built by citizens and businesses who value education, health, public safety and who enjoy its natural beauty, rural character, and location in the region. As residents and businesses come and go, and economic trends rise and fall, changes will occur. Norwalk continues to place value on long-range planning to ensure the community of today evolves to meet the anticipated needs of the future. The purpose of this 2042 Comprehensive Plan for Norwalk is to establish a shared vision for the community to guide future actions and decisions and assist in projecting and managing growth, change, public improvements and development in the community. This guidance provides predictability and consistency over time, which encourages investment. We plan so that we can act and react in a changing world with a confident understanding of our common values and goals.

The City’s future growth, to be guided by this Comprehensive Plan, will be driven by the Township’s reputation as a leader in K-12 education as well as its proximity to services, higher education, commerce, innovation and proximity to the Des Moines Metro Area. The region’s abundance of quality recreation and business growth opportunities also adds to the quality of life experienced by residents.

This plan is an active part of the community’s efforts to attract people and businesses to the City’s unique small town feel and development opportunities. The content within this plan sets to create the best version of the City for future generations to live, work, play, stay, and learn.

Existing Land Use Breakdown

Figure 4.1 breaks down the percentage of each land use category by total acres. Nearly 60% of existing land within the city limits is open space, agriculture or undeveloped. Figure 4.2 breaks down the existing land use of the developed land within Norwalk. Doing so better reflects the built environment in Norwalk. Over half of all built land in Norwalk is low-density residential, which mainly includes single-family detached homes. Nearly one-quarter of the community is parks and recreation land and another 8.5% is public / semi-public, which includes governmentowned land, schools, churches, and other institutions. Typical employment land, both commercial and industrial, represent 5.5% and 2.3%, respectively. Medium and highdensity residential land collectively represent less than 5% of existing land uses.

4-62 | Chapter 4 - Norwalk Comprehensive Plan
0%10%20%30%40%50%60%70% Open Space / Agricultue / Undeveloped Low-Density Residential Parks and Recreation Public / Semi-Public Commercial High-Density Residential Industrial Medium-Density Residential Developing 59.0% 20.6% 9.8% 2.7% 2.6% 1.0% 0.9% 0.7% 0.6% 0%10%20%30%40%50%60% Low-Density Residential Parks and Recreation Public / Semi-Public Commercial High-Density Residential Industrial Medium-Density Residential Developing 50.8% 23.9% 6.5% 5.2% 2.5% 2.1% 1.7% 1.4%
Figure 4.1 - Existing Land Use by Total Acres (All Land Use) Figure 4.2 - Existing Land Use by Total Acres (Developed Land)

Existing Land Use in Norwalk

The map below shows the geographic distribution of existing land use in Norwalk. Most of this land is located in west Norwalk as shown in light green. Around 22% of the remaining land is low-density residential, shown in light yellow. The next largest land use category by total acres is parks and recreation, shown in darker green, which includes park facilities as well as golf courses. The large amount of open space, agriculture and undeveloped land leaves only small percentages for the remaining land use categories.

Existing Land Use Map - Norwalk, IA

Norwalk City Limits

Open Space / Undeveloped

Low-Density Residential

Medium-Density Residential

High-Density Residential

Parks & Recreation

Public / Semi-Public

Commercial

Industrial

Developing

Water

Chapter 4 - Land Use & Growth Management | 4-63
NORTH .50 MI .25 0

Future Land Use Definitions

Future Land Use Definitions

The Future Land Use Plan was created using a set of Future Land Use categories, which are defined below with general purpose and typical uses.

Agriculture Reserve

General Purpose:

This land use category is designated for those areas that: are located within the floodplain; may have steep topography; are large areas of wetlands or significant trees; or may consist of high value farmland. As within most of Iowa, the Corn Suitability Ratio (CSR) should be considered but is not intended to be a factor in slowing future growth within Norwalk’s planning area. Land being zoned or developed that includes area designated as Agricultural Reserve/Open Space should preserve these areas as natural open space, park land or buffers.

Typical Uses:

1. Crop production, including grazing lands

2. Private grain storage

3. Residential structures in connection with farming operations

4. Renewable energy equipment

5. Tourism activities such as hunting preserves, fishing, etc.

Low-Density Residential

General Purpose:

This is the future land use category is dominated by single-family detached dwellings with a typical density of 1 to 5 dwelling units per acre. Typical lot sizes will range from 7,500 to 15,000 sq. ft. Lots should include public or private street frontage and driveway access and may also include an alleyway.

Typical Uses:

1. Single-family detached residential structures (7,000 sq. ft. to 3-acre lot sizes)

2. Accessory structures that are subordinate to the primary structures

3. Religious uses and structures

4. Educational uses and structures

5. Community/Recreational Center

6. Parks

7. Mobile home parks provided the facilities meet a specific set of design criteria.

4-64 | Chapter 4 - Norwalk Comprehensive Plan

Future Land Use Definitions

Medium-Density Residential

General Purpose:

This future land use category consists of a mix of small-lot single-family residential dwellings, row houses, and townhomes with a typical density of 5 to 12 dwelling units per acre. Lots should include public or private street frontage and driveway access and may also include an alleyway.

Typical Uses:

1. Single-family residential dwellings

2. Two-family residential dwellings

3. Single-family horizontally attached residential dwellings, townhouses

4. Necessary accessory uses and structures that are subordinate to the primary structure

5. Religious uses and structures

6. Educational uses and structures

7. Community/recreational center

8. Parks

9. Mobile home parks, provided the facilities meet a specific set of design criteria.

High-Density Residential

General Purpose:

The High Density Residential land use category typically contains denser areas of residential rather than the standard single-family development that has occurred in Norwalk for the past 30 to 40 years. This category will include items such as smaller single-family lots and denser development types such as multi-family and apartment structures. Density will range between 5 to 18 dwelling units per acre.

Typical Uses:

1. Single-family horizontally attached residential dwellings, townhouses

2. Condominiums

3. Multi-family dwellings including apartments

4. Necessary accessory uses and structures that are subordinate to the primary structure

5. Parks

6. Religious uses and structures

7. Educational uses and structures

8. Community / Recreational Center

Chapter 4 - Land Use & Growth Management | 4-65

Future Land Use Definitions

New Urbanism

General Purpose:

This specific “Flex” category is intended to be used in locations where a mixture of residential use (Medium to High Density) and General/Neighborhood Commercial uses would be appropriate. These areas should be located along major arterials and at the intersections of major arterials. These areas could also contain a mixture of uses directly within the same building.

Typical Uses:

1. Single-family horizontally attached residential dwellings, townhouses

2. Condominiums

3. Multi-family dwellings including apartments (horizontal design versus vertical)

4. Necessary accessory uses and structures that are subordinate to the primary structure

5. Religious uses and structures

6. Educational uses and structures

7. Community/Recreational Center

8. General and Neighborhood level commercial and office uses

9. Mixed Uses by Planned Unit Development

Commercial / Industrial Flex

General Purpose:

These areas are similar in concept to the New Urbanism Land Use. This is an area where mixtures of commercial and lighter industrial uses are allowed to coexist.

Typical Uses:

1. General commercial uses

2. Wholesale businesses

3. Necessary accessory uses and structures that are subordinate to the primary structure

4. Religious uses and structures

5. Educational uses and structures

4-66 | Chapter 4 - Norwalk Comprehensive Plan

Future Land Use Definitions

Parks & Recreation

General Purpose:

The Parks & Recreation future land use category is set aside for public, private and semi-private recreational land such as parks, trails, golf courses, greenways, and recreation fields. Ownership may be private but is often public and available for use by all residents and visitors.

Typical Uses:

1. City park or recreation land

2. Greenway or trails

3. Golf courses

4. Recreational playing fields or complexes

Public / Semi-Public

General Purpose:

This land use category is set aside for public and semi-public land such as city / county / state owned land, institutional land such as schools or libraries, as well as land set aside for utilities.

The Public / Semi Public future land use category includes publicly owned land such as City Hall, the library, and police/fire facilities. It also includes semi-public land such as cemeteries. Institutional facilities such as schools and universities land also fall into this category.

Typical Uses:

1. City, County, State or Federally owned properties

2. Institutional uses such as schools or libraries

3. Semi-public land such as cemeteries

Chapter 4 - Land Use & Growth Management | 4-67

Future Land Use Definitions

Commercial

General Purpose:

This land use category is intended to provide an area for basic commercial/retail/office uses to occur. These areas may be groupings of buildings and structures or individual buildings. These areas are intended to provide goods and services as well as a small employment center for the immediate area in Norwalk.

Typical Uses:

1. General and neighborhood level commercial and office uses

2. Necessary accessory uses and structures that are subordinate to the primary structure

3. Religious uses and structures

4. Educational uses and structures

5. Community/recreational center

Industrial

General Purpose:

This land use category is intended to provide an area for basic industrial uses to occur. These areas may be developed with groupings of buildings and structures or individual buildings. The ideal situation would be a mixture of light and moderate industrial uses. These areas are intended to act as an employment center for the immediate area in Norwalk.

Typical Uses:

1. Warehousing and storage

2. Self-service storage facilities

3. Adult entertainment when the required guidelines are met

4. Light manufacturing

5. Necessary accessory uses and structure

6. Religious uses and structures

7. Educational uses and structures

8. Community/recreational center

4-68 | Chapter 4 - Norwalk Comprehensive Plan

Planning Boundary

Planning Boundary

The map below shows the planning boundary created for the Norwalk Comprehensive Plan Update. The planning boundary extends far beyond the existing city limits for several reasons. While not all areas of the planning boundary will develop within the planning horizon year, the large planning boundary provides flexibility with several new areas proposed for different land use types. The map can also be referenced when reviewing proposed development outside of existing city limits within the community’s two-mile extraterritorial review area to see if the proposed land use is consistent with planned future uses for the area. This large planning boundary works to preserve the long-term boundaries of the community by limiting incompatible land development and preserving right-of-way for proposed future streets.

Planning Boundary - Norwalk, IA

Planning Boundary

Norwalk City Limits

Nearby Cities

Floodplain

Chapter 4 - Land Use & Growth Management | 4-69
NORTH .50 MI .25 0

Future Land Use Plan

Future Land Use Plan

The following pages contain the Future Land Use Map for Norwalk. This map will help guide growth and development through 2040 and beyond. The Future Land Use Plan creates opportunities throughout the community for additional residential, commercial, and industrial land. The Land Use Plan shows a large expansion of residential land at all density levels. While low-density residential remains the dominant land use type, the plan shows a significant increase in the amount of proposed mediumdensity residential land, which provides more diverse housing types at density levels that match the look and feel of the community. High-density residential has also been proposed at key intersections throughout the planning boundary.

The plan shows a large, proposed expansion of Industrial land in Norwalk, south of existing city limits and north of North Creek. Commercial industrial flex, general commercial, and higher density residential land is shown along the Interstate 35 corridor. Several proposed arterial and collector streets are shown in dashed lines on the map. Also included is a proposed additional interchange on Interstate 35 near the intersection with Filmore Street. This new interchange would greatly improve Norwalk’s ability to utilize its proximity to Interstate 35 for commercial and industrial / flex land uses.

The chart below shows the breakdown by total acres for each future land use category. Over 30% of land is shown as Agricultural Reserve - mainly areas with floodplain. The dominant built land use is lowdensity residential followed by medium-density residential. Employment land (industrial, commercial industrial flex, and commercial land uses) account for just over 16% of the future land use area.

