Architecture Graduate Portfolio

Page 1

Architecture Mudit Seema Vijay Jain Bachelor in Architecture | Rizvi College of Architecture | 2016-2021 folio. port folio.

muditjain1819@gmail.com

Mudit

Seema Vijay Jain

B.Arch. | Rizvi College of Architecture

SOFTWARE SKILLS

Drafting & 3-D Modelling

Autodesk AutoCAD

Rhinoceros 3D

Graphics & Presentation

Adobe Photoshop

Google SketchUp

Twinmotion

ACHIEVEMENTS

Sports Assistant

Rizvi College of Architecture | 2017-2018

ANDC Co-Head Rizvi College of Architecture | 2018-2019

Louis I Kahn Trophy Head Rizvi College of Architecture | 2018-2019

Adobe Illustrator

linkedin.com/in/mudit-jain-65b069218

ABOUT ME

Thane, Maharashtra

+91-7208595360

I have always looked upon architecture as a tool to collaborate and create something meaningful for the stakeholders involved. I hold strong interest in institutional and public space design challenges.

My journey in these five years of education has been all about discovering myself, learning and evolving to be sensitive, diligent and taking up the task with utmost confidence. Having played cricket, a team sport and taking up leadership roles regularly in college has honed my skills to work in a team

Having completed the first half of the architectural journey, I am looking forward to explore the second half with the same enthusiasm & energy to learn and evolve further!

EDUCATION

Smt. Sulochanadevi Singhania School

ICSE | 2002-2014 | Thane, Maharashtra | 95.16%

Smt. Sulochanadevi Singhania School

ISC | 2014-2016 | Thane, Maharashtra | 95.60%

Rizvi College of Architecture

B.Arch. | 2016-2021 | Bandra, Maharashtra | CGPA 8.86

PROFFESIONAL EXPERIENCE

Sanjeev Joshi Architectural Consultancy

Internship | 18th November, 2019-30th May, 2020 | Vadodara, Gujarat

Architectural Designer in collaboration with Saksham Garg Freelance | 2021 | Residential Layouts

CorelDRAW

PowerPoint

Adobe InDesign

Google Slides

WORKSHOPS & CONFERENCES

Laurie Baker Centre Exposure Program

Laurie Baker’s Approach in Architecture | Laurie Baker Centre | 2017

25th-29th Archfest

Workshops, Seminars & Book Launch | Rizvi C.O.A | 2016-2020

19th & 20th International Conference on Humane Habitat

Guest Lectures & Seminars | Rizvi C.O.A | 2017-2018

1st ‘Architecture & People’ International Conference

Seminars & Book Launch | Rizvi C.O.A 2020

Carpentry Workshop

Archfest | Rizvi C.O.A | August 2018

Bamboo Workshop

Zynorique Initiatives | Nagaland | May 2019

VSCDL-INTACH Banyan Heritage Fest

Seminars & Heritage Walks | Vadodara | November 2019

Bamboo Construction Workshop (Online)

Konkan Bamboo and Cane Development Centre | June 2020

How to Festival 2.0 (Online)

Presentations by Construction Industry Experts Locator India | 2021

Louis I Kahn Trophy Mentor Rizvi College of Architecture | 2019-2020

Treasurer Rizvi College of Architecture | 2019-2020

COMPETITIONS

Annual NASA Design Competition

Top 64 Entry | NASA India | 2017-2018

Louis I Kahn Trophy Participant College | NASA India | 2017-2018

Annual NASA Design Competition Participant College | NASA India | 2018-2019

Louis I Kahn Trophy Special Mention | NASA India | 2018-2019

How to Festival 2.0

Quiz Winner Locator India | 2021

Kurula Varkey Design Forum

Thesis Panel | Participant | CEPT | 2021

SKILLS & LANGUAGE

Documentation, Model Making, Presentation, Leadership, Teamwork

Proficient in English, Hindi

CONTENTS ACADEMIC WORK 01-55 FREELANCE WORK 85-86 PROFESSIONAL WORK 56-84 Internship @ SJAC Consultancy, Vadodara PROFESSIONAL WORK 56-84 Internship @ SJAC Consultancy, Vadodara 01 मुख्यधारा 02-25 Mainstreaming the marginalised via a case of the transgender Community Design Dissertation Semester 9 & 10 2020-21 02 Interstate Bus Terminal 26-38 Thane Mulund Octroi Naka @ Eastern Express Highway Architectural Design | Semester 9 | 2020 03 Commemoration Centre 39-46 Celebrating the duo of Salim-Javed, Kamal Amrohi Studios @ Jogeshwari, Mumbai Architectural Design | Semester 6 | 2019 04 Villa Design 47-55 Working Drawings Architectural Representation & Detailing | Semester 5 & 6 | 2018-19 02 Shannen C.B.S.E. School 65-68 Halol Working Drawing, Detail Drawings and Site Visits 03 Gulbrandsen Technologies 69-74 G.I.D.C. Jhagadia Working Drawing, Detail Drawings and Site Visits 04 Munjal Auto 75-80 Waghodia Interior Design, Detail Drawings and Electrical Layout 05 Party Plot 81-84 Devgadh Baria Toilet Detail Drawings & Site Visit 01 Rotycan Turbotech 57-64 G.I.D.C. Makarpura Working Drawing, Design & Furniture Layouts, Detail Drawings, 3-D Model and Renders 01 Bungalow Proposal 85-86 Khanpur, Rajasthan Floor Layouts
TABLE OF
TABLE OF CONTENTS

, Mainstreaming the marginalised via a case of the transgender Community Design Dissertation | Semester 9 & 10 2020-21

Interstate Bus Terminal, Thane Mulund Octroi Naka

Architectural Design | Semester 9 | 2020

Commemoration Centre, Celebrating the duo of Salim-Javed, Kamal Amrohi Studios

Architectural Design | Semester 6 | 2019

Mainstreaming the marginalised via a case of the transgender Community

Subject: Design Dissertation

Academic Year: 5th Year, June’20-May’21

Work Type: Individual Work

Project Type: Socio-Economic Intervention in the public domain

Mentor: Prof. Saurabh Barde

Tools Used:

Villa Design, Working Drawing

Architectural Representation & Detailing | Semester 5 & 6 | 2018-19

HYPOTHESIS

• A generative socio-economic society focusing on congenial and healthy social environment can be the new normal within the architectural context providing the impetus to the inclusion of the marginalised in the mainstream

• Collaboration, Interaction and Capacity development in architectural domain would restore dignity amongst the marginalised.

• Evolution of an architectural program in such a case will be a continual process rather than a static monotonous & restricted feature.

मुख्यधारा
मुख्यधारा
01 02 03 04 01
01 02 Academic Work | मुख्यधारा | Design Dissertation June‘20-May‘21 Academic Work Select Projects 2016-2021 ACADEMIC WORK

ABSTRACT

Marginalised people are side-lined groups of people within a given culture, context and history, at risk of being subjected to multiple discrimination due to the interplay of various personal characteristics such as sex, gender, age, ethnicity, religion or belief, health status, disability, sexual orientation, gender identity, education or income, or living in various geographic localities.

MY EXPERIENCE

Whether it be travelling in local trains for Ganpati Darshan at Siddhivinayak, Lal Baug Cha Raja during childhood or commuting for college, I often encountered the Hijras in the trains clapping their hands and begging for money

They were usually assertive in their approach while begging, not hesitating to touch, tease or shame anyone - anything that would make the person awkward which would result in the person giving money to the hijra so that they move ahead. There was a certain unrest or rather a sense of discomfort in the train compartment whenever they were present. People seemed to surrender to their requests as if it had become a daily routine of their life. This made me curious to study and know about these ‘Hijras’ as they seemed unique in going about their daily routine but they were never discussed about after they got down from the train or in any general talks or discussions in the public or at home. The Supreme Court judgment declaring transgender as the third gender made me further curious to study about this community.

Design Dissertation was the perfect opportunity for me to dwell upon the life and existence of the hijra community in our society and understand their lifestyle, social and economic standing.

The prevalent and imposed binary with respect to gender i.e. the gender binary of male-female has resulted in the discrimination and marginalisation of the transgender community. The transgender community has faced discrimination and isolation for years, by this dominant gender binary of male and female. The lack of empathy and ability to comprehend has resulted in them being stigmatised, pushing them on the fringes of the mainstream society. They are often the silent and invisible victims of discrimination, violence, social stigma, and assault.

01 मुख्यधारा
03 04 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 Female
Social Stigma & Discrimination Violence & Assault
Male Gender Fluid/ Gender Queer

SITE SELECTION

The site was selected based on the following criteria:

• Site should be located in the urban realm

• Site should have public accessibility i.e. should be accessible to the masses.

• Site should be near the source of oppression or livelihood for the transgender community or else it should fall in the route to their place of residence, daily routine.

• There should be existing development and scope for future development in the precinct.

SITE INTRODUCTION

Location - Dharamveer Nagar

Coordinates -19°13’N, 72°58’ E

Site Area - 6179 SQ.M (Approx.)

Elevation- 24M above MSL

Owned by - Thane Municipal Corporation

Smt Gladys Alvares Road

Proposed Site (Vacant Land)

Maharashtra

Mumbai

CLIMATE ANALYSIS

05 06 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21
Thane City Metropolitan Region (MMR) Tulsidham Road

A. Adding the built mass Plinth and defining the Public Spine B. Staggering the built mass, adding volumes along with passages to establish a connection with the public spine.

PROGRAM CORRELATION DIAGRAM

In the diagram below, the blue dots show the required relation of the spaces in the public domain whereas the pink dots show the require relation of the spaces in a shared domain. The dot being at either of the extremes of the horizontal program line implies a strong connection between the spaces and as it goes towards the centre, the intensity of the required connection decreases. Inferring from the diagram, public spine and its relation with the built mass was absolutely vital as this connection in the public domain is the major pull factor for the intervention

C. By staggering the volumes, the public spine flows through the site intertwining the built in the public domain.

D. Maintaining the porous character of the site by not defining a fixed entry yet defining the movement by combination of hardscape and softscape.

PROGRAM OVERVIEW CONCEPTUAL MASSING: SITE LEVEL
07 08 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 Art Block Canteen Block Drama Block Amphitheatre 6M Wide Service Access Public Spine Finance Block Admin Block Hydroponics Block Establishing Connection Residential Block Amphitheatre Public Spine Public Spine External Passage to blur the boundary Double height volume for the hydroponics setup
entrance gateway
Adding Upper floor volume Adding softscape to act as a buffer and define the movement Adding hardscape elements to define the character of the public spine
Raising Residential Block partly on stilts to form an inviting
Adding ramps, multiple connections to connect the upper floors and further divide the public spine into smaller pockets. The landing also forms a gateway linking the built blocks

ART BLOCK: DESIGN DETAILS

The space houses hands on art activities, making it important to keep its edge porous visually and physically as well, so that the visitors also become a part of the setup The eastern edge having a passage along with the facade having central pivot windows helps to bring in the public connect and also provides natural light and ventilation to the space. Also, the space incorporates levels sans the internal walls resulting in open studio setup further linking it to public spine.

Conceptual Massing

Exploded Isometric View

C. Adding First Floor Mass, Subtracting mass on first floor to create spill out void

GROUND FLOOR
@+2.70
09 10
MASTER PLAN
LVL.
A. Dividing the Plinth mass into smaller zones
Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 30M Wide Tusidham Road 6M Wide Service Road 12M Wide Road 12M Wide Road 0 5 15 30 M 1 2 2 2 2 12 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 14 14 15 16 17 19 19 18 13 13 3 3 3 3 3 4 6 7 8 9 10 10 11 11 5 5 5 5 5 1 Legend: 1-Vegetable Selling Pod 2-Retail Pod 3-Fast Food Pod 4-Drama Studio 5-Toilet Block 6-Dance Studio 7-Hands-On Art Studio 8-Canteen Dining 9-Canteen Kitchen 10-Central Ramp 11-Exhibition Standee 12-Amphitheatre 13-Landscape Pad 14-Bridge Above 15-Micro-Financing Block 16-Locker Facility 17-Admin Block 18-Hydroponics Block 19-Parking
Plan Ground Floor Level +450 Lvl. Legend: A. Hands-On Art Studio B. Podcast & Music Studio C. Spill Out Void D. Toilet Block A B S P C D D First Floor Level +4650 Lvl. Roof Level +7950 Lvl. Staircase Spill Out Void Passage Toilet Block Podcast Studio Art Workshop
D. Final Massing
Key

ART BLOCK: DETAIL DRAWINGS

Podcast & Music Studio Acoustical Planning

Acoustic Panel Fixing Detail (Detail ‘P’)

DRAMA BLOCK: DESIGN DETAILS

The space houses hands on activities thus, the passage on the either sides along with the jali screen and central pivot full height windows provide the visual porosity and also help in naturally illuminating and ventilating the space. The use of levels also provides an opportunity to get in the visitors providing the public attention to the intervention

Conceptual Massing

DRAMA BLOCK: DETAIL DRAWINGS

Jali Screen Fixing Detail (Detail ‘T’)

Acoustic Panel Layers

Art Block Slab Skylight Detail (Detail ‘S’)

A. Dividing the Plinth mass into smaller zones

D. Final Massing

B. Adding Passage, Subtracting mass to create void

Central Swing Pivot Door Fixing Detail (Detail ‘U’)

C. Adding First Floor Mass, Subtracting mass on first floor to create spill out void

Detail
‘V’
11 12 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 Key Plan Ground Floor Level +450 Lvl. Legend: A. Drama Studio B. Dance Studio C. Vocational Training Studio D. Spill Out Void E. Toilet Block A B C C E E D First Floor Level +4650 Lvl. Roof Level +7950 Lvl. U T Staircase Spill Out Void Passage Passage Toilet Block Drama Workshop Dance Studio Vocational Training Sound Source Low Frequency High Frequency Legend: Foam Bass Trap installed at every corner Acoustic Panels installed on wall surface 15mm thk Toughened Glass finished with silicone sealant 15mm thk Toughened Glass finished with silicone sealant 2mm thk Protective Rubber 50x40x6 M.S. Angle Frame 50x75 M.S. Box Frame 1.5mm thk PVB Film Masonry Wall Acoustical Core Fiberglass Textured Finish Z- Clips 25mm thk Panel 230mm thk Masonry Wall 230mm thk Masonry Wall 230x50 TW Frame Pivot Door Door Frame with Groove Rotating Hinge Rotating Hinge M.S. Jali Framework 200x200x75 Camp Jali Block 200x200x75 TV Jali Block V

DRAMA BLOCK: DETAIL DRAWINGS

The butterfly roof helps in bringing in the light and wind thus, maximising the natural illumination and ventilation.

Butterfly Roof Exploded Isometric View

Rafter Fixing Detail

CANTEEN BLOCK: DESIGN DETAILS

Food being one of pull factors of any public space, the façade of this block is kept porous to help connect with the fast food arrangement in the public which further leads to stepped seating. The jali screen and planter beds along the western facade filter the low angle light.

Conceptual Massing

A. Dividing the Plinth mass into smaller zones

Post Fixing Detail

B. Defining Kitchen and dining area, adding passage

Conceptual Section

Joist Fixing Detail

C. Adding First Floor Mass, Subtracting mass on first floor to create spill out void

Exploded Isometric

View 13 14 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 200x400 Mangalore Tiles 40x40 treated T.W. Purlins @300c/c 12.5mm thk Gypsum Sheet
treated T.W. Rafters @1200c/c 1050x600 R.C.C. Gutter Awning window fixed to a wooden frame 50x50 treated T.W. Posts @200c/c Eaves board Filtered Light Filtered Light Passage Passage Program Space 100x150 Treated T.W Joist 100x150 Treated T.W Joist 100x150 Treated T.W Joist 230x600 R.C.C Beam M.S Flat Double T Section fixed to beam with anchor fasteners 100x150 Treated T.W Joist 100x150 Treated T.W Post 50x125 Treated T.W Rafter @1200c/c Evening Western Sun Rays Early Morning Eastern Sun Rays Rainwater Runoff Rainwater Runoff Key Plan Ground Floor Level +450 Lvl. Legend: A. Canteen Dining B. Canteen Kitchen C. Multipurpose Hall D. Spill Out Void E. Toilet Block A B V C D E E First Floor Level +3750 Lvl. Roof Level +7050 Lvl. Staircase Spill Out Void Passage Toilet Block Multipurpose Hall Kitchen Dining Area
50x125

CANTEEN BLOCK: DETAIL DRAWINGS

Flower Bed (Detail ‘V’)

Flower Bed Layers

PUBLIC SPINE: DETAIL DRAWINGS

The rainwater directed from the roof flows through the protruding gutter. The rain chain then helps it flow into the landscape pad which then gets percolated and stored in the storage tank.

PUBLIC SPINE: DESIGN DETAILS

In the public spine, the commercial pods along the southern edge act as the first pull factor for the visitors. There is a central ramp which divides the public spine into two parts. In order to enhance the central ramp’s function beyond being a transitional element, the space below is sunken 600mm which opens it up for having exhibition standee and stepped seating along with the fast food pods which provides a lively character to the public spine bringing in the visitors.

On the other side the stepped planter bed along the ramp, exhibition standees and landscape pads further define the spine and its movement. The public spine culminates into the amphitheatre and the gravel beds help in percolation the rainwater.

300mm thk Gravel Bed

300mm thk Sand Bed

300mm thk Gravel Bed

100mm dia. Perforated Pipe

600mm thk Boulder Bed

450mm wide R.C.C. Coping

300mm thk

Gravel Bed

100mm dia.

