Book Architecture

Page 1

ARCHITECTURAL WORKS + MORE

PORTFOLIO MARIA VICTORIA DEVIA

1



Maria Victoria Devia Arkitek A. MSA 2019



Maria Victoria Devia Arkitekt A. MSA

PROFILE

Born / 1982.01.30 / Bogotá, Colombia Residence Stockholm, Sweden. Advanced knowledge, more than 10 years of experience assisting architectural projects. • Experienced as assistance design. • Proven effective drawing Cad, BIM skills in clearly presenting. • Ability to work effectively as a part of a team or individually. • Ability to use a variety of media in the development and documentation of a design project • Experience in prefab housing projects Swedish Standards, BBR, BSAB system • Multilingual: Fluent in English and Spanish. Current Swedish student



CONTENTS ARCHITECTURAL PROJECTS

Nyhem Byggsystem. Prefab Modular Construction System 8 Kuttern. Apartments House 12 Typology Collection. Houses for Modular Construction System 16 Petrobras. Competition, Finalist 18 Office of Public Works. Selected works 22 COTAS. Competition, 1st place 26 CEA. Master Plan, Landscape 28 Tahuichi Stadium. Competition 1st place 30 R. Sweeny. Art Gallery Store / Academic work 34 Arredondo. House 38 Kalamarí. Housing 42 Marayaú. Housing 46

Research

Abstract of Master Tesis Theory and practical of architecure Universidad Politecnica de Cataluña, Spain

45


Maria Victoria Devia - 2019

NYHEM BYGGSYSTEM Skills:

Archicad Vector Works, BIM

Role:

Tasks: •

Head Architect

• • •

Stockholm-Sweden Changzu-China

Location:

Collaboration with: Nyhem Bostad AB

Develop, design and evaluate concepts for the construction system. (Skiss-Programhandlingar-Granninshandlingar-Systemhandlingar, etc) Create a typology collection using Nyhem Modular Byggsystem. Assist external consultants and Project developers to use NyhemByggsystem. Coordinate representation material such as interior renders and drawings according BASB system, Schemas, etc. Produce and coordinate representation material to build a Prototype in China.

Project description: The scope was to create a modular prefabricated system and develop an innovative technical solutions. I Joint the team in an early stage of the project, when NyhemBostad got founds from Boverket to develop the Idé-concept. (Swedish National Board of Housing) My role was to turn the Ideas into architectural and construction language. The main idea stands over this criterias: Flexibility, Transport, Cost, Energy efficiency and Industrial manufacturing. This project has the interesting value to produce experimental solutions based on test and result evaluations, the multidisciplinary team involved turned the design process into a new opportunity to explore non traditional solutions on the architectural field. The initial phase was to build a prototype on a factory in which was possible to test and evaluate the technical and spatial solutions. During 6 months the design team worked on complete and produce the documentation to manufacture 2 apartments and 1 staircase module. In total 7 modules. The Factory was based in Changzhou,China. Was a big challenge for them to meet Swedish standards, It became a learning process experience to cooperate with such a large factory specialized in industrial manufactured houses. Phase two, that actually happened in parallel, was to design the first housing project in Sweden. 23 Apartments for Gävle municipality. With a real project new questions emerged and also new solutions, so the system incorporated a new modular size to performance a bigger apartments. (see Gävle project pag 12) A third approach into Nyhem byggsystem is the parallel work developing housing typologies; The innovative solutions were integrated in different scales of design having the milimetrical control that supposed to use steel material, and standard shipping sizes, up to produce and evaluate the most efficient house typology for the targeted market: “Low cost and affordable housing”. So with that input was produced a house collection of different alternatives. The strategy was based on use a modular grid, that organize and simplify the design process jumping between: Module Apartment - House. (see Typology Collection pag 16)

8


1. Nyhem Byggsystem

Representation of 20� modular container size.

Layout of Apartments in the System

9


Maria Victoria Devia - 2019

Nybygget.

Drawings for a first Prototype. Manufactured in China and assembled in Norrtälje-Sweden 2017. Op. Interiors of the 2 Room Aparment Prototype.

10


1. Nyhem Byggsystem

11


Maria Victoria Devia - 2019

KUTTERN. Apartments House Skills:

Tasks:

Tools:

• • • •

Building Permision Architecture Archicad Vector Works

Role:

Support Architect

Location:

Gävle-Sweden

Collaboration with:

Nyhem Bostad AB Jagnefelt & Milton

Coordinate with local Architects the Building permit the project. Solve inqueres from municipality and Architects involved Colaborate with specialists and consultants on early stage of the project. Design and Produce Interior Design documents.

Project Description:

BOSTÄDER

EG

R ST

S FÖ

AT

PL

The demand was to produce a proposal for existing master plan on the city of Gävle (north of sweden) Nyhem collaborate with the Stockholm based office of Architecture Jägnefält Milton on produce the commissioned project from one of the biggest Housing cooperatives in the country, HSB. The program is solved in two houses. Uses 2 apartment types from Nhem Byggsystem. And developed a Stairs and Elevator solution to be built on site. Services and common areas like Laundry, Storages, Technical rooms and entrances follows the design criteria using the same modular sizes than the apartments. This project collects a results from the prototype 1.0 and implement a new technical solutions for facade system, roof and foundation criterias. BIL

CYKLAR 4 PL

RT FA /UT IN- RAGE GA

D

BOSTÄDER

-

FR

TÄK FL M RU

LJÖ MI M RU

A OL TS RG PE EPLA UT

MARKMODELLERING KULLE OM ÖVERSKOTTSMASSOR FINNS

ND SA DA LÅ

HUSHÅLLSAVFALL

BOSTÄDER

RUM

UPPHÖJD TORGYTA GÅNGFARTSOMRÅDE

R

RE

TU

LP

KU

KS

LE

MILJÖ

SITTMUR

CYKLAR 6 PL

³ ³

HKP

FÖRR ÅD 23 CYKLA

R

CYKLAR 18 PL

BOSTÄDER TRAPPHUS CYKLAR 18 PL

TRAPPHUS CYKLAR 6 PL

BOSTÄDER TRAPPHUS

12


2.Kuttern.

FÖRESKRIFTER

FÖRESKRIFTER

Leverantör ansvarar för hållfasthet och uppfyllande av gängse krav och normer.

Leverantör ansvarar för hållfasthet och uppfyllande av gängse krav och normer.

HÄNVISNINGAR

HÄNVISNINGAR Fasader se ritn.

Fasader se ritn.

A-40.3-A01 - 04 A-40.3-B01 - 04 A-40.2-A01 - 03 A-40.2-B01 - 02

-0,02

18

81

1,3kvm

1.3 kvm

1,3 kvm

1.3 kvm

16

15

14

13

12

11

10

7 6 5

3

ST

2

1

1

11

12

13

14

15

16

17

18

4 G

1.3 kvm

1,3 kvm

2

3 2 1

1.3 kvm

1 kvm

MT

9 8

7 6

4

3

2 1

10

9 8

5

4

3

TM

TM

TM

TM

TM

TM

1.3 kvm

+0,0

1.3 kvm

POST 1 kvm

G

G A_2001 2 ROK 54kvm

B_2003 2 ROK 54kvm

C

TM

A_2002 1 ROK 54kvm

B_2002 1 ROK 54kvm

TP

K/F

B_2001 2 ROK 54kvm

G

A_2003 2 ROK 54kvm

K/F

C

G

C

1.3 kvm

SK

1.3 kvm 1 kvm

ST

G

1.3 kvm +0,0

1 kvm

K/F

+0,0

K/F

B_1001 2 ROK 54kvm

K/F

A_1001 2 ROK 54kvm

ST

TEKNIK

C

+0,0

G

1 kvm

TEKNIK

G

G

1.3 kvm

G

POST

LGH-FRD 20 st

SK

+0,0

A_1002 2 ROK 54kvm

17

1.3 kvm

ST

4

1,3 kvm

G

71

G

61

7 6 5

G

7 6 5

G

51

ST

41

G

31

G

21

FRD 9 8

G

11

01

9 8

G

1:12

10

ST

11

K/F

12

G

13

G

14

G

1:12

15

TM

16

FRD

G

17

B

B

A

-0,02

18

A-40.3-A01 - 04 A-40.3-B01 - 04 A-40.2-A01 - 03 A-40.2-B01 - 02

Sektioner se ritn.

