Bachelor Degree_Architecture Porfolio

Page 1

POR T FO L IO

NAAVEN RAO


ASSISTANT ARCHITECT

I’m a friendly person, I’m honest & punctual, I work well in a team but also on my own as I like to set myself goals which I will achieve, I have good listening and communication skills. I have a creative mind and

TABLE OF CONTENT

am always up for new challenges. I am well organized and always plan ahead to make sure I manage my time well.

No.9, Solok Setia 2a, Taman Setia, 41200 Klang, Selangor D.E, Malaysia

21

During the period of 3 months as intern here I was tasked to in various task thats exposed that is more into the job scope of an assistant architect. During this time also I have joined the competition Home Concept 2030.

UCSI University Bachelor of Science (Hons) in Architecture Alfa International College Diploma in Architecture

• Creating 3D SkechUp modal of retreat house. • Making a whole set of tender drawings.

Sekolah Kebangsaan Bukit Rimau Standard 1 - Standard 6 (UPSR)

D E S I G N

S K I L L S

01

BAJAU RE-COLLECTION CENTER

02 THE 2ND COMING

• Involved in Home Concept 2030 from design up till submission. • Site visit and site measure and site inspection with supervisor.

Sekolah Menengah Kebagsaan Kota Kemuning Form 1- Form 5 (SPM)

ACADEMIC WORK

Worked as an Intern at KKNG Architect, Petaling Jaya

8

Worked as an Intern at Liz Thomas Architect, Klang During the period of 3 months as intern here I was tasked to mainly only help assistant architect in both 2D and 3D related work which required less supervsion. • Creating door and window schedule in accordance to the given plan. • Site visit and site measure. • Ammending 3D modal in SkechUp • Creating a soft copy of guard house from the given refrence,.

L E A D E R S H I P 2021 - GRADUATION EXHIBITION MEMBER 2017-18 - ASSISTANT SECRETARY IN ALFA SPOKEN LANGUAGE - ENGLISH, BAHASA MELAYU

https://issuu.com/naavenr?issuu_product=header&issuu_subproduct=publisher-home&issuu_context=link&issuu_cta=profile

MISCELLANEOUS 03 INTERNSHIP - KUALA NILAM - BUKIT FRASER - KUALA LIPIS - SEPUTEH HOUSE - HOME CONCEPT 2030


DEGREE - ACADAMIC WORK

01 BAJAU RECOLLECTION CENTER

1


DEGREE - ACADAMIC WORK

2 Year 3 Semester 1 Design Studio 5 The chosen site for this project is located Semporna coastal area, where sea dwellers known as Bajau resides. The Bajau communities are refugees from neighboring country of Philippines. Most the Bajau communities are scattered in groups and live along coastal areas of west Sabah, mostly in Semporna.

recyling center

biofuel

trashes within the settelment

Heat + Temperature + water + biomass product Temperature Catalyst

Algea cultivation

Pressure

The live on wooden stilts taken from mangrove trees that is present along the coastal area. Most the communities doesn’t have proper sewage, and infrastructure system within their settlements. Most the of the younger generations are jobless and illiterate as they are not accepted into public school because of lack of identification card.

solid residue

waste products/ CO2

aqueous crude Biochar + Biofuel + Carbon dioxide + oil water recycable materials that can be sold. algea feeding

medecine

diesel jet oil

carbon materials

Dissection + biofuel pipping to transfer waste to the center

seaweed cultivation

the Bajau community are left in their circle

Mangroove as natural shield

The Lepa collects trashes in the settelment

The conyevor belt show the changes in Bajau community


DEGREE - ACADAMIC WORK

3

Y

MAIN BUILDING

MAIN BRIDGE

BOAT PARK

FEMALE MALE TOILET TOILET EXTERNAL GOODS LIFT (self-support)

Year 3 Semester 1

CONTROL ROOM

Design Studio 5

BOAT PARK

X

The part of my proposal is to create a central space, where they can gain economical advantage, in which it will directly help in many problem the communities have. The part of my proposal is to create a space where their main source of income comes from converting the waste system in the commuites into reusable energy and selling it of energy company.

BOAT PARK

X COMPRESSED RECYCLED STORAGE TRACK

This indirectly cleans their communities while also gaining additional space. Besides that a newer community area and few spaces for cafes and restaurants are built specifically to run by the Bajau people as additional income.

BOAT PARK

The main building is placed along the main bridge connecting the land area and the Bajau communities living above the sea along the coast. Its located in strategic place, where it can be meeting place between tourists and the Bajau people. The building uses mezzanine floor to fits in additional spaces, thus the overall building doesn’t fully overwhelm the surrounding site. Each spaces are then connected with an OKU friendly ramp that goes from ground floor till the top floor.

LOADING AREA

VEHICLE ACCESS

MAIN BRIDGE

GROUND FLOOR SCALE 1:250

Y Y EXTERNAL GOODS LIFT (self-support)

Y MALE TOILET

SERVICE ROOM

MALE TOILET

FEMALE TOILET EXTERNAL GOODS LIFT (self-support)

X X

Y

Y

Y

X X

COMPRESSED RECYCLED STORAGE TRACK

COMMUNITY CENTER

RESTAURENTS

X X

FEMALE TOILET

RESTAURENTS

X ALGEA PRODUCTION

X

X

X

HTL PROCESS SORTING FACILITY

RESTAURENTS

COMPRESSED RECYCLED STORAGE TRACK BIOCHAR AND BIOFUEL STORAGE

Y

1ST FLOOR

1ST MEZZANINE FLOOR

SCALE 1:250

SCALE 1:250

Y

2ND MEZZANINE FLOOR

2ND FLOOR

3RD FLOOR

SCALE 1:250

SCALE 1:250

SCALE 1:250

Y

Y

Y


DEGREE - ACADAMIC WORK

story of the space action

reaction

SORTING FACILTY AND HTL PROCESS The main facilty located above ground represents the important space. The heiracy indicates Bajau is important now.