Perforated Pipe

Vegetable Selling Pod Details

300mm thk Soil Mix

3mm thk Polycarbonate Sheet

450mm wide R.C.C. Coping

100mm dia. Perforated Pipe

100mm thk P.C.C. Bed

75x75 M.S Box Truss welded to horizontal member

+600 Lvl.

75x75 M.S Horizontal Member welded to vertical member

75x75 M.S Vertical Member Welded to Base Plate

+400 Lvl. +200

100mm Thk R.C.C Coping

Washer Head Screw

H-Profile Joiner Cap

3mm Thk Polycarbonate Sheet

75x75 M.S Box Truss Member

150mm Thk P.C.C Bed

View of the Flower Bed
Bed Details Landscape Pad Exploded Isometric View Rainwater Surface Drain Detail Section Plan Key Isometric View Exploded Isometric View Plan Landscape Pad Section 15 16 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 230mm thk masonry Vegetation Soil Mix Insulation & Protection Layer 150mm thk Brick Bat Coba Soil Mix Geotextile Drainage Layer Protection Layer 150mm thk Brick Bat Coba 150mm thk R.C.C. Slab Landscape Pad Landscape Pad Central Access Ramp Fast Food Module Retail Pod Retail Pod Vegetable Selling Pod Stepped Seating Exhibition Standee Amphitheatre Gravel Bed Gravel Bed Polycarbonate Sheet Fixing Detail 150mm dia. void to anchor rain chain 150mm dia. Rain chain 230mm thk masonry 230mm thk masonry 230mm thk masonry Void to let in rainwater
Gravel
100mm Thk P.C.C Bed Lvl.
230mm Thk Brick masonry finished with plaster

RESIDENTIAL BLOCK: DESIGN DETAILS

The voids along the western and eastern face staggered along the floor plates help bring in the prevailing winds to the O.T.S and further into the spaces ensuring cross ventilation and it also becomes the spill out space for individual floor plates.

Conceptual Massing

A. Placing Admin & Finance Block, subtracting mass to create a void

B. Raising 1st & 2nd floor partly on stilts, adding central O.T.S along with an additional void in western direction.

C. Placing 3rd & 4th floor, subtracting mass along western & eastern direction

PUBLIC SPINE: DETAIL
Retail Pod Details Plan Display Box Fitting Detail 17 18 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 +150 Lvl. UP UP 150mm Thk P.C.C Bed 25x25 M.S Vertical Supports welded to Base Plate & M.S Flat Ring 300mm wide Display Boxes 75x75 M.S Vertical Member Welded to Base Plate 75x75 M.S Horizontal Member welded to vertical member 75x75 M.S Box Truss welded to horizontal member 25mm Thk Engineered Wood Box finished with Veneer 5mm Thk M.S Flat Ring welded to Vertical Supports 25x25 M.S Vertical support 3mm Thk Polycarbonate Sheet Staircase Toilet Block Toilet Block Couple Rooms Open to Sky void Production Space Dormitory Dormitory Key Plan Ground Floor Level +450 Lvl. First Floor Level +3750 Lvl. Third Floor Level +10350 Lvl. Roof Level +16950 Lvl. Legend: A. Admin Workspace B. Admin HOD Office C. Micro-Financing Dept. D. Open to Sky Void E. Spill Out Void F. Toilet Block G. Production Workshop H. Store Room I. Dormitory J. Couple Rooms K. Service Block L. Overhead Tank A B C D E E E E F F F G H I I I J K K L J F Exploded Isometric View Key Isometric View Exploded Isometric View
DRAWINGS

SITE ELEVATION: EAST ELEVATION

The elevation highlights the public spine flowing through the site and the use of colours to further enhance the space and reinforce the design idea. The light brick red colour of the drama block and the orange apricot colour of the canteen block reinforce the idea of optimism and jovial spaces. The blue colour of the art block brings a sense of calm and positivity to the space.

SECTIONAL PERSPECTIVE VIEWS

Section A-A’ 19 20 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 +450 Lvl. +450 Lvl. +4650 Lvl. +4650 Lvl. +7950 Lvl. +7950 Lvl. +10550 Lvl. +10550 Lvl. +18450 Lvl. 0 2.5 7.5 15 M Key Plan Key Plan A A' 0 2 5 10 M Art Block Drama Block Canteen Block Residential Block Hydroponics Block Parking Podcast Studio Hands On Art Studio Dining Area Multipurpose Hall Toilet Block Amphitheatre

PERSPECTIVE VIEWS

This cross section depicts the relation of the public spine with the built mass at the intersection of the ramp and canteen block. The art and drama block open out to the informal street so formed under the ramp.

This cross section highlights the space below ramp with the exhibition standees and the stepped seating which gets the public attention to the canteen

SECTIONAL
Section C-C’
21 22 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21 Drama Block Central Ramp Public Spine Dining Area Canteen Block Residential Block Hydroponics Setup Public Spine Central Ramp +450 Lvl. +450 Lvl. +3750 Lvl. +3750 Lvl. +7050 Lvl. +7050 Lvl. +10550 Lvl. +9650 Lvl. 0 1 3 6 M Key Plan B C B' C' 0 3 6 M
Section B-B’
DESIGN VIEWS 23 24 Academic Work | मुख्यधारा Design Dissertation | June‘20-May‘21
Blurring the boundary: Aerial View from South East, depicting the connection of built mass with public spine and the porosity of the site edge. Blurring the boundary: Aerial View of the Public spine showing the Central Ramp & the commerce pods blending in with the landscape pads. Blurring the boundary: View of the Public spine from below the bridge connecting the built mass. Pull Factor View of the Public spine showing the Canteen and the fast food pods along with the stepped seating.

Interstate Bus Terminal

Thane-Mulund Octroi Naka @ Eastern Express Highway

Subject: Architectural Design

Academic Year: 5th Year, July’20-December’20

Work Type: Group Work with Saksham Garg & Vatsala Shukla

Project Type: Public Infrastructure Development

Mentor: Prof. Minaz Ansari & Prof. Saurabh Barde

Tools Used:

PROJECT VISION

The project envisions to enhance the public transportation system along Thane and Mumbai, making it more efficient and sustainable by having one node connecting major interstate and inter district bus routes

The Exhibition Program aimed at giving opportunities to local craftsman/small business of Mumbai Metropolitan Region by providing them a platform which will further attract local business from other states and can help develop a collaborative environment to learn and exhibit work.

Surrounded on three sides by natural entities the project also aims to be environmentally conscious and sustain in its given environment by minimising its negative effects on its surrounding

DESIGN VIEWS Academic Work | मुख्यधारा | Design Dissertation June‘20-May‘21 Academic Work | Interstate Bus Terminal Architectural Design July‘20-December‘20 25 26
02
Pull Factor: View of the Public spine showing the Vegetable Selling pods along with the exhibition standees. Work & Stay: View of the Open to Sky void of the residential block with stepped plinth around the green.

Interstate Bus Terminal

INTRODUCTION

Octroi is a kind of charge or tax, which is collected by the state government on those goods that have been bought into the city/state for the purpose of personal use and sale Mumbai has 5 such nakas distributed throughout the city. These large chunks of land are now defunct due to abolition of octroi.

“The five entry points are very useful from the logistics point of view for the city. We are exploring options such as setting up passenger stations there. Big cities have a station where the inter-city buses halt. Their route ends at the entry points. The passengers can then take local buses from the entry points and travel to reach their destination in the city. This is very well-executed by Ahmedabad and even Delhi.”

- Municipal Commissioner Ajoy Mehta

SITE CONTEXT

Octroi Nakas

Mulund Octroi Naka

Thane-Mulund Octroi Naka

Airoli Octroi Naka

Mankhurd Octroi Naka

Dahisar Octroi Naka

SITE INTRODUCTION

Coordinates: 19.1764° N, 72.9684° E

Site Area: 56700 SQ.M (Approx.)

After deducting highway buffer (DP 2034): 44165 SQ.M (Approx.)

SITE ACCESSIBILITY

Proposed Site (Anand Nagar Octroi Land)

Roads connecting from EEH, The Gavanpada Exit (Nodes 1) and Navghar Underpass road (Node 2) leads to a dead end. They do not reconnect with the EEH and the site, making the precinct isolated from the Site.

18M Wide D.P Road Railway Line

Eastern Express Highway Secondary Road

Navghar Road towards Mulund Station Tertiary road towards Navghar Road Mulund Flyover/90 Feet Road Road Dead End

Conclusion

The Mulund East precinct has a densely residential and mixed-used land use. The proximity of the Mulund railway station, the connecting flyover to Mulund West & internal bus routes makes the precinct internally well connected.

02
Architectural Design | July‘20-December‘20 Academic Work | Interstate Bus Terminal 28 27
54M Wide Eastern Express Highway 18M Wide Hari Om Nagar Road

A. Extent of site used for the program.

D.1. Ground Floor Terminal Concourse placement on site

NODE 2

The Navghar Road is the first connecting node for Mulund East precinct to the Eastern Express Highway.

NODE 3

The Node 3 is the only immediate connecting access(U-turn) to the Octroi Naka Site from the Greater Mumbai lanes of the EEH.

PROGRAM OVERVIEW

D.2. Placement of First Floor, Subtracting mass to create Double height Concourse Entrance

NODE 1

The Gavanpada Service Road Exit serves as a connect for the Neelam Nagar, Gavanpada area to Thane city.

B. Building footprint established.

Bus Bays (Boarding + Deboarding + Maintenance)

C. Final building footprint along with the vehicular circulation.

D.3. Creating another double height space for the departure & waiting area

INTER STATE BUS TERMINAL SECONDARY PROGRAM

Terminal Administration

PRIMARY PROGRAM

Cafeteria (Enclosed & Semi-Open)

Ticketing & Information + Waiting Area

Passenger Convenience Vehicular Parking

Commercial Inserts

Medical Facilities Bus Workshops Exhibition Spaces

I.P.T. Modes Integration of Local Buses on Site Perimeter

D.4. Ground Floor for Maintenance area

D.5. Lifting part floor on stilt, addition of double height for maintenance area

SITE ACCESSIBILITY
ZONING & CIRCULATION
30 29 Architectural Design | July‘20-December‘20 Academic Work | Interstate Bus Terminal
Future Proposals Future Proposals Bus Flow Legend: Common vehicular entry Private Vehicles & Rickshaw Local Bus Flow Way to basement Future Proposals Future Proposals Future Proposals

12MWideI.S.B.TBusRoad

PASSENGER CIRCULATION PLAN

GROUND FLOOR PLAN CONCEPTUAL MASSING 32 31 Architectural Design | July‘20-December‘20 Academic Work | Interstate Bus Terminal 1 1 2 3 4 5 5 6 6 7 8 8 9 9 9 10 11 12 13 13 14 14 15 16 16 17 18 19 20 21 22 22 23 23 24 24 25 25 26 26 27 28 29 30 31 32 12M Wide I.S.B.T Bus Road
54M Wide Eastern Express Highway 12M Wide I.S.B.T Bus Road Idle Parking Bays Arrival Bays Departure Bays 9M Wide Road 6M Wide Road 7.5M Wide Road +200LVL +300LVL 17 - Public Staircase 18 - Information & Tourist Enquiry 19 - Emergency Exit 20 - Staff Toilet 21 - Waiting Area 22 - Waiting Area Landscape Module 1 23 - Waiting Area Landscape Module 2 24 - Departure Area Cafe - Security Cabin 2 - Local Bus Drop Off/Pick-Up 3 - Rickshaw Drop Off/Pick-Up 4 - 4 Wheeler Drop Off/Pick-Up 5 - Entry 6 - Exit 7 - Spill Out Space 8 - Ticketing & Enquiry Departing Passenger Movement Legend: Arriving Passenger Movement For First Floor Toilet Ticket Counter Escalator Staircase Lift Medical Facility Bus Service Taxi Service Cycle Parking Bus Petrol Pump Bus Parking Parking 9 - Public Toilet 10 - Back Office & Announcement 11 - Medical Facility 12 - Lost & Found, Cloak Room 13 - Arrival Area Cafe 14 - Arrival Area Shops 15 - Escalators 16 - Passenger Lift 25 - Departure Area Shop 26 - Departure Area Display Shop 27 - Visitors Lounge 28 - Maintenance Bays 29 - Washing Bays 30 - Bus Staff Pantry & Lounge 31 - Maintenance & Washing Area Admin 32 - Fuelling Stations 0 5 15 30 M 0 5 15 30 M

WESTERN

EXPLODED ISOMETRIC VIEW PUBLIC FURNITURE MODULE DESIGNS
34 Architectural Design | July‘20-December‘20 Interstate Bus Terminal Display Shop Module (3 Units) Display Shop Module (1 Unit) Cafe Module Book Store Module Landscape Seating Module Landscape Seating Module 2 Display Shop Module (2 Unit) Eatery/ Snack Shop Module Seating Module Roof Level Structural System First Floor Level Ground Floor Level
ELEVATION
SECTIONAL PERSPECTIVE VIEWS
SYSTEM
DRAWINGS
STRUCTURAL
DETAIL
36 35 Architectural Design | July‘20-December‘20 Academic Work | Interstate Bus Terminal KEY SECTION 2 B +200 Lvl. +6200 Lvl. +11200 Lvl. -4500 Lvl. 0 3 8 18 M KEY SECTION 1 DETAIL SECTION ‘A’ through the Atrium in the Terminal Concourse DETAIL SECTION ‘B’ through the Passenger Waiting facility in the Departure area A 0 5 12 22 M +200 Lvl. +6200 Lvl. +11200 Lvl. +17500 Lvl. -4500 Lvl. Tie Beam Secondary Beam Fanning Brace M.S Circular Column Drainage Pipe Supporting Mesh View of Structural Column Slope on roof layer Floor Drain Trap Drain Pipe Hollow Steel Stanchion Hollow Steel Stanchion Base Plate Gusset Plate Fanning Brace M.S Mesh Hollow Steel Stanchion Structural Column Detail View of a series of structural column Sheeting with Insulation Tie Beam M.S Rafters M.S Joists M.S Plate M.S Gusset Plate M.S Gusset Plate M.S Circular Column M.S Circular Column A B C A. B. C. Canopy M.S Purlins M.S Rafters V-Column Entrance Area View Terracotta Louvers Horizontal Pivot M.S Mullion Louvre Detail Photovoltaic Glass Panel Frame Transparent Electrode AR Coating Transparent Substrate AR Coating UV Reflector Glass Layering
SOUTHERN ELEVATION DROP-OFF CANOPY DETAILS FACADE DESIGN DETAILS
DESIGN VIEWS
View of Central Atrium consisting eating spaces, corridor connecting Cafeteria and Admin spaces View of Enclosed Cafeteria, looking towards Bus Departures. View of Bus Departure area, showing waiting space and eatery shops etc.
38 37 Architectural Design | July‘20-December‘20 Academic Work | Interstate Bus Terminal
View of the bus terminal from F.O.B. above Eastern Express Highway

03 Commemoration Centre

SITE LOCATION & ANALYSIS

Kamal Amrohi studios (Kamalistan studios) was established in 1958, spread over 15 acre, it is situated in Jogeshwari East off JogeshwariVikhroli link road in Mumbai. It was founded by Syed Amir Haider Kamal Naqvi popularly known as Kamal Amrohi who was a film director and screenwriter.

Commemoration Centre

Celebrating the duo of Salim-Javed @ Kamal Amrohi Studios, Jogeshwari, Mumbai

Subject: Architectural Design

Academic Year: 3th Year, December’18-May’19

Work Type: Individual Work

Project Type: Institutional Architecture

Mentor: Ar. Joyeta Sen

Tools Used:

PROJECT BRIEF

Cinema is the reflection of the society and the events taking place. It is the evolution of mankind. It is a platform bound by no religions language or any other restrictions but a platform to express your talent and thoughts. It is one of the force that binds the citizens of the country together.

The idea of the project was to design a commemorative centre celebrating the works of an individual/s which inspires the visitors as well as imparts knowledge and trains them to develop their skills in this creative field. The program was looked upon as an opportunity to honour the legends as well as celebrate one of the primary thriving industries of the country.

Jogeshwari-Vikhroli Link Road

CONCEPT & DESIGN IDEAS

Academic Work Commemoration Centre 39
03
Architectural Design | December‘18-May‘19 40 SITE
Kamal Amrohi Studio
The Second Part Of The Site Can Be Used For Developing The Core Design PrevailingSouthWestWinds MorningLight EveningLight Site Being Divided Into Two Parts By The Line Of Trees The Line Of Trees Provide Some Resistance Rom The Vehicular Noise Levels Maximum Intensity Of Incident Light Sun Path High Noise Levels From The Link Road Service Road Existing line of trees Existing line of trees
Jogeshwari PrevailingNorthEastWinds
The entrance gate made of exposed concrete standing tall in between the line of trees reflecting the bold personalities of Salim-Javed High, dense hedges on either sides focus and guide the movement of the visitors towards the Tribute Wall at the entrance.

Comparatively higher ceiling height for comedy Low ceiling height for terror

Library has two floors and one underground floor for the archival section.

The studio is connected to the library and has height 1.5 times the of library

CONCEPT & DESIGN IDEAS

“ART IS NURTURED IN LONELINESS BUT EXHIBITED IN PUBLIC”

Highlighting this quote by Salim Sir, the auditorium provides an opportunity for the talent of the young learners to be fine-tuned, nurtured in the more private atmosphere whereas the amphitheatre provides an opportunity for it to be exhibited in public.

