Vilas Park Master Plan Report

Page 81

Pump House The pump house was built in the 1990’s to provide a water source for winter maintenance of the lagoon for ice-skating. The structure was recently replaced with a new building (Figure 5.11). The pump house is wood clad, on a concrete slab and is in good condition. The building is connected to the asphalt path running northsouth through the park (Figure 5.12).

PLAYGROUNDS AND OTHER ACTIVITIES Playgrounds There are three playgrounds in Vilas Park. The west playground is near the multi-use trail and is connected to it by an asphalt path (Figures 5.13 and 5.14). The surface material is rubber mulch over a gravel base. This playground was manufactured by Miracle60 and placed in 1994. A small playground is located near the mounds in the upper park along Erin Street. This playground is known as the “Dinosaur Playground” due to the dinosaur-themed equipment (Figure 5.15). The equipment is Landscape Structures61 and was also installed in 1994. The surface is rubber mulch over gravel with no connection to the surrounding walkways. The equipment is not compliant with current ADA guidelines.

Figure 5.13. West Playground

Figure 5.16. Shoe Playground

60 www.miracle-recreation.com 61 www.playlsi.com

Figure 5.14. West Playground

Figure 5.15. Dinosaur Playground

Figure 5.17. Old Woman in a Shoe

VILAS PARK MASTER PLAN 2020

81


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Community Input Meeting

7min
pages 209-212

Stakeholder Meetings

12min
pages 195-201

Interagency Regulatory Meetings

7min
pages 205-208

Focus Group Meetings

3min
pages 202-204

Public Engagement..................................................................................................................................page 1635 Common Elements of the Plans

7min
pages 165-169

Review and Input on the Concepts

2min
pages 193-194

Overall Analysis

2min
pages 156-159

Wind

1min
page 155

Tree Survey

3min
pages 132-136

Soils

3min
pages 151-154

Relevant Planning Documents

16min
pages 137-147

Lake Wingra

3min
pages 120-121

Lagoon

2min
pages 122-123

Mound Group

8min
pages 126-131

Wetlands

2min
pages 124-125

Parking Counts

6min
pages 106-115

Edible Landscape

0
page 96

Traffic Analysis

3min
pages 100-102

Children's Memorial Benches

0
page 97

Paths

6min
pages 89-92

Signs and Wayfinding

4min
pages 93-95

Bridges

1min
page 88

Playgrounds and Other Activities

4min
pages 81-83

Chronology

20min
pages 53-70

Significance

3min
pages 51-52

Community Engagement in Phase II and III - Concepting and Master Plan

1min
pages 47-49

Comment Cards

1min
pages 25-26

Online Public Survey

3min
pages 27-29

Focus Groups

3min
pages 42-43

On-Site Interviews and Observations

6min
pages 30-38

Community Engagement Process

2min
pages 18-19

Community Partner Advisory Group

1min
page 41

Community Information Meeting

5min
pages 21-24

Community Engagement in Phase I - Input

1min
page 20
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.