4-70 | Chapter 4 - Norwalk Comprehensive Plan
31.5% 28.4% 11.8% 7.3% 5.5% 5.0% 3.9% 3.3% 1.9% 1.3% 0%5%10%15%20%25%30%35% Agriculture Reserve Low-Density Residential Medium-Density Residential Industrial Commercial Industrial Flex Parks & Recreation High-Density Residential Commercial Public / Semi-Public New Urbanism Future Land Use Breakdown - Norwalk, IA

Future Land Use Plan

Planning Boundary

Norwalk

Nearby Cities

Parcel

Floodplain

Great Western Trail

Future Greenbelt Corridor

Future Land Use + Streets Draft 11-16-2022

Existing Highway

Existing Major Arterial

Existing Minor Arterial

Proposed Minor Arterial

Existing Major Collector

Proposed Major Collector

Proposed Minor Collector

Agriculture Reserve

Low-Density Residential

Medium-Density Residential

High-Density Residential

New Urbanism

Commercial

Commercial Industrial Flex

Industrial Public / Semi-Public Parks & Recreation Water

0 .50 miles .25

Chapter 4 - Land Use & Growth Management 4-71

Future Streets

4-72 Chapter 4 - Norwalk Comprehensive Plan
0 .50 miles .25 Future Streets Draft 11-16-2022 Existing Highway Existing Major Arterial Existing Minor Arterial Proposed Minor Arterial Existing Major Collector Proposed Major Collector Proposed Minor Collector Planning Boundary Norwalk Nearby Cities Floodplain Great Western Trail

Zoning Compatibility Matrix

Zoning Compatibility Matrix

The zoning compatibility matrix shows the relationship between the future land use categories and the City of Norwalk’s existing zoning districts. Zoning districts have been listed as either compatible (“C”) or partially compatible (“PC”) within each of the corresponding land use categories.

This matrix should be used as the basis for determining the appropriate zoning district(s) for land that is annexed into the City or as a property rezoning is being considered. As noted at the beginning of this chapter, if the zoning desired for a given property is incompatible with its land use designation, the designation on future land use map should be first amended accordingly. In certain situations, an update or amendment to this matrix may be warranted to address changes in development patterns or revisions to the City’s zoning code regulations.

Chapter 4 - Land Use & Growth Management | 4-73
Land Use Categories C - Compatible PC - Partially Compatible Zoning Districts A-R Agricultural Reserve RE-1 Single-Family Rural Estates R-1 Single-Family Residential R-2 One and Two-Family Residential R-3 Medium Density Multiple-Family Residential R-4 High Density Multiple-Family Residential R-5 Mobile Home Park C-O Commercial Office C-1 Neighborhood Commercial C-2 Community Commercial C-3 Highway Service Commercial C-4 Old Town Business TC Town Center Commercial PC Professional Commerce Park IC Industrial Commerce Park M-1 General Industrial CD Conservation District PUD Planned Unit Development Agriculture Reserve / Open Space C C PC Low Density Residential C C C PC C PC Medium Density Residential PC C C C PC PC High Density Residential PC C C C PC PC New Urbanism C PC C PC C C PC PC Commercial / Industrial Flex C C C C C PC PC PC Parks & Recreation C C PC Public / Semi-Public C PC C PC Commercial C C C C C C C PC PC Industrial C C C PC PC
Zoning Compatibility Matrix Norwalk Zoning Compatibility Matrix

Annexation Priority Plan

Annexation Priority Plan

The figure below identifies the annexation priorities for the City of Norwalk. In order to protect the City’s potential growth boundary, Areas “A” should be very high priority for voluntary annexation and infrastructure investment necessary to secure voluntary annexations petitions. Annexation within Areas “B” are secondary priorities, and Areas “C” should occur as development warrants and infrastructure extensions are completed. Due to their limited development potential, the areas not identified on this map should be low priority for annexation. All annexations should be voluntary in nature following the provisions of Iowa Code Section 368.7. The City of Norwalk has no intention to conduct involuntary annexations of territory as further prescribed in the Iowa Code Section 368.11.

Annexation Priority Plan

4-74 | Chapter 4 - Norwalk Comprehensive Plan
Planning Boundary Norwalk City Limits Nearby Cites NORTH .50 MI .25 0 Priority A1 Priority A2 Priority A3 Priority B1 Priority B2 Priority B3 Priority C1 Priority C2 Annexation Priority A1 C2 B1 A2 B2 B3 C1 A3

Land Use Goals and Strategies

Strategies:

1. Consult the Comprehensive Plan when reviewing rezoning requests and development proposals (including subdivisions within the City’s 2-mile extra-territorial review area) to determine if they are consistent with the Comprehensive Plan’s Future Land Use Plan and related goals and strategies.

2. Require new development connect and extend street, water, and sanitary sewer infrastructure necessary to both serve their project and allow for future development of the neighboring properties.

3. Require new developments and subdivisions (including rural development) have public streets built to City design standards and have at least one access point to a paved street network.

4. Consider prohibiting or discouraging private streets.

5. Require any proposed development that cannot connect to City sewer and/or water provide dry sewer mains, easements, plans, and agreements to connect at some point in the future when service is available.

6. Preserve right-of-way and easement corridors for future streets and utilities.

Goal #2 Promote walkable and interconnected neighborhoods to maintain the small town feel of Norwalk.

Strategies:

1. Limit the use of cul-de-sacs and dead-end streets and require collector streets connect through proposed developments to provide multiple streets in which to circulate traffic.

2. Require new development construct sidewalks and trails and connect these trails and sidewalks to existing and future adjoining developments.

Chapter 4 - Land Use & Growth Management | 4-75
Goal #1 Grow Norwalk in a manner that is financially sustainable and maintains and improves the community’s quality of life.

Annexation Goals and Strategies

Goal #1 Conserve Norwalk’s natural resources and protect property from flooding and erosion.

Strategies:

1. Consider adoption of stream buffer, slope preservation, and tree canopy preservation ordinances to protect the natural areas and City’s watersheds from over-development.

2. Prohibit development within the floodplain.

Goal #2 Implement a Strategic Annexation Plan

Strategies:

1. Develop an annexation and infrastructure investment priority plan and work with area property owners within those areas to annex into the City of Norwalk when appropriate to make land available for development.

2. Discourage rural subdivisions within the City’s 2-mile extra territorial review area that either do not meet the City’s subdivision regulations or are not consistent with the Comprehensive Plan.

3. Create an infrastructure extension plan to provide the backbone for major infrastructure, including streets, bridges, sanitary sewers and water service, as necessary to prepare areas for future annexation and development.

4-76 | Chapter 4 - Norwalk Comprehensive Plan

Norwalk, Iowa

Chapter 5 Implementation

Guiding Daily Decisions

City Roles and Responsibilities

Responsibility for implementing this plan lies primarily with the Planning and Zoning Commission and City Staff.

City Council City Staff

City Council sets priorities, approves budgets and tax rates, and often has the final say on key aspects of public and private development projects. The value and legitimacy of this plan is directly related to the degree to which Council members are aware of the plan and expect City actions to be consistent with this plan. Each Council member should have a copy of this plan and be familiar with the major goals and objectives described herein. The City Council should expect and require that staff recommendations and actions both reference and remain consistent with this plan, or that the plan is amended as needed to fit changing conditions.

Planning and Zoning Commission

Land use and development recommendations are a core component of this plan, and the Planning and Zoning Commission has a major role in guiding those decisions. Planning and Zoning Commission members shall each have a copy of this plan and shall be familiar with the content, especially Chapter 4: Land Use. It is generally the responsibility of the Planning and Zoning Commission to determine whether proposed projects are consistent with this plan, and to make decisions and recommendations that are consistent with this plan. In cases where actions that are inconsistent with this plan are deemed to be in the best interest of the City, the Planning and Zoning Commission should initiate efforts to amend the plan to better reflect City interests. This will help to reinforce the legitimacy of the plan as an important tool in guiding City decision making.

City staff have a significant influence on the selection and completion of all kinds of capital and operational projects. It is imperative that City staff know about, support, and actively work to implement the various strategies and actions in this plan.

Specifically, the following people should consult and reference the comprehensive plan during goal-setting processes, annual budgeting, planning for major public projects, and in the review of private development projects:

• City Manager

• Community Development Staff

• Economic Development Staff

• Public Works Staff

These key staff members are expected to know and track the various goals, strategies, and vision laid out in this plan, and to reference that content as appropriate in communications with residents, business owners, and elected and appointed officials. All other staff members should be aware of the plan and the connections between the plan and City projects. The purpose of this extra effort is to strengthen staff recommendations and reinforce the plan as a relevant tool integral to City functions and decision making.

5-78 | Chapter 5 - Norwalk Comprehensive Plan
Implementation

Education and Advocacy

Implementation of this plan also depends on the actions and decisions of entities other than City government. Some responsible, non-municipal parties that the City collaborates with include:

• Norwalk Community School District

• Warren County

• Iowa Department of Transportation

• Iowa Department of Natural Resources

• Des Moines Area Metropolitan Planning Organization

It is necessary to persuade these entities to be active partners in the implementation of the vision, goals, and strategies of this plan.

The following City activities can support this effort:

• Share this plan with each organization, including a memo highlighting sections of the plan that anticipate collaboration between the City and the organization.

• Take the lead role in establishing a collaboration for key or crucial initiatives of the City that require regional collaboration

• Know and communicate the intent of relevant objectives and strategies—partner organizations need to understand and buy into the rationale before they will act.

• Utilize the goals and vision from the plan to support requests for monetary support for City efforts.

Utilizing Existing Tools

Many of the strategies identified in this plan presume the use of existing City ordinances, regulations, and programs. The City’s key implementation tools include:

Operational Tools

• Annual Goal-Setting Process

• Annual Budget Process

• Capital Improvement Plan

Regulatory Tools

• Building and Housing Codes

• Zoning Ordinance

• Subdivision Regulations

• Warren County Ordinances

• State Regulations

• Federal Regulations

Funding Tools

• User Fees

• Tax Abatement

• Tax Increment Financing (TIF) Districts

• Development Fees

• State, Federal, and Private Grant Programs

Surrounding Area Comprehensive Plans

• Warren County Comprehensive Plan

• Madison County Comprehensive Plan

• Des Moines Metropolitan Area Plans

• City of West Des Moines Comprehensive Plan

• City of Cumming Comprehensive Plan

• City of Des Moines Comprehensive Plan

• Iowa DOT Future Improvement Plans

Chapter 5 - Implementation | 5-79

Action Plan

The Action Plan detailed on the following pages is designed as a guide to help City officials, community leaders, and private investors prioritize opportunities and address issues with the City and the surrounding area. The desired vision for the City cannot be created over night. However, by incrementally implemented the recommendations within this plan, the City can achieve the desired outcomes set forth in this comprehensive plan.

Guiding Annual Decisions Annual Report

To provide lasting value and influence, this plan must be used and referenced regularly, especially during budgeting and goal setting processes. To inform the annual processes, City staff will prepare a concise Comprehensive Plan Annual Report for the City Council with input from the Planning and Zoning Commission, including the following information.

• Action items in progress or completed during the prior 12 months (celebrate successes!)

• Staff recommendations for action items to pursue during the next 12 months, including removing or adding items.

• City actions and decisions during the past 12 months not consistent with the plan (if any).

• Staff recommendations for any amendments to the adopted plan.

Link to Annual Goals and Budget

The most important opportunity for this plan to influence the growth and improvement of the City is through the annual goal-setting, budgeting and capital planning processes. These existing annual efforts determine what projects will and will not be pursued by the City, so it is very important to integrate this plan into those processes every year.

The compilation of actions in the next section is a resource to support decisions about how and where to invest the City’s limited resources. The Annual Report should draw from these actions and decisions. The Planning Commission should make formal recommendations for the Council’s consideration, identifying those choices and commitments most likely to further the goals and objectives identified in this plan.

The following process and schedule is recommended.

Step 1 - Staff completes the Comprehensive Plan Annual Report.