FORM & SPACE DEVELOPMENT FORM & SPACE DEVELOPMENT
Academic Work Commemoration Centre 41 Architectural Design | December‘18-May‘19 42 RECEPTION & WAITING LOUNGE HALL OF FAME
3-D VIEW OF HALL OF FAME
LIBRARY & TRAINING STUDIOS Multiple Lines drawn at different angles on a Plane Multiple Lines drawn at different angles on a Plane Multiple Lines drawn at different angles on a Plane Dividing the Form on the basis of the Functions Dividing the Form on the basis of the Functions Dividing the Form on the basis of the Functions Light well for the basement floor Plane Plane Plane Buttress like Fins act as Aesthetic as well as Structural Member Buttress like Fins
Aesthetic
as Structural Member Buttress like Fins act as Aesthetic as well as Structural Member Waiting Lounge Reception Plinth Plinth Plinth First Floor Ramp Wooden Louvers Wooden Louvers Wooden Louvers Form Form Form Toilet Toilet Love Library Comedy Studio Studio Terror Negative Area Negative Area Negative Area
3-D VIEW OF LIBRARY & TRAING STUDIOS
act as
as well
Maximum ceiling height for love

DESIGN ELEVATIONS

GROUND FLOOR PLAN DESIGN SECTIONS
Academic Work Commemoration Centre 43 Architectural Design | December‘18-May‘19 44 0 3 8 16 M Auditorium Dormitory Amphitheatre Library Reception Studio Parking Entrance Gate Hall Of Fame Reception Cafeteria Amphitheatre Dormitory Sit-Out Toilet 0 2 5 10 M SECTION B-B’ SECTION C-C’ SECTION D-D’ KEY PLAN 0 2 5 10 M 0 2 5 10 M Studio Library Library Sit-Out Dormitory Cafeteria Auditorium Auditorium Dormitory Library Sit-Out Studio Entrance Gate Parking Reception Cafeteria Hall Of Fame C’ G’ G C B B’ D’ E’ E D 0 2 5 10 M ELEVATION G-G’ ELEVATION E-E’ 0 2 5 10 M +10450 Lvl. +450 Lvl. +450 Lvl. +450 Lvl. -2550 Lvl. +3450 Lvl. +3450 Lvl. +3450 Lvl. +7050 Lvl. +6450 Lvl. +6450 Lvl.
Academic Work Commemoration Centre 45 Architectural Design | December‘18-May‘19 46 MODEL PHOTOGRAPHS Entrance Parking Studio Library Reception
of fame Auditorium Amphitheatre Cafeteria Dormitory Sit-out AERIAL VIEW OF THE DESIGN
Hall

Villa Design

Working Drawings

Subject: Architectural Representation & Detailing

Academic Year: 3th Year, June’18-May’19

Work Type: Individual Work

Project Type: Residential

Mentor: Ar. Wasim Noori & Ar. Samruddhi Kubal

Tools Used:

PROJECT BRIEF

The brief was to design a villa in the given plot size, having a maximum of 4 bedrooms, living and dining area, kitchen and a multipurpose entertainment room. A parking capacity of 2 vehicles was also to be accommodated within the plot boundary. The working drawing for the same was to be detailed and developed throughout the year highlighting any three details of the design in the final portfolio.

Villa Design

SETTING OUT LAYOUT

Academic Work | Villa Design 47
04
04
Working Drawing June‘18-May‘19 48 DETAIL 'Z' RAMP (0M,0M) (3M,4M) (3M,19.32M) AC 10 6000 6000 8250 5000 5000 PARKING G+2 VILLA FOOTPRINT AREA 276.075 SQ.M A 10 C P.B.M MANHOLE (21.02M,4M) (21.02M,19.32M) AD 9000 12000 4000 5000 5000 1200 5000 5000 30020 DETAIL 'Y' 5000 13750 5000 4835 6450 5000 4835 6450 5000 6000 10820 8485 -0.15M 1950 B D T.B.M 12M WIDE MAIN ROAD AB AA 18020 15320 15320 6000 3000 11000 1200 9600 5000 5000 30320 30320 DETAIL 'X' 18020 5000 5000 4535 5000 8485 5000 5000 4685 6000 5000 +/-0.00M 6000 1500 REVISION R0 NAME SCHEDULE UNIVERSITY OF MUMBAI DETAIL 'Y' @1:5 T.B.M TEMPORARY BENCH MARK DETAIL 'Z' DETAIL 'Z' @1:50 450x450 R.C.C FINISHED WITH 18MM PLASTER RAMP (0M,0M) (3M,4M) (3M,19.32M) AC 1 10 6000 6000 8250 5000 5000 NOTES :· THIS IS AN ACADEMIC EXERCISE. · DRAWINGS SHOULD NOT BE MEASURED. · DATA'S ARE ASSUMED WHEREVER REQUIRED. · R.C.C FRAMED STRUCTURE. · REFER SEPARATE NOTES FOR MINIMUM DEPTH,THICKNESS,PROJECT SPECIFICATIONS FOR STRUCTURAL MEMBERS. · ALL DIMENSIONS IN MM UNLESS SPECIFIED. · BRICKS TO BE LAID WITH FROGS UPWARDS. · MORTARS SHOULD NOT EXCEED 15 MM IN THICKNESS. · FIRST COAT TO BE MADE WITH WATER PROOFING ADMIXTURES. · DRIP MOULD TO BE PROVIDED TO ANY PROJECTIONS. · PLASTER THICKNESS 12 MM INTERNALLY AND 18 MM EXTERNALLY. · ALL DIMENSIONS ARE FROM UNFINISHED TO UNFINISHED FACE. · LEVELS ARE MENTION WITH REFERENCE TO THE FLOOR LEVEL. · ARCHITECTURAL PROJECTIONS SUCH AS CHAJJA,CANOPIES TO BE SHOWN IN DOTTED LINE. · VOIDS TO BE MARKED WITH DIAGONAL LINES. · DRAWINGS TO BE CHECKED THOROUGHLY BY THE SITE ENGINEER BEFORE THE EXECUTION OF WORK. · ANY AMBIGUITY TO BE CLARIFIED BY THE ARCHITECT WITH IMMEDIATE EFFECT IN WRITING. 3RD YEAR B.ARCH. WORKING DRAWING EXAM SEAT NO - 1423 DWG. NOSCALE 1:100 MU-1643 MUDIT VIJAY JAIN 10 P.B.M PERMANENT BENCH MARK(MANHOLE) 230 425 115 VILLA LAYOUT 115 SR NO. SYMBOL DESCRIPTION 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 C X PB X S X R.C.C COLUMN COLUMN CENTERLINE SUNK SLAB BRICK WALL PAVED FOOTPATH TILE DROP LEVEL MARKER DUCT C- R.C.C COLUMN X- NUMBER PB- PLINTH BEAM X NUMBER S- SLAB X- NUMBER ONE WAY SLAB TWO WAY SLAB B X B- BEAM X- NUMBER LIGHT POST DOWN TAKE PIPE NAHANI TRAP 425 230 PARKING 230x75 PRECAST PATLI G+2 VILLA FOOTPRINT AREA 276.075 SQ.M 10 C P.B.M MANHOLE (21.02M,4M) (21.02M,19.32M) AD 9000 12000 4000 5000 5000 1200 5000 5000 30020 DETAIL 'Y' 5000 13750 5000 4835 6450 5000 4835 6450 5000 6000 10820 8485 -0.15M 1950 TITLE ROLL NO 212.5 SETTING OUT PLAN DETAIL 'X' @1:5 212.5 B D T.B.M 12M WIDE MAIN ROAD AB AA 18020 15320 15320 6000 3000 11000 1200 9600 5000 5000 30320 30320 DETAIL 'X' 1 18020 5000 5000 4535 5000 8485 5000 5000 4685 6000 5000 AC 350x300 PRECAST GUTTER WITH C.I. GRATING +/-0.00M 6000 1500 RIZVI COLLEGE OF ARCHITECTURE DATE 25/04/2019

COUMPOUND WALL DETAILS

SECTION A-A’ CUT THROUGH STAIRCASE STRIP SECTION CUT THROUGH TOILET
51 Working Drawing June‘18-May‘19 52 Academic Work | Villa Design NOTES · THIS · DRAWINGS · DATA'S · R.C.C · REFER DEPTH, SPECIFICATIONS MEMBERS. · ALL · BRICKS · MORTARS THICKNESS. · FIRST PROOFING · DRIP PROJECTIONS. · PLASTER 18 · ALL UNFINISHED · LEVELS THE · ARCHITECTURAL CHAJJA,CANOPIES LINE. · VOIDS · DRAWINGS THE OF · ANY ARCHITECT WRITING. WORKING ROLL DWG. SCALE NAME TITLE UNIVERSITY SCHEDULE
W5 D1 D1 D1 MASTER BEDROOM MASTER BEDROOM KITCHEN DINING AREA PASSAGE PASSAGE W1 W1 300 600 750 600 800 1900 600 800 1900 600 800 3550 600 1200 1650 600 300 600 750 1200 450 450 600 2700 600 2400 600 1200 150 230MM THICK DRY RUBBLE PACKING EARTH PACKING 1000MM PLINTH PROTECTION 230x600 R.C.C PLINTH BEAM(TYPE B) 230MM THICK BRICK WALL R.C.C WAIST SLAB M.S RAILING 100MM THICK R.C.C JALI 150MM RISER 32MM THICK T.W BOARDING BALCONY 50x50 M.S BOX SECTION 100MM THICK R.C.C JALI 230x600 R.C.C BEAM 100MM HIGH SKIRTING 38MM THICK CEMENT SCREEDING 12MM THICK TILES AS PER SPECIFICATIONS 150MM THICK R.C.C MIDLANDING 150MM THICK COPING 1200MM BRICK MASONARY PARAPET WALL 100MM THICK R.C.C JALI 150MM RISER 32MM THICK T.W BOARDING 230MM THICK BRICK WALL R.C.C COLUMN FINISHED WITH 18MM THICK PLASTER FLUSHING DOMESTIC R.C.C OVERHEAD TANK OVERFLOW PIPE 230MM THICK BRICK WALL 600 DIA. C.I LID 230x600 R.C.C PLINTH BEAM(TYPE B) 150MM THICK R.C.C SILL 150MM THICK R.C.C LINTEL 100MM THICK BRICK BAT COBA 150MM BRICK WORK 50x50 M.S BOX SECTION USED FOR RAILING 600MM CHAJJA 230MM THICK BRICK WALL R.C.C COPING 100MM THICK BRICK BAT COBA 150MM BRICK WORK 50x50 M.SBOX SECTION USED FOR RAILING 3300 3150 600 450 2100 900 750 1200 1050 450 150 450 2700 450 100 2550 600 100 2100 2100 2700 3150 3300 3150 3000 1200 150 1350 2400 600 3000 1200 1650 1350 230 1500 450 150 2250 3300 4950 100MM THICK BRICK BAT COBA +/-0.0M +0.60M +1.50M +2.70M +3.30M +3.90M +6.45M +7.20M +9.75M +10.35M +11.70M +13.50M +14.70M +16.35M +16.95M 75 TERRACE GROUND LEVEL PLINTH LEVEL SILL LEVEL(KITCHEN) LINTEL LEVEL(KITCHEN) BEAM BOTTOM LEVEL FIRST FLOOR LEVEL LINTEL LEVEL(MASTER BEDROOM) SECOND FLOOR LEVEL CHAJJA LEVEL(MASTER BEDROOM) TERRACE LEVEL TERRACE PARAPET LEVEL MUMTY LEVEL OVERHEAD TANK SLAB BOTTOM LEVEL OVERHEAD TANK SLAB TOP LEVEL OVERHEAD TANK BUND WALL LEVEL 2700 2550 TILL HARD STRATA TILL HARD STRATA TILL HARD STRATA TILL HARD STRATA R.C.C JALI ENCASING R.C.C JALI ENCASING R.C.C JALI ENCASING R.C.C JALI ENCASING LINTEL 2400 2100 2400 2400 2100 2100 2700 2700 RIZVI NOTES THIS IS AN ACADEMIC EXERCISE. DRAWINGS SHOULD NOT BE MEASURED. DATA'S ARE ASSUMED WHEREVER REQUIRED. R.C.C FRAMED STRUCTURE. REFER SEPARATE NOTES FOR MINIMUM DEPTH, THICKNESS,PROJECT SPECIFICATIONS FOR STRUCTURAL MEMBERS. ALL DIMENSIONS IN MM UNLESS SPECIFIED. BRICKS TO BE LAID WITH FROGS UPWARDS. MORTARS SHOULD NOT EXCEED 15 MM IN THICKNESS. FIRST COAT TO BE MADE WITH WATER PROOFING ADMIXTURES. DRIP MOULD TO BE PROVIDED TO ANY PROJECTIONS. PLASTER THICKNESS 12 MM INTERNALLY AND 18 MM EXTERNALLY. ALL DIMENSIONS ARE FROM UNFINISHED TO UNFINISHED FACE. LEVELS ARE MENTION WITH REFERENCE TO THE FLOOR LEVEL. ARCHITECTURAL PROJECTIONS SUCH AS CHAJJA,CANOPIES TO BE SHOWN IN DOTTED LINE. VOIDS TO BE MARKED WITH DIAGONAL LINES. DRAWINGS TO BE CHECKED THOROUGHLY BY THE SITE ENGINEER BEFORE THE EXECUTION OF WORK. ANY AMBIGUITY TO BE CLARIFIED BY THE ARCHITECT WITH IMMEDIATE EFFECT IN WRITING. SCHEDULE SECTION A-A' A A' A A' D1 D1 MASTER BEDROOM MASTER BEDROOM PASSAGE PASSAGE W1 800 1900 600 800 3550 600 1200 1650 600 100MM THICK R.C.C JALI 230x600 R.C.C BEAM 12MM THICK TILES AS PER SPECIFICATIONS 150MM THICK R.C.C MIDLANDING 150MM THICK COPING 1200MM BRICK MASONARY PARAPET WALL 100MM THICK R.C.C JALI 150MM RISER 32MM THICK T.W BOARDING 230MM THICK BRICK WALL R.C.C COLUMN FINISHED WITH 18MM THICK PLASTER FLUSHING DOMESTIC R.C.C OVERHEAD TANK OVERFLOW PIPE 230MM THICK BRICK WALL 600 DIA. C.I LID 450 2550 600 100 2100 1200 150 2400 600 3000 1200 1650 230 2250 3300 4950 TERRACE TILL HARD STRATA R.C.C JALI ENCASING R.C.C JALI ENCASING SCHEDULE WINDOW SCHEDULE DOOR SCHEDULE NOTES :THIS IS AN ACADEMIC EXERCISE. DRAWINGS SHOULD NOT BE MEASURED. DATA'S ARE ASSUMED WHEREVER REQUIRED. · R.C.C FRAMED STRUCTURE. REFER SEPARATE NOTES FOR MINIMUM DEPTH, THICKNESS,PROJECT SPECIFICATIONS FOR STRUCTURAL MEMBERS. ALL DIMENSIONS IN MM UNLESS SPECIFIED. · BRICKS TO BE LAID WITH FROGS UPWARDS. MORTARS SHOULD NOT EXCEED 15 MM IN THICKNESS. FIRST COAT TO BE MADE WITH WATER PROOFING ADMIXTURES. · DRIP MOULD TO BE PROVIDED TO ANY PROJECTIONS. · PLASTER THICKNESS 12 MM INTERNALLY AND 18 MM EXTERNALLY. ALL DIMENSIONS ARE FROM UNFINISHED TO UNFINISHED FACE. LEVELS ARE MENTION WITH REFERENCE TO THE FLOOR LEVEL. ARCHITECTURAL PROJECTIONS SUCH AS CHAJJA,CANOPIES TO BE SHOWN IN DOTTED LINE. VOIDS TO BE MARKED WITH DIAGONAL LINES. · DRAWINGS TO BE CHECKED THOROUGHLY BY THE SITE ENGINEER BEFORE THE EXECUTION OF WORK. · ANY AMBIGUITY TO BE CLARIFIED BY THE ARCHITECT WITH IMMEDIATE EFFECT IN WRITING. WORKING DRAWING 3RD YEAR B.ARCH. ROLL NO EXAM SEAT NO -1423 DWG. NO 19 REVISION R0 SCALE 1:25 NAME SCHEDULE TITLE UNIVERSITY OF MUMBAI MUDIT VIJAY JAIN MU-1643 STRIP SECTION VILLA LAYOUT STRIP SECTION THROUGH TOILET W1 W1 W1 300 450 1350 150 2400 600 600 1800 1250 1250 1000MM PLINTH PROTECTION 230x600 PLINTH BEAM(TYPE B) 230MM THICK BRICK WORK 230x750 R.C.C BEAM 100MM HIGH SKIRTING 150MM HIGH BRICKWORK 100MM THICK BRICK BAT COBA 150MM HIGH BRICKWORK 100MM THICK BRICK BAT COBA 38MM CEMENT SCREEDING 600MM CHAJJA 230MM THICK BRICKWORK R.C.C. COPING +/-0.0M +0.60M +3.90M +7.20M +10.50M +11.85M GROUND LEVEL PLINTH LEVEL SLAB LEVEL (FIRST FLOOR) SLAB LEVEL (SECOND FLOOR) SLAB LEVEL (TERRACE) TERRACE PARAPET LEVEL BULLNOSE DRIP MOULD DRY RUBBLEPACKING 12MM THICK MORTAR FOUR SHUTTER ALUMINIUM SLIDING WINDOW AS PER SPECIFICATION FIXED WINDOW AS PER SPECIFICATION 12MM CERAMIC TILE CLADDING(WET) 12MM THICK MORTAR 12MM CERAMIC TILE CLADDING(WET) 75x50 M.S BOX SECTION FOUR SHUTTER ALUMINIUM SLIDING WINDOW AS PER SPECIFICATION DRIP MOULD BULLNOSE 75x50 M.S BOX SECTION FOUR SHUTTER ALUMINIUM SLIDING WINDOW AS PER SPECIFICATION DRIP MOULD 38MM CEMENT SCREEDING 150 2400 600 600 1800 150 2400 600 600 1800 W2 W2 W2 W2 W2 STORE ROOM TOILET TOILET TOILET TOILET TOILET 1400 600 450 2450 1200 3300 3100 200 1400 TERRACE 230MM THICK BRICKWORK 230x600 PLINTH BEAM(TYPE 150MM THICK R.C.C SILL 150MM THICK BRICK BAT COBA 38MM CEMENT SCREEDING 230x600 R.C.C BEAM 450x300 TILE WALL FINISH(FULL HEIGHT) 300MM THICK BRICK BAT COBA 38MM THICK CEMENT SCREEDING 230MM THICK BRICKWORK R.C.C COPING 150MM THICK BRICK BAT COBA 38MM CEMENT SCREEDING +/-0.0M +0.60M +1.80M +2.70M +3.70M +7.00M +10.30M +6.40M +6.00M +5.10M +9.70M +9.30M +8.40M +11.70M GROUND LEVEL PLINTH LEVEL SILL LEVEL(TOILET LINTEL LEVEL(TOILET) SUNK SLAB LEVEL (FIRST FLOOR) SILL LEVEL(TOILET) LINTEL LEVEL(TOILET) SLAB BOTTOM LEVEL SUNK SLAB LEVEL (SECOND FLOOR) SILL LEVEL(TOILET) LINTEL LEVEL(TOILET) SLAB BOTTOM LEVEL SUNK SLAB LEVEL (TERRACE) TERRACE PARAPET LEVEL 3150 150MM THICK R.C.C. SLAB 150MM THICK R.C.C. SLAB 450x300 TILE WALL FINISH(FULL HEIGHT) 230x600 R.C.C BEAM 230x600 R.C.C BEAM 150MM THICK R.C.C. SLAB 1200 3300 3100 STRIP SECTION THROUGH BALCONY RIZVI COLLEGE OF ARCHITECTURE DATE 25/04/2019 ELEVATION KEY PLAN SECTION E-E’
SECTION A-A'