A

Sektioner se ritn.

TVÄTTSTUGA

BV/ TM

TT

14 kvm

B

190719

A

MD

171023

MD

DATUM

SING

B

ANDRIGEN AVSER

BET

BYGGLOVHANDLING

ANT

ANDRIGEN AVSER

DM

ANT

DM

BET

MD

171023

MD

DATUM

SING

BYGGLOVHANDLING

-0,02

B

A

A

B

-0,02

190719

A

+0,0 TM

DM

-0,362

DM

-0,362

DM

RULLST -0,362

DM

BV/ RULLST -0,362

KUTTERN

KUTTERN

A

HUS A, PLAN 0 - ENTRÉPLAN

A

K

HUS A, PLAN 1

V

K V

E UPPDRAG.NR

RITAD/KONSTR AV

000,0

MD

DATUM

ANSVARIG

SKALA

NUMMER

HANDLÄGGARE

E

MD

UPPDRAG.NR

RITAD/KONSTR AV

000,0

HANDLÄGGARE

MD

DATUM

ANSVARIG

SKALA

NUMMER

MD

1:50 0

1

2

3

4

5m

1:50 Skala 1:50- A1 (1:100 - A3)

A-40.1-A00

1:50 @ A1

0

BET

1

2

3

4

5m Skala 1:50- A1 (1:100 - A3)

BET

A-40.1-A01

1:50 @ A1

FÖRESKRIFTER

FÖRESKRIFTER

Leverantör ansvarar för hållfasthet och uppfyllande av gängse krav och normer.

Leverantör ansvarar för hållfasthet och uppfyllande av gängse krav och normer.

HÄNVISNINGAR

HÄNVISNINGAR

Planer se ritn.

Planer se ritn.

A40.1-A00 - 03 A40.1-B00 - 03 A-40.3-A01 - 04 A-40.3-B01 - 04

Fasader se ritn.

A40.1-A00 - 03 A40.1-B00 - 03 A-40.3-A01 - 04 A-40.3-B01 - 04

Fasader se ritn.

A_3003

A_3002

A_3001

B_3003

B_3002

B_3001

A_2003

A_2002

A_2001

B_2003

B_2002

B_2001

A_1001

B_1001

TEKNIK A_1002

SEKTION A-A

TEKNIK

SEKTION C-C B

MD

B

171023

MD

A

DATUM

190719

SING

A BET

ANT

ANDRIGEN AVSER

190719

BET

ANT

BYGGLOVHANDLING

KUTTERN

KUTTERN

K V

E

E

UPPDRAG.NR

MD SING

A

K V

000,0

MD

171023 DATUM

BYGGLOVHANDLING

A

RITAD/KONSTR AV

MD

DATUM

ANSVARIG

SKALA

NUMMER

HANDLÄGGARE

UPPDRAG.NR

MD

000,0

1:50 0

ANDRIGEN AVSER

RITAD/KONSTR AV

MD

DATUM

ANSVARIG

SKALA

NUMMER

HANDLÄGGARE

MD

1:50 1

2

3

4

5m

0 Skala 1:50- A1 (1:100 - A3)

1:50 @ A1

A-40.2-A01

1

2

3

4

5m Skala 1:50- A1 (1:100 - A3)

BET

1:50 @ A1

13

A-40.2-A03

BET


Maria Victoria Devia - 2019

5

YTSKIKT OCH SNICKERIER PRODUKT

UTFÖRANDE

Innerdörrar

vit 0500N, tröskel i ask

Trycke

Krom

1

Foder

Fabriksmålad, vit, NCS S 0500N, 56x12 mm

2

Sockel

Fabriksmålad, vit, 56x15 mm, NCS S 0500-N

3

Golv

vit 14 mm, 3-stav

4

Vägg

Målat, vit, NCS S 0500-N, glanstal 5.

5

Tak

NCS S 0300-N, dock målat i våtrum NCS S 0300-N.

3

Säkerhetsdörr med titthål

NCS S3005-Y50R

6

Fönsterbänk

Natursten

4

3

1

6

2

Produkterna som visas här kan komma att bytas ut. http://nyhembostad.se/

Page 3

MD_2018/07/24

3. KITCHEN AND LIVINGROOM

ZONE:

2 RoKB - 2roKA

3

1

17

G

2. Bathroom

11

1. Entrance Hall ST

Comments

T: +46 725 31 33 00 info@nyhem.com

10

G

G

4. Bedroom

G

ROOM:

NYHEMBOSTAD

G

2

G

Apartment 2RoKb

K/F

G

Room 3. Living Room & Kitchen

1 Floor

Oak Parquet

2 Baseboard / Kicker

Wood

3 Walls

Painted Gypsum Board

14

180725

4

MATERIAL

SURFACE SPECIFICATION Factory Painted UV lacquer 3 rods

COLOR

Tinted White

15(4)*192*1860

DM

3. Kitchen / Living Room

Factory painted (Water based paint)

8

See wall description

4 Ceiling

2ROK-B3

Painted Gypsum Board

18

7

NCS S 0300-N or RAL CLASSIC 90016 or RAL DESIGN 110 9005

9

NCS S 0300-N or RAL CLASSIC 90016 NCS S 0300-N (RAL 90016)

OTHERS:

Apartment 2RoKb

(Jambs) wall Opening, 5 entrance to Room3

wood

6 Balcony Door

Thermal break system Aluminium:2.0 mm 3. Glass:5mm+9A+5mm clear tempered 4. Powder coated

NCS S 0300-N / NCS S 0300-N

See Door schedule A-43.4-010

RAL CLASSIC 90016 / RAL DESIGN 110 9005

180725

Room 3. Living Room & Kitchen

7 Windows

MATERIAL

1 Floor

Oak Parquet

2 Baseboard / Kicker

Wood

3 Walls

Painted Gypsum Board

SURFACE SPECIFICATION Factory Painted UV lacquer 3 rods

K3

Tinted White

NCS S 0300-N or RAL CLASSIC 90016

Painted Gypsum Board

NCS S 0300-N (RAL 90016)

OTHERS: (Jambs) wall Opening, 5 entrance to Room3

wood

6 Balcony Door

Thermal break system Aluminium:2.0 mm 3. Glass:5mm+9A+5mm clear tempered 4. Powder coated

NCS S 0300-N / NCS S 0300-N

See Door schedule A-43.4-010

RAL CLASSIC 90016 / RAL DESIGN 110 9005

Factory painted (Water based paint)

NCS S 0300-N / NCS S 0300-N

Threshold: Tinted White

7 Windows

PVC

Factory painted

8 Windows ledge

Marble

Carrara

9 Wardrobes:

Frame: HD Particle Board, Melamine surface (total 18 mm)

Frame: Factory painted

Aluminium*Silent Gliss 1080

Wall outlets: Sockets 11 and switches:

Plastic

12 Lights / Lamps: 13 Wall joints

LED spot light Covering strip 5-7cm

NCS S 0300-N / NCS S 0300-N

9 Wardrobes:

Frame: HD Particle Board, Melamine surface (total 18 mm)

Frame: Factory painted

10 Curtain fittings:

Aluminium*Silent Gliss 1080

Wall outlets: Sockets 11 and switches:

Plastic

12 Lights / Lamps:

LED spot light

NCS S 0300-N or RAL CLASSIC 90016 / RAL DESIGN 110 9005

14 Radiators*

Grad-in, Korado , Radik VKU 11 or similar

Factory Painted

15 Ventilation Outlet:

Circular.

16 Ceiling joints*

Visible Plastic gasket or visible metal cover strip or elastic joint (sika)

Steel Powder coated.