Step 2 - Planning Commission considers Annual Report and makes formal recommendation to Council regarding action items to pursue any comprehensive plan amendments.

Step 3 - Department Directors consider Annual Report and Planning Commission recommendations and complete goal setting exercises. Council holds a public hearing and considers adoption of any comprehensive plan amendments.

Step 4 - City Council goal setting

Step 5 - Budget preparation process

Step 6 - Budget Adopted

5-80 | Chapter 5 - Norwalk Comprehensive Plan

Potential Funding Sources

Below are several of the broad funding sources available to help offset costs to complete the projects listed in this plan.

General City Funding

It is assumed that some general funds and/or general obligation bonds will be required to assist with the completion of projects or as a matching sources for state or federal grants.

Special Assessments

Particular projects that benefit individual properties (e.g. water, sewer, or sidewalk installations) could be funded through special assessments whereby the City recoups initial design and construction costs through increased property tax assessments on those properties for a set period of time.

Revenues

Projects related to drinking water, sanitary sewer, and storm water could be funded using system revenues, bonds, or fees collected from system users across the community.

Private

Donations, Grants - Some of the wayfinding projects could be partially or fully funded through private donations or public fund raising. Funding for other infrastructure projects can also be offset by using funds from impact fees the City collects as part of the approval of new development.

State and Federal Grants and Programs

There are many different state or federal grants and programs that many be able to offset the costs of some of the identified projects. Only those programs most likely to award funding to are listed.

Tax Increment Financing (TIF)

Tax increment financing is a program where the additional taxes generated from a development in a TIF district would go towards specified public improvements in a community. This program helps the impacts of new development on a community while improving the attractiveness of the City.

Potential Partners

Norwalk Iowa Chamber of Commerce

Des Moines Area Metropolitan Planning Organization

Warren County Conservation

Warren County Soil and Water Conservation District

Iowa Department of Natural Resources

Iowa Department of Transportation

Norwalk Police Department

Norwalk Fire Department

Norwalk Public Library

Heart of iowa Regional Transportation Agency

Norwalk Community School District

Chapter 5 - Implementation | 5-81
NCC
DMAMPO
WCC
WCSWCD
IDNR
IDOT
NPD
NFD
NPL
HIRTA
NCSD

Action Items: Community Facilities and Services

Goal 1: Maintain reliable, quality services, utilities, and facilities to encourage growth and reinvestment. Support policies that enhance natural areas through the development process.

Develop design guidelines for community gateways and wayfinding signage that welcomes visitors and coheres future and existing aesthetics.

Review

and

Identify areas where infill or redevelopment are feasible and prioritize design standards and development incentives that utilize infill and redevelopment areas

Establish a dangerous and dilapidated program to identify and address dangerous and dilapidated areas.

immediate City of

Norwalk

3 ongoing City of Norwalk

3 ongoing City of Norwalk

Goal 2: Ensure that public facilities and City provided services meet the needs of residents and businesses, especially as new development increases demand for those facilities and services

Develop a first responders and essential services expansion plan to accommodate anticipated growth.

Maintain maintenance and replacement schedule.

Conduct community wide first responder needs assessment to determine future needs of fire and police.

Identify and secure a location for new library facility and support library expansion plans.

1 immediate City of Norwalk, NPD, NFD

2 immediate City of Norwalk, NPL

Identify facilities and services that warrant regular feedback. 5 ongoing City of Norwalk

Develop community communication strategy to gather feedback. 2 ongoing City of Norwalk

Identify processes which warrant community feedback. 3 immediate City of Norwalk

Adopt community engagement procedures into City Code.

Establish procedures to conduct community outreach for necessary processes.

3 ongoing City of Norwalk

5-82 Chapter 5 - Norwalk Comprehensive Plan
Priority Timeline Potential
Strategy Action Item
Partners Funding Opportunities
Provide
and
2 ongoing City of Norwalk, IDNR, WCC, WCSWCD General City Funding Encourage
of
and
1 ongoing City of Norwalk
educational opportunities for City Council to better understand development processes
environmental best practices.
implementation
DNR
EPA standards in development.
Identify prominent landmarks and areas to
4 mid-term City of Norwalk Codify design regulations for community signage. 4 mid-term City of Norwalk Implement wayfinding techniques
the
established signage regulations. 3 immediate City of Norwalk General City Funding, State and Federal Grants and Programs
indicate.
throughout
City using
Encourage connectivity among new and existing developments through pedestrian and bicycle facilities. immediate City of Norwalk
update walkabilty study in Greenways Plan to maintain awareness of priority areas for repair. 2
General
Work with Community Development, Public Works, City Staff and Council, Parks and Recreation, and other relevant public resources to maintain a sidewalk connectivity plan that includes procedures for implementing public and private connections. 2
City Funding, State and Federal Grants and Programs
Explore development incentives that prioritize infill development/ redevelopment and utilize existing public infrastructure.

Action Items: Transportation

Goal 1: Develop a comprehensive system that provides accessibility to traditional and alternative modes of transportation effectively throughout Norwalk.

maintenance and improvement of transportation infrastructure to support business and employment growth.

Goal 2: Provide guidance for safe, efficient, coordinate, and convenient multi-modal transportation system that is integrated with land use and development plans and that protects and enhances natural resources. Encourage development of environmentally-friendly multi-modal transportation facilities.

Chapter 5 - Implementation 5-83
Strategy Action Item Priority Timeline Potential Partners Funding Opportunities
Prioritize
Continue to address
planning. 5 ongoing City of Norwalk Optimize transportation funding through grant opportunities, technical assistance, and local and regional transportation planning. 1 ongoing City of Norwalk, Warren County, DMAMPO
and
Continually update pavement management data every 2-3 years to determine existing and
pavement
5 mid-term City of Norwalk Coordinate city pavement repair schedule with existing and future transportation plans and projects. 5 ongoing City of Norwalk Maximize traffic efficiency
corridor. Continue to support adopted
management plan
Iowa DOT. 2 ongoing City of Norwalk, IDOT Update traffic studies along corridor as needed. 2 ongoing City of Norwalk, IDOT, DMAMPO Coordinate transportation plans with
city and
plans. Identify overlap in Greenspace Plan and Transportation plans to provide non-recreational bike and pedestrian routes throughout the City. 2 immediate City of Norwalk General City Funding, Private, State and Federal Grants and Programs Continue to explore opportunities for transit connectivity to the greater metro area. 2 mid-term City of Norwalk, Warren County, DMAMPO
transportation infrastructure quality through capital improvement
Maintain
utilize pavement repair/ replacement schedule.
desired
qualities.
along Iowa 28
access
with
other
regional
Utilize the Greenways
Plan to guide transportation development. 5 ongoing City of Norwalk Continue to encourage partnerships with public transportation to provide access to employment and essential services. 5 ongoing City of Norwalk, HIRTA Encourage non-vehicular
Support development plans that prioritize non-vehicular transportation. 2 ongoing City of Norwalk Encourage connectivity of both vehicular and non-vehicular transportation through limited use of cul-de-sacs. 2 ongoing CIty of Norwalk
multi-modal
Review traffic incident data and
5 ongoing City of Norwalk Identify signage needs and implement cohesive signage for vehicular and non-vehicular traffic. 5 ongoing City of Norwalk
Conduct parking
4 long-term City of Norwalk Review and
5 ongoing City of Norwalk
Identify
3 ongoing City of Norwalk Establish
to
4 long-term City of Norwalk
Plan and the Comprehensive Parks and Open Space
transportation options and overall connectivity.
Prioritize safety in
transportation development.
identify crash mitigation strategies.
Explore alternative parking space requirements that reduce the need for large parking lots.
analysis for downtown and high-traffic areas.
revise parking regulations to adhere to EPA and ADA standards.
Explore opportunities for more comprehensive multi-modal transportation within the City and throughout the region.
processes which warrant community feedback.
procedures
conduct community outreach for necessary processes.

Action Items: Parks and Recreation

Strategy Action Item Priority Timeline Potential Partners Funding Opportunities

Goal

Prioritize distribution of adequate green space in future development.

with regional governments, agencies, and organizations to connect Norwalk’s recreational trails to the Central Iowa Trails system.

a trail system which enhances the community’s walkabilty, and provides safe access to community parks, schools, and regional

Goal 2: Provide a robust recreation system for all residents and visitors.

for residents

Diversify recreational facilities to expand opportunities for numerous activities.

5-84 Chapter 5 - Norwalk Comprehensive Plan
1:
and
that
Increase
Evaluate and address ADA compliance in
and redevelopment projects in public rights of way. 2 ongoing City of Norwalk Utilize the Greenways Master Plan and the Comprehensive Park and Open Space plans to guide the development of trails, parks, and open spaces. 2 ongoing CIty of Norwalk
Identify areas deficient in recreational space. 3 ongoing City of Norwalk Reevaluate size and spacing standards for neighborhood parks to ensure long term sustainability of management costs. 2 immediate City of Norwalk
Identify opportunities for and encourage involvement in regional trail development. 3 mid-term City of Norwalk, Warren County, DMAMPO Coordinate Norwalk’s transportation and recreation plans with those of the region to optimize projects and development. 3 mid-term City of Norwalk, Warren County, DMAMPO Establish
systems Conduct a community walkabilty study. 5 ongoing City of Norwalk Coordinate the Greenways Master Plan with the Norwalk School District to increase accessibility to school facilities. 2 ongoing City of Norwalk, NCSD
Develop and support a comprehensive system of safe, aesthetically pleasing, and useful open spaces
trails
serve the entire community.
accessibility to trails, parks and open spaces.
improvement
Collaborate
trail
Collaborate with adjacent municipalities
and
Identify and address gaps in recreation opportunities between existing and adjacent communities and agencies. 2 mid-term City of Norwalk, Warren County, Neighboring Municipalities Continue to coordinate with adjacent communities and agencies for recreational facilities and programs. 2 mid-term City of Norwalk, Warren County, Neighboring Municipalities
and
Evaluate physical and financial accessibility to recreational services for residents and visitors of all socioeconomic situations. 3 ongoing City of Norwalk
community members to
and development. 3 ongoing City of Norwalk
Develop a comprehensive inventory of
and
recreational facilities and
3 ongoing City of Norwalk Establish a
to
recreational
for residents and individuals. 2 ongoing City of Norwalk
and agencies for recreation facilities
programs.
Improve accessibility of recreation facilities and programs
visitors.
Engage
help guide recreational planning
current
desired
activities.
means
fund current and additional
opportunities

Action Items: Agriculture and Natural Resources

Chapter 5 - Implementation 5-85
Priority
1: Manage, enhance, and preserve land and water resources and the natural environment by avoiding development on high value wetlands and floodplains. Protect wetlands from unmitigated negative impacts. Establish community development standards that protect floodplains as defined by FEMA and designated on FIRM maps from incompatible development. 2 ongoing City of Norwalk Adopt City Ordinances that support National Pollutant Discharge Elimination System (NPDES) permit. 5 ongoing City of Norwalk Support healthy watersheds. Incentivize robust plantings in new development areas. 3 long-term City of Norwalk, IDNR, WCC, WCSWCD General City Funding Preserve the natural character of the watershed through green space acquisition, floodplain regulations, and drainage corridor and buffer protection. 5 ongoing City of Norwalk Enhance existing natural areas. Identify unique natural areas for restoration projects. 3 ongoing City of Norwalk Apply for funding opportunities for natural restoration projects. 3 ongoing CIty of Norwalk, WCSWCD Community Conservation Grant Program Goal 2: Protect and enhance the natural settings unique to the character of Norwalk. Encourage use of greenspace in new developments. Incentivize establishment of greenspace in new development areas. 3 ongoing City of Norwalk, IDNR Incentivize robust plantings in new development areas. 3 ongoing City of Norwalk, IDNR General City Funding Conserve and restore natural features such as trees and natural waterways. Officialize the City’s natural resources efforts through certification programs such as Tree City. 3 immediate City of Norwalk, IDNR Establish development regulations that conserve and/or restore natural features to that comparable to pre-development. 4 long-term City of Norwalk Support community gardens, farmers markets, and other similar community based food projects. Conduct community needs assessment for local food systems. 3 mid-term City of Norwalk, Food Bank of Iowa, DMARC Identify resources such as space, time, and partnerships to establish a robust local food system. 3 mid-term City of Norwalk, Food Bank of Iowa, DMARC
Strategy Action Item
Timeline Potential Partners Funding Opportunities Goal

Action Items: Housing

Strategy Action Item Priority Timeline Potential Partners Funding Opportunities

Goal 1: Retain and attract residents including young professionals, families, and retirees by supporting a range of housing options.