SOUTH ELEVATION

SOUTHERN ELEVATION
KITCHEN DETAILS 53 Working Drawing June‘18-May‘19 54 Academic Work | Villa Design FOUR SHUTTER ALUMINIUM FRAMED SLIDING WINDOW WITH 5MM THICK GLASS AS PER SPECIFICATION 12MM THICK STONE FINISH CERAMIC TILE (GREY PYRAMID STONE) 50x50 M.S BOX SECTION FIXED TO 75x50 BOX SECTION(RAILING) 50MM THICK R.C.C JALI 12MM THICK STONE FINISH CERAMIC TILE (GREY PYRAMID STONE) 50x50 M.S BOX SECTION FIXED TO 75x50 BOX SECTION(RAILING) 50MM THICK R.C.C JALI FOUR SHUTTER ALUMINIUM FRAMED SLIDING WINDOW WITH 5MM THICK GLASS AS PER SPECIFICATION FOUR SHUTTER ALUMINIUM FRAMED SLIDING WINDOW WITH 5MM THICK GLASS AS PER SPECIFICATION R.C.C. BOXING FINISHED WITH 18MM THICK PLASTER 600MM R.C.C. CHAJJA FINISHED WITH 18MM THICK PLASTER PARAPET WALL WITH 150MM R.C.C COPING FINISHED WITH PLASTER R.C.C OVERHEAD TANK R.C.C COLUMN FINISHED WITH 18MM PLASTER FLOWER BED 600MM PLINTH FINISHED WITH 18MM THICK PLASTER, CLADDED WITH 12 MM THICK CERAMIC TILE(SPECTRA RUST) USING 12MM THICK MORTAR -5.73M +/-0.0M -0.60M -8.36M -5.73M -8.36M -8.36M -0.60M -8.36M P.C.C PLINTH PROTECTION 600MM PLINTH FINISHED WITH 18MM THICK PLASTER,CLADDED WITH 12MM THICK CERAMIC TILES(SPECTRA RUST) USING 12MM THICK MORTAR 600MM R.C.C ENCASING FINISHED WITH 18MM THICK PLASTER R.C.C. BOXING FINISHED WITH 18MM THICK PLASTER R.C.C. BOXING FINISHED WITH 18MM THICK PLASTER R.C.C COLUMN FINISHED WITH 18MM PLASTER R.C.C. BOXING FINISHED WITH 18MM THICK PLASTER 50x50 M.S BOX SECTION FIXED TO 75x50 BOX SECTION(RAILING) R.C.C COLUMN FINISHED WITH 18MM PLASTER 12MM THICK STONE FINISH CERAMIC TILE (GREY PYRAMID STONE) 50x50 M.S BOX SECTION(RAILING) EXTERNAL WALL FINISHED WITH 18MM THICK PLASTER,1 COAT OF PUTTY, 2 COATS OF PRIMER AND 2 COATS OF ASIAN PAINTS ULTIMA PROTEK DURALIFE EMULSION PAINT EXTERNAL WALL FINISHED WITH 18MM THICK PLASTER,1 COAT OF PUTTY, 2 COATS OF PRIMER AND 2 COATS OF ASIAN PAINTS ULTIMA PROTEK DURALIFE EMULSION PAINT
TOILET DETAILS
WINDOW SCHEDULE 4 SHUTTER ALUMINIUM FRAMED SLIDING WINDOW 5 MM THICK GLASS AS PER APPROVED SIZE ALUMINIUM FRAMED LOUVERED WINDOW WITH 10 MM THICK GLASS SANDWICHED BETWEEN 12 MM THK PLY WITH LAMINATE FINISH AND AIR SEALED 3 SHUTTER ALUMINIUM CASEMENT WINDOW 5MM VERTICAL WOODEN LOUVERS WINDOW WITH INTER LOCKING FINS PIVOTED AT THE TOP AND BOTTOM 10 MM THICK GLASS SANDWICHED BETWEEN 12 MM THK PLY WITH LAMINATE FINISH AND AIR SEALED ALUMINIUM FRAMED LOUVERED WINDOW WITH ALUMINIUM FRAMED LOUVERED WINDOW WITH UNFINISHED SIZE LINTEL 1500x2400 2400 1050x2100 2100 900x2100 2100 LAYOUT SECTION A-A’ TILE LAYOUT SUPPLY LAYOUT SECTION C-C’
DETAIL
TOP & FASCIA

DRAINAGE LAYOUT SECTION C-C’

Rotycan Turbotech, G.I.D.C. Makarpura

Working Drawing, Design & Furniture Layouts, Detail Drawings, 3-D Model and Renders

Shannen C.B.S.E. School, Halol

Working Drawing, Detail Drawings and Site visits

Gulbrandsen Technologies, G.I.D.C. Jhagadia

Working Drawing, Detail Drawings and Site visits

Munjal Auto, Waghodia

Interior Design, Detail Drawings and Electrical Layout

01 02 03 04 05

Party Plot, Devgadh Baria

Toilet Detail Drawings & Site Visit

TOILET DETAILS Academic Work Villa Design | Working Drawing June‘18-May‘19 55 56
PROFESSIONAL WORK
Professional Work Select Projects
SECTION A-A’ SECTION B-B’

Rotycan Turbotech

G.I.D.C. Makarpura

Client: Mr Tyrone Lemos

Scope of Work: Working Drawing, Design & Furniture Layouts, Detail Drawings, 3-D Model and Renders

Rotycan Turbotech

MASTER PLAN

Tools Used:

PROJECT BRIEF

Rotycan Turbotech is a company engaged in mechanical & electrical designing of stream-turbo alternator plants. The task was to design & detail the factory & admin block of their new establishment in Makarpura.

All the drawings belong to SJAC Consultancy, Vadodara. None of the same shall be copied/altered or reproduced without the permission of the concerned authority.

Rotycan Turbotech
01
58 01
Professional Work 57 99.663 99.687 99.729 99.708 99.657 Mobile Tower Compound Wall To Temple Chokdi Compound Wall 99.00 99.00 99.25 PANTRY OFFICE ADMIN AREA CARPET AREA 150.80M +100.500LVL OPEN ROLLING SHUTTER CLEAR HEIGHT 6M TURBO VENT SKY LIGHT ROLLING SHUTTER CLEAR HEIGHT 6M FACTORY AREA CARPET AREA 767.43M 0.60x0.23 0.60x0.23 0.60x0.23 SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT 0.90x0.53 0.60x0.23 CANOPY ABOVE GATE 2 Heavy Trucks RAMP PLANTER BED UP +100.500 LVL. +100.300 LVL. +100.350 LVL. +100.100 LVL. +100.500 LVL. +100.500 LVL. +100.500 LVL. +100.050 LVL. GARDEN GATE 2 Light wt. Trucks Compound Wall UP SECURITY CABIN GATE 3 Corporate Entry +100.350 LVL. METAL GAZEBO PAVED WALK-WAY +100.050 LVL. GARDEN PLINTH PROTECTION PLINTH PROTECTION PLINTH PROTECTION PLINTH PROTECTION PLINTH PROTECTION OTLA +100.350 LVL. OTLA +100.350 LVL. 3.490 UP CANOPY ABOVE CANOPY ABOVE 450MM HIGH SIDE WALL 450MM HIGH SIDE WALL 450MM HIGH SIDE WALL 450MM HIGH SIDE WALL FAMILY ROOM +100.350 KITCHEN COMMON WASHROOM UP UP OTLA TOILET OUTHOUSE 491FT OTLA +100.350 CHAJJA ABOVE 1.200 OUTHOUSE C.A=17.14M

OUTHOUSE 1 DETAILS

TERRACE PLAN

OUTHOUSE 2 DETAILS

SETTING OUT LAYOUT
LINEOUT LAYOUT
Rotycan Turbotech 60 Professional Work 59 GATE 1 GATE 3 light weight trucks Heavy Trucks 2.55 1.39 2.95 6.82 13.82 10.31 37.71 10.84 4.5 5.09 9.6 14.38 50.69 5 1.29 6.52 6.6 10.64 4.65 9.9 8.53 50.79 3.81 13.77 7.57 3.16 3.87 7.04 3.98 37.71 4 1.84 6.26 7.45 GATE 2 Heavy Trucks ALL DIMENSIONS TO BE MEASURED FROM THE OUTER FACE OF THE COMPOUND WALL ALL DIMENSIONS TO BE MEASURED FROM THE OUTER FACE OF THE COMPOUND WALL ALL DIMENSIONS TO BE MEASURED FROM THE CENTRE OF THE COMPOUND WALL ALL DIMENSIONS TO BE MEASURED FROM THE CENTER OF THE COMPOUND WALL 6.55 4.61 6.8 6.85 6.93 12.99 5.56 4.52 5.18 4.51 5.6 7.02 6.58 FACTORY AREA 40.23 19.9 10 5.9 30.23 O.T.S COURTYARD 3.62 4.1 4.1 6.38 OFFICE ADMIN AREA 25.8 20.23 TO BE MAINTAINED ON SITE TO BE MAINTAINED ON SITE 3.170 1.250 2.860 4.710 4.600 1.800 1.430 1.660 2.400 4.250 4.140 3.000 PLAN OTLA +100.350 UP CHAJJA ABOVE CHAJJA ABOVE CHAJJA ABOVE D4 L.L=2.40M W3 S.L=1.00M L.L=2.40M 0.600 1.200 0.600 0.370 1.200 0.530 0.900 1.200 1.250 0.350 1.200 0.370 1.060 0.370 0.690 230MM WIDE SLITS @230MM C/C SILL=600 LINTEL=2400 W3 S.L=1.00M L.L=2.40M W3 S.L=1.00M L.L=2.40M OUTHOUSE 1 C.A=17.14M2 185FT2 Ø100MM CENTRAL SUPPORT Ø1.60M SPIRAL STAIRCASE FLIGHT=3.50M NO. OF RISERS=20 EQUAL RISERS OF 175MM 1 2 3 4 5 6 8 9 10 11 12 13 UP
TERRACE +103.700 LVL +102.900 LVL CHAJJA BELOW CHAJJA BELOW 4.710 4.600 2.860 1.500 0.300 1.740 1.470 3.460 1.430 1.660 0.300 Ø100MM CENTRAL SUPPORT Ø1.60M SPIRAL STAIRCASE FLIGHT=3.50M NO. OF RISERS=20 EQUAL RISERS OF 175MM 14 15 16 17 18 19 20 12 13 DN A B C C D F G H J A B D C1 0.60x0.23 C6 0.60x0.23 START FACE +/-0.0 C1,C2,C3,C4,C5 0.115 5.85 0.115 40.23 40 C2,C5,C6 +6.115M C2,C5,C6 C2,C5,C6 +18.115M C2,C5 C2,C5,C7 +30.115M C5,C8 C5,C8 END FACE +40.23 0.115 C6 0.60x0.23 C6 0.60x0.23 C6 0.60x0.23 C7 0.60x0.23 START FACE +/-0.0 2 4 7 9 10 END FACE +25.80M C2,C2,C2,C2, C2,C2,C8,C8 +6.015M C3 +10.150M C1,C6,C6,C6, C6,C7 +0.115M C3 +11.675M C3 +14.650M C3 +15.535M C4 +19.185M C3 +21.190M C5,C5,C5,C5, C5,C5,C5,C5 +25.685M 4 5 6 7 8 9 10 C3 +10.150M C1,C6,C6,C6, C6,C7 +0.115M C3 +11.675M C3 +14.650M C3 +15.535M C4 +19.185M C3 +21.190M C5,C5,C5,C5, C5,C5,C5,C5 +25.685M END FACE +25.80M START FACE +/-0.0 START FACE +/-0.0 C1,C2,C3,C4,C5 C2,C5,C6 +6.115M C2,C5,C6 C2,C5,C6 +18.115M C2,C5,C7 +30.115M C5,C8 C5,C8 END FACE +40.23 0.115 0.115 40.23 40 0.115 5.9 3.855 1.525 2.975 0.885 3.650 2.005 C2 0.53x1.065 C2 0.53x1.065 C2 0.53x1.065 C2 0.53x1.065 C2 0.53x1.065 C2 0.53x1.065 C8 0.53x1.065 C8 0.53x1.065 C3 0.23x0.38 C3 0.23x0.38 C4 0.23x0.30 C5 0.53x0.90 C5 0.53x0.90 C5 0.53x0.90 C5 0.53x0.90 C5 0.53x0.90 C5 0.53x0.90 C5 0.53x0.90 C5 0.53x0.90 C3 0.23x0.38 C3 0.23x0.38 BUILDING FOOTPRINT LINE BUILDING FOOTPRINT LINE BUILDING FOOTPRINT LINE C3 0.23x0.38 0.115 E C6 +23.965M 0.150 F G H J C2,C5 E C6 +23.965M 0.115 3 C2,C2,C2,C2, C2,C2,C8,C8 +6.295M 2 C2,C2,C2,C2, C2,C2,C8,C8 +6.015M 3 C2,C2,C2,C2, C2,C2,C8,C8 +6.295M DETAIL 'B' DETAIL 'D' DETAIL 'A' DETAIL 'C' 4.495 O.T.S COURTYARD 3.620 FAMILY ROOM OTLA +100.350 KITCHEN CHOKDI COMMON WASHROOM UP UP OTLA +100.350 L.L=2.40M D1 L.L=2.40M D2 L.L=2.40M D2 L.L=2.40M D3 L.L=2.10M L.L=2.10M W1 S.L=1.00M L.L=2.40M W2 S.L=0.75M L.L=2.40M 4.700 1.610 1.660 1.430 1.100 4.470 1.100 O.T.S 4.240 0.900 0.600 1.800 0.900 1.000 0.200 1.190 0.750 1.150 0.900 2.025 0.750 0.375 0.900 1.390 1.200 1.200 1.315 1.380 0.500 0.730 0.200 1.000 1.300 0.640 0.430 0.280 0.280 1.100 0.665 0.565 0.690 2.180 0.690 1.495 230MM WIDE SLITS @230MM C/C SILL=600 LINTEL=2400 230MM WIDE SLITS @230MM C/C SILL=600 LINTEL=2400 230MM WIDE SLITS @230MM C/C SILL=600 LINTEL=2400 PARTITION WALLS UPTO 2250MM HEIGHT ONLY SKYLIGHT ABOVE 230MM WIDE SLITS @230MM C/C SILL=600 LINTEL=2400 1.000 0.750 A A B B PLAN TOILET OUTHOUSE 2 C.A=45.62M 491FT 1.600 Ø100MM CENTRAL SUPPORT Ø1.60M SPIRAL STAIRCASE FLIGHT=3.50M NO. OF RISERS=20 EQUAL RISERS OF 175MM 11 12 13 UP RAISED PLATFORM +100.200 FLOOR LVL. +100.350 SLAB TOP LVL. +103.700 SKYLIGHT TOP LVL. +104.750 ROAD TOP LVL. +99.708 3.350 3.600 0.600 1.800 2.550 0.700 W1 D=300 D= 450 D= 450 SIDE WALLS PROJECTED 450MM 230MM WIDE SLITS @230MM C/C SILL=600 LINTEL=2400 D= 450 EAST ELEVATION SKYLIGHT CHAJJA PROJECTION D3 D3 FLOOR LVL. +100.350 SLAB TOP LVL. +103.700 SKYLIGHT TOP LVL. +104.750 ROAD TOP LVL. +99.708 SKYLIGHT SECTION BB FAMILY ROOM & KITCHEN CHOKDI COMMON WASHROOM OTLA 2.400 1.050 0.300 0.250 3.600 0.150 GROUND FLOOR LAYOUT TERRACE LAYOUT GROUND FLOOR LAYOUT EASTERN ELEVATION
B-B’
SECTION