1 2

ALGEA PRODUCTION, BIOCHAR AND BIOFUEL STORAGE

3

The bi-product of the HTL process are stored here, where gravitinal force used to transport out.

COMPRESSED RECYCLED BLOCK STORAGE

4

Further income can be achived with selling of recycled materials. While also cleans the ocean.

GATHERING POINT Where public, Bajau communities, working class meet together

CAFES AND RESTAURENTS As the bi-product are sold. The Bajau has better income to open their own cafes. Reducing the dependence on ocean enviroment.

5 COMMUNITY CENTER

6

The spaces on the left show where all the storage space are located. This storage spaces equalls income value as they can later be selled to gain profit. This also reduces the waste and trashs that accumulated on site.

As the community have higher income, they have more spare time for themselves. Creating more closed pack communites.

The spaces on the right show the reaction from gaining all the profit. The Bajau can now self-sustain that they could leave activites that would harm the ocean enviroment.

4


DEGREE - ACADAMIC WORK

FORM DEVELOPEMENT 5

Solid block on proposed site

A solid block of cube was first form on the porposed site.

Access to the proposed building is through the main bridge. Allow for direct transit. Fire safety staircases are placed on each side to comply with fire requirements and easy access out and into the building

Void

Void is created. It creates space segreation and creates privacy

The building are the opened up to allow natural ventilaion and views The design also is to create a sense of community with no blockage of wall.

Location of the main space. Away from any other space that would be affected from the sound and heat. Easy transit out of byproduct.

The building are elevated to different height to create space privacy. To separate

Ramp are used as direct acces to the space within the building. It allows for easy transportation of goods to other space that does not require the usage of goods lift.


DEGREE - ACADAMIC WORK

6 DETAIL 5

Year 3 Semester 1

DETAIL 4

Design Studio 5

VERTICAL TRACK ELEVATION SCALE NTS

FLOOR TRACK PLAN SCALE NTS

The detail drawing on the left showing the track system where compressed recycled materials are placed, where they can be easily be transported to lower floor and be pushed to loading bay, to be transported out of the site. The detail drawings below shows typical construction detail of a section. DETAIL DRAWINGS

DETAIL 3 2500

DETAIL 5

5000

ZOOM IN PLAN

DETAIL 3

5000

DETAIL 4

DETAIL 2 2700

ZOOM IN ELEVATION

DETAIL 2 DETAIL 1

PORTION WALL DETAIL SCALE NTS DETAIL 1


DIPLOMA - ACADAMIC WORK

7

OVERLOOKING RECYCLE STORAGE AREA

BIRD'S EYE VIEW

For full indepth detail of the preject, please do scan the QR code or click the link given https://issuu.com/naavenr/ docs/naavenrao_1001954474


BLANK


DEGREE - ACADAMIC WORK

02 ND THE 2 COMING

TASK 01. CONCEPTUAL: LITERATURE REVIEW ILLUSTRATION (THEMATIC DRAWING) THE RESERRUCTION

8

TABULATION OF sG.lEMBING ELEMENT AND SCENES

Year 3 Semester 2

ASK 01. CONCEPTUAL: LITERATURE REVIEW ILLUSTRATION (THEMATIC DRAWING) Design Studio 6

HE RESERRUCTION

The site was EL DORADO OF THE EAST - means The Golden One or The Lost City of Gold; A title given to the small town of Sungai Lembing, Pahang for its significant economical contribution when it became the epicentre for tin mining in the 1900s under a British company - Pahang Consolidated Company Limited (PCCL) who had a 120- year lease to mine the area. After facing an economic downturn due to the crash of global tin prices in the 1980s - which forces PCCL to cease operations in 1986 has transformed Sungai Lembing into an abandoned ghost town.

INAL COLLAGE

The first part of the proposal is to create an artwork, which related to the idea and concept of later proposal in the project. The artwork i created comes from the idea from Bernard Tschumi’s Manhattan Transcript. Where actions are translated into idea of space through owns interpretation of the action.

Sungai Lembing evolved around tin mines and the activites done corresponding to it. The main part of the tine story are the tin miners, of how the tin minerals are excavated on site and also the atmosphere within the tunnel mine that the miners experience. The second important part of Sungai Lembing tin mine are the locomotive. The main transportation system to transport the minerals and also as transportation system for public users. The final piece of the Sungai Lembing mine are the factory, where all the minerals excavated are processed and transported away the Sungai Lembing.


DEGREE - ACADAMIC WORK

DISSECTION

This spaces explores the importance of locomotive during the PCCL era. The top image showing the movement of human at the train stop located near the chinese school. The red block, shows the journey of the locomtive when its is not in mine tunnel nor the mining factory. On the end side of the block represents the tunnel mine.

9 This image shows the end of the locomotive journey from the tunnel to the mining factory. In certain cases the trailers are pushed manually by the human to transport it.

The near side represents the Mining factory.

It is brought to a shelter stop where it is then minerals are kept before moving it into the factory.

While the circular shaped shows the movement of human during the construction of the train track.

The collecters on side of the shelter represents the minerals that has pass through the shelter. The stepped shape shows the various stages in the mine factory to produce the tin mineral.

