Seilbahn Zugspitze Hasenauer Architekten Baucon ZT Garmisch-Partenkirchen
Steel Structures: 120 ton + 1100 ton
2018
Facades: 2400 sq.m. + 6500 sq.m.
Keyfacts lower station Y-Pillar Steel structures for cover Other substructure
ca. 26 ton ca. 80 ton ca. 9 ton
Transom-Mullion-Façade: Interior glazing: Fire protection Doors/Windows: Sheet metal lining
ca. 1100 sq.m. ca. 150 sq.m. ca. 140 sq.m. ca. 1000 sq.m.
Timeline Engineering and construction time: 06.2015 - 06.2018 Special facts in 2017 180 days with snow 490 cm of snow 20. april -27,2 degrees at 06. january 180 km/h maximum wind force 11. dicember 48 days a year with gale-force gusts (>104 km/h)
©Visualisierungen Berg- und Talstation BZB-Hasenauer Architekten
Keyfacts upper station Steel structure north midsection (installed on active track) ca. 240 ton exterior sections ca. 450 ton Steel structure south A-Pillar ca. 250 ton Stairs ca. 70 ton Transom-Mullion-Façade Glass roof Fire protection Doors/Windows Sheet metal lining
ca. 2100 sq.m. ca. 90 sq.m. ca. 270 sq.m. ca. 3900 sq.m.
Lower station Technical drawings
Our top project 2018. Let’s get some more of this kind.
Thomas Rossetto Project Manager Detail H35
Detail H37
Grundriss E0 1´´´´
4´
2
3´
Pos. 01 10 A 5
J
6
Pos. 01 10 A
7
I
Pos. 01 10 A
Pos. 01 10 B
8
9´
Pos. 02 10 B
J
I
H
Pos. 01 10 B
G
H
Pos. 04 30 D
Pos. 02 10 C Pos. 02 10 A
A´
A´ Pos. 02 10 G
8
9´
Pos. 02 20 E G
B
B
5
Pos. 02 10 D
6
7
C
C
Pos. 02 10 F
D
D
Pos. 02 10 E
E
E
Pos. 02 20 D
F
F Pos. 02 20 C
Pos. 02 20 A
Pos. 02 21 A
4´
MP
3´
MST
2
MAS
HP1
1´´´´
HP2
Pos. 02 20 B
31
Detail H36
Pos. 10 10 A
FREIGABE - APPROVAZIONE STATUS STATO
DATUM DATA
FREIGABE OHNE ANMERKUNGEN APPROVATO SENZA NOTE FREIGABE MIT ANMERKUNGEN APPROVATO CON NOTE NEUVORLAGE ERFORDERLICH RIEMETTERE
A B C
ÜBERSICHTSPLAN - INQUADRAMENTO
+14.284
+13.777
Alupaneel
Alupaneel
Alupaneel Alupaneel Alupaneel
Alupaneel Alupaneel
Alupaneel
Achse
GT-E
+10.700
Achse
Anmerkungen lt. Bauphysik eingetragen! Änderungen lt. Freigabe vom 30.08.2016 eingetragen! Änderungen lt.+9.890 Freigabe vom 11.08.2016 eingetragen! GT-E Achse 1758x2401 Erstausgabe
DATUM - DATA
INDEX - INDEX
Achse
1955x1701
20/10/2016 26/09/016 26/08/2016 GT-E 1442x2162 25/07/2016
Alupaneel
0C 0B 0A 00
GT-E
+11.180
1105x566
Alupaneel GT-E
1105x780
GT-E
1220x736
Alupaneel
Achse
1220x2930
GT-E
2325 NC/wn INTERNE KONTROLLE CONTROLLO INTERNO
ABTEILUNG REPARTO
TB ST PL MASSSTAB SCALA ANSICHT
+5.900
UNTERSCHRIFT FIRMA
Market H. Hofer M. Treibenreif H. 1:2
BAUHERR
1570x1295
Alupaneel
Alupaneel
GT-E
1220x1475
GT-E
1105x1620
GT-E
1120x2527
GT-E
Alupaneel
GT-E
GT-E
1953x2880
GT-E
963x2840
Alupaneel
1120x1750
GT-E
1953x2880
GT-E
1267x2715
1955x2371
GT-E
1220x2930
GT-E
792x2755
GT-E
1267x1750
GT-E
963x1750
GT-E
522x2755
+8.870
792x1945
STAHLBAU PICHLER GMBH/SRL - 39100 BOZEN/BOLZANO - VIA EDISON-STRASSE 15, Tel.0471/065000 - Fax 0471/065001 - E-MAIL: info@stahlbaupichler.com
ZEICHNER DISEGNATORE
GT-E
1570x954
GT-E
565x1945
AUFTRAGSNR. NR°COMMESSA
GT-E
NAME - NOME
BENENNUNG ÄNDERUNG - DENOMINAZIONE MODIFICA
+8.870
Alupaneel
Alupaneel
NC/wn NC/wn NC/wn NC/wn
GT-E
+8.920
Alupaneel
Alupaneel
+11.170
Alupaneel
Alupaneel
+11.707
Alupaneel
+7.690
+7.690
COMMITTENTE
+7.200
Bayerische Zugspitzbahn Bergbahn AG BAUSTELLE
CANTIERE +6.300
Zugspitzbahn Fassade Tal BENENNUNG
Pos. 10 10 B
DESCRIZIONE
Pos. 10 10 D Pos. 10 10 C
H-Details zu Plan 2325-1000/1001/1002
Grundriss E0/E-1/E+1 H30 bis H37 ZEICHNUNGSNUMMER
NUMERO DISEGNO
2325 F
01
P 4003 0C
FREIGABE - APPROVAZIONE STATUS STATO
ÜBERSICHTSPLAN - INQUADRAMENTO
A B C
FREIGABE OHNE ANMERKUNGEN APPROVATO SENZA NOTE FREIGABE MIT ANMERKUNGEN APPROVATO CON NOTE NEUVORLAGE ERFORDERLICH RIEMETTERE
DATUM DATA
Lower station On site
Upper station Technical drawings
I’m proud to have contributed substanstially to this project.
Klaus Kreuzer Structural Engineer
Upper station On site
This project was special from the very beginning until the end.
Michael Istenich Technical Sales
© Vetrotech Saint-Gobain, Fotograf Christoph Seelbach
www.pichler.pro