Support the inclusion of rental housing in neighborhood planning efforts to meet the community’s business and employment growth needs.

2 immediate City of Norwalk

Encourage development and redevelopment of mixed-density neighborhoods.

Produce and maintain community facilities, utilities, and infrastructure that are attractive to developers, current residents, and future residents.

Utilize development and land use plans to guide development and placement of a variety of housing units including single-family detached, townhome, duplex, multifamily apartment buildings, and mixed-use buildings, and other forms of housing sought out by home buyers and renters.

Adopt development standards that cohere the community and enhance the built environment.

Engage residents in community development plans to align new development with the needs of residents.

Incentivize mixed-density housing developments.

2 immediate City of Norwalk

Support the development of homes that serve a diverse population.

Encourage and adopt policies and regulations aimed to integrate housing types and density.

5 ongoing City of Norwalk

2 ongoing City of Norwalk

2 immediate City of Norwalk

2 immediate City of Norwalk

Reduce barriers to housing development opportunities.

Regularly review zoning and subdivision codes to ensure they are not a primary barrier to development.

Provide flexibility for desired development opportunities.

2 ongoing City of Norwalk

2 ongoing City of Norwalk

Goal 2: Maintain quality housing and community character by encouraging the maintenance and improvement of the existing housing stock and properties throughout the community.

Reduce barriers to housing opportunities for current and future residents.

Encourage development of a diverse range of housing opportunities.

Increase accessibility of community services (City of Norwalk, Warren County, and regional housing programs) that aid in housing needs.

2 ongoing City of Norwalk

2 immediate City of Norwalk

Pursue opportunities to improve existing housing stock.

Evaluate need and opportunity for dedicated City funding focused towards housing improvements.

Coordinate existing funding including local organizations and grant opportunities to help improve housing stock.

Increase accessibility of rental information for tenants by including information on City website and various public spaces.

3 mid-term City of Norwalk

3 mid-term City of Norwalk

3 immediate City of Norwalk

Improve the local rental process for both renters and tenants.

Provide renters information regarding rental inspection programs and best practices through the City website and various public spaces.

3 immediate City of Norwalk

5-86 Chapter 5 - Norwalk Comprehensive Plan

Action Items: Economy and Employment

Strategy Action Item Priority Timeline Potential Partners Funding Opportunities

Goal 1: Strengthen the local economy of Norwalk.

Support the development of public and private partnerships that aid existing and potential businesses.

Support the Norwalk Area Chamber of Commerce and provide resources for businesses to engage with the Chamber via the City website and various public spaces.

Develop City-sponsored events to increase awareness of local businesses.

Engage with the Norwalk community to understand economic needs of businesses and residents.

2 ongoing City of Norwalk, NCC

3 ongoing City of Norwalk, NCC

3 ongoing City of Norwalk, NCC

Provide guidance for future economic growth.

Create a Comprehensive Economic Development Strategy (CEDS) plan to help guide future economic growth.

2 immediate City of Norwalk

Coordinate existing community plans to direct development incentives, annual budgets, and capital improvement planning.

Establish procedures to review, revise, and track implementation of all local community plans.

Incentivize involvement of local businesses and organizations to help improve coordination of local plan implementation.

Improve neighborhood resilience and market Norwalk as a premier place to grow families and businesses.

Direct public and private resource investment into business and residential areas that are in early decline to maximize impact and minimize the potential for blight.

Promote community engagement through opportunities such as events and marketing of said opportunities.

2 immediate City of Norwalk

2 mid-term City of Norwalk, NCC

3 long-term City of Norwalk

3 ongoing City of Norwalk

Goal 2: Prioritize development of the physical environment that supports local businesses and increases accessibility to local businesses.

Improve visibility of and access to businesses in Norwalk. Develop signage regulations that support business advertising. 4 long-term City of Norwalk

Support transportation infrastructure that provides intuitive access to business centers.

2 ongoing City of Norwalk

Create walkable, people-centered places that are enjoyable to inhabit and that enable people to walk between businesses.

Use wayfinding signage throughout the community to direct traffic to local businesses.

Analyze parking regulations to optimize parking availability for customers and employees, minimize unused parking, and promote walkable areas.

Ensure that all land uses are connected by safe and efficient vehicular and non-vehicular transportation infrastructure.

3 immediate City of Norwalk

4 long-term City of Norwalk

2 ongoing City of Norwalk

General City Funding, State and Federal Grants and Programs

Focus on revitalization and accessibility of business districts.

Incentivize beautification methods in business districts (such as plantings, murals, and facade improvements) that create an enjoyable space for residents and visitors to walk.

3 ongoing City of Norwalk

General City Funding, State and Federal Grants and Programs

General City Funding, TIF, Private Funding, State and Federal Grants

Chapter 5 - Implementation 5-87

Action Items: Intergovernmental Cooperation

Goal 1: Goal 1: Coordinate with Warren County, neighboring counties, and neighboring municipalities to optimize regional planning efforts.

with Warren County and surrounding municipalities to develop mutually beneficial land use plans.

Coordinate with local partners to develop a cohesive, convenient transportation system.

Communicate and coordinate any changes that may impact Norwalk and its 28E agreements.

Be present and active in decisions that impact adjacent and overlapping municipalities. 2

Goal 2: Partner with local, state, and federal agencies to enhance the culture and resources of Norwalk

Support the Norwalk Community School District in their growth and community engagement activities.

Partner with the Norwalk Community School District for land use, utility, and transportation improvement planning.

Partner with the Iowa Department of Natural Resources to advance planning efforts for natural resources, green space, and trail development.

with the school district in their plans for mutually beneficial building and site improvements.

representatives from Warren County Conservation, Warren County Soil and Water Conservation District, and other state agencies to help guide planning efforts and implementation.

5-88 Chapter 5 - Norwalk Comprehensive Plan
Strategy Action Item Priority Timeline Potential Partners Funding Opportunities
Coordinate
Identify
2 immediate City of Norwalk Form relationships with necessary partners to
procedures for coordinating future growth plans. 3 mid-term City of Norwalk, Warren County, DMAMPO, Neighboring Communities
Participate in intergovernmental councils and committees. 2 ongoing City of Norwalk Identify
ongoing
areas of overlapping or adjacent jurisdiction.
develop
overlapping needs and work to make Norwalk’s plans considerate and beneficial to the region. 2
City of Norwalk, Warren County, DMAMPO, Neighboring Communities
ongoing
Establish
immediate City of Norwalk,
Communities
City of Norwalk, Warren County, DMAMPO, Neighboring Communities
intergovernmental communication procedures in the Hazard Mitigation Plan. 2
Warren County, Neighboring
Engage with the
immediate City of Norwalk, NPSD Promote community
ongoing City of Norwalk
Collaborate
3 mid-term City of Norwalk, NPSD Include
activities to provide insight on school transportation needs. 3 immediate City of Norwalk, NPSD
Norwalk Community School District regarding community activities. 2
activities on the City website and various public spaces. 2
a school transportation representative in transportation planning
Seek
3 mid-term City of Norwalk, IDNR, WCSWCD, WCC Promote local
3 immediate City of Norwalk, IDNR, WCSWCD, WCC
conservation efforts on the City website and various public spaces.

Engage in maintaining and advertising the Warren County Hazard Mitigation Plan.

Encourage energy efficiency in buildings, lighting, and infrastructure. 4

Goal 1: Encourage sustainable practices throughout the community including development and infrastructure practices. Promote environmental sustainability.

Support development practices that allow for the capture and use of clean energy that does not negatively impact neighboring properties or future growth opportunities.

Continually monitor local changes that may affect the Warren County Hazard Mitigation Plan. 3

Promote education and awareness regarding hazards and risks in the community.

Establish general cost/benefit analysis procedures to evaluate efficiency of public expenditures and improvements.

Support economic sustainability.

Utilize CEDS, Norwalk Comprehensive Plan, Long Range Transportation Plan, and other local plans to help prioritize future activities and maximize funding strategies for projects.

Goal 2: Establish and promote a unique and welcoming community culture.

Collaborate with local leaders to improve residents’ connections to City departments, local nonprofit organizations, and each other.

Increase opportunities to engage with the local government.

Continue providing and promoting educational opportunities for residents to meet local leaders and better understand processes of local government. 3

Reduce barriers to gatherings by providing temporary exceptions to regulations such as noise ordinances. 4

Norwalk

of Norwalk

immediate

City

City of Norwalk

Chapter 5 - Implementation 5-89
Strategy Action Item Priority Timeline Potential Partners Funding Opportunities
long-term City
of Norwalk
long-term City of Norwalk
3
Norwalk,
ongoing City of
Warren County
ongoing City of Norwalk
3
2 immediate City of Norwalk
2 ongoing City of Norwalk
2 immediate City of Norwalk
mid-term City of Norwalk
Encourage interaction among residents through community-wide events and small-scale gatherings such as neighborhood block parties. mid-term City of
mid-term City
Develop accessible and simple guidelines for establishing moderately scaled community focused events. 2
Encourage neighborhood involvement to increase safety through active participation of residents.
Create safe and inviting spaces for residents to inhabit in their leisure time. 2
of Norwalk
mid-term
Establish a community communication network that promotes information sharing. 3
Action Items: Resilience

Action Items: Land Use

Strategy Action Item Priority Timeline Potential Partners Funding Opportunities

Goal 1: Grow Norwalk in a manner that is financially sustainable and maintains and improves the community’s quality of life. Consult the Comprehensive Plan when reviewing rezoning requests and development proposals (including subdivisions within the City’s 2-mile extraterritorial review area) to determine if they are consistent with the Comprehensive Plan’s Future Land Use Plan and related goals and strategies.

Require new development connect and extend street, water, and sanitary sewer infrastructure necessary

Require new developments and subdivisions (including rural development) have public streets built to City design standards and have at least one access point to a paved street network.

Adopt and enforce regulations that preserves and enhances community character through the built environment.

Require any proposed development that cannot connect to City sewer and/or water provide dry sewer mains, easements, plans, and agreements to connect at some point in the future when service is available.

corridors for future streets and utilities.

Goal 2: Promote walkable and interconnected neighborhoods to maintain the small town feel of Norwalk.

Require that collector streets connect through proposed developments to provide multiple streets in which to circulate traffic

mobility/connectivity policy that limits the use of cul-desacs and dead-end roads.