RAL 9010

Factory painted (if metal)

NCS S 0300-N / NCS S 0300-N

K4

See A-46.4-030 Frame: HD Particle Board, Melamine surface (total 18 mm)

Flush mounted, Stainless steel, 2 Bowls with drain surface

K5 Taps

Talis 2 Hansgrohe or similar

K6 Stove / Cook Top

Brand: Siemens Induction Plate

K7 Oven

Brand: Siemens

Wood

K5

K8

RAL CLASSIC 90016 / RAL DESIGN 110 9005

KITCHEN:

K4 Sink

NCS S 0300-N or RAL CLASSIC 90016 / RAL DESIGN 110 9005

5

Product: Lindab | till-, och frånluftsventile, AIRY

Tempered glass back painted

White

NCS S 0300-N or RAL CLASSIC 90016 / RAL DESIGN 110 9005

Wood

Compact laminate 12mm

White

White

Covering strip 5-7cm

K1 Cabinets

White

Recessed. Replaceable bulb Gu10 bulbs

13 Wall joints

K3 Splash back

Recessed. Replaceable bulb Gu10 bulbs

6

White White

K2 Work Top

K9

Fronts: Factory painted Matt Finished. NCS S 0300-N or RAL CLASSIC 90016 / Include recessed grips RAL DESIGN 110 9005

Fronts:18 MDF Lacquer Matte

RAL CLASSIC 90016 / RAL DESIGN 110 9005 Gray

13

See A-46.4-030

K7

Black

Product code: EU631BEF2S (or similar)

K10

White

Inbyggnadsugn, vit, 3D varmluft. Product Code: HB20AB212S (or similar) Dim:595 x 595 x 548

Grad-in, Korado , Radik VKU 11 or similar

Factory Painted

15 Ventilation Outlet:

Circular.

Steel Powder coated.

RAL 9010

Factory painted (if metal)

NCS S 0300-N / NCS S 0300-N

K8 Range hood / Extractor Stainless Steel / Under Cabinet Brand: CASMJA

K9 Fridge freezer

Product: Lindab | till-, och frånluftsventile, AIRY Visible Plastic gasket or visible metal cover strip or elastic joint (sika)

K10

NCS S 0300-N / NCS S 0300-N RAL CLASSIC 90016 / RAL DESIGN 110 9005

Carrara

NCS S 0300-N or RAL CLASSIC 90016 / RAL DESIGN 110 9005

14 Radiators*

16 Ceiling joints*

Factory painted

Marble

RAL CLASSIC 90016 / RAL DESIGN 110 9005

Fronts: MDF

10 Curtain fittings:

K4

8 Windows ledge

Fronts: MDF

NCS S 0300-N or RAL CLASSIC 90016 or RAL DESIGN 110 9005

See wall description

4 Ceiling

NCS S 0300-N / NCS S 0300-N

Threshold: Tinted White PVC

COLOR

15(4)*192*1860 Factory painted (Water based paint)

Factory painted (Water based paint)

K2

Brand: Siemens

K6

White

Product Code: KG 36VXW31 iQ300

RAL CLASSIC 90016 / RAL DESIGN 110 9005

Lights and electrical K10 plug under cabinet

Plastic

White

K11 Dish Washer*

Brand: Siemens

White

K1

Product Code: SR 45E231SK iQ300

KITCHEN: K1 Cabinets

*materials to be confirmed

See A-46.4-030 Frame: HD Particle Board, Melamine surface (total 18 mm)

Fronts: Factory painted Matt Finished. NCS S 0300-N or RAL CLASSIC 90016 / Include recessed grips RAL DESIGN 110 9005

Fronts:18 MDF Lacquer RAL CLASSIC 90016 / RAL DESIGN 110 9005

MATERIAL CONCEPT & PRODUCT REFERENCE

K2 Work Top

Compact laminate 12mm

K3 Splash back

Tempered glass back painted

Flush mounted, Stainless steel, 2 MD_2018/07/24 Bowls with drain surface

K4 Sink

K5 Taps

Talis 2 Hansgrohe or similar

K6 Stove / Cook Top

Brand: Siemens Induction Plate

Matte

Gray

NYHEMBOSTAD

See A-46.4-030 Black

Product code: EU631BEF2S (or similar)

K7 Oven

Brand: Siemens

White

Inbyggnadsugn, vit, 3D varmluft. Product Code: HB20AB212S (or similar) Dim:595 x 595 x 548

K8 Range hood / Extractor Stainless Steel / Under Cabinet Brand: CASMJA

K9 Fridge freezer

Brand: Siemens

White

Product Code: KG 36VXW31 iQ300

Lights and electrical K10 plug under cabinet

Plastic

White

K11 Dish Washer*

Brand: Siemens

White

Product Code: SR 45E231SK iQ300 *materials to be confirmed

14

T: +46 725 31 33 00 info@nyhem.com


2.Kuttern.

15


Maria Victoria Devia - 2019

TYPOLOGY COLLECTION. Study for Modular Construction System Skills:

Tasks:

Autocad • Explore different alternatives for housing solutions Vector Works • Evaluate the rate of building construction areas In Design • Produce a visual catalog of houses.

Role:

Architect Responsable

Location:

Create a template to display prospects analysis

Project Description:

Stockholm Sweden The assignment was to collect the different house schemas made during a period whe-

Collaboration with:

re the company explored to start developing own projects and eventually accepting commissions from external developers.

Rohid Danihya Robert Vangstad We made a municipality analysis in order to find the potential cities in which operate. Analyzing social, economical and political facts. Going through city and district offiMichael Malmborg cial master plan strategies. Dan Tornkvist

This project is a compilation of approximately 10 real proposals and experimental ideas of new houses. The assignment summarizes all of them on a flexible catalog easy to continue adding future projects. Is a tool to help other architects to understand the potential and limitations for new projects and to simplify design process on early stages using Nyhem-Construction System.

16


3.Typology Collection.

17


Maria Victoria Devia - 2019

PETROBRAS Skills:

Autocad Vector Works Phothoshop

Role: Location:

Santa Cruz, Bolivia

Collaboration with: Waldo Alborta Gabriel Garcia Hebert Vargas Erika Tsukayama

Tasks: • • • •

Create and maintain a user-friendly database of company: templates, standards, families, details, manuals, etc. Contribute with design ideas Research projects and concepts related to the assignment Analyze the program and develop design proposals

Project description: The commission was to produce an Ide project that reinforce the corporate image of the company and the possibility of becoming a symbol of social welfare from technological development to the region. Briefing memories: Scales of observation: visual targeting strategies . The intersection of two avenues emphasizes a perception point of view. The idea is to enhance observation scales: A first remote monitoring the entire volume is perceived as a big plane, second approach: fragmented pieces and highlight stick and at the end the immediate environment: visible changes of levels, textures and technological details. Composition as a Hub The orthogonal structure is restructured with diagonals that connects the main house with the structure of the entrance hall. The lineal given by the house has correlation with the structural axis previously explained plus the intention to cause the building of being invaded for the avenue traffic flow, brings the idea of use an analogy of a train crossing by. So the building is moving!. The fact of being placed parallel to Av “ quinto anillo “ involves shifting income to a lower-speed path and to be stronger in the corner. The work with emphasis on maintaining the single block, divide it into two wings, each in stripes as hierarchies. Each wing has the elements required to support security and emergency. The ground floor solve public program and entrances. The secondary sector has been assembled with the master volume optimizing the use of land and better functional relationships, this has been a great achievement in the project as its integrated and compact dimension. The parking area form a second block , has a platform containing a terrace garden that replaced the floor and integrated into the program, there is also the restaurant a privileged area where employees can access through the second level of the bridge thought as a plugin that has the possibility to integrate new projects

18


4. Petrobras

19


Maria Victoria Devia - 2019

20


4. Petrobras

21


Maria Victoria Devia - 2019

OFFICE OF PUBLIC WORKS Skills:

Autocad Vector Works Phothoshop

Role:

Design Project Manager

Location:

Santa Cruz - Bolivia

Collaboration with:

Waldo Alborta Zona-C Studio Office of Public Projects

Tasks: • • • • •

Work with the marketing department to create and maintain all company templates, standards, & manuals. Create and maintain a user-friendly database of company templates, standards, families, details, manuals, etc. Continuously edit and improve blocks, components, details, templates and parameters. Meet regularly with project teams to provide specific and targeted support. ​Contribute with design ideas