The shows the construction of the trian track. This image shows the early beginnings of tin mineral production. The left image shows the hectic work that is happening in Sg. Lembing during the PCCL era. The center block shows the journey of tunnel train to transport the tin mines excavated in the tunnel. The train connects directly to the shaft. The right image shows the joints and movement of miners excating the tin minerals. The wall represents the tunnel wall thats is excated upon.

Movement of people represented in the column form. While the movement are shown as the block that goes in between those columns. While the brown blocks shows the surrounding context, while showing it harh enviroemts.

This image show the process thats happens on mining factory. The top image shows the grinder and the conveyor belt, the images shows as rotating door with wall going along the few grinders. The bottom image shows “Mendulang” . The center block rotatable to represent the circular motion of “Mendulang” process.


DEGREE - ACADAMIC WORK

10 Year 3 Semester 2 Design Studio 6 Sungai Lembing not only is now a ghost town, it also now has lost its historical value of such is the Sungai Lembing mining factory that used to stood tall on the edge of Sungai Lembing town. As part of the proposal detail study of the selected was carried it out and my selected site is location of the previously stood mining factory. Space narrative was done to understand how the created artwork would relate to site in context with created modal representation.

SPACE NARRATIVE MINING TUNNEL EXPERIENCE

LOCOMOTIVE EXPERIENCE

MINE TUNNEL TRAIN AND THE ATMOSHPERE WITHIN THE SMALL TUNNEL MINE

ACTIVITES ARE MANAGED BY THE COMMUNITES OF Sg.LEMBING

EXPERIECING THE JOURNEY FROM MINE TUNNEL THROUGH PAST LOCOMOTIVE AND PUSHING OWN MINE COUCH.

JOURNEY FROM MINE TUNNEL TO EXCAVATING THE MINERALS TO TRANSFERTING IT TO THE MINE FACTORY, WHERE GRINDING AND MENDULANG ARE DONE MINING FACTORY EXPERIENCE


DEGREE - ACADAMIC WORK

11

EXPLODED PROGRAMMATIC ACCOMODATION

THIRD FLOOR

MINE WALL MAZE WALL GALLERY 2

SECOND FLOOR GALLERY 1 POST MINING EXPERIENCE STUDIO/WORKSHOP

AMPHITEATER

CAFES TRAIN MUSEUM

FIRST FLOOR

PARKING ENTRANCE DROP-OFF

GROUND FLOOR COURTYARD WATER FEATURE WALL CLIMB MURAL WALL

OPEN-AIR GALLERY

STRUCTURAL REMENANTS


DEGREE - ACADAMIC WORK

12 Year 3 Semester 2 Design Studio 6 On the ground floor where most of the remaining structural columns are used as open air gallery. The general area on the ground floor are opened area, where the area can be used as resting area and also a place of ‘Instagram spot’. 2

Large concrete block will be used as not only as structural elements but also as mural wall, where communities can come together and pain a mural wall. The freight lift and locomotive are added additional to the history of the site. Slow ramps are used to as connection to upper floors.

1 1

1

7 1. OPEN SPACE 2. OPEN-AIR GALLERY

SPATIAL ELEMENTS

3. TNB SUB-STATION 4. MALE TOILET

WALL/ROCK CLIMB

FREIGHT LIFT

5. REFUSE CHAMBER 6. STORAGE 1

Few of attraction point, to attract different batch of tourists. With the provided space of 6m, it allows for classes and simple to moderate activity.

7. FEMALE TOILET One of the access point for both miners and to transport minerals from below ground level are by using shaft elevator. Where it is strcutural exposed. Similar conceprt of feright lift are used on site to provide similar expercience. Its does not need core to be supported.

MURAL WALL

Annually there as have been few competirions related to arts carried out in Sg. Lembing. Part of community engagement and also as education mural walls are provided to express their artistis side.

REMNENTS

LOCOMOTIVE

Exposed strcutral column and load bearing wall creates a natural space for exposed open-air gallery to show the structure in its exposed nature while creating collage of new and old.

Traces of locomotive/ train has been non-existance currently present on Sg.Lembing thus creating and saving any left train remnets scattered in the site as part of preservation and attraction point.

5

4

3


DEGREE - ACADAMIC WORK

13

Year 3 Semester 2 III 4

II 3

I

2

2

2

1

2

Design Studio 6 On the first floor, 3 separate block of spaces are used for different activities. The first spaces are used as studio or workshop which both independent artist and community can use. The second space is used as experience center. Where tourists can experience how mendulang, grinder are used. The scaffolding play area are also erected in the space. The third space is used as gallery area. Where public or artist work can be displayed.

1. DISPLAY AREA 2. STUDIO/WORKSHOP 3. POST MINING EXPERIENCE SPACE i - SCAFFHOLDING SPACE ii - GRINDER ROOM iii - MENDULANG AREA 4. GALLERY 1

SPATIAL ELEMENTS STUDIO/WORKSHOP Studio and workshop spaces where it can be used to teach locals and toursits of any arts related matter. The structural remnants on site creates a natural display area surrounding the studio where homemade arts can be displayed or precious part of the history.

POST MINING EXPERIENCE AREA

GRINDER

MENDULANG A grinding machine of tine minerals before it goes to mendulang. Minature grinder are provided where it can be manually manuavered

Mendulang experience where, local and toursts can mendulang with flowing water above the structural remenants.

SCAFFHOLDING PLAY AREA Along the gallery space, there are many structures where it can be converted into display walls. Such as the actual picture showed.

Scaffholding like play area where its acts as resting area for locals and toursits visiting the space. It also represents past construction of train track with the help of scaffholdings.