5-90 Chapter 5 - Norwalk Comprehensive Plan
Adopt a formal
for
development and rezoning requests. 2 immediate City of Norwalk Review the Comprehensive Plan annually and make necessary amendments. 3 ongoing City of Norwalk
Future Land Use Plan compliance review process
new
new
2 ongoing City of Norwalk Support infill development and proposals adjacent to existing infrastructure. 2 ongoing City of Norwalk
Require
developments to allow for interconnection with public infrastructure.
Establish and enforce street design standards. 3 mid-term City of Norwalk Establish and enforce mobility/connectivity policies. 3 mid-term City of Norwalk
Explore overhaul of the City’s development regulations to support plan implementation. 2 immediate City of Norwalk Review impact of Zoning Ordnances (consider a Health Improvement Assessment) on the wellbeing of current and future residents. 4 mid-term City of Norwalk
Continue to require that new developments to have City utility
2 ongoing City of Norwalk Promote new
or
2 ongoing City of Norwalk
easement
Adopt policies that
and
corridors. 2 immediate City of Norwalk Promote development that adheres to right-of-ways and easement corridor policies. 3 mid-term City of Norwalk
connections.
development in areas that City infrastructure is available
planned.
Preserve right-of-way and
preserve right-of-way
easement
Adopt
2 mid-term City of Norwalk Coordinate
2 mid-term City of Norwalk
a
mobility/connectivity policies to regional and local transportation plans to improve coordination of minor and major traffic arteries.

Strategy

Require new development construct sidewalks and trails and connect these trails and sidewalks to existing and future adjoining developments.

Goal 3: Conserve Norwalk’s natural resources and protect property from flooding and erosion.

Consider adoption of stream buffer, slope preservation, and tree canopy preservation ordinances to protect the natural areas and City’s watersheds from over development.

Action Items: Land Use (Continued) & Annexation

Prohibit development within established floodplains.

Adopt development standards that include appropriate setbacks and mitigation for natural waterways including the analysis and stabilization of waterways adjacent to new development.

Support floodplain delineation studies when floodplain-adjacent development occurs.

Encourage a local culture that promotes and enhances natural spaces including greenbelt preservation along the North River.

Goal 4: Implement a Strategic Annexation Plan

Develop an annexation and infrastructure investment priority plan and work with area property owners.

Discourage rural subdivisions within the City’s 2-mile extra territorial review area that either do not meet the City’s subdivision regulations or are not consistent with the Comprehensive Plan.

Consider coordinating with the county to develop local policies that encourage growth within the City’s 2-mile extra territorial review area to be congruent with the City’s Comprehensive Plan.

Promote development that adheres to the Comprehensive Plan.

Create an infrastructure extension plan to provide the backbone for major infrastructure, including streets, bridges, sanitary sewers and water service, as necessary to prepare areas for future annexation and development.

Chapter 5 - Implementation 5-91
Priority Timeline Potential Partners
Action Item
Funding Opportunities
Update walkabilty study in
Plan. 4 long-term City of Norwalk Consult Greenways Master Plan and
and
Plan in development approval processes. 2 ongoing City of Norwalk
Greenways Master
Comprehensive Parks
Recreation
Conduct a natural resources
and
analysis to identify natural areas of
3 mid-term City of Norwalk, WCSWCD Community Conservation Grant Program
inventory
watershed
interest.
3 long-term City of Norwalk
2 ongoing City of Norwalk
2 mid-term City of Norwalk
Coordinate resident outreach plan for annexation areas. 2 immediate/ ongoing City of Norwalk Consider annexation incentives for property owners within annexation areas. 3 long-term City of Norwalk
2 immediate City of Norwalk, Warren County
2 ongoing City of Norwalk
Identify potential infrastructure
for annexation areas. 2 mid-term City of Norwalk Develop funding opportunities inventory for future infrastructure needs. 2 ongoing City of Norwalk
needs

Appendix A Community Profile

Norwalk, Iowa

Introduction

The Community Profile is a summary of current conditions and recent trends in Norwalk, based on the best available data from the City of Norwalk, Warren County, Iowa Department of Natural Resources, Iowa Department of Transportation, United States Department or Agriculture, National Resources Conservation Services, ESRI Business Analyst, United State Census Department, and other resources.

The purpose of the Community Profile is to enable readers of the plan to identify current conditions in Norwalk and with that information make informed choices about the future of the community. This report is included as an appendix to the Norwalk 2042 Comprehensive Plan so that it may be easily updated from time to time as new data becomes available.

A-104 | Appendix A -Norwalk Comprehensive Plan

Review of Previous Plans and Studies

2013 & 2016 Comprehensive Plan

NORWALK, IOWA

The Comprehensive Plan created for Norwalk in 2013 was designed to promote orderly growth and development for the community, as well as provide policy guidelines to enable citizens and elected officials to make informed decisions about the future of the community. The overarching purpose and components of the plan are listed below:

The Purpose of the Plan:

• Guide Future Development

• Encourage a Strong Economic Base

• Serve as an Information / Management Tool

• Analyze Existing Conditions

• Evolve as the Community Changes

• Establish Goals

• Guide with Recommendations

• Encourage Community Engagement

• Identify and Build Upon Community Character

Plan Components:

• Introduction

• Public Participation and Collaboration

• Natural Resources

• Community Character and Redevelopment

• Land Use

• Transportation

• Housing

• Economic Development

• Hazard

• Demographics

• Community Facilities

• Implementation

Identification of Sub Areas

The 2013 Comprehensive Plan also identifies three sub areas within the community that require further study, including the creation of a detailed master plan.

To review the full plan please visit: https://p1cdn4static.civiclive.com/UserFiles/Servers/ Server_6519743/File/Government/Departments/ Economic%20Development/2013_CompPlan5946.pdf

Appendix A - Community Profile | A-105
COMPREHENSIVE PLAN 2013

2013 & 2016 Comprehensive Master Plan

A-106 | Appendix A -Norwalk Comprehensive Plan
Appendix A - Community Profile | A-107

Sub Area 1 Master Plan

Sub Area 1, located in the Northeast region of Norwalk, has been identified as a quickly growing section of the City’s planning area demonstrating strong potential for development. In addition, the area’s capacity and demand for continued growth serve as key opportunities to create and build upon a cohesive community vision. The community has a desire to plan for and accommodate growth while retaining Norwalk’s small-town atmosphere that makes it an attractive place to live, work and play.

As the population has continued to grow, the city has seen an increased demand for diversity within the transportation network.

The City of Norwalk received a grant from the Greater Des Moines Metro Planning Organization (DMAMPO) to create a plan for Sub Area 1 as a viable and recognizable urban development node. In the Fall of 2015, the City of Norwalk began the process to develop a detailed master plan for the area identified on the Future Land Use Plan as Sub Area 1 with the goal of creating a vibrant and walkable urban center for the community that provides a diverse range of options for housing, retail, recreation, and employment. The Sub Area 1 Master Plan is intended to promote new urbanism concepts and focus on the following:

To review the full plan please visit:

https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_6519743/File/Government/Boards%20and%20 Commissions/Planning%20and%20Zoning/Norwalk%20Sub%20Area%201%20Booklet%20Draft_02152017.pdf

A-108 | Appendix A -Norwalk Comprehensive Plan
1. Land Use Natural Resources and Parks Zoning
2. Building Form
3. Transportation (including complete streets principles)
4. Utilities
5. Implementation

MASTER PLAN

Appendix A - Community Profile | A-109 14 NORWALK SUB AREA 1 MASTER PLAN NORWALK SUB AREA 1 LAND USE MAP NORWALK, IOWA MARCH 2016 MIXED USE Olson Consultants Architecture-Planning-Appraising 2832 104 St STE 201 Urbandale Iowa 50322 Austin Fisher Mail: fshr.austin@gmail.com -Olson Consultants Architecture-Planning-Appraising 2832 104 St STE 201 Urbandale Iowa 50322 Bob Olson Mail: bobo@proxymity.com -Olson Consultants Architecture-Planning-Appraising 2832 104 St STE 201 Urbandale Iowa 50322 Austin Fisher E-Mail: fshr.austin@gmail.com Phone: 515-705-8418 Olson Consultants Architecture-Planning-Appraising 2832 104 St STE 201 Urbandale Iowa 50322 Bob Olson E-Mail: bobo@proxymity.com Phone: 515-975-5090 Olson Consultants Olson Consultants MAY 2016 COMM MDR COMM COMM HDR INDUSTRIAL FLEX INDUSTRIAL FLEX AG RESERVE / VLDR LDR DRAINAGE DRAINAGE DRAINAGE DRAINAGE MDR AG RESERVE / VLDR MDR AG RESERVE / VLDR MIXED USE COMM COMM COMM OPEN SPACE LDR MDR OPEN SPACE MU MU MU MU MU MDR OS OS COMM PUBLIC LDR LDR MDR MU MU LDR OFFICE/ BUSINESS PARK DRAINAGE LDR MDR LDR MDR INDUSTRIAL FLEX MDR LDR AG RESERVE / VLDR LDR AG RESERVE / VLDR MDR COMM COMM COMM COMM TOWN SQUARE DRAFT: 07.06.2016 NORWALK SUB AREA 1 TRAILS PLAN NORWALK, IOWA MAY 2016 400' 800' 200' 0' MU MU LDR LAND USE PLAN The land use plan for Sub Area 1 encompasses current zoning conditions and distinguishes individual uses based on color. Incorporated are a mix of uses including Low, medium, and high residential; commercial space, mixed-use locations, office space, drainage districts, industrial flex space, agricultural reserve/VLDR; and existing park and recreational areas. Determining the highest and best uses for these land segments regarding accommodation of future growth will involve thorough analysis of the City’s current land use plan in tandem with evaluation of elements such as projected population growth, community demographics, and anticipated demand. LEGEND Open Space Public Low Density Residential Medium Density Residential High Density Residential Mixed Use Commercial Industrial Flex Office/Business Park Agricultural Reserve / VLDR 19 NORWALK SUB AREA 1 MASTER PLAN

Comprehensive Park and Open Space Plan

The Comprehensive Park and Open Space Plan is a planning document used to guide future Norwalk park system improvements and acquisitions. The planning process was a joint effort between the City of Norwalk and Snyder & Associates, Inc. The concept was to have a stand-alone plan that aligned with the Comprehensive Plan adopted in 2013 and updated in 2016.

The planning process included an inventory of existing facilities and amenities, public input, geographic review, and service coverage analysis. From this, the following goals were defined:

1. Establish a comprehensive plan to guide the acquisition and development of park and recreation facilities and amenities.

2. Determine a park classification system to evaluate park types and establish service area criteria.

3. Identify potential park locations in areas that have been identified as deficient in the park system as future development occurs.

4. Provide a diversity of recreational facilities to allow for equal opportunities for all residents and visitors.

5. Establish accessible facilities which are compliant with current ADA regulations and guidelines.

6. Establish a trail system which enhances the community’s walkabilty, and provides safe access to community parks, schools, and regional trail systems.

7. Establish a list of improvements to existing park sites and estimates of cost so priorities can be established by City staff and the Parks and Recreation Advisory Commission.

8. Establish a set of needs, priorities, and potential costs for key future park improvements.

The plan was adopted in January 2018 and remains the guiding document for parks and open space planning in Norwalk.

To review the full plan please visit: https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_6519743/File/Government/Departments/Parks%20 and%20Rec/Norwalk%20Comprehensive%20Park%20and%20Open%20Space%20Plan%20final.pdf

A-110 | Appendix A -Norwalk Comprehensive Plan COMPREHENSIVE PARK AND OPEN SPACE PLAN JANUARY 5, 2018
Appendix A - Community Profile | A-111
MAP 2.3 MAP 2.4

Comprehensive Park and Open Space Plan

A-112 | Appendix A -Norwalk Comprehensive Plan
3.1
MAP
3.2
MAP

Greenways Master Plan

The City of Norwalk has experienced growth over the last several years and needs improved connectivity of established and new neighborhoods to local amenities, community resources, and nearby regional trail systems.

After meeting with the city and gaining an understanding of their vision, Bolton & Menk prepared an approach that allowed the city to use a custom created data collector application through ESRI ArcGIS and complete a focused data collection exercise with volunteers. The Norwalk Greenways Work-group inventoried all sidewalks and trails in the community and evaluated the pavement condition, width, and locations and descriptions of trip hazards encountered.

