Primavera P6 - Importance of Planning in Schedule Development

Page 1

Primavera P6

Importance of Planning in Schedule Development


What is a Schedule/ Plan? A schedule/ plan can be defined as a sequential series of steps that are followed to achieve a defined target or goal. A schedule/plan is created with a combination of planning, estimation, activities, resources, and requirements.


What is Schedule Development?

Schedule Development is the process of developing a schedule or plan after analyzing and gathering all the requirements of Project Management.


Benefits of Planning Monitoring and controlling of project activities Allocating resources in such a way as to reap maximum benefits Assessing time delays Tracking progress of the project


Planning Methods What-if scenario analysis Critical Chain Method

Critical Path Method

Adjusting Leads and Lags

Schedule Network Analysis Schedule Model


Points to Consider while Planning A alyzi g the P oject’s Re ui e e ts Deciding the Frequency of Revision

Defining a Baseline

Assigning Roles and Responsibilities


Points to Consider while Planning Train the Project Team Members

Gather the Required Data

U de sta di g P i ave a P6™ Setti gs


Primavera Online Training

Thank You (+91) 8130666209 info@multisoftvirtualacademy.com www.multisoftvirtualacademy.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.