DEGREE - ACADAMIC WORK

14

Year 3 Semester 2 Design Studio 6 The second floor, tourists continue the experience of the mining tunnel and shaft. Maze wall represents the various tunnel that leads into the depth of the tunnel. The mine wall is where tourists can experience the sounds and space of the tunnel mine. Where at certain spaces, the mine tunnel are noisy and claustrophobic.

4

8

The 3rd space, is the train museum, where part of the train are placed in here. As locomotive and train where part of the main transportation in Sungai Lembing then.

7 5

All the spaces are connected with an amphitheater area, where the tourists can enjoy and rilex while overlooking the hill side of Sungai Lembing.

5 5 1. AMPHITHEATER 2. MALE TOILET 3. FEMALE TOILET

SPATIAL ELEMENTS

4. TRAIN MUSEUM 5. CAFE/RESTAURENTS

MAZE WALL

6. GALLERY 2 Maze wall represents the confusing maze tunnel that are often branches into confusingly similar walls that leads into nothingness. In each pocket of space within the maze there are open space where it has small timeline of history.

7. MINE TUNNEL 8. MAZE WALL

MINE WALL EXPERIENCE

SPACE

Maze tunnel shows the feeling of being claustrophobic with all the tunnel walls being so closed to each other. Creating the feeling of how the miners used to work in such state.

TRAIN MUSUEM

Traces of locomotive/ train has been non-existance currently present on Sg.Lembing thus creating and saving any left train remnents scattered in the site aspart of preservation and attraction point.

SOUND

As people walk along the space sound system of people excavating the minerals are played where it creates echo that resonants alsong the space. The space is inspired from the Jewish Museum in Berlin by Daniel Libeskind

3

2

1 6


DEGREE - ACADAMIC WORK

15


DEGREE - ACADAMIC WORK

16


DEGREE - ACADAMIC WORK

17

For full indepth detail of the preject, please do scan the QR code or click the link given https://issuu.com/naavenr/ docs/naaven_rao_100195474


BLANK


DEGREE - INTERNSHIP

KKNG Architect

03 MISCELLANEOUS Kuala Nilam

Progress:KKNG Architect

There were always constant development update between my supervisor and me regarding the drawings. ThereKuala wouldNilam be daily progress check related to the project. SketchUp were completely used in this project

LOCATION : KUALA NILAM, PAHANG TASK: CREATE 3D MODAL OF THE SITE FROM THE GIVEN SITE PLAN SOFTWARE: SKETCHUP

KKNG Architect

Kuala Nilam project id located at Pahang. Its a townhouse design concept. Kuala Nilam project was still in design development stage where constant client meeting Progress:- was conducted during this stage. I was tasked to create a 3D modal of the site and house. From the given floor plan, I was to create a façade design from the plan. It was a longer processupdate wherebetween it tookmyalmost 2 months of progress. There were constant deThere were always constant development Kuala sign changes in terms façade supervisor and me regarding the drawings. ThereofNilam would be design which includes all from window design, roof daily progress check related to the project. overhang length, parapet wall design till the car porch design. SketchUp were completely used in this project

Progress:There were always constant development update between my supervisor and me regarding the drawings. There would be daily progress check related to the project. SketchUp were completely used in this project

18


DEGREE - INTERNSHIP

03 MISCELLANEOUS KKNG Architect

LOCATION : BUKIT FRASER, PAHANG TASK: UPGRADING A DESIGN OF RETREAT HOUSE SOFTWARE: SKETCHUP Bukit Fraser retreat house is a private project located at Bukit Fraser. The site is located on a slope site covered by durian plantation. The project currently on design development stage. I was tasked to propose new spaces without changing the design itself. The design uses simple design where a large cuboid shape space is divided by in half to create 2 rooms, which then can be opened to create 1 single space. While the kitchen and verandah are used to maximize the advantage view points.

KKNG Architect

19

KKNG Architect

Retreat House

Progress:-

P

There were always constant development update between my supervisor and me regarding the drawings. There would be daily progress check related to the project

T s d

I also propose new layout entirely, but it didn’t move far as the client had limited budget

Retreat House

SketchUp were completely used in this project

KKNG Architect

I t

S

Retreat House

Design Proposal 2

Progress:There were always constant development update between my supervisor and me regarding the drawings. There would be daily progress check related to the project

Progress:I also propose new layout entirely, but it didn’t move far as the client limiteddevelopment budget There were alwayshad constant update between my supervisor and me regarding the drawings. There would be SketchUp wererelated completely in this project daily progress check to the used project I also propose new layout entirely, but it didn’t move far as the client had limited budget SketchUp were completely used in this project


DEGREE - INTERNSHIP

03 MISCELLANEOUS

+ SECTION

100

100

100

100

BEDROOM 2

DINING

DINING

BEDROOM 2

BEDROOM 2

DINING

DINING

BEDROOM 2

BEDROOM 2

1500

1500

100

BEDROOM 2

DINING

100 800

800 100

1500

1500

DINING

100

SECTION X-X SCALE 1:100

LOCATION : KUALA LIPIS, PAHANG TASK: AMMENDING ALL DRAWINGS TO THE UPDATED FLOOR PLAN SOFTWARE: AUTOCAD

600

600 544

100

Kuala Lipis is a single storey terrace housing development in Pahang. When I was given the task about the project, its was currently in submission stage. I was assigned to first make amends to the plan. I was tasked to update the plan, elevation and sections while also changing the description of materials used. After the completion, I was then tasked to make the tender drawings, in which I was tasked to make reflected ceiling plan, floor finishes, toilet and kitchen detail and etc.

MASTER BEDROOM

TOILET

BATH

KITCHEN

1550

BEDROOM 2

1550

CAR PORCH

150 800 100

DRIVEWAY

150 900

2800

1500

100

350 445

544 3525

SECTION Y-Y SCALE 1:100

KKNG ar c h i t e ct

k e a t i x @ y a h o o . c o m

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

CADANGAN PEMBANGUNAN PERUMAHAN KEDIAMAN YANG MENGANDUNGI 34 UNIT RUMAH TERES 1 TINGKAT (20'X70'), 14 UNIT RUMAH TERES 1 TINGKAT (20'X75'), 1 BLOK 32 UNIT PANGSAPURI 4 TINGKAT, 1 UNIT RUMAH SESEBUAH & 1 UNIT PENCAWANG PADAT DI ATAS LOT 838, MUKIM PENJOM, DAERAH LIPIS, NEGERI PAHANG DARUL MAKMUR UNTUK TETUAN ENG HAN PROPERTY SDN. BHD.

DRAWING TITLE

ISSUED/ REVISION NO. DESCRIPTION

PHASE 1 - TERRACE 1 STOREY (20'X70')

DATE

DRAWN BY

KJ

CHECK BY

KKNG 2019

DATE

FASA 1 34 UNIT RUMAH TERES 1 TINGKAT (20'X70') 14 UNIT RUMAH TERES 1 TINGKAT (20'X75') 1 UNIT PENCAWANG PADAT 1 UNIT LOJI RAWATAN KUMBAHAN (STP) KAWASAN LAPANG

FOR TENDERING

REF

PHG-LPS-TDR-PH1/T70-2019

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET :

+ PLAN

+ FLOOR FINISH GROUND FLOOR PLAN

1500

SCALE 1:175

100 700

1200

700

KITCHEN

YARD

BED 3

KITCHEN

YARD

KITCHEN

BED 3

KITCHEN

BEDROOM 3

KITCHEN

YARD

KITCHEN

BEDROOM 3

YARD

BEDROOM 3

YARD

LIVING

2275

100

225 200 200

600

1750

100 1100

DINING BEDROOM 2

DINING

BEDROOM 2

1200

MASTER BED

DINING

562

600

DINING

R

BEDROOM 2

300

2750

900

R

350

BED 2

BATH

TOILET

EP

2750

R

T

EA

2100

T

EA

EP

BATH

TOILET

100

900

100

T

EA

EP

100

DINING

100

BED 2

225

150

2275

BED 2

1200

DINING

BATH

TOILET 1400

213 600

500

TOILET

225

BATH 2

TOILET

600

BATH 2

TOILET

900

225

BATH 2

1150

600 325

900

3550

BED 3

3550

425

2350

1200

100

100 425

MASTER BEDROOM LIVING

LIVING

LIVING

100

BATH 1

1400

MASTER BATH

850

1900

BATH 1 BATH 1

MASTER BEDROOM

MASTER BEDROOM

1200

LIVING

MASTER BATH

1900

MASTER BED

3850

MASTER BED

1200

LIVING

100

CAR PORCH

CAR PORCH

300

1200

650

600 400

CAR PORCH

CAR PORCH

driveway

driveway

3525

CAR PORCH

1800

625

100 800

MASTER BATH

300

CAR PORCH

275 250

5575

2100

driveway

525

200

350

DRIVEWAY

GROUND FLOOR PLAN

GROUND FLOOR PLAN

SCALE 1:100

SCALE 1:100

KKNG ar c h i t e ct

k e a t i x @ y a h o o . c o m

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

CADANGAN PEMBANGUNAN PERUMAHAN KEDIAMAN YANG MENGANDUNGI 34 UNIT RUMAH TERES 1 TINGKAT (20'X70'), 14 UNIT RUMAH TERES 1 TINGKAT (20'X75'), 1 BLOK 32 UNIT PANGSAPURI 4 TINGKAT, 1 UNIT RUMAH SESEBUAH & 1 UNIT PENCAWANG PADAT DI ATAS LOT 838, MUKIM PENJOM, DAERAH LIPIS, NEGERI PAHANG DARUL MAKMUR UNTUK TETUAN ENG HAN PROPERTY SDN. BHD. FASA 1 34 UNIT RUMAH TERES 1 TINGKAT (20'X70') 14 UNIT RUMAH TERES 1 TINGKAT (20'X75') 1 UNIT PENCAWANG PADAT 1 UNIT LOJI RAWATAN KUMBAHAN (STP) KAWASAN LAPANG

DRAWING TITLE

PHASE 1 - TERRACE 1 STOREY (20'X70')

ISSUED/ REVISION NO. DESCRIPTION

FLOOR FINISH GROUND FLOOR PLAN

DATE

DRAWN BY

KJ

CHECK BY

KKNG

DATE

FOR TENDERING

REF

2019 PHG-LPS-TDR-PH1/T70-2019

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET : 061

KKNG ar c h i t e ct

k e a t i x @ y a h o o . c o m

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

CADANGAN PEMBANGUNAN PERUMAHAN KEDIAMAN YANG MENGANDUNGI 34 UNIT RUMAH TERES 1 TINGKAT (20'X70'), 14 UNIT RUMAH TERES 1 TINGKAT (20'X75'), 1 BLOK 32 UNIT PANGSAPURI 4 TINGKAT, 1 UNIT RUMAH SESEBUAH & 1 UNIT PENCAWANG PADAT DI ATAS LOT 838, MUKIM PENJOM, DAERAH LIPIS, NEGERI PAHANG DARUL MAKMUR UNTUK TETUAN ENG HAN PROPERTY SDN. BHD. FASA 1 34 UNIT RUMAH TERES 1 TINGKAT (20'X70') 14 UNIT RUMAH TERES 1 TINGKAT (20'X75') 1 UNIT PENCAWANG PADAT 1 UNIT LOJI RAWATAN KUMBAHAN (STP) KAWASAN LAPANG

DRAWING TITLE

PHASE 1 - TERRACE 1 STOREY (20'X70')

ISSUED/ REVISION NO. DESCRIPTION

PLAN GROUND FLOOR PLAN

DATE

DRAWN BY

KJ

CHECK BY

KKNG

DATE

FOR TENDERING

REF

2019 PHG-LPS-TDR-PH1/T70-2019

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET : 021a

20


DEGREE - INTERNSHIP + BATH 1

100

1650

100

100

1400

100

100

1650

100

100

1400

100

100

550

21

600

1150 600

1650

2

600

1150

1150

850

800

550

1400

550

100

2100

2700 1550

1550

1550 850

VIEW 1

50

SCALE 1:50

50

850 50

PLAN

2700

2700 400

2100

600

1550

100

400

2100

800

4

2700

1 VIEW 3

VIEW 2

VIEW 3

VIEW 4

+ BATH 2 & TOILET

100

+ PLUMBING & SANITARY

1025

100

100

1400

100

100

1400

100

100

1400

100

100

1400

100

550 2700

100

850

1550

TOILET 1550

TOILET

2100

2700

2700

600

1150

550 2100 50

550

550 2100

BATH 2 1550

BATH 2

1550

TOILET

2700

600 2100

2700

600

600 2700

BATH 2 1550

BATH 2

50

600

1150

600

550

225 1150

600

6

TOILET

1025

2700

800

225 600

1 VIEW 2

200

KITCHEN

150

850

800 375

BATH 2

800

TOILET

1025

1550

TOILET

225

4

5

BATH 1

100

550

800

3

1 VIEW 2

100

1150

550

BATH 2

150

100

2100

1400

225

325

100

1025

1980

SCALE 1:50

VIEW 1

KKNG ar c h i t e ct

k e a t i x @ y a h o o . c o m

WATER DISTRIBUTION LAYOUT

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

1) ALL INCOMING WATER SUPPLY PIPE FROM TAPPING POINT TO WATER METER TO ENGR'S DETAIL 2) OTHER INCOMING UNDERGROUND BUIRED PIPE TO BE OF PVC PIPE CLASS 9 3) ALL DISTRIBUTION PIPES TO BE OF UPVC PIPE CLASS D

BATH 1

50

50

50

250

PLAN

TOILET

BATH 2

CADANGAN PEMBANGUNAN PERUMAHAN KEDIAMAN YANG MENGANDUNGI 34 UNIT RUMAH TERES 1 TINGKAT (20'X70'), 14 UNIT RUMAH TERES 1 TINGKAT (20'X75'), 1 BLOK 32 UNIT PANGSAPURI 4 TINGKAT, 1 UNIT RUMAH SESEBUAH & 1 UNIT PENCAWANG PADAT DI ATAS LOT 838, MUKIM PENJOM, DAERAH LIPIS, NEGERI PAHANG DARUL MAKMUR UNTUK TETUAN ENG HAN PROPERTY SDN. BHD. FASA 1 34 UNIT RUMAH TERES 1 TINGKAT (20'X70') 14 UNIT RUMAH TERES 1 TINGKAT (20'X75') 1 UNIT PENCAWANG PADAT 1 UNIT LOJI RAWATAN KUMBAHAN (STP) KAWASAN LAPANG

VIEW 2

VIEW 3

DRAWING TITLE BATH 1 PLAN VIEW 1 VIEW 2 VIEW 3 VIEW 4

PHASE 1 - TERRACE 1 STOREY (20'X70')

BATH 2 & TOILET PLAN VIEW 5 VIEW 1 VIEW 6 VIEW 2 VIEW 3 VIEW 4

VIEW 4

ISSUED/ REVISION NO. DESCRIPTION

VIEW 5

DATE

DRAWN BY

KJ

CHECK BY

KKNG 2019

DATE

FOR TENDERING

VIEW 6

REF

PHG-LPS-TDR-PH1/T70-2019

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET : 102

KITCHEN

SANITARY EQUIPMENTS LAYOUT (ALL U.P.V.C. PIPES TO BE OF APPROVED TYPE)

KKNG ar c h i t e ct

k e a t i x @ y a h o o . c o m

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

CADANGAN PEMBANGUNAN PERUMAHAN KEDIAMAN YANG MENGANDUNGI 34 UNIT RUMAH TERES 1 TINGKAT (20'X70'), 14 UNIT RUMAH TERES 1 TINGKAT (20'X75'), 1 BLOK 32 UNIT PANGSAPURI 4 TINGKAT, 1 UNIT RUMAH SESEBUAH & 1 UNIT PENCAWANG PADAT DI ATAS LOT 838, MUKIM PENJOM, DAERAH LIPIS, NEGERI PAHANG DARUL MAKMUR UNTUK TETUAN ENG HAN PROPERTY SDN. BHD. FASA 1 34 UNIT RUMAH TERES 1 TINGKAT (20'X70') 14 UNIT RUMAH TERES 1 TINGKAT (20'X75') 1 UNIT PENCAWANG PADAT 1 UNIT LOJI RAWATAN KUMBAHAN (STP) KAWASAN LAPANG