Project description: In 2007 under the direction of architect Waldo Alborta. I serve on the planning Office of Public Works of the city of Santa Cruz, Boliva. The Idea was to generate a database of projects for the city following pre established Detail Planned that defines the City necessities. so as a strategy of collaboration with the public institution system this department was created. All the projects developed were created in a record time, and some of them just reached an initial concept level. Here is shown 3 projects that represent what was part of integral action plan for the public buildings: 1-Distrital Cultural Center 2-Distrital Health Center 3-Distrital Administration City Hall

22


5. Office of Public Works. Selected Works

1. District - Cultural Center

Design concept: Waldo Alborta Drawing & Renders: Maria Victoria Devia

23


Maria Victoria Devia - 2019

AREA VERDE

CASILLEROS

preparacion

20

baños públicos 7m2

archivo de historias clínicas 4

baños públicos 7m2

baños públicos 7m2

laboratorio básico 11.38m2

Consultorio con baño29m2 area de espera

7m2 porteria

DORMITORIO GUARDIA 10M2

ingreso de servicio

Almacén general 12

ESPERA 16m2

1

LAMINA

recepción10.5m2

hall de ingreso

DORMITORIO CON BAÑO MEDICO RESIDENTE 23M2

CENTRO DE SALUD 24 HORAS

ZONIFICACION - PROGRAMA ESC 1:200

RECUPERACION

sala polivalente 21m2

sala de espera lavado-vestidor medico5

OFICINA 15m2

24.75

enfermeria Clinico 17m2

Consultorio odontologico 17m2

Consultorio Clinico 17m2

farmacia 7m2 ingreso Prinicipal Enfermeria 13.5m2

GALERIA

AREA TOTAL DE CONSTRUCCION

626 m2

150 m2

GOBIERNO MUNICIPAL AUTÓNOMO DE SANTA CRUZ DE LA SIERRA

GALERIAS Y ACERAS

OFICIALÍA MAYOR DE PLANIFICACIÓN

Sala de Usos Múltiples 39m2 48 personas

RESPONSABLE: ARQ. MA.VICTORIA DEVIA

Cuarto de basura 4.3

Baño y Vestidor del personal 23m2

PATIO DE SERVICIO

60m2 Cuarto de instalaciones 6m2

sala de partos

roperia 12m2

Cuarto de limpieza 4m2

Taller de mantenimiento 13m2

PROGRAMA FUNCIONAL BÁSICO DEL CENTRO DE SALUD PRIMER NIVEL CON CAMAS*

sala de maternidad 21m2 lavanderia 12m2

DIRECCIÓN DE PLANIFICACIÓN

cocina -comedor - despensa 18

2. Health District Center

*INFORMACION SUMINISTRADA POR LA DIRECCION MUNICIPAL DE SALUD

24


5. Office of Public Works. Selected Works

3. District City Hall

25


Maria Victoria Devia - 2019

COTAS Telecommunications company Competition:

1st place

Skills:

Autocad Vector Works Phothoshop

Role:

Project manager

Location:

Santa Cruz, Bolivia

Team:

Luis Fernandez de Cordova Nataly Dorado Maria Victoria Devia

Tasks: • Ability to use a variety of media in the development and documentation of a design project • Work as a part of a team creating and maintaining a user-friendly database of company templates, standards, families, details, manuals, etc. • Continually update company content database - being sure that users have needed content in a timely mannor. Project description: In 2009 COTAS Launched the competition. The design of the headquarters that were spread in different buildings in the city. The call included a proposal for urban and landscape design, for a 10 hectares land. 6 months later we developed the project and produced the documents to make an open tender for construction phase. Functional: The Layout proposed has a clean reading, the orientation ensures optimal sun exposure and lighting conditions, take advantage of the nice visual and enabling future growth in stages. Solves and control noise, and suits perfectly in the natural topography of the land. To facilitate the communication between departments and mobility of employees, areas that make up the various blocks of the project were grouped in one building that rests on a large body of water, protected by two galleries that allow light to pass into two transparent volumes separated by a large empty space. Four height levels generated by the “square of the communication”. This space acts as a place of chance encounters , including a lobby entrance, is the connection between the two volumes and is the starting point. The Workspace : Two minor halls are in front of work environments, generating a gradual transition between inside and outside, two panoramic elevators and stairs connect the lobbies of each level.

26


6. Cotas

27


Maria Victoria Devia - 2019

CEA ENVIRONMENTAL PARK - Master Plan Skills:

Autocad Vector Works Phothoshop

Location:

Santa Cruz, Bolivia

Role:

Project Design Assistant

Collaboration with:

Luis Fernandez de Cordova

Tasks: • Create and maintain a user-friendly database of company templates, standards, families, details, manuals, etc. • Continually update company content database - being sure that users have needed content. • Make presentations • Schemas, models and studio material during the design process. Project description: Space criteria The limits definition appears between natural ecosystems areas representing, there will be no physical boundaries is therefore to be formed into small compact masses forests. There will be a perimeter fence to condition the public access to the park for a single main entrance. This enclosure must be lightweight so as to allow a visual connection with the interior of the park. the existing species of special interest will be used as key references in the spatial organization of the park. Formal criteria: Organic plot. The resulting scheme on the analogy of ecosystems represented physically on the ground creates an organic pattern that directs natural course. Rational frame on the other hand axes on which the architectural program for the buildings are structured, propose a structure based on linear axes of organization. The proposed merger between the two manages to generate a fluid, variable and alternative route . Techn criteria Ensure staged construction In some cases, due to the physical characteristics of each ecoregion is required to alter the natural conditions that comprise the field today. For which it is contemplated to use the material excavating gaps for generate the proposed scenario.

28


7. Environmental Park - Master Plan

29


Maria Victoria Devia - 2019

STADIUM Skills:

Autocad 2d Vector Works 2d-3d Phothoshop

Role:

Architect Designer

Location:

Santa Cruz, Bolivia

Team:

Maria Victoria Devia Hebert Vargas Alberto Menacho Nataly Dorado

Tasks: • • • •

Propose and resolve the technical solutions. Architecture project researcher: Regulations (local and international regulations for stadiums FIFA) Power Points for public presentations Develop schemas, models and studio material during the design process.

Project description:

In 2007 the city government launched a competition for redesign the city stadium: Ramón Tahuichi Aguilera. The main requirement was to implement a covering, and make a proposal for resolve several urban gaps. The revitalization project includes outside areas of the stadium, achieving a comprehensive solution for the project: redesign public bathrooms, principal entrances, ticket booths, dressing rooms, stages, the placement of seats, big screen. according to the FIFA rules.

30


8. Stadium

31


Maria Victoria Devia - 2019

32


8. Stadium

33


Maria Victoria Devia - 2019

Richard Sweeny Gallery Skills:

Autocad Phothoshop Sketch Up Pro/ Vray

Location:

Barcelona - España

Academic project

Tasks: • • •

Lighting design Display design Commercial and visual concepts

Project description: This is a Self initiative project during the Specialization Program in Interior Design 2011 IED Barcelona. The challenge was to merge commercial activities with art exhibition. Under this premise was proposed to have a free path, where visitors can stop and observe each item without obeying a strict order, start the visit by the principal access, from the main street La Rambla, or through the secondary street, they can choose to start the suggested path: 1.FOLDED ROOM , 2. LIVING CUBE and 3. FOLDED ROOM. FOLDS AS STATEMENT PANEL To support artist concepts all the display panels are folded and have different sizes.

