Coming and Goings Comings Pam Taylor (100) to 448/Roman Space Telescope (RST) Jacob Burke (566) to 450/Division Matthew O’Neil (372) to 401.1/ Rapid Spacecraft Development Office (RSDO) Ross Henry (551) to 483/Restore-L Charles Bacon (599) to 484/ Exploration and In-Space Services (ExIS) subsystems Chris Carson (599) to 434/Lucy Jamie Esper (592) to 450.2/ Technical Enterprise Mission Pathfinder Office (TEMPO) Detail position Devon Greene (Reinstatement) to 405/Resource Analysis Office (RAO) Roger Clason (700) to 470/ Joint Polar Satellite System (JPSS) Russell Snyder (599) to 481/ Architecture Development Office (ADO)
January 1 through June 30, 2020
Chetan Sayal (581) to 450/ Integrated LCRD LEO User Modem and Amplifier Terminal (ILLUMA-T) Corina Koca (544) to 460/ Geospace Dynamics Constellation (GDC) Kristen Brown (597) to 490/ Hazard Detection Lidar (HDL) Milton Davis (596) to 483/Restore-L Peter Rossoni (544) to 456/ LaserEnhanced Mission Communication Navigation and Operational Services (LEMNOS) Rene Wong Pineiro (221) to 450/ Division John Gygax (544) to 448/RST Richard Tseng (external) to 450/ Division Christy Hansen (610) to 400/FPD
Adam Matuszeski (599) to 422/ GeoCarb Andrea Poulin (544) to 401/ Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging (DAVINCI)
Ronald Miller (452) Retirement Mike Little (407) Reassignment to 606 Theresa Hayden (460) Retirement Bryan Fafaul (472) Retirement
Reassignments/ Realignments Details within Code 400 Ron Hooker (421) to 424/ Total and Spectral Solar Irradiance Sensor (TSIS)-2 Juli Lander (451) to 483/Restore-L James Morrissey (401) to 411.1/ Space Weather Follow-On (SWFO) L-1
Peyush Jain (581) to 450.2/TEMPO Detail position
Hsiao Smith (480) to 448/RST
Jon Verville (585) to 450.2/TEMPO Detail position
Vir Thanvi (458) to 450/Division
Jackie Townsend (470) to 448/RST Greg Dell (428) to 424/TSIS-2
Lamont Ruley (585) to 460/Division Goings Tyrone Dillard (383) to 460/Division
John Leon (425) Retirement
Bruce Milam (470) to 401.1/RSDO Roberto Aleman (421) to 460/ Division
Lou Kalil (405) Retirement
Todd King (483) to 422/GEOCarb
Renan Borelli (460) Retirement
Barbara Grofic (401) to 440/Division
Linda Pattison (470) Reassignment to 585
Param Nair (424) to 472/JPSS Flight
Azita Valinia (440) to NASA Engineeringi and Safety Center (NESC) 3-Year Temporary Appointment
Karen Rogers / Code 400
Administrative Officer
Volume 28 Number 2 SUMMER 2020
69