GROUND FLOOR LAYOUT

GROUND FLOOR FURNITURE LAYOUT

DESIGN LAYOUT

NORTHERN ELEVATION

RENDERED LAYOUT

EASTERN ELEVATION

Rotycan Turbotech 62 Professional Work 61 10 11 13 DOWN PANTRY COURTYARD +100.30LVL M.D.'S OFFICE TOILET S.L=0.90M SG1 OFFICE ADMIN AREA +100.50LVL CARPET AREA=150.87M =1624FT OPEN PANTRY COURTYARD GARDEN WITH TWO BENCHES STAIRCASE DATA APPROX. EACH TREAD 275MM WIDE ROLLING SHUTTER CLEAR HEIGHT = 6M ROLLING SHUTTER CLEAR HEIGHT = 6M TURBO VENT SKY LIGHT ENTRY FOR LIGHT WEIGHT TRUCKS ROLLING SHUTTER CLEAR HEIGHT = 6M ENTRY FOR HEAVY WEIGHT TRUCKS ENTRY URINAL W.C W.C STORAGE FACTORY AREA B.U.A.=834.71M =8985FT CARPET AREA=767.43M =8260.55FT 600MM PROJECTION C1 0.60x0.23 C6 0.60x0.23 C7 0.60x0.23 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 1.065x0.53 600MM PROJECTION ABOVE 600MM PROJECTION ABOVE 100MM A.A.C BLOCK WALL D1 L.L=2.80M V1 S.L=1.50M S.L=1.00M L.L=2.40M L.L=2.40M W13 S.L=1.00M L.L=2.40M S.L=1.00M L.L=2.40M S.L=0.90M L.L=2.80M S.L=0.45M L.L=2.80M W16 L.L=2.80M S.L=1.00M L.L=2.40M S.L=1.00M L.L=2.40M L.L=2.40M S.L=1.00M L.L=2.40M D4 D9 S.L=1.50M W20 L.L=2.80M W21 L.L=2.80M S.L=1.00M D4 W22 L.L=2.40M S.L=1.00M S.L=1.00M S.L=1.00M S.L=1.00M S.L=1.00M S.L=1.00M S.L=1.00M W22 L.L=2.40M W22 L.L=2.40M S.L=1.00M W23 L.L=2.40M L.L=2.40M D3 L.L=2.10M L.L=2.40M L.L=2.10M SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT TURBO VENT SKY LIGHT SKY LIGHT 14 C5 0.90x0.53 C5 0.90x0.53 C5 0.90x0.53 C5 0.90x0.53 C5 0.90x0.53 0.30x0.23 C3 1.065x0.53 1.065x0.53 1.065x0.53 1.065x0.53 1.065x0.53 1.065x0.53 1.065x0.53 C6 C6 0.60x0.23 C6 0.60x0.23 2.670 1.200 1.345 1.460 0.100 1.490 0.675 1.235 0.440 0.655 3.130 1.050 0.750 1.400 5.585 1.400 5.400 5.215 2.175 1.350 3.620 1.350 1.740 0.800 0.900 1.650 1.350 0.670 0.600 0.315 0.835 0.750 1.700 2.000 0.370 1.200 0.400 0.780 1.120 1.360 1.200 1.790 5.470 1.120 3.300 1.050 5.470 1.590 5.470 1.420 1.200 1.260 1.850 1.800 0.605 1.525 0.480 1.430 0.750 4.185 4.555 3.870 4.100 3.620 4.100 5.670 1.100 1.250 0.879 1.250 0.600 0.970 0.750 0.500 0.600 0.370 0.300 3.755 1.250 5.670 0.880 2.070 0.600 3.870 1.945 1.460 0.100 1.490 0.675 1.235 1.695 3.130 1.050 0.750 0.600 1.400 0.230 3.620 0.600 1.525 0.480 1.430 2.344 1.200 0.170 3.000 0.150 0.150 3.000 0.255 3.000 0.350 4.000 1.60 17.935 0.450 1.030 3.150 0.600 1.735 1.200 0.170 3.000 0.680 3.000 0.635 3.000 0.650 4.000 2.500 1.120 3.000 1.200 5.320 1.270 3.000 1.200 5.470 1.270 3.000 1.200 5.470 1.270 3.000 1.200 5.470 1.270 3.000 1.200 5.470 1.650 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 3.000 2.245 4.500 1.155 3.000 0.680 40.230 0.515 4.500 0.455 5.470 0.170 3.000 0.150 3.000 3.000 1.080 1.800 3.000 2.995 1.070 3.000 1.080 3.000 1.080 1.800 0.905 3.000 0.905 2.995 1.065 C3 0.38x0.23 C3 0.38x0.23 0.38x0.23 3.320 0.455 4.500 0.515 5.470 4.835 4.500 0.665 10.000 0.460 0.600 1.385 1.585 0.900 0.600 0.370 5.900 39.170 39.770 2.720 0.900 3.850 1.570 VERANDAH +100.350lvl. CANOPY ABOVE S.L=0.90M SG2 S.L=0.45M SG2 S.L=0.90M SG3 S.L=0.45M SG4 S.L=0.90M SG4 S.L=0.45M SG5 S.L=0.90M SG6 S.L=0.45M SG7 S.L=0.90M SG8 S.L=0.90M L.L=2.80M 30.23 CANOPY ABOVE CANOPY ABOVE PLINTH PROTECTION PLINTH PROTECTION PLINTH PROTECTION PLINTH PROTECTION PLINTH PROTECTION R INDICATIVE INDICATIVE RAILING BEHIND THE STRUCUTRAL GLAZING 150MM TILE BAND 12MMx12MM GROOVE PLASTER 12MMx12MM GROOVE PLASTER 12MMx12MM GROOVE IN PLASTER 12MMx12MM GROOVE IN PLASTER 12MMx12MM GROOVE PLASTER 12MMx12MM GROOVE PLASTER D=600 D=600 D=600 D=600 12MMx12MM GROOVE PLASTER 12MMx12MM GROOVE PLASTER 12MMx12MM GROOVE PLASTER 12MMx12MM GROOVE PLASTER SG1 SG2 SG3 SG4 SG5 SG6 SG7 SG8 SG9 D1 D=300 D=300 D=300 D=300 D=300 D=300 W26 STRUCUTRAL GLAZING W16 D9 ROLLING SHUTTER CLEAR HEIGHT=6M INDICATIVE STRIP LIGHTING TURBO VENT(INDICATIVE ONLY) D=300 D=300 D=300 D=300 D=300 D=300 NORTH ELEVATION GROUND FLOOR LVL. +100.500 FIRST FLOOR LVL. +103.75 TERRACE LVL. +107.00 PARAPET LVL. +108.00 MUMTY LVL. +110.00 PINNACLE LVL. +112.876 ROAD LVL. +99.708 VERANDAH LVL. +100.350 RAISED GARDEN LVL. +100.300 RAISED GARDEN LVL. +100.300 4.500 6.000 3.100 4.100 2.250 1.400 7.500 FLOATING D=600 ROLLING SHUTTER CLEAR HEIGHT=6M R TURBO VENT(INDICATIVE ONLY) INDICATIVE STRIP LIGHTING 150MM TILE BAND BRICK TILE CLADDING 150MM TILE BAND BRICK TILE CLADDING 150MM TILE BAND 150MM TILE BAND 150MM TILE BAND D4 SG11 V1 D=600 W22 W22 W22 DUCT D=300 D=600
FIRST FLOOR LVL. +103.75 GROUND FLOOR LVL. +100.500 TERRACE LVL. +107.00 PARAPET LVL. +108.00 MUMTY LVL. +110.00 PINNACLE LVL. +112.876 ROAD LVL. +99.708 VERANDAH LVL. +100.350 SITE LVL. +100.050 PLINTH PROTECTION CANOPY PLINTH PROTECTION 4.000 6.000 1.000 3.250 3.250 3.250 3.000 2.100 METAL SCULPTED MURAL 10 UP 11 12 19 13 DOWN PANTRY TOILET COURTYARD +100.30 LVL TOILET W1 S.L=0.90M L.L=2.80M VERANDAH +100.350lvl. OPEN PANTRY COURTYARD GARDEN WITH TWO BENCHES STAIRCASE DATA FLOOR TO FLOOR HT. =3.25M 19 RISERS OF EQUAL HEIGHT=171MM APPROX. EACH TREAD 275MM WIDE ENTRY ENTRY W.B W.C STORAGE 600MM PROJECTION ABOVE C1 0.60x0.23 C6 0.60x0.23 C7 0.60x0.23 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 C2 1.065x0.53 D1 L.L=2.80M W2 S.L=0.90M L.L=2.80M W3 S.L=0.45M L.L=2.80M W4 S.L=0.90M L.L=2.80M W5B S.L=0.90M L.L=2.80M W6 S.L=0.45M L.L=2.80M W4 S.L=0.90M L.L=2.80M W7 S.L=0.45M L.L=2.80M W8 S.L=0.90M L.L=2.80M SG1 S.L=0.90M L.L=2.80 V1 S.L=1.50M L.L=2.10M W9 S.L=1.00M L.L=2.40M D5 L.L=2.40M W11 S.L=1.00M L.L=2.40M W10 S.L=1.00M L.L=2.40M W12 S.L=0.90M L.L=2.80M W13 S.L=0.45M L.L=2.80M W14 S.L=0.45M L.L=2.80M W15 S.L=1.00M L.L=2.40M W16 S.L=1.00M L.L=2.40M D5 L.L=2.40M W17 S.L=1.00M L.L=2.40M D4 L.L=2.40M D9 L.L=2.40M V2 S.L=1.50M L.L=2.80M W18 S.L=1.20M L.L=2.80M W19 S.L=2.20M L.L=2.80M S.L=1.00M L.L=2.40M D4 L.L=2.40M D4 L.L=2.40M D3 L.L=2.40M D2A L.L=2.10M D2A L.L=2.10M W5A S.L=0.45M L.L=2.80M SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT 14 C2 1.065x0.53 C2 1.065x0.53 C2 1.065x0.53 C2 1.065x0.53 C2 1.065x0.53 C6 0.60x0.23 C6 0.60x0.23 C6 0.60x0.23 HUDDLE ROOM PRINT/XEROX STATION CABIN M.D.'S OFFICE 3.200 2.400 0.600 0.600 2.400 1.200 1.790 0.890 0.900 2.600 3.600 ACCOUNTS DEPARTMENT 2.100 1.350 0.750 0.900 1.263 1.263 0.600 1.200 4.025 1.480 0.900 0.730 0.900 0.700 0.900 0.350 1.650 1.250 0.450 2.380 4.000 1.375 1.250 1.375 3.600 0.500 1.250 2.855 2.850 1.800 0.750 1.450 1.800 0.450 1.000 1.350 2.399 1.450 0.750 1.800 R0.530 1.845 1.515 2.355 4.555 0.845 1.000 1.570 1.650 0.970 1.290 0.450 1.600 1.275 1.650 1.250 1.000 1.250 0.600 2.180 1.500 0.450 1.250 1.800 0.900 1.685 3.620 4.100 0.900 1.285 1.710 WAITING AREA 3.035 2.210 1.400 1.685 3.653 CANOPY ABOVE 1.285 1.120 1.360 1.790 1.120 3.300 1.050 1.590 0.400 0.400 0.400 0.400
EAST ELEVATION

GROUND FLOOR FURNITURE LAYOUT

ENTRANCE CANOPY DETAIL DRAWINGS

DESIGN LAYOUT

SECTION XX

SECTION YY

VIEW FROM NORTH-EAST

RENDERED LAYOUT

SITE SECTION
Rotycan Turbotech 64 Professional Work 63 2 10 UP 11 3 DOWN COURTYARD BELOW +750 LVL TOILET OPEN BALCONY TOILET TOILET TOILET OPEN BALCONY TOILET DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 DUCT 0.48x0.30 W.C W.B W.B W.B W.B W.B W.B W.C W.C W.C 600MM PROJECTION BELOW +4150LVL W21 S.L=0.45M L.L=2.80M SG4 S.L=0.45M L.L=2.80M W22 S.L=1.00M L.L=2.40M V3 S.L=1.70M L.L=2.80M V3 S.L=1.70M L.L=2.80M V3 S.L=1.70M L.L=2.80M V3 S.L=1.70M L.L=2.80M V3 S.L=1.70M L.L=2.80M V3 S.L=1.70M L.L=2.80M W23 S.L=0.45M L.L=2.40M W24 S.L=0.45M L.L=2.40M W25 S.L=0.45M L.L=2.40M W26 S.L=0.45M L.L=2.40M W27 S.L=0.45M L.L=2.40M W28 S.L=1.00M L.L=2.40M W29 S.L=1.00M L.L=2.40M V4 S.L=1.70M L.L=2.80M V4 S.L=1.70M L.L=2.80M W30 S.L=1.00M L.L=2.40M W30 S.L=1.00M L.L=2.40M W31 S.L=0.45M L.L=2.40M D3 L.L=2.40M D7 L.L=2.40M D4 L.L=2.40M D2 L.L=2.40M D2 L.L=2.40M STEP UP STEP UP D2 L.L=2.40M STEP UP D2 L.L=2.40M D2 L.L=2.40M D3 L.L=2.40M D3 L.L=2.40M D3 L.L=2.40M D3 L.L=2.40M D3 L.L=2.40M D8 L.L=2.40M SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT SKY LIGHT ROLLING SHUTTER CLEAR HEIGHT = 6M +4150LVL STAIRCASE DATA FLOOR TO FLOOR HT. =3.25M 19 RISERS OF EQUAL HEIGHT=171MM APPROX. EACH TREAD 275MM WIDE SG2 S.L=0.0M L.L=3.80 S.S RAILING C1 0.60x0.23 C6 0.60x0.23 C7 0.60x0.23 C2 0.23x0.53 C6 0.60x0.23 C6 0.60x0.23 C6 0.60x0.23 C2 0.23x0.53 C2 0.23x0.53 C2 0.23x0.53 C2 0.23x0.53 C2 0.23x0.53 GUEST ROOM GUEST ROOM GUEST ROOM GUEST ROOM GUEST ROOM CONFERENCE ROOM GUEST LOUNGE AND PANTRY 3.890 1.000 1.445 1.445 2.400 1.350 1.350 5.100 1.235 0.970 0.700 3.670 0.249 3.170 3.550 2.20 1.20 0.450 0.600 1.710 0.600 1.000 1.20 0.450 0.90 1.20 2.600 3.990 0.600 1.000 2.600 1.300 0.600 0.900 1.200 1.200 0.450 1.200 0.900 0.600 1.300 1.20 0.450 0.900 1.200 1.200 0.450 1.200 0.900 1.20 0.450 2.925 3.750 0.600 1.000 2.700 3.990 0.600 1.300 0.600 1.000 2.490 3.990 1.000 0.600 0.600 1.300 2.600 3.990 1.570 1.630 1.920 1.570 2.080 1.655 CANOPY 1.520 165° 105° 0.750 1.057 R0.420 Turbo Vent(INDICATIVE ONLY) VERANDAH(+100.35) ROAD TOP LVL(+99.708) SECTION-PLINTH LEVELS W.R.T. ALL EXTERNAL LEVELS & VIS A VIS MAKARPURA MAIN ROAD TOP LEVEL 3.250 1.000 2.400 6.500 9.750 17.932 1.000 0.450 1.450 2.400 0.600 0.450 ADMIN+OFFICES +RECEPTION GUEST HOUSE+ BOARD ROOM RCC column upto 3.25m ht. Sheeting Steel column ROAD TOP LVL(99.708) PLINTH LVL(+100.500) SITE GROUND LVL(+100.050) SITE GROUND LVL(+100.050) 12° PLINTH LVL(+100.500) PLINTH LVL(+100.500) 5.180 25.800 6.539 INDICATIVE CANOPY 12.376 9.858 NORTH ELEVATION R SG1 SG3 SG9 W26 D1 INDICATIVE RAILING INDICATIVE RAILING 150MM TILE BAND 150MM TILE BAND BRICK TILE CLADDING D=600 D=300 D=1200 D=1200 D=600 D=1200 D=1200 D=1200 DUCT DUCT RAISED GARDEN(+100.30 LVL.) INDICATIVE RAILING BEHIND THE STRUCUTRAL GLAZING 12MMx12MM GROOVE IN PLASTER 12MMx12MM GROOVE PLASTER 12MMx12MM GROOVE IN PLASTER SG2 STRUCTURAL SUPPORT FOR CANOPY -BEAM TAKEN FROM THE COLUMNS FLOATING COLUMN FIRST FLOOR GROUND FLOOR VERANDAH CANOPY R.C.C STRUCTURAL COLUMN C6 IN ELEVATION FLOATING COLUMN R.C.C BEAM R.C.C BEAM TERRACE ACP CANOPY M.S MEMBER CABLE/PIPE M.S PLATE TO ANCHOR CABLE M.S PLATE TO ANCHOR CABLE
X X B A 0.150 0.200 DETAIL A M.S PLATE TO ANCHOR CABLE R.C.C BEAM CANOPY 1.2 1.5 0.200 0.150 0.3 M.S PLATE TO ANCHOR CABLE ACP SHEET 75MMØ MS TUBULAR MEMBER M.S MEMBER Ø100MM 2.980 1.625 1.625 CANOPY PLAN 6.230 1.200 1.500 2.980 1.625 1.625 ACP CANOPY 75MM Ø TUBULAR MAIN FRAME BELOW Ø100 M.S MEMBER FIXED TO THE STRUCTURAL BEAM USING ANCHOR FASTENER BOLTS ACP SHEET 75MM Ø TUBULAR MAIN FRAME MEMBER 75MM Ø MS TUBULAR MAIN FRAME MEMBER
Y Y ALUMINIUM STRUT M.S BACK BASE PLATE C DETAIL B DETAIL C 6.247 0.543 0.543 0.543 0.498 0.498 0.498 0.543 0.543 0.543 0.498 0.498 0.498 MS BACK BASE PLATE M.S BACK BASE PLATE MS BACK BASE PLATE M.S BACK BASE PLATE (INCLINED) DETAIL D D ALUMINIUM STRUTS D

Shannen C.B.S.E School

Phase 1, Halol

Client: Shannen Trust

Scope of Work: Working Drawing, Detail Drawings and Site visits

02 Shannen C.B.S.E. School

CLASSROOM BLOCK TOILET LAYOUTS

Tools Used:

PROJECT BRIEF

Shannen C.B.S.E School is a G+3 storeyed school for Pre-primary to higher secondary grades to be completed in 2 phases of development. The first task was to plan out and freeze the toilet block’s design in the main classroom block as well as the central admin block toilets. It was further then to be detailed via elevations (internal & external) to decide upon the fixtures and respective dimensions. The second task was to resolve overall site levels based on the site visit and finalize the ramp positions and spans accordingly for the toy train route, to re-work the kitchen location and layout as well as the storage and chokdi. Also, to detail out a passage jali and courtyard jali on the ground floor.

All the drawings belong to SJAC Consultancy, Vadodara. None of the same shall be copied/altered or reproduced without the permission of the concerned authority.

Shannen C.B.S.E. School
02
66
Professional Work 65 GROUND FLOOR LAYOUT TYPICAL LAYOUT (1ST, 2ND, 3RD FLOOR)
TOILET BLOCK SECTION
TOILET BLOCK INTERNAL ELEVATIONS
Shannen C.B.S.E. School 68 Professional Work 67 + 16300LVL 500.00 JANITOR'S CLOSET JANITOR'S CLOSET JANITOR'S CLOSET JANITOR'S CLOSET 3600.00 350mm Sunk slab Fisrt Floor + 4500 LVL 3100.00 3450.00 3100.00 2400.00 600.00 Exposed brick 3100.00 2400.00 D9 V5 450.00 2400.00 600.00 900.00 2100.00 WC ROAD LVL ±0 LVL Ground Floor + 900 LVL SECTION E-E' 3100.00 2400.00 3100.00 2400.00 3100.00 2400.00 3600.00 3600.00 D9 D9 D9 2.40M HIGH PARTITION 2.40M HIGH PARTITION 2.40M HIGH PARTITION V7 V7 V7 1000.00 600.00 1000.00 600.00 450.00 2400.00 2100.00 450.00 600.00 2400.00 1000.00 2100.00 450.00 2400.00 2100.00 WC WC WC 350mm Sunk slab 350mm Sunk slab Second Floor + 8100 LVL Third Floor + 11700 LVL Terrace +15300 LVL PARAPET PARAPET PARAPET 1000.00 1000.00 1000.00 500.00 3100.00 3450.00 500.00 3100.00 3450.00 500.00 3100.00 3450.00 3100.00 2400.00 600.00 3100.00 2400.00 600.00 3100.00 2400.00 600.00 Exposed brick Exposed brick Exposed brick +18300 LVL 3600.00 COURTYARD 4" Down take pipe CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM 4" Down take pipe 4" Down take pipe Ground Floor + 900 LVL Second Floor + 8100 LVL ROAD LVL ±0 LVL First Floor + 4500 LVL Third Floor + 11700 LVL Terrace +15300 LVL + 16300LVL +18300 LVL Ground Floor + 900 LVL Second Floor + 8100 LVL ROAD LVL ±0 LVL Fisrt Floor + 4500 LVL Third Floor + 11700 LVL Terrace +15300 LVL + 16300LVL +18300 LVL 350mm Sunk slab 350mm Sunk slab 350mm Sunk slab Exposed brick Exposed brick Exposed brick Exposed brick D6 V5 V2 MIRROR WB D1 500.00 350.00 1000.00 850`.00 1100.00 2400.00 3100.00 3600.00 1200.00 2100.00 3600.00 1100.00 850`.00 2100.00 2400.00 1000.00 350.00 500.00 3600.00 1100.00 850`.00 2100.00 2400.00 1200.00 1000.00 350.00 500.00 3600.00 1100.00 850`.00 2100.00 2400.00 350.00 500.00 MIRROR MIRROR MIRROR WB WB WB WC 350mm Sunk slab 350mm Sunk slab 350mm Sunk slab WB WB WB WB URINAL URINAL URINAL URINAL V2 600.00 2400.00 850.00 550.00 2500.00 600.00 900.00 350.00 350.00 350.00 600.00 350.00 350.00 2500.00 600.00 900.00 600.00 550.00 850.00 2400.00 350.00 600.00 350.00 350.00 2500.00 600.00 900.00 600.00 550.00 850.00 2400.00 350.00 600.00 350.00 350.00 2500.00 600.00 900.00 600.00 550.00 850.00 2400.00 450.00 WC 450.00 WC 450.00 WC 450.00 V2 D6 D6 D6 V5 V5 V5 V2 V2 1650.00 1650.00 1650.00 1650.00 BOY'S TOILET ELEVATION A BOY'S TOILET ELEVATION B V5 D6 V5 V2 D6 V5 V2 D6 D6 V5 V2 3100.00 3600.00 3100.00 3600.00 3100.00 3600.00 3100.00 3600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 3100.00 3100.00 3100.00 2400.00 600.00 3100.00 3100.00 2400.00 600.00 3100.00 2400.00 600.00 3100.00 2400.00 600.00 2400.00 600.00 1050.00 Ground Floor + 900 LVL Fisrt Floor + 4500 LVL Second Floor + 8100 LVL Third Floor + 11700 LVL Terrace +15300 LVL + 16300LVL ROAD LVL ±0 LVL +18300 LVL Lintel + 3300 LVL Exposed Brick Exposed Brick Exposed Brick Exposed Brick DUMMY COLUMN 900.00 1050.00 900.00 1050.00 900.00 1050.00 900.00 900.00 600.00 900.00 600.00 900.00 600.00 900.00 600.00 225 4900 30° 600 1500 18 1432 50 OUTSIDE ELEVATION +900LVL PLAN OUTSIDE INSIDE 50x100 M.S. BOX SECTION PLACED AT 120MM C/C @ ∠30° C-CHANNEL 600MM HIGH BRICK MASONARY WALL GRANITE FRAME OUTSIDE INSIDE SECTION 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 225 30° 30° 10 11 12 13 14 15 16 17 18 19 20 21 10 11 12 13 14 15 16 17 18 19 20 21 C-CHANNEL 50x100 M.S. BOX SECTION PLACED AT 120MM C/C @ ∠30° GRANITE FRAME 230 1120 1120 230 EQ EQ 10 11 12 13 14 15 PLINTH LVL. +900 BEAM BOTTOM LVL. +4000 2400 700 10 11 12 13 14 EQ OUTSIDE LVL. +900 2700 2240 230 EQ OUTSIDE ELEVATION 230MM BRICK MASONARY UPTO BEAM BOTTOM 50x25 M.S BOX SECTION(MAIN FRAME) 12x12 M.S. SQUARE SECTION PLACED AT EQUAL C/C DISTANCE 12x12 M.S. SQUARE SECTION PLACED AT EQUAL C/C DISTANCE PLAN OUTSIDE INSIDE 'A' DETAIL 'A' PARLIAMENT HINGE 60x60 M.S ANGLE LOCK PLATE TOWER BOLTS TOWER BOLTS NOTE: 150x150 C/C(APPROX) GRID TO FOLLOWED AND FINAL ADJUSTMENTS TO BE DONE ON-SITE AS PER REQUIREMENTS EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ R EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ DN +750 MM D6 W14 W13 CLASSROOM SILL @ 1000 MM LVL LINTEL @2400 MM SILL @ 1000 MM LVL SILL @ 1000 MM LVL LINTEL @2400 MM SILL @ 1000 MM LVL LINTEL @2400 MM +900 MM +800 MM Store OPEN TO SKY CHOWKDI 750 5250 600 4030 1625 2000 1405 1500 1000 600 KITCHEN +900MM 2700 2240 500 1755 4260 1790 600 1000 2647 600 600 2500 2020 2040 2000 430 430 1500Ø CIRCULAR OPENING RING SILL:1000 LINTEL:2500 500 1500 630 900 5250 W SILL:1000 LINTEL:2500 1500Ø CIRCULAR OPENING RING SILL:1000 LINTEL:2500 900Ø CIRCULAR OPENING RING SILL:1300 LINTEL:2200 4650 4050 1830 230 230 5FT-6FT SHED ABOVE A A SECTION E-E’ ELEVATION THROUGH COURTYARD INTERNAL ELEVATION A INTERNAL ELEVATION B
JALI DETAIL DRAWINGS
KITCHEN LAYOUT

Gulbrandsen Technologies

G.I.D.C. Jhagadia

Client: Gulbrandsen Technologies

Scope of Work: Working Drawing, Detail Drawings and Site visits

Tools Used:

PROJECT BRIEF

Gulbrandsen Technologies, Jhagadia is a Greenfield chemical manufacturer setup whose interior revamp & individual block extensions was taken up by our firm.

The first task was to plan out & freeze the extension of the existing security block as per the new industrial building code requirements . The second task was to prepare & furnish the admin block toilet details necessary for completion of on-going site work. The third task was to prepare the possible ramp options for all the blocks individually to make them accessible for the physically challenged visitors as well.

All the drawings belong to SJAC Consultancy, Vadodara. None of the same shall be copied/altered or reproduced without the permission of the concerned authority.

Gulbrandsen Technologies

03
70
03 Gulbrandsen Technologies ADMIN BLOCK LAYOUT
Professional Work 69 C' B' A' A C

JHAGADIA-SECURITY BLOCK ELECTRICAL LAYOUT

ELEVATION B

TL1,TL6 @ 8'8"(2600MM) FROM F.F.L.; TL5,TL13,TL14 TO BE ON CEILING; OTHER TUBELIGHTS @9'6"(2850MM)

FURNITURE LAYOUT
LAYOUT &
Gulbrandsen Technologies 72 Professional Work 71 C' B' A' A B C AC AC WALL FAN(7'0" From Finish Floor) SB-4 SB-3 SB-2 CEILING POINT SWITCH BOARD WALL Point(8'0" From Finish floor) EXHAUST FAN FAN POINT HEIGHT OF SB FROM FINISHED FLOOR To Bottom of Switch Board SB-1 Tube Light PLUG POINT REMARKS Hanging Light Point LED LIGHT
FOOT LIGHT POINT GEYSER POINT Furniture Light Point(4'-6" Heihgt ) Night Lam Point (9" Height) False Ceiling Point DEALT BY: MUDIT ELECTRICAL LAYOUT TABLE SB-5 SB-6 SB-7 SB-8 SB-9 SB-10 5 Amp Plug 4'-0" 5 Amp Plug 3 1 2'-8" 5 Amp Plug 3 4'-0" 3 5 Amp Plug 2 4'-0" 4'-0" 1 4'-0" 4'-0" 1
2 3 3 1 4 1 2 1 3 2 1 2 2'-8" 2 3 3 2'-8" 2'-8" 5/15 Amp Plug 2 1 5 Amp Plug 5/15 Amp Plug AIR CONDITIONER BOTTOM TO BE AT
4'-0" 5 Amp Plug SB-11 2 5/15 Amp Plug 5/15 Amp Plug 5/15 Amp Plug
ELECTRICAL
TABLE
NOTES:-
GULBRANDSEN
9'6"(2850MM)
ELEVATION C
Gulbrandsen Technologies 74 Professional Work 73 LADIES TOILET 1485 600 1485 1059 1000 D2 GENTS TOILET 1000 1846 1081 19 500 602 602 602 1485 960 1600 385 758 500 615 850 750 D2 600 885 NAPOLI CIDER 600 x 600 INOX 38.5 X 38.5 X 13 CM CAT.NO.91050 INOX 38.5 X 38.5 X 13 CM CAT.NO.91050 500 NT NT A A B B G G E E F F D D C C MARIO STAR RATED CAT.NO.20082 50 X 50 X 36 CM MARIO STAR RATED CAT.NO.20082 50 X 50 X 36 CM MARIO STAR RATED CAT.NO.20082 50 X 50 X 36 CM C' C' H H H' H' NT 500 NT BIB COCK AND HEALTH FAUCET BIB COCK AND HEALTH FAUCET 500 BIB COCK AND HEALTH FAUCET 500 450 450 850 1081 19 PLAN A PLAN B PLAN C GRANITE LEDGE TOP GRANITE LEDGE TOP GRANITE LEDGE TOP 1081 960 INOX 38.5 X 38.5 X 13 CM CAT.NO.91050 600 NT J 600 348 348 3450 1081 750 150 600 150 1350 Mirror 6"-Granite skirting SCI-7330-L 600 x 300 Mirror area not to be tiled 130 150 38 287 287 146 50 J PLAN A-GENTS TOILET WASH BASIN COUNTER PLAN K K FALSE CEILING 300 300 300 300 112 150 150 Mirror 360 600 300 300 112 150 300 300 450 750 1350 115 960 2400 150 900 SCI-7330-L 600 x 300 SCI-7330-L 600 x 300 Mirror area not to be tiled FALSE CEILING INOX 38.5 X 38.5 X 13 CM CAT.NO.91050 PLAN B-LADIES TOILET WASH BASIN COUNTER PLAN ELEVATION J-GENTS TOILET WASH BASIN COUNTER ELEVATION K-LADIES TOILET WASH BASIN COUNTER 130 38 19 50 600 DETAIL M -W.B COUNTER DETAIL STEEL GREY GRANITE W.B COUNTER W.B W.B W.B M M STEEL GREY GRANITE W.B COUNTER 50MM WIDE STEEL GREY GRANITE PATTI STEEL GREY GRANITE WASH BASIN COUNTER 150MM HIGH STEEL GREY GRANITE SKIRTING OF TWO SIDES DHAR POLISH ONLY 1061 960 1350 1350 TILES TILES 6"-Granite skirting 19 19 50 150MM HIGH STEEL GREY GRANITE SKIRTING OF THREE SIDES 385 146 50 385 NT 146 S.B S.B S.B S.B S DETAIL S-GRANITE SKIRTING TOP DETAIL SKIRTING TOP EDGE 5MM CHAMPHER NOTE:ALL GRANITE TO BE USED IS "STEEL GREY GRANITE" FLUSH VALVE 1847 600 115 547 600 SCI-7330-L 600 x 300 FALSE CEILING 450 19 602 602 450 450 850 19 19 230 1200 970 19 19 602 602 1200 19 230 970 1200 450 R25 850 1200 PLAN C-GENTS TOILET GRANITE PARTITIONS PLAN ELEVATION P-GENTS TOILET GRANITE PARTITION BETWEEN URINALS Q P N ELEVATION Q-GENTS TOILET GRANITE PARTITION BETWEEN URINAL AND WASHBASIN STEEL GREY GRANITE PARTITION STEEL GREY GRANITE PARTITION ELEVATION N-GENTS TOILET GRANITE PARTITIONS N P Q STEEL GREY GRANITE PARTITION URINAL R25 R25 400 W.B COUNTER BEHIND 750 INCLINED PARTITION EDGE 450 400 50 970 R25 R25 URINAL GRANITE PARTITION DETAIL INCLINED PARTITION EDGE PARTITION CORNERS TO BE FINISHED WITH A CURVATURE OF 25MM STEEL GREY GRANITE PARTITION PARTITION CORNERS TO BE FINISHED WITH A CURVATURE OF 25MM 602 FLUSH ABOVE FLUSH ABOVE FLUSH ABOVE FLUSH VALVE FLUSH VALVE 1175 600 NOTE:ALL GRANITE TO BE USED IS "STEEL GREY GRANITE"
ADMIN BLOCK TOILET DETAILS SECTION C-C’

Munjal Auto

Waghodia

Client: Mr Munjal

Scope of Work: Interior Design, Detail Drawings and Electrical Layout

Munjal Auto MASTER PLAN

Tools Used:

PROJECT BRIEF

Munjal Auto is an automobile manufacturing company whose office interior revamp work was taken up by our firm. The task was to develop & detail the interior elevations of the office reception area & the meeting rooms followed by detailing of the furniture & partitions (if any) used in the respective spaces.