Axonometric Sketch: Tour route and component 3D Sketch Up, Photoshop

34


9. R. Sweeny Gallery

35

Main front entrance 3D Sketch Up Photoshop


Maria Victoria Devia - 2019

36


9. R. Sweeny Gallery

37


Maria Victoria Devia - 2019

ARREDONDO HOUSE Skills:

Autocad Vector Works

Location:

Santa Cruz, Bolivia

Role:

Project Design Assistant

Collaboration with:

Luis Fernandez de Cordova FDC&R Studio

Tasks: • •

Drawing and plotting Coordinate technical solutions

Project Description: The Arredondo house is located in Santa Cruz de la Sierra, in the eastern region of Bolivia, characterized by the tropical weather, strong winds and high sun light. Beeing part of FDC&R Team, I was in charge of this project. The residence responds to the owner’s brief for a family house where they could engage relatives and friends. Materials and formal choices were informed by a desire to root the structure into the site. Indoor and outdoor living is orchestrated by balancing views with privacy, communal space with intimacy.

38


10. Arredondo House

N

vecino

muro de HºAº visto

+0,45

DEPOSITO

Proyeccion Losa

BOMBA PISCINA

JARDIN

+0,45

4,025

+0,425

DORM. SERVICIO

BAÑO 3

DECK DE MADERA

3,65

+0,425 TERRAZA

DORMITORIO 2

DORMITORIO 1

PATIO DE ROPAS

+0,30

LAVANDERIA

VESTIDOR BAÑO 2

VESTIDOR

a/c DESPENSA

BAÑO 4 ROPA BLANCA

BAÑO 1

VESTIDOR

DORMITORIO PPAL

+3,775 LOSA DE HºAª

HALL DE INGRESO

SALA DE ESTAR

+0,45

+0,425

+0,30

+0,425

JARDIN INTERIOR

GALERIA

vecino

39

19

18

17

16

15

14

29

28

27

26

25

24

23

22

20

VESTIDOR

+0,45 +0,30

21

+3,775

19

18

8

9

17

7

6

5

15

14

16

4

3

2

11

13

12

1

ESTUDIO

10

IMERA AV . P R

+3,775

+4,875 calefon (gas)


Maria Victoria Devia - 2019

40


10. Arredondo House

FACHADA ESTE

FACHADA OESTE

1,05

1,625

+0,45

+0,30

SALA DE ESTAR

+0,15

+0,0

0,75

0,25 0,275

2,575

4,075

2,675

2,675

4,075

HALL DE ACCESO

LIVING - COMEDOR

0,25

0,350,25 +0,425

+0,45

+0,30

CORTE 4-4`

CORTE 6-6`

41

2,7

2,675

2,7

2,675 +0,45

0,125

SALA DE ESTAR

2,675

2,675

5,175

0,65

Prever Regilla colectora de agua

DORMITORIO 1

0,125

+3,775

+3,775

0,25 0,35

+3,775

0,75

1,4

2,8

2,15

2,15

0,5

+6,925

0,275

Losa técnica para equipos A/C

3,425

+6,175

0,7

0,875

CORTE 5-5`

+5,175

ESCRITORIO

+0,45

5,175

3,125 LIVING - COMEDOR

±0.00

0,25

0,25

1,4 0,25

3,725

+0,45

CORTE 3-3`

+6,675

0,35

1,75

1,175 2,7 SALA DE ESTAR

+3,775

5,175

0,35 0,25

3,725 2,675

2,7

2,675

+0,45

LIVING - COMEDOR

+5,175 +6,675

+3,775

2,675

1,4

+6,675

+3,775 0,4 0,25

1,175

0,25 0,2 0,5

0,525

+3,775

DORMITORIO PPAL

+6,175

0,7

1,275

0,25

+5,175

1,625

1,625

0,525

1,275

+6,925

6,225

+6,925 0,175

0,275

3,075

+9,90

DECK DE MADERA

+0,425


Maria Victoria Devia - 2019

KALAMARI HOUSING Skills:

Vector Works Phothoshop

Location:

Santa Cruz, Bolivia

Role:

Architect, Project Design manager

Collaboration with:

Guillermo Devia

Tasks: • •

Design an apartment house Coordinate technical solutions

Project description: Solve the program for a housing project in a plot of 30m x 15m. The Idea was to optimize the rate among building area, and living area. The proposal came with 3 apartment types simplifying the floor plan layout, and solving the parking on the ground floor together with the social areas. The facade has a movement among the openings for a proper natural light and natural ventilation

42


11. Kalamari Housing

43


Maria Victoria Devia - 2019

44


11. Kalamari Housing

45


Maria Victoria Devia - 2019

MARAYAU HOUSING Skills:

Vector Works Phothoshop

Location:

Santa Cruz, Bolivia

Role:

Architect, Project Design manager

Collaboration with:

Guillermo Devia

Tasks: • •

Coordinate technical solutions Design an apartment house

Project description: In a corner plot with a rectangular shape, faced to a pedestrian passage the program is solved in that way to incorporate and take advantage of the green area, to enhance the way of that. A simple and clear floor plan layout distribute the apartments along a spine corridor that distribute each unit. The bric on the facade was used in order to take a local material.

46


12. Marayau Housing

Balcón: 4,5 m2

Balcón: 4,5 m2

Balcón: 4,5 m2

Balcón: 4,5 m2

Dpto 306 - P.Baja (E) 90 m2

+.40

Dpto 305 P.Baja (E) 90 m2

Dpto 307 P.Baja (D) 88,5 m2

IH

Deposito

G

21 4 9

5

3

G Dpto 303 (B2) 44 m2

G

Dpto 302 (B2) 44 m2

Dpto 301 (B) 55 m2

UBICACION:

GUILLERMO DEVIA LOPEZ arquitectura y construccion

PROYECTO:

PLANTA BAJA

CONDOMINIO MARAYAÚ

ESC. 1:150

16

UBICACION:

GUILLERMO DEVIA LOPEZ arquitectura y construccion

PROYECTO:

ZONA: NORTE UV. 16 MANZANA 62 CALLE MARAYAU

Tercer Anillo Externo 12-77 / guillermodevia@deviaconstructora.com Tel. +591 3272800

8

7 10

13

12

16

15

11

LAMINA

CONTENIDO:

NIVEL 3

CONDOMINIO MARAYAÚ

ESC. 1:150

Santa Cruz - Bolivia

Terraza 19m2

Balcón:"A" 4,5 m2

Balcón "C" 4,5 m2

Balcón "C" 4,5 m2

Santa Cruz - Bolivia

Balcón "C" Balcón "C" 4,5 m2 4 m2

NOTA: Las dimensiones son referenciales y susceptibles a variaciones durante la ejecución de la obra.

LAMINA

CONTENIDO:

ZONA: NORTE UV. 16 MANZANA 62 CALLE MARAYAU

Tercer Anillo Externo 12-77 / guillermodevia@deviaconstructora.com Tel. +591 3272800

14

17

NIVEL 3

TANQUE AGUA

NOTA: Las dimensiones son referenciales y susceptibles a variaciones durante la ejecución de la obra.

46

19m2 Terraza

+.40

visita

PLANTA BAJA

8

12

15

14

13

17

16

9

6

5

4

3

2

1

7

visita

6

2

1

11

10

G

Telefono medidores IH

+.40

1

2

G

Dpto 304 P. Baja (F) 90 m2

3

4

5

6

7

8

9

10

Balcón: 3,5 m2

Portería

20

19

18

17

16

15

14

13

12

11

RECEPCION

+.40

+0.0

SALON COMUN 36m2

NIVEL DE ACERA

AREA JARDIN COMUN 180m2

30,5 m2

Jardinera (no accesible)

Terraza

Dpto 304 P.Alta (F) 26m2

Dpto 305 P. ALta (E) 55m2

+12.40

losa de H.A

UBICACION:

PROYECTO:

LAMINA

CONTENIDO:

ZONA: NORTE UV. 16 MANZANA 62 CALLE MARAYAU

Tercer Anillo Externo 12-77 / guillermodevia@deviaconstructora.com Tel. +591 3272800

NIVEL 1

CONDOMINIO MARAYAÚ

ESC. 1:150

UBICACION:

GUILLERMO DEVIA LOPEZ arquitectura y construccion

26

PROYECTO:

ZONA: NORTE UV. 16 MANZANA 62 CALLE MARAYAU

Tercer Anillo Externo 12-77 / guillermodevia@deviaconstructora.com Tel. +591 3272800

8

maquinas ascensor 7

15

16

NIVEL 4

+12.40

LAMINA

CONTENIDO:

NIVEL 4

CONDOMINIO MARAYAÚ

ESC. 1:150

Santa Cruz - Bolivia

56

Balcón:"A" 4,5 m2

Balcón "C" 4,5 m2

Balcón "C" 4,5 m2

Santa Cruz - Bolivia

Balcón "C" Balcón "C" 4,5 m2 4 m2

viga canal

NOTA: Las dimensiones son referenciales y susceptibles a variaciones durante la ejecución de la obra.