DRAWING TITLE PLUMBING & SANITARY WATER DISTRIBUTION LAYOUT SANITARY EQUIPMENTS LAYOUT

PHASE 1 - TERRACE 1 STOREY (20'X70')

ISSUED/ REVISION NO. DESCRIPTION

DATE

DRAWN BY

KJ

CHECK BY

KKNG

DATE

FOR TENDERING

REF

2019 PHG-LPS-TDR-PH1/T70-2019

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET : 051

DOOR & WINDOW SCHEDULE SCALE 1:50

KKNG ar c h i t e ct

k e a t i x @ y a h o o . c o m

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

CADANGAN PEMBANGUNAN PERUMAHAN KEDIAMAN YANG MENGANDUNGI 34 UNIT RUMAH TERES 1 TINGKAT (20'X70'), 14 UNIT RUMAH TERES 1 TINGKAT (20'X75'), 1 BLOK 32 UNIT PANGSAPURI 4 TINGKAT, 1 UNIT RUMAH SESEBUAH & 1 UNIT PENCAWANG PADAT DI ATAS LOT 838, MUKIM PENJOM, DAERAH LIPIS, NEGERI PAHANG DARUL MAKMUR UNTUK TETUAN ENG HAN PROPERTY SDN. BHD. FASA 1 34 UNIT RUMAH TERES 1 TINGKAT (20'X70') 14 UNIT RUMAH TERES 1 TINGKAT (20'X75') 1 UNIT PENCAWANG PADAT 1 UNIT LOJI RAWATAN KUMBAHAN (STP) KAWASAN LAPANG

DRAWING TITLE

PHASE 1 - TERRACE 1 STOREY (20'X70')

ISSUED/ REVISION NO. DESCRIPTION

DOOR & WINDOW DOOR & WINDOW SCHEDULE

DATE

DRAWN BY

KJ

CHECK BY

KKNG

DATE

FOR TENDERING

REF

2019 PHG-LPS-TDR-PH1/T70-2019

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET : 081


DETAIL A-RAILING PLAN SECTION SCALE 1:10

DRAWING TITLE

k e a t i x @ y a h o o . c o m

ar c h i t e ct

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

KKNG CADANGAN PROJEK PERUMAHAN YANG MENGANDUNGI:

JALAN BEKA HOUSE

DRAWING TITLE KL-BEKA-2020

XX ROOF DETAIL

ISSUED/ REVISION NO. DESCRIPTION

ISSUED/ REVISION NO. DESCRIPTION

DATE

DATE

CPN KKNG

KL-BEKA-TD-2018

18 MARCH 2021

SCALE 1:10

KL-BEKA-2020

DRAWN BY CHECK BY DATE REF

TNB METER

DETAIL B-RAILING SECTION

DRAWING TITLE

XX ROOF DETAIL

DATE

270

CADANGAN PROJEK PERUMAHAN YANG MENGANDUNGI:

JALAN BEKA HOUSE

ISSUED/ REVISION NO. DESCRIPTION

75 70

k e a t i x @ y a h o o . c o m

40

ar c h i t e ct

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

25

KKNG

KL-BEKA-2020

3

STAIRCASE 2 RAILING DETAILS

25 172

CADANGAN PROJEK PERUMAHAN YANG MENGANDUNGI:

JALAN BEKA HOUSE

172

KKNG ar c h i t e ct

k e a t i x @ y a h o o . c o m

4 70

4

TASK: CREATE TENDER DRAWINGS SCALE 1:5

SOFTWARE: AUTOCAD

22

03 MISCELLANEOUS 29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

2 2

3 3

Seputeh house is a bungalow house located in Kuala Lumpur. It’s a renovation project where all of the existing building on site will be demolished and a new proposed design will be built. The stage was already in submission stage and tender stage. But the project had a slow start because of the pandemic. I was tasked to complete the tender drawings where it consists of plans, elevations, sections,staircase detail, roof details, reflected ceiling plan, electric layout plan, floor finishes, toilet schedule, door and window schedule. As it was a big project, there were many details that need to be shown. 50 50 50 50 50 50

LOCATION : SEPUTEH HOUSE, KUALA LUMPUR DETAIL C-MOUNTING DETAIL

DRAWN BY KKNG

CPN

18 MARCH 2021

CPN

KL-BEKA-TD-2018

DRAWN BY

KL-BEKA-TD-2018

18 MARCH 2021

KKNG

SHEET :

SHEET :

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET :

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

REF

DATE

CHECK BY

REF

DATE

CHECK BY

SD7

STAIRCASE 2 SECTION

SCALE 1:50

270

1

900

DEGREE - INTERNSHIP


DEGREE - INTERNSHIP

KKNG k e a t i x @ y a h o o . c o m

ar c h i t e ct

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

ar c h i t e ct

KKNG k e a t i x @ y a h o o . c o m

29 jalan ss4c/5 taman rasa sayang 47301 petaling jaya selangor malaysia t. 603 - 7801 6682 f. 603 - 7801 6681 / 603 - 7805 4094

CADANGAN PROJEK PERUMAHAN YANG MENGANDUNGI:

JALAN BEKA HOUSE

CADANGAN PROJEK PERUMAHAN YANG MENGANDUNGI:

SD7 JALAN BEKA HOUSE

DRAWING TITLE KL-BEKA-2020

XX ROOF DETAIL

KL-BEKA-2020

XX ROOF DETAIL

DRAWING TITLE

W18

23

ISSUED/ REVISION NO. DESCRIPTION

ISSUED/ REVISION NO. DESCRIPTION

SSD2

DATE

DATE

DRAWN BY

KKNG

CPN

18 MARCH 2021

CHECK BY DATE

CPN

KL-BEKA-TD-2018

KKNG

REF

DRAWN BY

KL-BEKA-TD-2018

18 MARCH 2021

CHECK BY DATE REF

FD1 SHEET :

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

SHEET :

All rights reserved. The information contained in this document is Copyright and cannot be reproduced or copied by any means without the written permission of KKNG architect. Any license, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement between KKNG architect and the instructing party. Any third party intending to use this information for any purpose whatsoever must first contact KKNG for written permission and suitability of application.

