West Baraboo Village Forest Site Grading Plan Page

Page 1

VILLAGE FOREST PARK PROJECT - PHASE 3 VILLAGE OF WEST BARABOO SAUK COUNTY, WISCONSIN LEGEND

SHEET INDEX

UTILITIES

EXISTING WATER MAIN

PROJECT LOCATION

G - GENERAL SHEETS

EXISTING WATER MAIN, VALVE & HYDRANT

G 101

EXISTING WATER SERVICE & CURB STOP

TITLE SHEET

C101

OVERALL SITE PLAN

C102

EROSION CONTROL

C103

SITE PLAN

GAS & ELECTRIC :

PROPOSED WATER MAIN, VALVE, & HYDRANT PROPOSED WATER SERVICE & CURB STOP

C104-105

GRADING PLAN

EXISTING SANITARY SEWER & MANHOLE

C106-107

UTILITY PLAN

PROPOSED SANITARY SEWER & MANHOLE

C108

PLAN AND PROFILE - MAIN ROAD

EXISTING FORCEMAIN

C501-502

EROSION CONTROL DETAILS

C503-505

STANDARD DETAILS

TELEPHONE :

PROPOSED STORM SEWER & INLET

<

C506

SANITARY SEWER DETAILS STORM SEWER DETAILS

PROPOSED STORM SEWER & MANHOLE

C508

WATER MAIN DETAILS

BURIED ELECTRIC

C509

STORMWATER DETAILS

CENTURY LINK ATTN: STEVE BISHOP 130 4TH STREET BARABOO, WI 53913 (605) 355-7501

EXISTING STORM SEWER & INLET

C507

ALLIANT ENERGY ATTN: NEIL GOODCHILD 520 COMMERCE AVENUE BARABOO, WI 53913 OFFICE: (608) 356-0643 CELL: (605) 575-8860

SEWER & WATER:

BURIED GAS & VALVE

VILLAGE OF WEST BARABOO ATTN: WILLIAM CLARY 500 CEDAR STREET WEST BARABOO, WI 53913 CELL: (608) 356-2516

BURIED CABLE TELEVISION BURIED TELEPHONE BURIED FIBER OPTICS OVERHEAD UTILITY RAILROAD TRACKS

CATV:

EXISTING CURB & GUTTER

CHARTER COMMUNICATIONS ATTN: BRANDON STORM 2701 DANIELS STREET MADISON, WI 53718 OFFICE: (608) 274-3822 CELL: (608) 444-9493

PROPOSED CURB & GUTTER

MAP LINK

EXISTING SIDEWALK PROPOSED SIDEWALK EXISTING CULVERT PIPE PROPOSED CULVERT PIPE FENCE LINE DRAINAGE ARROW SILT FENCE RIGHT-OF-WAY

PROJECT LOCATION

BASELINE PROPERTY LINE TREE LINE BENCHMARK IRON PIPE IRON ROD CONTROL POINT UTILITY POLE & GUY 1 000.00

SOIL BORING LIGHT POLE PEDESTAL

Dial

or (800) 242-8511

STREET SIGN © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS

MAILBOX

www.DiggersHotline.com

FLAGPOLE

LOCATION MAP

TREE - DECIDUOUS TREE - CONIFEROUS

NOT TO SCALE

TREE TO BE REMOVED

PROJECT DATE: 11.03.22

NO.

DATE

REVISION

BY

DRAWN BY:

JH

.

.

.

.

DESIGNED BY:

DW

.

.

.

CHECKED BY:

RG

.

.

.

PLOT DATE: 11/21/2022 3:45 PM, G:\00\00082\00082098\CADD\Construction Documents\00082098 Title Sheet - Phase 3.dwg

.

. .

ENGINEERING | ARCHITECTURE | SURVEYING FUNDING | PLANNING | ENVIRONMENTAL 1230 South Boulevard, Baraboo WI 53913 (608) 356-2771 www.msa-ps.com © MSA Professional Services, Inc.

NOTE: UTILITY LOCATIONS SHOWN ON PLANS ARE APPROXIMATE AND CONTRACTOR SHALL HAVE APPROPRIATE UTILITY MARK EXACT LOCATIONS PRIOR TO CONSTRUCTION.

PROJECT NO.

VILLAGE FOREST PARK PROJECT - PHASE 3 VILLAGE OF WEST BARABOO SAUK COUNTY, WISCONSIN

TITLE SHEET

00082098 SHEET

G101


MATCH LINE TO NORTH (SEE SHEET C105) 989 0 99 1 99 992

982 983

993

994 995 996 997 998 999 00 10 01 10 02 10 03 10 04 10 05 10 006 1 007 1 1008 9 0 10101001112 1100134 11001156 1101

10 10

997.78 998.01

12''W

1053+00 10''W

8''SS

S

100+00

1008

PROTECT EXISTING PAVEMENT, CURB & GUTTER

1007

1010 06

10

0

101

7

8''SS

100

1006.93

VILLAGE OF WEST BARABOO PARCEL ID 191-0003-00205

VF -

(10 )

4

100

8''SS

1003

996.00

04 3 10 00 02 1 0 01 1 0 0 1 00 1

10

2.

03

100

PROPOSED BIORETENTION BASIN 3.

2

1001

4.