NOTA: Las dimensiones son referenciales y susceptibles a variaciones durante la ejecución de la obra. GUILLERMO DEVIA LOPEZ arquitectura y construccion

viga canal

viga canal

Dormitorio 1

NIVEL 1

17

10

13

12

11

16

15

14

17

10

9 12

6

11

5

4

3

14

viga canal

Escalera de servicio (acceso Tanques y maquinas ascensor)

G

G 8

7

9

6

5

4

3

1

Dpto 101 (B) 55 m2

2

G

Telefono medidores IH

G

13

G +3.40

IH

Dpto 102 (B2) 44 m2

G

Dpto 103 (B2) 44 m2

G

Dpto 307 P. ALta (D) 63,5 m2

Dpto 306 P. ALta (E) 55 m2

Terraza 44m2

Dpto:107 (A) 92,5 m2

G

Dpto 106 (C) 90 m2

VIGA CANAL

celocia

(ventilacion natural)

G

G

Dpto 105 (C) 90 m2

Dpto 104 (C) 90 m2

G

celocia

(ventilacion natural)

viga canal

viga canal

Viga canal de H.A

Portería

losa de H.A

8

7

+15.40

+12.40

ESC. 1:150

NIVEL 5

Viga canal de H.A

viga canal

NOTA: Las dimensiones son referenciales y susceptibles a variaciones durante la ejecución de la obra.

LAMINA

26

TANQUE AGUA

GUILLERMO DEVIA LOPEZ arquitectura y construccion

PLANTA BAJA

visita 7 8

12

15

14

13

NIVEL 1

11

CONTENIDO:

CONDOMINIO MARAYAÚ

17

PROYECTO:

ZONA: NORTE UV. 16 MANZANA 62 CALLE MARAYAU

16

Tercer Anillo Externo 12-77 / guillermodevia@deviaconstructora.com Tel. +591 3272800

Santa Cruz - Bolivia

47

AREA JARDIN COMUN 180m2

ERA

UBICACION:

visita

Santa Cruz - Bolivia

+.40

Tercer Anillo Externo 12-77 / guillermodevia@deviaconstructora.com Tel. +591 3272800

NIVEL 1

21 5

4 9

6

3 10

NOTA: Las dimensiones son referenciales y susceptibles a variaciones durante la ejecución de la obra. GUILLERMO DEVIA LOPEZ arquitectura y construccion

viga canal

10

Deposito

11

16

15

14

+.40

1

2

3

Dormitorio 1

4

5

6

7

8

9

10

17

+.40

9

5

6

4

3

2

2

1

13

12

1

20

19

Telefono medidores IH

Dpto 101 (B) 55 m2

losa de H.A

+15.40

G

RECEPCION +3.40

IH G

G

18

17

G

16

15

14

Dpto 102 (B2) 44 m2

13

12

11

Dpto 103 (B2) 44 m2

viga canal

viga canal losa de H.A

G

+15.40

G

Dpto:107 (A) 92,5 m2

Tanque Elevado

Dpto 106 (C) 90 m2

+.40

celocia

(ventilacion natural)

G

G

Dpto 105 (C) 90 m2

Dpto 104 (C) 90 m2

losa de H.A losa de H.A

+0.0

SALON COMUN 36m2

celocia

(ventilacion natural)

NIVEL DE ACERA

Jardinera (no accesible)

viga canal

Viga canal de H.A

AREA JARDIN COMUN 180m2

UBICACION: ZONA: NORTE UV. 16 MANZANA 62 CALLE MARAYAU

PROYECTO:

LAMINA

CONTENIDO:

CONDOMINIO MARAYAÚ

NIVEL 5 CUBIERTA ESC. 1:150

66



Research: Abstract of Master Tesis Theory and Practice of Architecture.

Title: Life in The Public Space Through The Mat-Building Maria Victoria Devia Nuño Official Master Degree: Theory and Practice of Architecture Department of Architectural Design Line of research: Architecture in Mass Society Tutors: Eduard Bru, Aquiles Gonzalez and Xavier Llobet UPC-2013 Keywords: Mat Building, Public Space, Mobility, Human Scale. Abstract. Start with Public Space analysis through a single optic Is in a sense complex. The definition involves a number of facts that could address the study: from historical approaches, topographical, economic, social, artistic and environmental just to identify some. There are situations that, by definition, are applied to public spaces as universal codes of use. But what happens when we think these spaces through the way of how they are perceived during a journey? Probably individual experience will be influenced by others behavior, the people may sit on steps, lie on the floor and have a coffee... among many other activities. From this, I would like to think about mobility, starting with the reinterpretation of the concept definition of “Mat-Building” proposed by Alison Smithson (1974) in order to recognize action strategies in the relationship of the individual user, the architecture and place. It is also interesting to think about the reasons of how cities can be recognized through unique components, and how these elements can simultaneously determine the perception of each one. Through this thesis I intend to make the analysis of interventions in public space using the Scale as an tool to explore from the micro towards the macro, recognizing the continuous relationship between the building and the site, the site and the city: urban and human scale. finding the link established during the design process. The work is carried out by an exercise of sharing knowledge and analysis criteria. Dynamic contrast based on the proposed design of Raul Jimenez, a senior student of the School of Architecture ETSAB with the theoretical approach that is developed in the following pages. The thesis is divided into three parts, the first chapter sets APPROACH TOOLS previous definitions and criteria for analysis where we will define concepts to use and to understand how each action is applied on each public space. In the next section, Chapter 2, SCALES OF ACTION is a comparative analysis of the three proposals cities: Barcelona, Berlin and Cairo. The relationships with the concepts previously defined to allow assessment of the performances at different scales. And finally, in the last section CONCLUSIONS Chapter 3 presents a synthesis of research and work outcome. In Annex file, are the student project sheets and supporting data information concerning the three cities.

URIhttp://hdl.handle.net/2099.1/20505

49



LIST OF PROJECTS

Category

Project name + Type

[PC] KALAMARĂ? housing 2013. Santa Cruz de la Sierra Bolivia 1560m2 G.Devia empresa constructora Guillermo Devia + MVDN

Date. Location Custumer Architects


Maria Victoria Devia - 2019

DM

1200mm 3400mm

F

2700mm

W-01

1700mm

G

1

Net Area: 65,346 sq mG Gr. Area: 65,346 sq m

2868

Sht-1

1.2ml

1100mm

7 8

Suelo de Parquet Natural

1 2

10 12

OPCIÓN 4 2868

2001mm

[S] Multifamiliar Anglaril. Housing 2012, Santa Cruz de la Sierra, Bolivia MVDEVIA

BC3A BC3B

AX4A AX4B

K/F

SK

ST

G

G

K

NOTA: Los dibujos, planos e imágenes representados en el presente documento no pueden ser reproducidos ni ejecutados sin la autorización del autor y forman parte de una propuesta de diseño.

