RHYTHM NAHAR
P RTF LIO
INTERIOR DESIGN
2022-2024
Rhythm Nahar Connect with me: naaharrhythm@gmail.com www.linkedin.com/in/rhythm-nahar24834419a artandwords_by_r +91-7974964183
About Me I am currently pursuing my masters in interior designing from Unitedworld Institure Of Design (2022-2024). I believe taking down ones imagination, creativity and thinking process onto a paper or nowadays softwares creates our own versions of designs. And as an aspiring design student and future professional, I would like to make people understand this unspoken language. Through design language, connecting people with their five senses would be a goal for me, so that they can experience the unspoken.
Education Unitedworld Institure Of Design Masters in Interior Design July 2022- May 2024 Institute Of Management Studies Bachelors In Business Administratioin ( E- Commerce) July 2018- June 2021 St. Raphael’s H.S. Girls School Sr. Secondary- Commerce with Maths 2016-2018
Experience Head Of Operations- Nahar Hosiery June 2020- April 2022 Digital Marketing Intern- Feedbox November 2019- December 2019 Teacher- The Genius School March 2019- May 2019 Volunteering- National Service Scheme, Indore June 2016- May 2018
Achievements
Software Skills
Part of PRAXIS 4.0 Logo installation team- 2022
Autodesk Autocad 2D
Part of the making of Cannon workshop featured at PRAXIS 4.0
Sketchup 3D
Team-work of Shape Grammer displayed in the Ahmedabad Design Week at Karnavati University
V-ray
Key Member in organizing comittee of Annual Sports Fest In College (2018-2019) Felicitated twice as Best Parade Commander in school (2018/2017)
Soft Skills
1
1
1
2
3
4
5
2
3
4
5
2
3
4
5
Adobe Photoshop 1
2
3
4
Adobe Illustrator 1
2
3
4
5
3
4
5
3
4
5
Adobe Indesign 1
2
Rhino 1
2
Team Work Leadership Communication Organized Creative thinking
5
Languages Hindi English
C O N T E NT
01
Neutral Curves Corporate Office
02
Stone Age 2.0 Residential
03
Wall Of Metal Society & Furniture
04
Technical Drawings Ceiling & Electrical
05
Additional Display Praxis 4.0- Team work
01
Neutral Curves Corporate Office
Location: Pune, Maharashtra Area: 269.9 sq meters Client: Automobile Design Startup Brief: The concept was to create a friendly working environment for the employees while introducing abstract curves to the space to remove the typical rigidity. The space was enhanced with a hint of Eclectic theme combined with Neutral tones for walls and floors.
eclectic
neutral Mood Board
3
2
4
5
1. Reception 2. Cabin 1 3. Cabin 2 4. Workspace 5. Storage 6. W/C
3
4
2
5
Plan
6
1
6 1
N
Color Board
Exploded Isometric
Reception
Cabin
Workspace
Workspace- Wide View
Reception Plan
Backdrop Curves- wood and lights
02
Stone Age 2.0 Residential
Brief:
6
4 1. Theatre 2. Kitchen
2
3. Living room 4. Laundry 5. Dining 6. Activity Room 7. Bedroom 8. Bathrooms
1
7
Plan
9. Balcony N
Merging 2 Interior styles- Industrial and Modern Theme together to create a residence for a 23 year old student. Neutral tones with Wooden furniture and stone walls was what she found most connected to. From welcoming guests to spending her personal time and persuing her hobbies, the home has it all. The plan consists of Living room to engage with guests, Going through a hidden door to the theatre room with connecting balcony, Dining and Kitchen, Activity room with 2 spaces, Painting area and Gaming area, Guest bathroom, Master bedroom and attached dressing and toilet, and into this space, a Study area embracing the rays of the sun through fixed windows.
5
3 8
9
1. Theatre
Color Board
2. Kitchen 5
6
3. Living room
4
2
4. Dining 5. Activity room 6. Bedroom 7. Bathroom 8. Balcony
7
3 1 8
Plywood- Furniture Concrete Wall
Material Board
Stone Cladding
Wooden Flooring
Zig-Zag Wooden Floor Sofa Upholstery
Living room
Kitchen
Bedroom
Activity room
Low Level Sofa Seating
Tall Unit Screen
Theatre Concept
Hidden Door
Low Level Sofa Seating
Sliding Door To Balcony
Living Room Unit- Hidden door to Theatre
03
Wall Of Metal Society & Furniture
Brief: This is an Outer Covering of a Dustbin. In connection to Urban Society and Furniture. Inspecting the site- Bus Terminal, to identify the problems in context with environment, hygiene, furniture, etc.. Various problems like littering, cleaning issues, locations and placement of dustbins were found. For the solution, building a wall- like structure around a circumscribed bin was finalised.
Scale: 1:5 Measurements (in mm) (original): H 1300, h 1100 W 1650, Dist. b/w 2 Points 1100 Material: Sheet Metal Thickness: 1 mm Shape exploration: Icosahederon
Final Product (without circumscribed bin)
3D Models
3D- ISO View
Top View
Autocad Drawings
1300 mm
1100 mm
Inspired from the Platonic Solid- Icosahederon, and keeping in mind the purpose, experimenting with the dimensions, the final shape was thus formed. Process: - Exploring Solid - Finalising Dimensions - Making 2D and 3D - Finalising Material - Material Procurement - Laser Cutting - Bending and Welding - Grinding Rough Surfaces
1650 mm Front View
Top View
3D- ISO View
04
Technical Drawings Ceiling & Electrical
A
LVL -200 LVL -200
LVL -450
Surface light
LVL -200
Gypsum Ceiling POP Ceiling
LVL -450
Bracket Light
A'
A
LVL -200
A' Ceiling Plan
Ceiling Section
Electrical Layout
Floor Plan
SYMBOL
DESCRIPTION
1
1 WAY WIRING
2
SWITCH BOARD
3
AIR CONDITIONING
4
CEILING LIGHT
5
BRACKET LIGHT POINT
Electrical Legend
SR. NO
Ceiling 3D
LEGEND
06
Additional Display Praxis 4.0- Team work
CANNON Brief: Workshop conducted by the university’s professors who’ve done remarkable in their fields, and 6 students from Interior Department working on “The Cannon”. Laying wooden stripes parellel to each other on the inner structure. Allowing bending and twisting these stripes to create the curves was the main goal while understanding material and geometry.
The Process
Final Product
T H E P R O C E S S
PRAXIS 4.0 LOGO Brief: The Exhibition of the interior design department in the university, every year, “Praxis” is conducted for the students to display their works, installation, etc. 8 students worked along with the guiding faculty to successfully create the logo of the year 2022, for “PRAXIS 4.0”. The students were involved in the process of planning, drawing, material cutting, pasting, drilling, grinding, sanding, painting and finally polishing.
S N I P P E T S
Final Product
+91-7974964183
RHYTHM NAHAR naaharrhythm@gmail.com