Through an in-depth analysis of the collected field data and discussions with community members at multiple community outreach events, Bolton & Menk formulated a series of improvement recommendations that created manageable projects the city could implement over the next 10 years. Recommendations focused on establishing significant trail connections, improving pedestrian amenities at key intersections, and filling existing sidewalk gaps.

The master plan seeks to establish a functioning trail system in Norwalk, create safe routes to schools, and reconnect community members to amenities. The master plan describes strategic implementation strategies, project budgets, funding resources, and information pertaining to construction standards.

To review the full plan please visit: https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_6519743/File/Government/Departments/Parks%20

and%20Rec/Parks/Greenways%20Master%20Plan%20Report-reduced%20(1).pdf

Appendix A - Community Profile | A-113 COMPREHENSIVE PAR OPEN SPAC Draft | November 2019
A-114 | Appendix A -Norwalk Comprehensive Plan 26 Greenways Master Plan Greenways Master Plan City of Norwalk, IA September 2019 Points of Interest Legend Norwalk City Limits 5 Minute Walking Radius (1/4 Mile) 10 Minute Walking Radius (1/2 Mile) Parcels ! I Future Parks Parcels NORWALK, IA GREENWAYS MASTER PLAN POINTS OF INTEREST - PARKS 50th Beardsley Street Sunset Drive 14 PARKS 2 Warrior Orchard Hills Park 3 4 8 Norwalk McAninch Sports Complex Billy O. Phillips Park Elizabeth Holland Park McDonald’s Woods Park City Park / Dog Park Brownie Park Norwalk Aquatic Center Windflower Park Delaware Street 80th Ave Legend Norwalk City Limits Roads Parcels ! I Sidewalk Inventory Overall Condition Good Fair Unsatisfactory Sidewalk Gap Incomplete/Planned Figure 3.3: Park Service Areas Map 25 Greenways Master Plan Greenways Master Plan September 2019 Legend Norwalk City Limits Roads ! I Legend Norwalk City Limits Roads Parcels ! I Sidewalk Inventory Overall Condition Good Fair Unsatisfactory Sidewalk Gap Incomplete/Planned (48.7 miles) (13.7 miles) (.32 miles) (20.9 miles) (4.2 mi) NORWALK, IA GREENWAYS MASTER PLAN EXISTING SIDEWALK / PATH CONDITIONS 50th Ave Beardsley Street EXISTING SIDEWALK / PATH CONDITIONS 28 80th Ave Figure 3.2: Exsiting Sidewalk Path Conditions Map 30 Greenways Master Plan Map Document: H:\NORWALK_CI_IA\T62119380\GIS\Maps\Norwalk 24x36 Gap Analysis Map.mxd Date Saved: 11/13/2019 1:53:17 PM Greenways Master Plan City of Norwalk, IA November 2019 Points of Interest Legend Sidewalk Gap Norwalk City Limits Roads Parcels 5 Minute Walking Radius (1/4 Mile) 10 Minute Walking Radius (1/2 Mile) ! I Norwalk Public Parks Norwalk Schools Community Churches Civic & Community Hubs NORWALK, IA GREENWAYS MASTER PLAN GAP ANALYSIS MAP 50th Ave Beardsley Street G 14 Sunset Drive GAP ANALYSIS MAP W. North Ave Delaware Street 28 80th Ave Figure 3.7: Gap Analysis Map
Greenways Master Plan

Demographics

Projected Population Growth 2020-2050

The following information is useful and is utilized in determining future land use needs. Growth forecasting predicts outcomes of when, where and how much population and household growth Norwalk can expect in the next 20 years.

According to United States Census, between 2010 and 2020 the population of Norwalk increased by 3,854 people to 12,799 people. This is an increase of about 4.31% per year or 43.1% over the 10 year timespan. Historically, the cumulative annual growth rate of the community is 45.1% every 10 year. Growth projections can also be made using linear growth calculations and exponential growth calculations as show in the table below.

To assist in future land use planning, this plan uses the average of the linear growth projections, exponential growth projections, and the cumulative annual growth rate of 4.31%. The table below shows that Norwalk is projected to have a population of 14,960 people in 2030, 20,461 people in 2040 and 28,262 people in 2050.

These chart below shows the observed and projected growth of Norwalk and the Des Moines Metropolitan Area from 1960 through 2050. The City’s rate of historical and projected growth tracks the metro area’s historical and projected rate of growth, but at a slightly lower rate.

Appendix A - Community Profile | A-115
14960 20461 28262 9649 10564 11479 16659 23871 34206 1328 1745 2676 5726 6884 8945 12799 18571 26947 39100 100000 200000 300000 400000 500000 600000 700000 800000 900000 1000000 1100000 0 5000 10000 15000 20000 25000 30000 35000 40000 45000 1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 NORWALK POPULATION + GROWTH PROJECTIONS Population*** Linear Growth* Exponential Growth** Cumulative Average % Growth Projection Des Moines Metro Population 0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% 35.0% 40.0% 45.0% 50.0% 55.0% 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020 NORWALK + DES MOINES METRO GROWTH RATES 1920-2020 Norwalk 10yr Growth Rate Des Moines Metro 10yr Growth Rate Norwalk Cummulative Average Growth Rate Des Moines Metro Cummulative Average Growth Rate

Population by Age and Gender

The chart below shows the distribution by 5 year age cohorts of Norwalk’s populace. The chart shows a healthy distribution across the age ranges and gender that usually include working age adults and their families. A good distribution of both young and established families supports a community’s ability to continue supporting existing businesses, schools and organizations. Additional economic and household growth can also be support by a healthy distribution of ages and genders.

Median Age

Norwalk

37.4

Warren County State of Iowa

39.3

38.1

A-116 | Appendix A -Norwalk Comprehensive Plan
Source: Iowa State Data Center

Employment

Employment information is an important indicator of current economic conditions and potential economic growth opportunities for the residents and businesses of Norwalk. The majority of Norwalk’s residents have jobs classified as white collar positions, followed by blue collar and services. The unemployment rate is medium and estimated 12 %. The largest labor force is Business/Financial followed by Sales. The chart below shows a comparison with Warren County and there are many categories that are much smaller and larger in the category such as Construction/Extraction and Education. It is also known that many workers commute to the surrounding region for work.

Appendix A - Community Profile | A-117
Labor Force By Occupation

Income

The median household income in Norwalk is estimated at $81,610, and the per capita income is $35,678. Per capita income (PCI) or average income measures the average income earned per person in a given area (city, region, country, etc.) in a specified year. It is calculated by dividing the area’s total income by its total population. Median income is the amount that divides the income distribution into two equal groups, half having income above that amount, and half having income below that amount.

Both are increasing as Norwalk’s population continues to grow and the City’s economy continues expanding.

A-118 | Appendix A -Norwalk Comprehensive Plan

Des Moines Metro Area Roadways

Norwalk, circled in green on the maps above, is located directly south of the City of Des Moines, central to the Des Moines Metro Area. Norwalk is easily accessed by State Highway 28 (north-south), State Highway 5/US Highway 65 to the north (east-west), and County Road G14 (east-west).

Norwalk’s citizens and business are serviced by Heart of Iowa Regional Transit Agency’s (HIRTA) public transit service which include student transportation, general public transit, non-emergency medical transportation, senior transportation, and the Job-Link Commuter Shuttle - serving Michael Food, Produce Innovations, Windsor Windows and Doors, Capital City Fruit, Rowe Electronics and La Quercia.

Previous planning efforts have laid out potential pathways for future arterials, collectors, trails and improved intersections in Norwalk, which are shown on the follow map.

Appendix A - Community Profile | A-119
Transportation
A-120 | Appendix A -Norwalk Comprehensive Plan Printed By: cjanson, File: C:\Users\cjanson\Documents\ArcGIS\Pr ojects\Norwalk\Maps for Appendix A.aprx Print Date: 1/22/2022 Data Sources: City of Norwalk CITY OF NORWALK WARREN COUNTY, IOWA FUTURE MOBILITY 2042 COMPREHENSIVE PLAN Maf fi ttLakeRd Pi neAve VeteransPkwy 5 WillowCreek GolfCourse Orilla 50th Ave 50thAv e Delaware St 43rd Pl B eards l e ySt Dakot aSt E l kHornS t Clark eSt 45th A v e G14Hw y S Or illaRd Ar myPostRd 28 5 5 5 EchoValley CountryClub BeardsleySt ElmAve HighRd CoolidgeSt B e ardsleySt NorthA ve 80thAve R57Hwy G14 Hw y FleurDr SunsetDr 28 28 LegacyGolf Club EchoValley CountryClub Lakewood Norwalk G24 H wy 28 Existing Collectors Proposed Collectors Principal Arterials Existing Arterials Proposed Arterials Existing Trails Planned Trails Proposed Trails Potential Intersection Improvements Norwalk City Limits

Commuting

According to the State of Iowa Data Center and the 2010 United States Census. The mean travel time to work has decreased in the past 18 years by half a minute to 22 minutes. This is not surprising as the drive to popular business areas in Des Moines is about 20 minutes. The majority of workers in Norwalk commute from outside of city limits, only a small amount of residents stay in town for work. According to 2018 data from the US Census Bureau, there is a large portion of workers coming into Norwalk from outside communities as well.

Appendix A - Community Profile | A-121

Below is feedback from the projects community input survey on residence commute information.

Travel Time To Work

A-122 | Appendix A -Norwalk Comprehensive Plan 0.00%5.00%10.00%15.00%20.00%25.00%30.00%
than 10 minutes 10 to 14 minutes 15 to 19 minutes 20 to 24 minutes
to 29 minutes
to 34 minutes
to 44 minutes
to 59 minutes
or more minutes
Less
25
30
35
45
60
0.00%20.00%40.00%60.00%80.00%100.00%120.00% Worked in state of residence Worked in county of residence Worked outside county of residence Worked outside state of residence
In Place Worked in place of residence Worked outside place of residence
Place of Work Living
Appendix A - Community Profile | A-123 Drinking Water System Printed By: cjanson, File: C:\Users\cjanson\Documents\ArcGIS\Pr ojects\Norwalk\Maps for Appendix A.aprx Print Date: 1/21/2022 Data Sources: City of Norwalk CITY OF NORWALK WARREN COUNTY, IOWA DRINKING WATER SYSTEM 2042 COMPREHENSIVE PLAN Maf fi ttLakeRd Pi neAve VeteransPkwy 5 WillowCreek GolfCourse Orilla 50th Ave 50thAv e Delaware St 43rd Pl B eards l e ySt Dakot aSt E l kHornS t Clark eSt 45th A v e G14Hw y S Or illaRd Ar myPostRd 28 5 5 5 EchoValley CountryClub BeardsleySt ElmAve HighRd CoolidgeSt B e ardsleySt NorthA ve 80thAve R57Hwy G14 Hw y FleurDr SunsetDr 28 28 LegacyGolf Club EchoValley CountryClub Lakewood Norwalk G24 H wy 28 NorwalkWaterMain2022 Norwalk City Limits