12''W

1000

W

SIDEWALKS SHALL NOT EXCEED 1.5% CROSS SLOPE, 5% 997 LONGITUDINAL SLOPE, AND A MINIMUM 0.5% SLOPE. CONTRACTOR SHALL VERIFY ALL GRADES PRIOR TO START S 996 OF CONSTRUCTION TO ENSURE SLOPE COMPLIANCE IF THERE ARE ANY DISCREPANCIES, CONTRACTOR SHALL S BRING THEM TO THE ENGINEER'S ATTENTION PRIOR TO 995 CONSTRUCTION. ALL BOC NUMBERS ARE THE TOP BACK OF CURB AND GUTTER. CONTRACTOR SHALL NOTE ALL TAPERS AND RAMPED CURBS 994 TO ACCOUNT FOR THE GRADE CHANGES. CONTRACTOR SHALL MEET GRADES AND PROJECT OR PROPERTY LIMITS WITH A SMOOTH AND CONTINUOUS TRANSITION. 993 12''W

04

10

1.

8''SS

10

04

998 99 10 9 00

1002 1001 1000 999 998 NOTES:

12''W

3 100

8''W

6 7 99 99

0001 1010 1002

8''W

8

8''W

1000.00

99

8''SS

99+00

1008.96

1008.45 1008.44

8 100

1006.00 1005.61 1005.18

10''W

18''SS

1008.45

1008.38

ZAJAK DR.

1009.19

5

5 100 04 10 03 10 02 1 10100000 1

10''W

18''SS

'

1006.57 1006.79

101+00 1008.44

1012

1007.00

10''W

8''SS

9 1000

99

998

997

1 1000 999

1007.02

'

1006.27 1006.03 1005.70 06 10

100

1007.02

6 9.9

1006.61

1006.48

1004.44

1008.44

1008.02 1008.18

R2

1004.49

102+ 00

0'

1005.63 1005.65

1004.55

1002

00 10 9 99 998 997 996

9.3 9

1.8

R3

1004.30

1004.27

1003

1006.58

T

1052+00 10''W

10''W

18''SS

1006.59

1051 +00

12''W

'

R150.00

1006.49 1006.60

R4

VF -

03

1006.47

10

1006.49 1004.28 R2.00', TYP.

1006.53 1006.70

1008.43

8''SS

1005.21 1005.48 1005.73 1005.53 1006.41 1006.68 1006.57 1006.69 1006.83 1006.96 1007.00

04

(11)

10 02 10 1001

06

1009

1006.28 1006.36

RY LN ROSEMA

CP 11

1005.35

10

1003.59 1003.53

1005.98

1005.10

1005.09

15 4 1 10

10

1005.99

12''W

05

10

10 18 1018

8''SS

1005

1050 +00

1005.86

R149.50'

1004.83 1004.67

PROPOSED BENCH SEATING, TYP.

1002.71 PROPOSED PARK PAVILION W/ RESTROOMS (PHASE 2 BY OTHERS)

10 3+ 1005.71 00 1004.87

1004.57

12''W

1002.81

1004.9

1004.74

1006

12''W

CONCRETE SIDEWALK (TYP.)

10 0

1002.25

8''W

1004.38 1004.58

07 PROPOSED 6 FOOT WIDE 5-INCH THICK

12''W

10

8''W

10

8''W

04

17 10 6 101

1002.25 1002.71

1004.46 1004.43 1004.64

08

1002.13

1013 1012 1011 1010

10

1001.63 1001.80

12''W

1004.43

10 10 17 16

09

'

10

.50

1002.67

1002.89

85

3 100

0'

10 1003.43 4+ 0 1003.44 0 1003.22 1003.44 1004.4

1002.50

R1

1001.63 1002.04 1002.38

02 10

1001.63 996

1003.43 1003.39

1002.4

W

1001.6

1001.11

09 101 1 0 01 1

1002.99

8''

995

1002.12 1002.4

G

R45.0

01 10

10 05 10 1 06 0 1 07 00 1 8 0

105+ 00

G

1000.31 1000.40 1000.55

1001.85 1001.67

1000.76

G

1000.44

12''W

PROPOSED BIORETENTION BASIN

R4.50', TYP.

1000.44 999.23 999.46 999.67 999.94

1000.94 1001.13 1001.14

PROTECT PROPERTY LINE (TYP.) 12''W

1000.48 106 +00 1001.43

R8.00'

.72' R5.00'

12

10

1000.00

998.01

79 995.00R

12''W

13 10

12 10

13

10

997.43 997.14

VILLAGE OF WEST BARABOO PARCEL ID 191-0003-00400

VILLAGE OF WEST BARABOO PARCEL ID 191-0003-00203

VILLAGE OF WEST BARABOO PARCEL ID 191-0003-00204

18''SS

00 7+ 10 996.52 996.75 997.01 997.13

999 00 10 001 1 2 100 003 1 1004005 1 006 1 007 8 1 00 1 1009

10 11

998

60

12''W

99 7

996

993 4 99 5 99

30

12''W

VILLAGE OF WEST BARABOO PARCEL ID 191-0003-00200

0

North MUP-VF - (5)

986

12''W

108+00

984 MATERIAL AREA FOR MASS GRADING OF EXTRA APPROXIMATELY 5,200 CUBIC YARDS 985

999

998

PROJECT DATE:

11.03.22

NO.

DATE

JH

.

.

DESIGNED BY:

DW

.

.

CHECKED BY:

RG

.

.

DRAWN BY:

.

REVISION

BY

.

.

.

.

.

.

PLOT DATE: Monday, November 21, 2022 3:46:27 PM, G:\00\00082\00082098\CADD\Construction Documents\00082098 Grading Plan - Phase 3.dwg

ENGINEERING | ARCHITECTURE | SURVEYING FUNDING | PLANNING | ENVIRONMENTAL 1230 South Boulevard, Baraboo WI 53913 (608) 356-2771 www.msa-ps.com © MSA Professional Services, Inc.

PROJECT NO.

VILLAGE FOREST PARK PROJECT - PHASE 3 VILLAGE OF WEST BARABOO SAUK COUNTY, WISCONSIN

GRADING PLAN

00082098 SHEET

C104


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.