[P] TALLBOHOV Järfälla Kommun. Housing-Markanvisning 2018. Järfälla, Sweden Nyhem Projektutvekling + Link Arkitektur

ST

G G G

G G G

G

G

G

F

bcn.27.11.12

7

[S] Reforma Vivienda Barceloneta. Housing - Renovation 2013Barcelona, España. Sup. 40m2 MVDEVIA

Werner Claassen

[EP] Kalamari, Apartments House. Housing 2012, Santa Cruz de la Sierra, Bolivia MVDEVIA + GDEVIA

K/F

3ROK-DPL

G

ST

ST

K/F

K/F

G G

11

6

CLIENTE:

[P] Apartment Types for NyhemByggsystem. Housing 2018, Sweden MVDEVIA + NYHEMBOSTAD G

G

3 1

2.7ml

2868

1100mm

871mm

W-01

1400mm 830mm

falso techo de Pladur para esconder dúctos de aire central y ducto Extractor de Aire

9

4587mm

TT

3ROK-DPL

ST

Barceloneta

Nueva carpintería Aluminio

12

Mesón y Salpicadero de Inox Cajones y muebles de madera

2

2075mm G

1/4 UBICACIóN:

Tabique de Pladur. Acabado Blanco

11

nueva instalación eléctrica

8

1.8ml

G

Paredes Existentes: Rascado y sin textura. Color Blanco

10

falso techo de Pladur para esconder dúctos de aire central

1200mm

2.2ml

0.6ml

12.2ml

4250mm

1200mm

9

Puerta Corrediza

4

2

2500mm

1412mm

3.6ml

D-1

1850mm

K 4250mm

Vigas de Madera Barnizadas

3

Reforma piso barceloneta

2400mm

615mm

W-01

W-01

Ladrillo visto de origen con capa de barniz mate

2

6

OPCIÓN 1

1100mm

[EP] Jakobsdalvagen 23. Interior 2018Nacka, Sweden MVDEVIA

1

5

OPCIÓN 2

2541mm

8.5ml

500mm

OPCIÓN 3

337mm

W-01

1141mm

W-01

W-01

[EP] Marayaú, Housing 2015, Santa Cruz de la Sierra, Bolivia MVDEVIA

SITUACIÓN ACTUAL

[P] Typology Collection Houses for Modular construction system . Housing 2018-Sweden-MVDEVIA + NYHEM

ST

L

G

DM

1ROK-A1

K/F

G

G

ST

L

G

2ROK-A2

G

DM

K/F

ST

G G

G

G

G

G

K/F

G

3ROK-B

Apartments 3D

2ROK-B2 2ROK-B3

181030

2ROK-B3

[P] Project

[P] Inspiration-Markanvisning Norrtälje. Housing-Markanvisning 2017. Sweden NyhemBostad AB

[P] Urubó House. Housing2012 Santa Cruz de la Sierra, Bolivia 150m2 MVDEVIA

[P] Kuttern, Apartments House. Housing 2016-2019 Gävle, Sweden NyhemBostad AB

[EP] Stairs Kalamari. Interior 2012, Santa Cruz de la Sierra, Bolivia -10-MVDEVIA

[S] The Serie House. Housing 2016. Sweden MVDEVIA

[P]R SWEENY Art Gallery Store Gallery Store / Academic work 2011Barcelona, Es MVDEVIA

[P] Modular Construction House System. Housing, 2016, Sweden NyhemBostad AB

[S] Fundación CIDEP . Offices 2011, Santa Cruz de la Sierra, Bolivia MVDEVIA + GMASC-Direccion de proyectos

[EP] Nybygget. Prototype + Showroom 2015,China - SwedenMVDEVIA + NYHEM

[EP] Baru, Apartments House. Housing 2011Santa Cruz de la Sierra, Bolivia Sup. 1744m2 MVDEVIA + GDEVIA

[EP] Executed

[C] Competition 52

[S] Sketch Idea


13. Summary [C] FWC. Wellnes Spa. Commercial 2015Italy Sandra Herrera & MVDN

[EP] Pop Up Store “Eva” Interior Commerce 2011Barcelona, Es Team: Grupo Interiorismo comercial ARTIDI BARCELONA

[P] Vivienda Container. Housing-Experimental 2011, Barcelona, Es MVDEVIA

[S] FCBC. Offices 2009, Santa Cruz de la Sierra, Bolivia *Colaboración Despacho FDC&R

[EP] Reforma Apartamento Auad. Interior, Renovation2011Sao Paulo, Brasil Sup. 110m2MVDEVIA

[P] Casa Sucre, Propossal for new use. Hotel - Commerce 2009 Santa Cruz de la Sierra, BoL. *Colaboración Despacho FDC&R + Cinthia Gimenez

[P] Cifo santa coloma. Housing 2011Barcelona, España 254m2 MVDEVIA

[P] COTAS. Offices 2008 9700m2 FDC&R

[P] Library Rubik. Interior Commerce 2011, Barcelona, España 200m2 MVDEVIA

[EP] Master Plan CEA, Environmental Education Center. Master Plan, Landscape 2008-Santa Cruz. Bolivia 10000m2 FDC&R

[EP] Pabellón YPFB Feria FEXPOCRUZ. Commercial 2010Santa Cruz. Bolivia Sup. 480m2 Gabriel García y MVDN Construction: G. Garcia &MVDN

[EP] Panorama. Housing 2008Santa Cruz. Bolivia Sup.2799m2 MVDEVIA

[EP] Arredondo House. House 2009, Santa Cruz. Bolivia Sup. 220m2 *Colaboración Despacho FDC&R

[EP]Ampliacion de Archivo CHACO SA. Offices 2008. Santa Cruz de la Sierra Bolivia Guillermo Devia + MVDN

[EP] Condominio San Andres. Housing 2005, SC. Bolivia MVDEVIA + G.Devia

[C] Expocasa, Concurso Objeto lumínico. Lighting - Art 2008Santa Cruz de la Sierra, Bol. Team: Nataly Dorado y MVDN

[EP] Stand YPFB Feria Expochaco. Commercial 2009Yacuiba, Bolivia Sup.: 50m2 Gabriel García y MVDN Construction: G. Garcia &MVDN”

[P] Office of Public Projects Selected works. 2007. Santa Cruz. Bolivia GMASC

53


Maria Victoria Devia - 2019

[P] Project

[EP] Stand YPFB ExpoSur. Exhibition 2009, Tarija, Bolivia Sup.: 45m2 Team: N.Dorado y MVDN

[P] Centro de salud. Health 2007Santa Cruz de la Sierra, Bolivia MVDEVIA + GMASC-Direccion de proyectos

[EP] Stand Jindal Feria de Puerto Suarez. Exhibition 2009Puerto Suarez, Bolivia Sup.: 50m2 Equipo de diseño: N. Dorado y MVDN

[P] Boulevard peatonal Av. Grigota. Public Space 2007. Santa Cruz de la Sierra, Bolivia MVDEVIA + GMASC-Direccion de proyectos

[C] Iglesia Cristiana – ex cine florida. Rehabilitation 2007. Santa Cruz de la Sierra, Bolivia MVDEVIA

[C] Concurso Sede de justicia Sucre. Offices 2005 Santa Cruz de la Sierra, Bolivia Equipo de diseño:Gina Arnez y Lilian Roig. Colaboradores: Sandra Herrea y Maria Victoria Devia

[P] Subalcaldia. Offices + Public Equipment 2007 Santa Cruz de la Sierra, Bolivia MVDEVIA + GMASC-Direccion de proyectos

[C] Concurso Alcaldía de La Paz. Offices 2005La Paz, Bolivia *Equipo Despacho Zona-C

[P] Centro Polivalente. Sports-Art 2007. Santa Cruz de la Sierra, Bolivia Team: Direccion de Planificacion

[S] Viviendas Pareadas. Housing 2005. Santa Cruz de la Sierra Bolivia 120m2 MVDEVIA

[C] Stadium Ramón Tahuchi Aguilera . Commercial-Sports 2007. Santa Cruz de la Sierra, Bolivia Equipo de diseño: Alberto Menacho, Hebert Vargas,Nataly Dorado y Maria Victoria Devia

[C] Church Equipetrol. Commercial 2005. Santa Cruz de la Sierra, Bolivia Hebert Vargas, Erika Tsukayama y Maria Victoria Devia”

[P] Vivienda Unifamiliar. House 2006Santa Cruz. Bolivia -220m2MVDEVIA

[C] Concurso Vivienda Unifamiliar. House 2004 Santa Cruz de la Sierra, Bolivia Team: Alberto Menacho, Andrea Vargas, Sandra Herrea y Maria Victoria Devia

