MMM Corones, the last Messner Mountain Museum by Zaha Hadid Architects.
Stahlbau PICHLER was responsible for installation of the 382 fiber cement panels with 28.000 metal parts (laser location search: 2700 points), Glass parts: 25 glasses + 2 curved glasses = 7,0 ton; technical drawings: 4600 files and more than 3.500 engineering hours