Portomaso Tower DeMicoli & Associates
St. Julian´s (Malta)
Steel Structures: 1300 t
2018
Facades: 2500 m2
Dimensions:
floor plan = ca. 40 x 20 meter, height = 46 meter
Key facts: 1200 linear meters of parapet / stainless steel net handrail 6000 square meters of sheet metal 1300 ton steel 2500 square meters of facades 2370 square meters of composite material coating 130 pcs “Unique” stainless steel cruises for downspouts 1285 linear meters of electro-polished stainless steel down pipes 12,5 ton heaviest beam 13,5 m longest beam 14850 bolts for connecting the structure Timeline Start and end of the project: 07.2017 - 09.2018
© DeMicoli & Associates
Engineering - steel structures
A “skyscraper� in steel is a challange for every structural engineer
Devid Rachelli Structural Engineer
Engineering - facades
This building was made for us: steel structures and facades!
Gerhard Mitterer Tecnical office
G
F
D
E
B
C
ROOF
AREA FOR SERVICES SCREENED BY A NON SOLID WALL
Level 11
Level 10
Level 9
Level 8 5 2
Level 7
4 FIRE ESCAPE STAIRS
3
Level 6
1 Level 5
Level 4
Level 3
Level 2 EXISTING COLUMNS TO BE REMOVED
PROPOSED PROFILE
Level 1
FIRE ESCAPE STAIRS AREA FOR SERVICES SCREENED BY A NON SOLID WALL
OFFICES CLASS 4A
FIRE ESCAPE STAIRS
OFFICES CLASS 4A
6 OFFICES CLASS 4A
OFFICES CLASS 4A
OFFICES CLASS 4A
OFFICES CLASS 4A
OFFICES CLASS 4A
OFFICES CLASS 4A
2
OFFICES CLASS 4A
3 OFFICES CLASS 4A
4 OFFICES CLASS 4A
MAJOR ALTERATIONS TO EXISTING CAFETERIA CLASS 4D
EXISTING PUBLIC ACCESS TO TRIQ IL-KNISJA
ARKADIA
FOODSTORE
On site
The construction site was spectacular like the building
Daniele Wegher Site Manager
On site
Perfect project management was needed for this highrise steel building
Gianfranco Piccolin Project Manager
New market, new challange - great satisfaction
Luca Benetti Head of Sales & Projects
©David Schreyer
With this “cruise ship“ we will conquer new international markets!
Daniele Maio Managing Director
©David Schreyer
www.pichler.pro