All the drawings belong to SJAC Consultancy, Vadodara. None of the same shall be copied/altered or reproduced without the permission of the concerned authority.

Munjal Auto
04
76
04
Professional Work 75 Granite Frame SP 2 SEATER SOFA Granite Frame Conference Table 7'x3' 2100MMx900MM @2'-6" MEETING ROOM NO-02 COUNTER TABLE LEGDE FINISHED WITH GREY LAMINATE TOP H @2'-9" 3'-4" 4'-3" 4'-3 3'-3" 3' 7' Granite Frame Granite Frame 12'-9 13'-7" 13'-5 MEETING ROOM 01 MEETING TABLE 4'-0" DIA 9'-9" 9'-2 2 2'-8" 2'-10" 2'-7 2'-7 3" Proposed Cubicals Staff toilet 5'-6" 8'-7 5'-0" 2'-6" 2'-6" 17'-4" 3'-0" Hindware ZEN size 56X45 cm cat.no 10049 Health Faucet Flush cock Hindware ZEN size 56X45 cm cat.no 10049 Hindware ORISSA PAN (Comfort) starwhite cat.no 20070 WC- FLORA size- 53X33X39cm starwhite cat.no 20098(P-23) TOILET 3'-6"X3'-0" TOILET 3'-6"X3'- 0" WC STAFF TOILET LADIES 9'- "X6'Proposed Cubicals ladies toilet WALL TAP Health Faucet SP HAND DRIER TOILET 3'-6"X3'- 0" WC HAND DRIER Hindware size- 53X33X39cm starwhite cat.no 20098(P-23) Flush cock Health Faucet Granite Frame WATER COOLER Granite SP Granite Frame LOW HEIGHT WALL @4'-0" STAFF TOILET GENTS 18'- "X9'Hindware ZEN size 56X45 cm cat.no 10049 UN UN UN UN 2'-6" 2'-10" 3'-6" Hindware Urinals CORTO size- 30X33X45cm cat.no 60022 TOILET 3'-6"X3'-0" Hindware Urinals CORTO size- 30X33X45cm cat.no 60022 Hindware ORISSA PAN (Comfort) cat.no 20070 Health Faucet Flush cock Hindware Urinals CORTO size- 30X33X45cm cat.no 60022 Hindware Urinals CORTO cat.no 60022 Janitor cabinet 3'-9 "X2'-9 1'-3" 1'-7" Brick Cladding Light Weight Block wall 7'-6" 1'-6" 1'-3" 2'-9" 2'-3" 2' 2'-3" 3" 4'-9" 7' STEEL GREY GRANITE TOP STEEL GREY GRANITE TOP 6" 8'-3" EXISTING CABINET TO BE RE-LAMINATED GLASS TO BE CHANGED 2 SEATER SOFA Granite Frame Granite Frame Step Down 4" Granite Patta Granite Patta Green area Green area Coffee Table SEATER MEETING TABLE Ø=900MM 3FT 6'-10" 5' 2'-10" 8'-1" 1'-8 2'-4" 2'-6" 1'-10 2 SEATER SOFA 3'-3" 3'-3" 1'-10" 1'-10" 3" Granite Frame Conference Table 4'9"x4'9" 1425x1425 H @2'-6" MEETING ROOM NO-03 3'-6" 3'-6" 3'-4" 4'-9" 4'-9" 13'-3 11'-7" 10' 2' W1 3' W3 W1 W4 W5 D1 D3 D2 D5 D4 D6 10'-2" D7 1'-11" 8'-10" 8" 4'-10" 3'-5" 4'-7 4'-8" 9'-2 1 3' 25'-1" 3' 24'-3" 6'-2 2 DRAWER BELOW DRAWER BELOW DRAWER BELOW 2'-4" 2' 2' 7'-3" 1'-6" 3'-6" 5'-11" COUNTER TABLE & LEGDE FINISHED @2'-9" 4'-7 3'-6

Elevation C

RECEPTION AREA RENDERS

RECEPTION AREA INTERNAL ELEVATIONS
Munjal Auto 78 Professional Work 77 Elevation A EXISTING GROOVE D2 L.L-7'9" D3 L.L-7'9" SEATER SOFA E x s n g F a s e C e n g L n e Gypsum FC Profile Gypsum FC Profile 7'-9" 13'-4" 16'-4 1 2 EXISTING CABINET TO BE RE-LAMINATED & GLASS TO BE CHANGED 9'-3" 8'-6" LIGHT WEIGHT BLOCK WALL WITH BRICK CLADDING GRANITE TOP FINISH COMPANY LOGO EXISTING ALUMINIUM WORK 3' 10'-2" RECEPTION DESK GLASS DOOR ON PATCH FITTINGS WALL LIGHT POINT @ 3'-6" 2'-6" 3'-7 1 12MM FROST GLASS GAP IN PLYWOOD 6" 1'-10 2 4'-5" 9'X3' CORPORATE PANEL Gypsum FC Profile E x s n g F a s e C e n g L n e 12'-11" 3' 8'4" D1 L.L-7'9" SEATER SOFA SEATER SOFA SEATER SOFA GLASS PARTITION WALL GLASS DOOR ON PATCH FITTING D4 L.L-7'9" RECEPTION DESK 3' 8'-6" 16'-5" 3'-6" 2'-6" 22'-5"
RECEPTION TABLE DETAIL DRAWINGS
EXISTING GROOVE COFFEE TABLE EXISTING ALUMINIUM WORK LIGHT WEIGHT BLOCK WALL WITH BRICK CLADDING & GRANITE TOP FINISH GLASS DOOR ON PATCH FITTINGS 5'x5'9" CORPORATE PANEL Existing Fixed Glass Window E x s n g F a s e C e n g L n e D1 L.L-7'9"
Elevation B
Existing Fixed Glass Window Existing Fixed Glass Window Existing Fixed Glass Window EXISTING GROOVE Gypsum FC Profile W1 S.L-6" L.L-7'9" W1 S.L-6" L.L-7'9" FIXED GLASS WINDOW FIXED GLASS WINDOW SEATER SOFA SEATER SOFA COFFEE TABLE D2 L.L-7'9" 7'-9" Wall Clock GLASS DOOR ON PATCH FITTINGS 4'-9" 5' 2'-10" TOUGHENED FIXED GLASS TOUGHENED FIXED GLASS 3'9"X3' CORPORATE PANEL 3'9"X3' CORPORATE PANEL RECEPTION DESK RECEPTION DESK PLAN 7'-6" 1'-6" 1'-3" 2'-9" 2'-3" 2' 2'-3" 3" 4'-9" 7' STEEL GREY GRANITE TOP STEEL GREY GRANITE TOP 6" RECEPTION DESK FURNITURE PLAN 5'-6" 2'-9" 2'-3" 2' 1'-10" 4'-9" 7' DRAWER BELOW 2' 2'-1" 3'-8" DRAWER BELOW DRAWER BELOW FOOTREST LEDGE ACCESSIBLE PLATFORM FOR C.P.U 2' 2' 3' 8" A B C D B C D 8'-3" A 8'-3" 3'-6" 2'-6" 3'-6" 2'-6" RECEPTION DESK FRONT ELEVATION (ELEVATION A) 3'-7 1 2 STEEL GREY GRANITE TOP FINISH DRAWER BEHIND 12MM FROST GLASS GAP IN PLYWOOD 6" PLATFORM BEHIND RECEPTION DESK SIDE ELEVATION (ELEVATION B) 3'-6" DRAWER BEHIND DRAWER BEHIND PLATFORM BEHIND VOID 2'-6" 3'-7 1 2 3'-7 1 2 RECEPTION DESK ELEVATION C RECEPTION DESK ELEVATION D 2" 1'-4 1 2 5" 5" 2'-6" 1 1 2 1' 3'-7 1 2 6" 2' 3'-6" 2" STEEL GREY GRANITE TOP FINISH STEEL GREY GRANITE TOP FINISH FOOTREST 12MM FROST GLASS BEHIND VOID STEEL GREY GRANITE TOP FINISH STEEL GREY GRANITE TOP FINISH STEEL GREY GRANITE TOP FINISH 2' 2' 9" 2'-3" 2" 1'-4 1 2 5" 5" 1 1 2 1' 2'-6" 3'-6" 3'-7 1 2 6" 1'-3" 1'-10 1 2 4'-5" 4" 4" SECTION A-A' VOID STEEL GREY GRANITE TOP FINISH STEEL GREY GRANITE TOP FINISH 2' 2' 3' 2" 1'-4 1 2 5" 5" 1 1 2 1' 2'-6" 3'-6" 3'-7 1 2 1'-3" 8" 6" A' A'

WALL TO BE FINISHED IN GREY PAINT WALL TO BE FINISHED IN RED(MUNJAL) PAINT Gypsum

ELECTRICAL LAYOUT & TABLE

Gypsum FC Profile

TO BE FINISHED IN RED(MUNJAL) PAINT

MEETING ROOM 2 ELEVATION B

ROOM 1 ELEVATION A

MEETING ROOM 3 ELEVATION B

WALL TO BE FINISHED IN RED(MUNJAL) PAINT

WALL TO BE FINISHED IN GREY PAINT

MEETING ROOM 2 ELEVATION D

MEETING ROOM DETAIL
DRAWINGS
Munjal Auto 80 Professional Work 79 MEETING ROOM NO-02 MEETING ROOM 01 STAFF TOILET LADIES 9'- "X6'WATER COOLER STAFF TOILET GENTS 18'- "X9'Step Down 4" Granite Patta Granite Patta Green area Green area Coffee Table MEETING ROOM NO-03 W1 W3 W1 W4 W5 D1 D3 D2 D5 D4 D6 D7 12"X12" F.C FIXTURE FCF1 12"X12" F.C FIXTURE FCF2 12"X12" F.C FIXTURE FCF3 12"X12" F.C FIXTURE FCF6 12"X12" F.C FIXTURE FCF5 12"X12" F.C FIXTURE FCF4 2'-6" 3'-6" 3'-6" 2'-6" 3'-6" 10'-0 2'-6" 6' 10'-0 10'-0 2'-6" SL1 12"X12" F.C FIXTURE FCF9 12"X12" F.C FIXTURE FCF8 12"X12" F.C FIXTURE FCF7 6' 6' 10'-0 TL1 TL2 TL3 TL4 TL5 TL6 2'-6" 1'-6" 3' 2' 5'-1" SB1 10'-0 10'-0 2'-6" 1'-6" 3'-11" WF1 SB2 12'-6" 4'-1" 3'-4" FCSP4 FCSP1 FCSP2 FCSP3 FCSP5 FCSP6 TL7 2' 2' 2' 2' 4'-11" 4'-8" 4'-10" AC TL8 12"X12" F.C FIXTURE FCF13 12"X12" F.C FIXTURE FCF10 12"X12" F.C FIXTURE FCF11 12"X12" F.C FIXTURE FCF12 F1 Ø900MM/3' 4'8" 4'-10" SB3 SB4 SB5 SB7 SB6 SB8 SB9 HAND DRIER HAND DRIER PP PP 6" 6" 6" 3' 6" 8'8" 3' 1'-3" 2'-6" 4'-6" 8'-2" 3' 4'-7" 2'-10" 2'-9" 3'-8" 2'-6" 2'-6" 2'-6" 2'-6" 6" 3'-8" 6'-5" 6'-7" 5'-10" 2'-6" 3'-5" 2'-6" 2'-6" 6" 2'-8" 5'-10" 2'-6" 3' 2'-6" 4' 2'-6" 5'-10" 6'-2" 3' SB10 SB11 12"X12" F.C FIXTURE FCF14 12"X12" F.C FIXTURE FCF15 12"X12" F.C FIXTURE FCF16 12"X12" F.C FIXTURE FCF17 Ø900MM/3' TL9 TL10 AC AC 12"X12" F.C FIXTURE FCF18 12"X12" F.C FIXTURE FCF19 12"X12" F.C FIXTURE FCF20 12"X12" F.C FIXTURE FCF21 F3 Ø900MM/3' TL12 TL11 SB13 SB12 SB14 SB15 TL17 TL13 TL14 TL15 TL16 TL18 PP PP 6" 6" 6" 3'6" 2' 2' 2' 2' 2'-1" 2'8" 2' 5' 2'-1" 5' 2'-1" 1'-11" 1'-11" 1'-11" 5' 5' 2'-11" 2'-6" 3'-5 4' AC AC WALL FAN FALSE CEILING SPOT POINT SWITCH BOARD WALL POINT @ 8'-0" EXHAUST FAN FAN POINT HEIGHT OF SB FROM FINISHED FLOOR To BOTTOM OF SWITCH BOARD GEYSER POINT TUBE LIGHT(1200MM/4') PLUG POINT FURNITURE POINT REMARKS HANGING LIGHT POINT NIGHT LAMP POINT@9" ht FALSE CEILING POINT PHONE POINT SB-1 SB-2 RECEPTION DESK SB-3 SB-4 SB-6 SB-7 SB-8 MEETING ROOM 1 RECEPTION DESK SB-9 SB-10 SB-11 SB-12 SB-13 SB-14 MUNJAL AUTO ELECTRICAL TABLE 01 RECEPTION MEETING AREA RECEPTION AREA MEETING ROOM 1 03 03 02 01 3'6"/4' 03 5 Amp Plug /15 Amp Plug ENTRANCE SB-5 03 01 01 Water Cooler point STAFF TOILET PASSAGE 03 02 03 03 02 MEETING ROOM 2 MEETING ROOM 2 MEETING ROOM 3 MEETING ROOM 3 LADIES TOILET Hand Drier point NOTE- All Switch Boards Heights from Finished Floor ALL TUBELIGHTS TO BE @ 9'(BOTTOM) FROM F.F.L. 09 01 5 Amp Plug /15 Amp Plug 5 Amp Plug /15 Amp Plug 02 3'6"/4' 3'6"/4' 03 5 Amp Plug /15 Amp Plug 2'101 02 01 04 01 3'6"/4' 5 Amp Plug /15 Amp Plug 3'6"/4' 3'6"/4' 04 03 01 01 3'6"/4' 03 5 Amp Plug /15 Amp Plug 5 Amp Plug /15 Amp Plug 02 04 03 01 01 3'6"/4' 03 5 Amp Plug /15 Amp Plug 5 Amp Plug /15 Amp Plug 01 5 Amp Plug /15 Amp Plug 3'6"/4' SB-15 GENTS TOILET Hand Drier point 03 5 Amp Plug /15 Amp Plug 3'6"/4' TUBE LIGHT(600MM/2') 5 Amp Plug /15 Amp Plug 2'101 2'101" 01(TL17) 01(TL13) MEETING ROOM 01 MEETING TABLE 4'-0" DIA 9'-9" 9'-2 1 2 2'-8" 2'-10" 2'-7 1 2 " 2'-7 1 2 " 3" 3'-3" 3'-3" 1'-10" 1'-10" 3" 3' 9'-2 1 2 " 6'-2 1 2 5'-6"
2'-6" 10' 3'x4' CORPORATE PANEL MEETING ROOM 1 ELEVATION A 4' LEDGE WITH LAMINATE FINISHED TOP 2'-9" 4' 3'x4' CORPORATE PANEL 6" COUNTER TOP SKIRTING
45.000°
WALL
TL7@9' Granite Frame SP Conference Table 4'9"x4'9" 1425x1425 H @2'-6" MEETING ROOM NO-03 3'-6" 3'-6" 3'-4" 4'-9" 4'-9" 13'-31" 11'-7" W4 W5 D6 3'-5" 1'-6" 3'-6" 5'-11" COUNTER TABLE & LEGDE FINISHED WITH LAMINATE TOP H @2'-9" 4'-7 3'-61 2 R8" W4 MEETING ROOM 3 ELEVATION B 4' 10'-2" 7'-6" 3'-6" 2'-6" W5 EXISTING MALIYA TO BE CLOSED CORPORATE PANEL CORPORATE PANEL CORPORATE PANEL CORPORATE PANEL
Gypsum FC Profile 10' 3' 7'-2" 10'-2" MEETING ROOM 2 ELEVATION D 2'-9" 4'x4' WIDE CORPORATE PANEL 4'x4' WIDE CORPORATE PANEL 4' 4' DRAWER DRAWER DRAWER CABINET CABINET VOID
WALL TO BE FINISHED IN RED(MUNJAL) PAINT
8" 1'-6 1 2 5" 1 1 2 GAP LEDGE WITH LAMINATE FINISHED TOP 6" COUNTER TOP SKIRTING DUST BIN 6" Gypsum FC Profile 10' TL10@9' 2'-6" 10'-2"
2
B 3' 7'-2" 4'x4' SOFT BOARD 4' 4'
MEETING ROOM
ELEVATION
10'
FC Profile
MEETING ROOM 1 LAYOUT MEETING ROOM 3 LAYOUT MEETING

FIRST FLOOR TOILET DETAILS

Party Plot

Devgadh Baria

Client: Maharaja Tushar Singh

Scope of Work: Toilet Detail Drawings & Site Visit

Tools Used:

PROJECT BRIEF

Party plot is a party lawn along with a G+2 resting facility (dormitory+ rooms) & other facilities to host any public events & celebrations, developed by the Maharaja of Devgadh Baria.

The task was to detail out the toilet blocks on the first & second floor to furnish the necessary details required to execute the task on-site.