[P] Centro de Educación Agro-Industrial CIA Offices 2006 Proyecto Final de Carrera, UPSA MVDEVIA

[EP] Unidad Educativa Rep. de Colombia. Education 2003, Santa Cruz de la Sierra Bolivia MVDEVIA

[EP] Vivienda Iraola. 2006 289m2 Collab Despacho Zona – C

[S] Vivienda sobre rieles, Workshop . Academic 2003 Buenos Aires, Argentina MVDN

[EP] Executed

[C] Competition 54

[S] Sketch Idea


13. Summary [S] Ascensor Alianza Francesa. Interior 2006. Bol.-4m2 MVDEVIA

[EP] Oficinas y Almacenes Norte CHACO SA. Offices 2002 Santa Cruz de la Sierra Bolivia Guillermo Devia + MVDN

[C] Petrobras Headquarters. Offices 2005 Santa Cruz de la Sierra, Bolivia 9500m2 W. Alborta, Gabriel Garcia, Erika Tsukayama, Fredy Saucedo, Hebert Vargas & Maria Devia

[C] Bus Central Station. Commercial 2003Camiri, Bol. Collab Despacho Zona – C

[EP] Stand Interior FEXPOCRUZ. Exhibition2005Santa Cruz. Bolivia 9m2 MVDEVIA

[C] International Competition for Arch. students “Vivienda e Identidad Cultural”. Academic Competition 2001Sao Paulo, Brasil Team: Alvaro Mamani, Yasmin Gutierrez y Maria Victoria Devia

55


Maria Victoria Devia - 2019

Arkitekt A. MSA

e-mail / victoriadevia@gmail.com Tel / +46 0736349985

EDUCATION

2012-2013 Master Degree “Theory and practice of architectural design” ETSAB, Escuela Técnica Superior de Arquitectura de Barcelona, Spain 2000-2006 Architect and Urbanism Degree. UPSA. Universidad Privada de Santa Cruz, Santa Cruz de la Sierra, Bolivia 1999 Woodrow Wilson High School Tacoma, Washington USA

WORKING EXPERIENCE

2008 - Present MVDevia. Barcelona, Spain.— Architect Director Architect designer. Collaborate with other architects 2015 - 2019 Nyhembostad AB, Stockholm — Architect Director Designing Housing projects, running detailed planning processes. Design solutions in the company’s own developed building system. Technical coordination with manufacturers in China 2008 - 2010 Luis Fernández de Córdova Studio, Santa Cruz. Bolivia Architect Assistant designer Workspaces, offices, house, Housing and master plans. Make project briefs interpretation Develop proposal for project design CAD Assistance BIM / Vector works Coordinate meetings with other professional involved in the project 2007 - 2008 Urban office Gob. city of Santa Cruz, Bolivia Architect Assistant designer Coordination in large scale projects at start stage 2004 - 2007 Zona-C, Studio. Santa Cruz de la Sierra, Bolivia Architect Assistant designer Make briefs. Design an assistances in final projects (house, housing, master plans) Graphic design assistance, printing and exhibition design Construction supervisor, drawing as built plans.

CONTINUING PROFESSIONAL EDUCATION 2010-2011 IED Instituto Europeo de Diseño 120h Barcelona, Spain Contemporary Interior Design 2011-2011 CIFO-Santa Coloma 654h -Barcelona, Spain Plotting for construction projects Acad LT / Revit 2011-2012 ARTIDI Escuela de Arte y Escaparatismo. Barcelona, Spain

Interior Design, Visual y Retail Design. 56


Curriculum Vitae

HONORS & AWARDS 2010 Honour mention Biennal de Arquitectura de Santa Cruz 2010 Project: Headquarters COTAS (telecommunications company) 2010 Palmera Dorada best Interior Design Pavilion. Feria Internacional de Santa Cruz. Project : Pabellón YPFB 2008 2 place Bienal de Santa Cruz 2008 Project: RENOVACION ESTADIO RAMON TAHUCHI 2008 1er place Contest Headquarters “Cotas” telecommunications company 2003 1er Place House Design Urb. Villa Bonita, consorcio del Urubo 2001 1 place Concurso Estudiantil “Vivienda e Identidad Cultural” XIX CLEFA Faculdad de Arquitectura e Urbanismo de la Universidad Presbiteriana Mack enzie. Sao Paulo. Brasil

EXHIBITIONS & PUBLICATIONS 2006 2006 2003

“URBANO” exposición artística colectiva. Categoría: Instalación conceptual “personajes” Galería Joyería Anahí -Santa Cruz-Bolivia “PENSAR CIUDAD” exposición colectiva de trabajos de finales de grado. Categoría: Instalación -Santa Cruz-Bolivia Workshop UPSA-Universidad de Palermo “Temporari housing” Buenos Aires -Argentina.

Revista Escala” Los concursos de arqutiectura Tomo XV Vol 169 (2001) “Concurso Conjunto Habitacional San Aurelio Project: concurso Conjunto Habitacional San Aurelio. Revista Esquicio UPSA , (2007) p 5-10 “Concurso Conjunto Habitacional San Aurelio” Project: Conjunto Habitacional San Aurelio Boletín Nº 15 Colegio de Arquitectos de Santa Cruz, Santa Cruz ¬Bolivia (2007) Project: Estadio Ramón Tahuchi Aguilera Boletín Nº10 Colegio de Arquitectos de Santa Cruz, Santa Cruz Bolivia (2008) Project: Edificio Administrativo COTAS

COMPUTER SKILLS

Archicad, Vector Works, Autocad SketchUp Adobe Creative suite (InDesign, Illustrator, Photoshop) Office (Word, Excell, Power Point)

57


Maria Victoria Devia - 2019

Reference Letter

58


Reference Letter

59


Maria Victoria Devia - 2019

60


Na Lourdes Mallarach Farrés, amb DNI 900016222T, arquitecta, col·legiada al COAC (Col·legi d’Arquitectes de Ctalaunya) amb núm. 22438/3, experta de formació ocupacional al CIFO (Centre d’Innovació i Formació Ocupacional) Santa Coloma, de penent del SOC (Servei d’Ocupació de Catalunya), Certifico: Que na Maria Victòria Devia Nuño, amb NIE Y1450074F, va ser alumne meva al curs de CP Representació de Projectes de l’Edificació de 654 hores de durada, durant l’any 2011. Que les unitats formatives del curs són: MÒDUL 1 MF0638_3 Representacions de construcció (190 hores) UF1 UF0306 Anàlisis dades i representació plànols UF2 UF0307 Representació gràfica i maquetisme UF3 UF0308 Reproducció i arxiu de documents MÒDUL 2 MF0339_3 Anàlisi i desenvolupament de projectes d’edificació (200 hores) UF1 UF0309 Anàlisis de projectes de construcció UF2 UF0310 Desenvolupament de projectes d’edificació UF3 UF0311 Desenvolupament d’elements estructurals de projectes d’edificació MÒDUL 3 MF0640_3 Instal·lacions d’edificació (90 hores) MÒDUL MP0073 Pràctiques professionals no laborals (120 hores) MÒDULS complementaris (54 hores) Prevenció de Riscos Laborals Inserció Laboral Sensibilització Mediambiental Que el 75% de les hores cursades són pràctiques usant els programes informàtics de dibuix en 2D i 3D: Autocad 2011 i Revit 2011, i programa d’amidaments i pressupostos TCQ 2000. Que l’alumne va assolir la qualificació d’Apte, superant sobradament els objectius marcats pel curs, gràcies a la seva aptitud i actitud sempre positiva, el seu interès, es mostrà participativa i col·laborant envers els seus companys, les seves habilitats socials i qualitats personals fan possible que assoleixi els objectius que es proposi. Per al que us pugui interesar, signo a Barcelona data 16 de desembre de 2013

Lourdes Mallarach Farrés, arquitecta

Lourdes Mallarach Farrés, arquitecta

61




MARIA VICTORIA DEVIA victoriadevia@gmail.com www.mvdevia.com

+46 0736349985 Jakobsdalvägen 23 - (13152) Nackastrand Stockholm, Sweden


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.