Sanitary Sewer System

A-124 | Appendix A -Norwalk Comprehensive Plan
Appendix A - Community Profile | A-125
Printed By: cjanson, File: C:\Users\cjanson\Documents\ArcGIS\Pr ojects\Norwalk\Maps for Appendix A.aprx Print Date: 1/21/2022 Data Sources: City of Norwalk CITY OF NORWALK WARREN COUNTY, IOWA STORMWATER SYSTEM 2042 COMPREHENSIVE PLAN Maf fi ttLakeRd Pi neAve VeteransPkwy 5 WillowCreek GolfCourse Orilla 50th Ave 50thAv e Delaware St 43rd Pl B eards l e ySt Dakot aSt E l kHornS t Clark eSt 45th A v e G14Hw y S Or illaRd Ar myPostRd 28 5 5 5 EchoValley CountryClub BeardsleySt ElmAve HighRd CoolidgeSt B e ardsleySt NorthA ve 80thAve R57Hwy G14 Hw y FleurDr SunsetDr 28 28 LegacyGolf Club EchoValley CountryClub Lakewood Norwalk G24 H wy 28 Storm Gravity Main Norwalk City Limits
Stormwater System
A-126 | Appendix A -Norwalk Comprehensive Plan Printed By: cjanson, File: C:\Users\cjanson\Documents\ArcGIS\Pr ojects\Norwalk\Maps for Appendix A.aprx Print Date: 1/21/2022 Data Sources: City of Norwalk CITY OF NORWALK WARREN COUNTY, IOWA FIBER OPTIC NETWORK 2042 COMPREHENSIVE PLAN Maf fi ttLakeRd Pi n eA v e VeteransPkwy 5 WillowCreek GolfCourse Orilla 50th Ave 50thAv e Delaware St 43rd Pl B eardsle ySt Dak o t aSt E l kHornS t Clark eSt 45th A v e G14Hw y S Or illaRd Ar myPostRd 28 5 5 5 EchoValley CountryClub BeardsleySt E l mAv e HighRd Coo l idgeSt Be ardsleySt NorthA ve 80thAve R5 7H wy G14 Hw y FleurDr SunsetDr 28 28 LegacyGolf Club EchoValley CountryClub Lakewood Norwalk G24 H wy 28 Fiber Optic Conduit Norwalk City Limits Fiber Optic Network

Community Facilities

Appendix A - Community Profile | A-127
A-128 | Appendix A -Norwalk Comprehensive Plan Watersheds

Development Limitations

Appendix A - Community Profile | A-129

Adjacent Jurisdictions - Future Land Use Plans

Warren County Future Land Use Plan

The majority of the City of Norwalk is located in Warren County. Warren County last updated their Future Land Use map as part of a Comprehensive Plan update in May of 2002.

The County’s Future Land Use plan proposes mostly Low Density Residential Uses and some Medium Density Residential growth around Norwalk. Because the County’s plan is 20 years old, and the other surrounding jurisdictions have updated their plans more recently, the information provided in the County’s plan will not have a significant impact on Norwalk’s Future Land Use planning efforts.

A-130 | Appendix A -Norwalk Comprehensive Plan

West Des Moines Future Land Use Plan

The City of West Des Moines lies North, Northwest, and West of Norwalk. The two cities share a border. The City of West Des Moines Future Land Use map was last updated in 2021 and shows considerable growth west along Veteran’s Parkway, north of Cumming. The proposed land uses around Norwalk’s boundary include Office, Regional Commercial, Single Family Residential, and Medium Density Residential Use.

A-132 | Appendix A -Norwalk Comprehensive Plan

Cumming Future Land Use Plan

The City of Cumming lies west of the City of Norwalk and the two cities share a border. The City of Cumming’s Future Land Use map was last updated in 2021 and shows additional Low Density Residential growth along the western edge of the City of Norwalk. The map also shows some small commercial develoment along G14, just west of the border between the two cities. Cumming’s Future Land Use map also shows considerable planned commercial and industrial growth around the City’s interchange at Interstate 35 and G14.

Appendix A - Community Profile | A-133
E FUTURE LAND USE MAP CITYOFCUMMING WARRENCOUNTY,IOWA CummingCityLimits Future Land Use Conservation Highway Commercial Low Density Residential Medium Density Residential Mixed Use Central Business Light Industrial Park 100 Year Floodplain Map Adopted: Sept. 27, 2021 Professional Commerce The data provided in this map is provided for informational and planning purposes only. The City of Cumming and MSA are not responsible for the misuse or misrepresentation of the data. 110TH LN CUMMING RD 130TH ST Great Western Trail CLARKE ST ORILLA RD 15TH AVE 30TH AVE S 35TH ST 25TH AVE 10TH AVE COOLIDGE ST 60TH ST 50TH ST 43RD ST G14 HWY 20TH AVE 44TH ST 35TH ST 29TH ST CUMMING AVE 44TH PL 34TH ST 58THPL CATTAILCREEK FERNWOOD DR 42NDLN 40TH AVE MISTY LN DOE RUN 30TH AVE COOLIDGE ST 10TH AVE 60TH ST G14 HWY 10TH AVE G14 HWY CUMMING AVE Middle South Creek 35

Madison County Future Land Use Plan

Madison County neighbors Warren County to the west, sharing a border with the proposed annexation area for the City of Norwalk. Madison County’s Land Use Map and ordinance were last updated in 2002. Since then, the County has experienced significant growth in the northern-most part of the county. The area along Interstate 35, which will be adjacent to the City of Norwalk, is primarily reserved for agricultural uses. This proposed land use will not have an impact on the future of Norwalk.

A-134 | Appendix A -Norwalk Comprehensive Plan

Norwalk, Iowa

Appendix B Survey Results

Norwalk Comprehensive Plan

How many people are in your household?

How many years have you lived in the City of Norwalk?

B-136 | Appendix B - Norwalk Comprehensive Plan Survey Results 8/5/2021 Norwalk Comprehensive Plan
1/13
https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11
Answered: 580 Skipped: 0 0 50 100 150 200 250 1 2 3 4 5 6 7+ 1 29 5% 2 108 18.62% 3 97 16.72% 4 207 35.69% 5 100 17.24% 6 32 5.52% 7+ 7 1.21%
Answers Count Percentage

8/5/2021 Norwalk Comprehensive Plan

Please select the top three qualities you believe make the City of Norwalk a great place to live today

https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11

Appendix B - Survey Results | B-137
2/13 Answered: 580 Skipped: 0 0 50 100 150 200 0-5 6-10 11-15 16-20 20+I do not live ... 0-5 179 30.86% 6-10 101 17.41% 11-15 90 15.52% 16-20 55 9.48% 20+ 135 23.28% I do not live in the City of Norwalk 20 3.45%
Answers Count Percentage

How would you rate the quality of life in Norwalk?

B-138 | Appendix B - Norwalk Comprehensive Plan 8/5/2021 Norwalk Comprehensive Plan
3/13 Answered: 574 Skipped: 6 0 100 200 300 400 500 LocationGrowingCommun... FriendlyandW... ParkandRecre... SchoolDistric... CommunityServ... LocalBusiness... QualityofHou... Location 495 85.34% Growing Community 37 6.38% Friendly and Welcoming Commuity 275 47.41% Park and Recreational Opportunities 67 11.55% School District 453 78.1% Community Services 26 4.48% Local Businesses 40 6.9% Quality of Housing 165 28.45%
https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11
Answers Count Percentage

8/5/2021

Norwalk Comprehensive Plan

Please select the top three changes you think would have the greatest impact on improving the quality…

https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11 4/13

Appendix B - Survey Results | B-139
Answered: 580 Skipped: 0 0 50 100 150 200 250 300 Excellent Good Fair Poor Excellent 245 42.24% Good 299 51.55% Fair 31 5.34% Poor 5 0.86%
Answers Count Percentage

What type of dwelling do you live in?

B-140 | Appendix B - Norwalk Comprehensive Plan 8/5/2021 Norwalk Comprehensive Plan
5/13 Answered: 576 Skipped: 4 0 100 200 300 400 500 IncreaseEmplo... ExpandRetail... ParksandRecr... ImproveHousin... ExpandCommuni... DecreaseTaxes... ImprovePublic... Increase Employment Opportunities 206 35.52% Expand Retail Shopping Options 401 69.14% Parks and Recreation Updating and Expansion 308 53.1% Improve Housing Affordability 125 21.55% Expand Community Services 139 23.97% Decrease Taxes and Fees 412 71.03% Improve Public Safety 57 9.83%
https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11
Answers Count Percentage

Please select up to four factors influenced your decision to live where you live right now.

Appendix B - Survey Results | B-141 8/5/2021 Norwalk Comprehensive Plan
6/13 Answered: 579 Skipped: 1 0 200 400 600 Single-Famil... MobileHome UnitinaDupl... UnitinaBuil... ActiveFarm Acreage GroupHome/Dor... Single - Family Home 508 87.59% Mobile Home 1 0.17% Unit in a Duplex 6 1.03% Unit in a Building With Living Units 21 3.62% Active Farm 1 0.17% Acreage 41 7.07% Group Home/Dormitory 1 0.17%
https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11
Answers Count Percentage

If you could open a successful business in Norwalk what and where would it be?

B-142 | Appendix B - Norwalk Comprehensive Plan 8/5/2021 Norwalk Comprehensive Plan
7/13 Answered: 575 Skipped: 5 0 100 200 300 400 500 GreatSchools...Safety/LowCri... Affordability EasyAccessto...Privacy/Seclus...People/Neighbo... LowTrafficClosetoFamil...ClosetoEmplo... Great Schools and Extracurricular Opportunities 404 69.66% Safety/Low Crime 379 65.34% Affordability 119 20.52% Easy Access to Recreation 70 12.07% Privacy/Seclusion 138 23.79% People/Neighbors 181 31.21% Low Traffic 210 36.21% Close to Family 194 33.45% Close to Employment 229 39.48%
https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11
Answers Count Percentage
Appendix B - Survey Results | B-143 8/5/2021 Norwalk Comprehensive Plan https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11 8/13 restaurant Store Open grocery Norwalk shop town Sunset 28 Hwy coffeeindoor CENTER retail business highway HyVee north main area 28. Family strip nice sports community town. & facility clothing boutique store. side restaurants home end Norwalk. great south city gym sit park etc. Dr. pool shop. drive small Car Lakewood East water rec gas goods full malls here. home. play studio / art Golf bar put Gift tax bar. 5 7 YMCA St Des run (i.e. 515 NA ball HS built Ace deli. at. fast 2 10 80 12000 General stop goal 2-5 bad $$ lane safe path 5. id I.e Fil Pa -off (i 2. Answered: 339 Skipped: 241 Please select the top two aspects of housing that you think are the most important to improve in Norw 0 100 200 300 400 Housing SupplyHousing CostHousing Qualit...Housing Divers...Housing Availa...Other Housing Supply 69 11.9% Housing Cost 355 61.21% Housing Quality 286 49.31% Housing Diversity 122 21.03% AnswersAnswers CountCount Percentage
B-144 | Appendix B - Norwalk Comprehensive Plan 8/5/2021 Norwalk Comprehensive Plan https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11 9/13 Answered: 558 Skipped: 22 Housing Availability 143 24.66% Other 51 8.79% What other concerns or opportunities do you see for housing growth in Norwalk over the next 20 years? Norwalk housing houses town growth homes community taxes developments traffic high tax school Affordable family Roads people income schools single built small City lot housing. bike lower property apartments low Des businesses building streets lots lack Norwalk. houses. infrastructure support close growth. up. years retail space west commercial love grocery areas additional moved larger traffic. Cost quality growing good taxes. families area move stop Moines fast land Make store & large BUILD rateDon’t run lane top PUT due school. range. issues well. sq ago it. etc. 2 golf rest home it’s left 5 20 ft ruin yo / + 28. in. DM 1 6 8 10 28 37 40 2040 to. = Na big. I’ll !! (I Answered: 296 Skipped: 284 What is the approximate distance of your commute to work (each way)? 0 200 100 150 50 No Commute <5 miles 5-10 11-15 >15 Answers Count Percentage

Please list the Weakness and Threats you see for the community related to Beautification.