FIRST FLOOR TOILET -1 PLAN SIZE: 1.75MX3.25M (MEASURED ON SITE)

All the drawings belong to SJAC Consultancy, Vadodara. None of the same shall be copied/altered or reproduced without the permission of the concerned authority.

NOTE:-WASH BASIN AND WATER CLOSET AS PER SELECTION. WALLS TO BE TILED UPTO 8' ONLY.

Party Plot
05
82
05 Party Plot
Professional Work 81 D5 V3 DUCT NT 3250 1750 Wash Basin Granite Counter Height @ 2'-9" 1200 900 1150 575 600 575 300 300 300 300 300 300 300 300 300 300 300 300 300 300 300 250 600 NT FLOOR TILE 300 X 300 2" Drop Bib cock @ 1'-6" & Health faucet @ 2'-0" Shower point on wall @ 7' & Diverter @ 4'-0" & Spout @ 2'-0" D A C B 1200mm Ledge wall with granite top finish W.C W.B Granite patti Granite patti 750 1000 TOILET 1 1.75MX3.25M START TILE START TILE 250 D5 1200 3150 300 300 300 300 300 250 600 600 600 600 750 885 115 WALL TILE 300 X 600 6" SKIRTING W.C W.B 1200MM HIGH LEDGE WALL WITH GRANITE TOP FINISH 320MM SUNK SLAB 800 115 1635 600 600 600 600 250 300 300 300 300 300 3150 WALL TILE 300 X 600 V3 W.C 1200MM HIGH LEDGE WALL WITH GRANITE TOP FINISH 320MM SUNK 300 300 300 300 300 300 150 300 300 300 150 50 600 600 600 600 1200 2050 2250 750 150 130 WALL TILE 300 600 WALL TILE 300 X 600 GRANITE PATTA GRANITE PATTA 320 MM SUNK 320 250 WASH BASIN 600 750 Spout Diverter 600 600 900 Shower Point @7'-0" PAPER HOLDER MIRROR NOT TO BE TILED 1200 2050 150 300 300 300 150 300 300 300 300 300 300 50 600 600 600 600 130 2250 750 150 320 150 1150 150 800 WALL TILE 300 X 600 WALL TILE 300 X 600 GRANITE PATTA GRANITE PATTA 6" SKIRTING W.C FLUSH VALVE HEALTH FAUCET 1150 320MM SUNK SLAB 1200MM HIGH LRDGE WALL WITH GRANITE TOP FINISH 1200 250
ELEVATION D ELEVATION A ELEVATION B ELEVATION C
SECOND FLOOR TOILET DETAILS Party Plot 84 Professional Work 83 TOILET - 3 -ELEVATION C TOILET - 3- ELEVATION D TOILET - 3 -ELEVATION B V3 6815 DUCT 230 1545 585 230 585 600 230 575 575 600 300 230 1950 575 600 575 1000 750 1000 750 1000 2648 1750 A D C B NT 2" Drop 1050 900 W.C D5 300 300 300 300 300 300 300 300 300 300 300 250 Shower point on wall @ 7' & Diverter @ 4'-0" & Spout @ 2'-0" Bib cock @ 1'-6" & Health faucet @ 2'-0" 1200mm Ledge wall with granite top finish Granite patti FLOOR TILE 300 300 FLOOR TILE 300 X 300 D5 NT 2" Drop 1050 900 W.C 300 300 300 300 300 300 150 300 300 300 300 300 250 Shower point on wall @ 7' & Diverter @ 4'-0" & Spout @ 2'-0" Bib cock @ 1'-6" & Health faucet @ 2'-0" 1200mm Ledge wall with granite top finish FLOOR TILE 300 300 FLOOR TILE 300 X 300 A D B C Granite patti 600 EQ EQ EQ 300 300 300 300 300 250 W.B W.B Wash Basin Granite Counter Height @ 2'-9" 300 300 300 300 300 45 FLOOR TILE 300 X 300 A D C B NT TOILET 3 1.75MX1.95M START TILE START TILE START TILE START TILE 150 Granite patti TOILET 4 1.75MX1.95M WASH BASIN AREA 1.75MX1.545M NT 600 750 PAPER HOLDER W.C FLUSH VALVE HEALTH FAUCET GRANITE PATTA Spout Diverter Shower Point @7'-0" WALL TILE 300 600 600 50 600 900 1050 900 1950 150 225 300 225 150 300 300 300 600 600 600 600 1200 1200MM HIGH LEDGE WALL WITH GRANITE TOP FINISH 3470 1750 WALL TILE 300 X 600 3000 600 300 300 300 300 300 250 600 600 600 600 V3 2250 750 50 GRANITE PATTA 1050 900 1950 3470 150 225 300 225 150 300 300 300 WALL TILE 300 X 600 WALL TILE 300 600 600 600 600 600 TOILET - 3 -ELEVATION A D5 750 885 115 1750 W.C WALL TILE 300 X 600 1200MM HIGH LEDGE WALL WITH GRANITE TOP FINISH 3000 600 300 300 300 300 300 250 600 600 600 600 SECOND FLOOR : TOILET -3&4 & WASH BASIN AREA PLAN SIZES AS MEASURED ON-SITE D5 750 1000 1750 WALL TILE 300 X 600 3000 600 300 300 300 300 300 250 600 600 600 600 6" SKIRTING 600 800 150 W.B TOILET - 4 -ELEVATION A TOILET - 4- ELEVATION B TOILET - 4- ELEVATION C TOILET - 4- ELEVATION D WASH BASIN AREA- ELEVATION C WASH BASIN AREA- ELEVATION D D5 750 1000 1750 WALL TILE 300 600 3000 600 300 300 300 300 300 250 600 600 600 600 6" SKIRTING 600 800 150 W.B WASH BASIN AREA- ELEVATION B 1545 3470 EQ WALL TILE 300 X 600 EQ 800 WALL TILE 300 600 1000 600 600 600 600 WASH BASIN AREA- ELEVATION A 600 750 PAPER HOLDER W.C FLUSH VALVE HEALTH FAUCET GRANITE PATTA GRANITE PATTA Spout Diverter Shower Point @7'-0" WALL TILE 300 600 600 50 600 900 1050 900 1950 150 225 300 225 150 300 300 300 600 600 600 600 1200 1200MM HIGH LEDGE WALL WITH GRANITE TOP FINISH 3470 1750 WALL TILE 300 600 3000 600 300 300 300 300 300 250 600 600 600 600 2100 D5 W.C 1200MM HIGH LEDGE WALL WITH GRANITE TOP FINISH 750 885 115 GRANITE PATTA GRANITE PATTA 1050 900 1950 3470 150 225 300 225 150 300 300 300 WALL TILE 300 X 600 WALL TILE 300 600 600 600 600 600 1770 WALL TILE 300 600 3000 600 300 300 300 300 300 270 600 600 600 600 V3 2250 750 50 1545 3470 300 300 WALL TILE 300 600 600 162 150 300 300 300 45 WASH BASIN 6" SKIRTING WASH BASIN MIRROR AREA NOT TO BE TILED 1545 1150 150 150 800 WALL TILE 300 600 SEATING AREA LIVING AREA SEATING AREA SEATER SOFA SEATING AREA D2 D5 V V3 D2 D2 BALCONY BALCONY BALCONY SEATING AREA SEATER SOFA DRESSING AREA DUCT DUCT W5 W5 W5 W STAIRS 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 LIVING AREA DRESSING AREA 4500 1350 2930 1351 230 3300 1500 3300 2930 1350 230 230 1235 230 1770 230 575 600 575 230 230 1235 230 1770 230 1800 1800 1800 1800 3300 4616 4500 4500 SEATER SOFA BED SOFA SOFA SEATER SOFA BED 11230 11230 230 C2 C3 C4 C1 C1 C5 C5 C4 C3 C2 C7 C6 C2 C8 C8 C7 C2 C6 450 1235 1235 1350 230 230 D2 W5 W W5 W 585 230 585 600 230 GRC JALI on the surface 585 585 600 GRC JALI on the surface STAIRCASE DATA FLOOR TO FLOOR HT 3600 MM TREAD=300 MM RISER= 150 MM NO. OF RISERS 24 1770 230 1350 1800 1350 230 1350 1800 450 2560 3250 575 600 575 3365 1000 750 115 370 115 115 1800 115 1235 115 1800 115 1235 300 1235 115 1800 115 2700 115 1800 115 3235 230 600 2145 900 335 900 335 1235 115 1800 115 2700 115 1800 115 3235 450 1800 1350 230 1350 1800 1350 230 1770 2560 750 115 1000 1235 115 1800 115 1235 230 1235 115 1800 115 1235 230 825 1650 825 230 542 1000 428 1500 230 542 1000 428 370 3695 1000 1290 3695 1000 1290 900 1500 900 3300 11460 230 785 115 1500 115 785 230 11460 2145 450 GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI W2 D5 D6 D6 WB Drop TOILET 1 TOILET 1750X3250 TOILET 1750X3250 WB Drop TOILET 2 C1 C1 600 1500 2145 1015 1500 115 1015 900 1500 900 1750 1920 1750 3250 3365 FIRST FLOOR PLAN SEATING AREA LIVING AREA SEATING AREA SOFA SEATER SOFA SEATING AREA D2 D5 V V3 D2 D2 BALCONY BALCONY BALCONY SEATING AREA SEATER DRESSING AREA DUCT DUCT W5 W5 W5 W5 STAIRS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 LIVING AREA DRESSING AREA 4500 6815 1350 2930 1351 230 3300 1500 3300 2930 1350 230 230 1235 230 1770 230 575 600 575 230 230 1235 230 1770 230 1800 1800 1800 1800 3300 4616 4500 4500 SEATER SOFA BED SEATER SOFA SEATER SOFA SEATER SOFA BED 11230 1915 11230 6055 300 230 230 C2 C3 C4 C1 C1 C5 C5 C4 C3 C2 C7 C6 C2 C8 C8 C7 C2 C6 450 1235 1235 1350 230 230 D2 600 W5 W5 W5 W5 585 230 585 600 230 GRC JALI on the surface 585 585 600 GRC JALI on the surface 1500 STAIRCASE DATA FLOOR TO FLOOR HT = 3600 MM TREAD=300 MM RISER= 150 MM NO. OF RISERS = 24 1770 230 1350 1800 1350 230 1350 1800 450 2560 3250 575 600 575 3365 1000 750 115 370 115 3695 1920 370 115 1800 115 300 1235 115 1800 115 1235 300 1235 115 1800 115 2700 115 1800 115 3235 230 600 900 335 900 335 1235 115 1800 115 2700 115 1800 115 3235 450 1800 1350 230 1350 1800 1350 230 1770 2560 750 115 1000 1235 115 1800 115 1235 230 1235 115 1800 115 1235 230 4065 1000 1290 825 1650 825 230 542 1000 428 1500 230 542 1000 428 370 3695 1000 1290 900 1500 900 3300 11460 230 785 115 1500 115 785 230 11460 2145 450 GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI GRC JALI W2 D5 D6 D6 WB WC TOILET 1 TOILET 1750X3250 TOILET 1750X3250 NT WB WC TOILET 2 D2 LOBBY W2 STAIRS 3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 W2 W2 W2 1350 2930 1350 3300 3300 2930 1350 230 230 SECOND FLOOR PLAN 1800 1800 1800 1800 3300 9345 2000 1235 230 2000 900 900 900 900 2000 2000 900 900 2000 900 900 900 900 900 900 2000 2000 900 900 2000 2000 900 900 900 900 2000 2000 2000 900 900 900 2000 900 900 2000 1050 900 1050 900 6355 1350 C2 C3 C4 C1 C1 C5 C5 C4 C3 C2 C7 C6 C2 C8 C8 C7 C2 C6 1545 450 450 600 575 230 575 600 230 600 1500 575 575 600 STAIRCASE DATA FLOOR TO FLOOR HT = 3600 MM TREAD=300 MM RISER= 150 MM NO. OF RISERS = 24 300 230 115 1800 115 2700 115 1800 115 1235 1950 2338 2338 1950 2338 1000 2648 1350 1800 1350 230 1350 1800 1350 1235 115 1800 115 1235 230 1235 115 1800 115 1235 115 500 1000 2200 300 300 300 300 300 300 300 300 370 230 300 1500 300 1500 500 4855 1235 115 2700 115 1800 115 1935 115 600 115 700 1350 1800 1350 230 1350 1800 1350 230 2145 1015 1500 115 1015 900 1500 900 1235 115 1800 115 1235 230 1235 115 1800 115 1235 370 2648 1000 1967 370 6355 9345 230 230 230 1750 1750 3250 3365 FIRST FLOOR PLAN V DUCT 575 600 575 NT 1750 1000 750 D5 WC TOILET 1750X1950 TOILET 5 TOILET 6 V 1750 WB WB TOILET 1750X1950 WASH BASIN AREA 1750X1545 1050 900 1050 900 575 575 1950 1950 V3 DUCT 575 600 575 NT 1750 1000 750 D5 WC TOILET 1750X1950 TOILET 4 V3 1750 WB WB TOILET 1750X1950 WASH BASIN AREA 1750X1545 NT NT Drop WC Drop WC TOILET 3

GROUND FLOOR LAYOUT

Bungalow Proposal

Khanpur, Rajasthan

Client: Mr Jain

Scope of Work: Floor Layouts

FIRST FLOOR LAYOUT

Tools Used:

PROJECT BRIEF

Given the plot size of 80’x50’ in a new developing township, the client listed a requirement of having 5 Bedrooms, Living & Dining Area, Kitchen, Multipurpose Room and a Servant Quarter. Necessary Spill-out spaces and garden was to be accommodated in the layout also complying with Vastu wherever possible.

Bungalow Proposal, Khanpur
01
WORK
FREELANCE
86
Freelance Work 85 LIVING ROOM 15'x13'9" DOUBLE HEIGHT DINING AREA 18'x13'9" MASTER BEDROOM 18'x13' KITCHEN 15'x13' GUEST BEDROOM 13'x15'5" WALK-IN WARDROBE 10'6"x8' WALK-IN WARDROBE 10'6"x8'7" TOILET 6'x12'10" TOILET 6'x8' DUCT 4" WIDE OUTDOOR SEATING DECK STORE 7'6"x7'3" WASH AREA 7'x7'3" SERVANT QUARTER 10"x9'5" TOILET 6'x9'5" 6' WIDE PASSAGE ENTRANCE PORCH 6'9"x15' 12' WIDE PARKING POWDER ROOM 5'6"x3'6" UP BAITHAK 8'3"x13' WET AREA 5' WIDE PASSAGE WITH PERGOLA ABOVE VERANDAH 8'9"x10'10" 6'9" WIDE PORCH GARDEN MIRROR MIRROR WET AREA WITH BATHTUB WET AREA 4" WIDE OUTDOOR SEATING DECK GARDEN GARDEN ENTRY ENTRY EXIT 12' WIDE DRIVEWAY 12' WIDE DRIVEWAY UP UP DOUBLE HEIGHT 25' WIDE ROAD 25' WIDE ROAD 30' WIDE ROAD + /- 0.00 LVL + /- 0.00 LVL + 1'6" LVL + 1'6" LVL + /- 0.00 LVL PROPOSED RESIDENCE PARAS RESIDENCY, PLOT NO. 48-51 KHANPUR, DIST. JHALAWAR, RAJASTHAN GROUND FLOOR PLAN SCALE 1:50 AR.SAKSHAM GARG +91-8003958591 AR.MUDIT JAIN +91-7208595360 DESIGNED BY N ENTRY EXIT 12' WIDE DRIVEWAY 12' WIDE DRIVEWAY 25' WIDE ROAD 25' WIDE ROAD 30' WIDE ROAD /- 0.00 LVL + /- 0.00 LVL BEDROOM 1 13'x15'5" WALK-IN WARDROBE 10'6"x8' WALK-IN WARDROBE 10'6"x8'7" TOILET 6'x12'10" TOILET 6'x8' DUCT MIRROR WET AREA WET AREA BEDROOM 2 18'x13' 4' WIDE BALCONY 4' WIDE BALCONY TOILET 6'x9'5" WET AREA BEDROOM 3 15'9"x11'5" WARDROBE ENTERTAINMENT ROOM 15'x11'11" OPEN KITCHEN 15'x9'7" MEDITATION ROOM 7'9"x5'9" TERRACE 9'x19'9" + 13'6" LVL +13'6" LVL DN DOUBLE HEIGHT DINING BELOW @ +1'6" LVL DOUBLE HEIGHT LIVING ROOM BELOW @ +1'6" LVL 6' WIDE PASSAGE PARKING SPACE BELOW GARDEN BELOW @ +/-0.0 LVL DUCT PROPOSED RESIDENCE PARAS RESIDENCY, PLOT NO. 48-51 KHANPUR, DIST. JHALAWAR, RAJASTHAN FIRST FLOOR PLAN SCALE 1:50 AR.SAKSHAM GARG +91-8003958591 AR.MUDIT JAIN +91-7208595360 DESIGNED BY N
HANDS-ON ACTIVITIES
MODEL PHOTOGRAPHS
Shivaji Park Site Model Scale 1:100 Basic Design Levels Model Scale 1:50 Archfest Sun board Wall Installation 2017 Archfest Bamboo Wall Installation 2018 Urban Intervention, Juhu Koliwada 2018 Bridge Design, Bamboo Workshop Nagaland 2019 Architectural Design Semester 4 Design Site Model Scale 1:100
Mudit Seema Vijay Jain muditjain1819@gmail.com | +91-7208595360

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.