D1


DEGREE - INTERNSHIP

03 MISCELLANEOUS Kolektif Baru Kolektif Baru is a design that mixes the current terrace house planning with Malaysia vernacular house, with newer added sustainability. Kolektif Baru utilizes the usage of previously not explored spaces. This create varies degree of space funtionality. Kolektif Baru tackle community engagement in every place possible while also enhancing the spaces within the houses for the better. Introduction of bigger masterplan where it resembles a “kampong” style where each houses are exposed to vegetation in every opening. A direct copy of vernacular house is the iconic “verandah” which was copied and paste into the proposal

single

type 1a

current terrace

opportunity Monotony

parking

industrial

Monotony design is a common issues with Malaysia terraces. Similar repetition are cheaper but it does not create a homely feeling but to more industrial feel.

Terrace house sizes makes the overall space parking limited. And with Malaysia culture of having more than 2 car per house. It causes congestion on the road and disturbing road flow.

Malaysia terrace arrangement are always facing each other, with just small breakage of greeneries.

Middle-lane

single

Terrace back-lane has been notorious to be known as ugly unused space. It was earlier functioned as fire safety and also for garbage collecting point. But now, its a wasted space.

Terrace middle-lane only usage is as fire breaker and access. The sizes of a common middle lanes can be used to accommodate a unit, while still acknowledging fire safety.

Malaysia terrace function is only residential and only that. With less space for different activies at the same time..

Middle-lane 3

1 3 2 1 3

2

1 3

strata

New proposal to break the monotony is to create linear lines with breakage in between and proposing usage of vegetation as part of facade design. The roof space also functions as additional design.

type 1a

greeneries Bigger playground and complex play are proposed as part of overall health master plan proposal

greeneries

roof

The overall design is lifted up; similar to “kampung houses”. The spaces now can be used as verandah and more cars can be fitted in.

exploded

single

strata

Back-lane The back-lane has been turned into greeneries, where it acts as play area, fire safety and also jogging area.

proposed terrace

proposed terrace

coMMunity

play

proposed terrace

current terrace

Proposed terrace “verandah” can be used as community gathering space such as marriage, birthday celebration and etc. This arrangement allows it to not use the road, thus not blocking the road. This dramatically increases communication between neighbors.

Proposed terrace has more spaces and wider spaces for play area within their houses. This increases the communication and connection between the families. The varieties of spaces means various of activities can be carried out within the home at same time.

sustainaBility

sustainaBility

rainwater harvesting

solar/ greeneries

The newly proposed roof top able to collect more rainwater, that later can be transported to rainwater tank, and be used for non consumption usage. Such as wc water. This roof top can be used as temporary storage is needed, with the lap pool can be converted as storage space.

Solar system drastically reduces electrical usage in terrace house. With introduction of greeneries, where it cools down the houses further reduces energy consumption of a terrace house.

area

proposed terrace

construction

plan

type 1a Foundation and structure are built on site. While other components are pre-fabed in factory.

With the whole plan have been lifted up, the ground floor now acts as verandah, where its can act as communal area. While the roof space can also be utilized for different types of spaces

current terrace

Current terrace design dose not utilize space efficiently especially the roof. By introducing roof top spaces, it creates different space typology for the user to explore.

Method 1

Jogging track that start from their own terrace house to encourage healthy lifestyle. With 2 proposed track, user can choose their preferred jogging path.

top utilization

Proposed terrace house has various greeneries introduced into the houses. Stacked proposed greeneries increases the lifestyle of the user while also reducing heat and provides clean air into the spaces.

sustainaBle

parking Vegetation strip acts as fence between the terrace ground the playground area. It also breaks of direct view from the terrace,

proposed terrace

The arrangement of opening and the proposal of courtyard increases the ventilation process. Introduction of both of stack and cross ventilation drastically reduces the houses temperature and the environment.

HOME CONCEPT 2030 COMPETITON SOFTWARE: AUTOCAD / SKETCHUP

Monotony 1 2

current terrace

typical

solutions New proposal of middle lanes are the upgraded version of “dewan” where it can be used as public space. It can act as a co-working space. Which is relevant to current working from home style.

proposed terrace

Current terrace only functions as residential. The proposed design combines residential with communal space. The ground floor now acts as communal space while top space as private area while residential in the middle.

current terrace

Back-lane

fenestration

strata

Method 2

Roof, walls, window and doors are constructed and fixed in factory. This reduces site workers and environmental waste.

Method 3

Constructed components are transferred to site by vehicles. Using pre-fab also reduces construction time.

Method 4

Final step is just attach all together. With less site distraction, quick and efficient construction and be done.

Home Concept 2030 is a competition by PAM and Sime Darby. The competition concept is to create a future home where it can accommodate together with the current post pandemic stat while also maintaining the culture of terrace houses. Along the process of this competition, we had various meeting, discussion and sketches on selecting our best design. For this project I was involved from the first stage,The process of this competition is more hard than I actually anticipated as there are many amends and there is always constant changes until we find the middle ground.

24


END THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.