Appendix B - Survey Results | B-145 8/5/2021 Norwalk Comprehensive Plan https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11 10/13 Answered: 579 Skipped: 1 No Commute 104 17.93% <5 miles 80 13.79% 5-10 124 21.38% 11-15 155 26.72% >15 116 20%
Strengths and Opportunities you see
community
Beautification. parks Norwalk Great park nice town opportunity community City Bike areas trails space walkingTrail town. parks. green 28 Lakewood area Holland Hwy opportunities beautiful older trees clean people Street Lots good Elizabeth highway development improve neighborhoods strength Des main open maintain community. medians Continue public neighborhood Strengths small Addition North paths Flowers beautification & landscaping Norwalk. love trails. make housing big wonderful Moines add sidewalks recreational etc. nice. developments buildings growth area. roads homes Connect place city. Businesses huge Lake areas. Strengths: keeping care malls fencing 28. golf lot downtown business improved Median art land center adding building location 5 larger money signs lights Feel visitors STREETS live it. time park. large west Close job road local FIX put Echo Valley turn kids run ponds out. side path alotted FB field enter rid east Avenue rest rec It’s up. / eye tie 40 of. die doa 3. 4. NE toll Redo 30' full fees left is. it! ia ago i.e. "go half et.
262 Skipped: 318
Please list the
for the
related to
Answered:
B-146 | Appendix B - Norwalk Comprehensive Plan 8/5/2021 Norwalk Comprehensive Plan https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11 11/13 Norwalk city people community beautification town 28 housing lack homes make green taxesGrowth trees Sunset older traffic main highway Bike HWY businesses & money trails houses parks buildings real park cost small nice walking lot pay etc. up. areas high Due road Des fast long bad tax plans brings run land Dr don’t big fix Plan income 5 change ALL! N/A paths trails. Threats: 28. idea . lots. 2. (i.e. lots art isn’t local $$ Rt / find lose it. 2 4 6 hope toll se age 1. risk ill it’s (10 put icon! state 28E Tom So. bids :) = lit 5' feel" bull led FB ice Answered: 259 Skipped: 321 Please list the Strengths and Opportunities you see for the community related to Development. businesses Norwalk development community people opportunity business town retail greatgrowth opportunities City Des area restaurants housing growing bike Bring Commercial Moines community. tax close land areas small options good center grocery room Norwalk. west lots Continue place Build lot space schools support residential attract local nice work shop high parks live trails don’t provide metro & strip north plan big base etc. city. safe 28 unique home building Feel none. houses Stop point roads find pay data die. biuld ugly Fast put kids rec in. 4 5 Pella isnt food. diverse add eat do. / I’d job 1. 1 2 3 7 10 idea bit on. DM in); (1 + "no tax) $ foot fill 2. ? Answered: 247 Skipped: 333 Please list Weaknesses and Threats you see for the community related to Development.
Appendix B - Survey Results | B-147 8/5/2021 Norwalk Comprehensive Plan https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11 12/13 Norwalk people community traffic town businesses development housing small city lack houses business developments commercial high area Des feelretail taxes tax Moines growth West school growing make options space Norwalk. schools etc. good property larger residential family town. areas trails residents infrastructure crime lower bring community. bike grow support close roads end fast apartments great Highway communities strip restaurants population homes Waukee Increased live big quality things 28 home shop plan years nice stay maintain run lot area. 28. fast. main low cars stores lose east & life cops is. hurts dont It’s sad love 804 beautiful hurt. pop live. fire / thing. sell visit key add bad I’m type 1 2 3 4 141 path yet. hole ages left. lot... .5-1 it. sea by. ( be. Answered: 244 Skipped: 336 Please list the Strengths and Opportunities you see for the community related to Mobility. Norwalk bike access trail Des trails great easy bypass walking town roads good traffic close city Highway Moines Mobility paths Connect west road 28Opportunity Moines. 5 school town. Western hwy lanes North make transportation nice developments Downtown DM people Location metro side Sidewalks sidewalk proximity housing high community community. huge love streets WDM major Future I-35 Cumming drive city. 4 ways pick main turning accessible interstate bus time connects area Park biking parks Trail. business Airport G14 Public places work areas Beardsley point roads. Bwahahaha drop ? Add Easier it. central end lot big quickly limited times. slow I’d flow citizens space long plan issue path key ride & exit I35 I-35. run lights. ave cab (and drive. golf cart ustrails. MTA past (add / Hills-etc. due EV Cost to? (I huge) ages Answered: 182 Skipped: 398 Please list the Weaknesses and Threats you see for the community related to Mobility.
B-148 | Appendix B - Norwalk Comprehensive Plan 8/5/2021 Norwalk Comprehensive Plan
13/13 traffic town Norwalk bike school Beardsley road North sidewalks people trails Hwy 28 roads high main access Lack streets City Des great make highway West drive East street south side town. increased areas area community grow dangerous walk good Sunset schools Ave connect traffic.transportation Lane public Moines bus Norwalk. major lights neighborhoods school. Orchard sidewalk move needed nice walking paths parking trail connected 4 half due Commute route stop Current 28. crossing residential intersection lanes flow western safely highway. planning uneven metro area. things time worse times growth it’s children live safe Hills infrastructure development work. lines mobility roads. ride speed here. built home 2 size gaps ? & busy kids ave. feel lot Turn 1 build too. I-35 5. adds easy off. Dr. end up. strip bad St all. left risk 3 5 10 14 20 25 200 mins JC foot it. fear drop ago hr jobs SW cut pm. car. 80th) Answered: 185 Skipped: 395
https://survey123.arcgis.com/surveys/a0a4849e4c3c49b8bf69652315393b54/analyze?position=0.field_11

Norwalk, Iowa

Appendix C Planning Maps

Existing Land Use Map

Norwalk City Limits

Open Space / Undeveloped

Low-Density Residential

Medium-Density Residential

High-Density Residential

Parks & Recreation

Public / Semi-Public Commercial Industrial

Developing Water

C-150 | Appendix C - Norwalk Comprehensive Plan
NORTH .50 MI .25 0
Existing Land Use Map - Norwalk, IA

Future Land Use Map

Planning Boundary

Norwalk

Nearby Cities

Parcel

Floodplain

Great Western Trail

Future Greenbelt Corridor

Future Land Use + Streets Draft 10-17-2022

Existing Highway

Existing Major Arterial

Existing Minor Arterial

Proposed Minor Arterial

Existing Major Collector

Proposed Major Collector

Proposed Minor Collector

Agriculture Reserve

Low-Density Residential

Medium-Density Residential

High-Density Residential

New Urbanism

Commercial

Commercial Industrial Flex Industrial Public / Semi-Public

Parks & Recreation Water

0 .50 miles .25

Appendix C - Maps | C-151

Future Mobility Map

C-152 | Chapter 4 - Norwalk Comprehensive Plan
0 .50 miles .25 Future Streets Draft 10-17-2022 Existing Highway Existing Major Arterial Existing Minor Arterial Proposed Minor Arterial Existing Major Collector Proposed Major Collector Proposed Minor Collector Planning Boundary Norwalk Nearby Cities Floodplain Great Western Trail
C-C
Appendix C - Maps | C-153
Development Limitations Map

Matrix

Appendix D Priority
Norwalk, Iowa

Priority Matrix (2023)

D-156 | Appendix D - Norwalk Comprehensive Plan Element Goal Strategy Priority Timeline Action Community Facilities and Services 2 2.1 Urgent Immediate Conduct community wide first responder needs assessment to determine future needs of fire and police. Community Facilities and Services 1 1.1 Urgent Ongoing Encourage implementation of DNR and EPA standards in development. Community Facilities and Services 1 1.2 Medium Immediate Implement wayfinding techniques throughout the City using established signage regulations. Community Facilities and Services 1 1.3 High Immediate Review and update walkability study in Greenways Plan to maintain awareness of priority areas for repair. Community Facilities and Services 1 1.3 High Immediate Work with Community Development, Public Works, City Staff and Council, Parks and Recreation, and other relevant public resources to maintain a sidewalk connectivity plan that includes procedures for implementing public and private connections. Community Facilities and Services 2 2.1 High Immediate Identify and secure a location for new library facility and support library expansion plans. Community Facilities and Services 2 2.3 Medium Immediate Identify processes which warrant community feedback. Transportation 1 1.1 Urgent Ongoing Optimize transportation funding through grant opportunities, technical assistance, and local and regional transportation planning. Transportation 1 1.4 High Immediate Review internal and external plans regarding transportation within the City and with adjacent communities. Parks and Recreation 1 1.2 High Immediate Reevaluate size and spacing standards for neighborhood parks to ensure long term sustainability of management costs. Agriculture and Natural Resources 2 2.2 Medium Immediate Pursue certification programs such as Tree City.
Appendix D - Priority Matrix D-157 Element Goal Strategy Priority Timeline Action Housing 1 1.1 High Immediate Support the inclusion of rental housing in neighborhood planning efforts to meet the commnity’s business and employment growth needs. Housing 1 1.1 High Immediate Utilize development and land
plans to guide development and
of a
of housing units include single-family detached, townhome, duplex, multifamily apartment buildings, and mixed-use buildings, and other
of housing sought out by homebuyers and renters. Housing 1 1.3 High Immediate Incentivize mixed-density housing developments. Housing 1 1.3 High Immediate Encourage and adopt policies and regulations aimed to integrate housing types and density. Housing 2 2.1 High Immediate Increase accessibility of community services (City of Norwalk, Warren County, and regional housing programs) that aid in housing needs. Housing 2 2.3 Medium Immediate Increase accessibility of rental information for tenants by including information on City website and various public spaces. Housing 2 2.3 Medium Immediate Provide renters information regarding rental inspection programs and best practices through the City website and various public spaces. Economy and Employment 1 1.2 High Immediate Create a Comprehensive Economic Development Strategy (CEDS) plan to help guide future economic growth. Economy and Employment 1 1.3 High Immediate Establish procedures to review, revise, and track implementation of all local community plans. Economy and Employment 2 2.2 Medium Immediate Use wayfinding signage throughout the community to direct traffic to local businesses. Intergovernmental Collaboration 1 1.1 High Immediate Identify areas of overlapping or adjacent juristiction. Intergovernmental Collaboration 1 1.3 High Immediate Establish intergovernmental communication procedures in the Hazard Mitigation Plan.
use
placement
variety
forms
Priority Matrix (2023)

Priority Matrix (2023)

a formal Future Land Use Plan compliance review process for new development and rezoning requests.

coordinating with the county to develop local policies that ensure any growth within the City’s 2-mile extra territorial review area to be congruent with the City’s Comprehensive Plan.

D-158 | Appendix D - Norwalk Comprehensive Plan Element Goal Strategy Priority Timeline Action Intergovernmental Collaboration 2 2.1 High Immediate Engage with the Norwalk Community School District regarding community activities. Intergovernmental Collaboration 2 2.2 Medium Immediate Include a school transportation representative in transportation planning activities to provide insight on school transportation needs. Intergovernmental Collaboration 2 2.3 Medium Immediate Promote local conservation efforts on the City website and various public spaces. Resilience 1 1.3 High Immediate Establish general cost/benefit analysis procedures to evaluate efficiency of public expenditures and improvements. Resilience 2 2.1 High Immediate Increase opportunities to engage with the local government. Resilience 2 2.3 High Immediate Create safe and inviting spaces for residents to inhabit in their leisure time. Land Use 1 1A High Immediate Adopt
Land Use 1 1D High Immediate Explore
of the
implementation. Land Use 1 1F High Immediate Adopt policies that
right-of-way and easement corridors. Land Use 4 4A High Immediate/ Ongoing Coordinate resident outreach plan for annexation areas. Land Use 4 4B High Immediate Consider
overhaul
City’s development regulations to support plan
preserve

Turn static files into dynamic content formats.

Create a flipbook