Graduate of the Construction Engineering Management Study Program, Department of Civil Engineering from Politeknik Negeri Padang with GPA 3.50/400. I have the ability and experience in the field of BIM multidiscipline (struktur, arsitektur, mechanical, plumbing system and electrical instrument) with Autodesk Software such as Revit, AutoCad, and Navisworks and project management.
By Muhammad Zulfajri
1
CONTENT
Modelling
. Produce Family Template
Coordination
. Clash Detection
. Problem Solving
Output
Project Schedule Animation
.
Project Schedulling
. Project 2
.
Electrical Panel Equipment
Mechanical Pump System
Lighting Fixture & Comunication device
Fire Protection Equipment
Hanger Support
HVAC FCU Cassette
Busduct Instalation
Valve System
Watter Tank
3
Modelling
P R O D U C E F A M I L Y
PRINCETON JC2 DATA CENTER
Princeton JC2 Data Center is one of the largest data centers in Indonesia, with gross floor area of 23,850m2 which has a capacity of 22MW. In this project I was appointed as MEP's Bim Modeller, which focuses more on coordinating electrical systems and is also involved in architecture interior.
4 P R O J E C T Modelling
Full View Building
Electrical System
MEP System
Chiller Room
Meeting Room Interior
ASRAMA LPMP BLOK A SUMATERA BARAT
This project has an area of ± 1,500 m2 and is built with 5 floors and one deck floor. in this project I did multi-disciplinary modeling starting from structure, architecture to MEP
Struktur Modelling Architecture MEP System
5 P R O J E C T Modelling
INFRASTRUCTURE GIRDER BRIDGE
In this project I modeled the girder bridge structure down to the details of the rebar and issued a Bar Bending Schedule (BBS) to quickly obtain volumes for implementing BIM 5D.
Detail Structural Rebar
Bar Bending Schedule (BBS)
6 P R O J E C T Modelling
Full View Bridge Modelling
INFRASTRUCTURE CABLE-STAYED BRIGDE
In this project I learned how to make a family of cable bridge components, for example girders, cable systems, and towers or pylons for the upper structure while the lower structure includes abutments, piers and pillar fillers.
7 P R O J E C T Modelling
Cable-Stayed Brigde Modelling
RESIDENTIAL PROJECT
In this project I did 3d modeling with sketchup for private housing with a minimalist design reference
8 P R O J E C T
Modelling
in the project modeling with BIM, it is necessary to ensure that all disciplines are well integrated or safe from clashes. therefore clash detection needs to be done in order to minimize errors. in overcoming the clash I usually use the clash detection feature automatically with Naviswork or directly with Revit.
9 Coordination C L A S H D E T E C T I O N
in the project modeling with BIM, it is necessary to ensure that all disciplines are well integrated or safe from clashes. therefore clash detection needs to be done in order to minimize errors. in overcoming the clash I usually use the clash detection feature automatically with Naviswork or directly with Revit.
10 Coordination S O L V E T H E P R O B L E M
With scheduling animations we can integrate work schedules with a visual appearance of work progress so that we can perfect the schedule. In this project I did a scheduling animation using a typical high-rise building with a schedule created in the ms project.
Output P R O J E C T S C H E D U L E A N I M A T I O N 11
Scheduling
In this project I estimated time and costs using MS Project.
11
Curriculum Vitae
" Don't be afraid to have big dreams, because those dreams will encourage you to keep trying" bit.ly/CV-MuhammadZulfajri
muhammadzulfajri24@gmail.com www.linkedin.com/in/muhammad-zulfajri
+6281268198812
T H A N K S Y O U FOR WATCHING