1 minute read

Comings and Goings

Next Article
Out and About

Out and About

Coming and Goings

January 1 through June 30, 2020

Comings

Pam Taylor (100) to 448/Roman Space Telescope (RST) Jacob Burke (566) to 450/Division Matthew O’Neil (372) to 401.1/ Rapid Spacecraft Development Office (RSDO) Ross Henry (551) to 483/Restore-L Charles Bacon (599) to 484/ Exploration and In-Space Services (ExIS) subsystems Chris Carson (599) to 434/Lucy Jamie Esper (592) to 450.2/ Technical Enterprise Mission Pathfinder Office (TEMPO) Detail position Devon Greene (Reinstatement) to 405/Resource Analysis Office (RAO) Roger Clason (700) to 470/ Joint Polar Satellite System (JPSS) Russell Snyder (599) to 481/ Architecture Development Office (ADO) Lamont Ruley (585) to 460/Division Tyrone Dillard (383) to 460/Division Adam Matuszeski (599) to 422/ GeoCarb

Andrea Poulin (544) to 401/ Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging (DAVINCI) Chetan Sayal (581) to 450/ Integrated LCRD LEO User Modem and Amplifier Terminal (ILLUMA-T) Corina Koca (544) to 460/ Geospace Dynamics Constellation (GDC) Kristen Brown (597) to 490/ Hazard Detection Lidar (HDL) Milton Davis (596) to 483/Restore-L Peter Rossoni (544) to 456/ LaserEnhanced Mission Communication Navigation and Operational Services (LEMNOS) Rene Wong Pineiro (221) to 450/ Division

John Gygax (544) to 448/RST Richard Tseng (external) to 450/ Division

Christy Hansen (610) to 400/FPD Peyush Jain (581) to 450.2/TEMPO Detail position Jon Verville (585) to 450.2/TEMPO Detail position

Goings

Lou Kalil (405) Retirement Renan Borelli (460) Retirement Linda Pattison (470) Reassignment to 585

Azita Valinia (440) to NASA Engineeringi and Safety Center (NESC) 3-Year Temporary Appointment John Leon (425) Retirement Ronald Miller (452) Retirement Mike Little (407) Reassignment to 606

Theresa Hayden (460) Retirement Bryan Fafaul (472) Retirement

Reassignments/ Realignments Details within Code 400

Ron Hooker (421) to 424/ Total and Spectral Solar Irradiance Sensor (TSIS)-2 Juli Lander (451) to 483/Restore-L James Morrissey (401) to 411.1/ Space Weather Follow-On (SWFO) L-1

Hsiao Smith (480) to 448/RST Jackie Townsend (470) to 448/RST Vir Thanvi (458) to 450/Division Greg Dell (428) to 424/TSIS-2 Bruce Milam (470) to 401.1/RSDO Roberto Aleman (421) to 460/ Division

Todd King (483) to 422/GEOCarb Barbara Grofic (401) to 440/Division Param Nair (424) to 472/JPSS Flight

Karen Rogers / Code 400 Administrative Officer

This article is from: