![](https://assets.isu.pub/document-structure/210212232818-95b2ab92e7861b338ec1b4972a27e2ae/v1/cf56d5ca98e6ebc2bda5eca40f32830c.jpg?width=720&quality=85%2C50)
1 minute read
Out and About
OUT & ABOUT
LIFE’S HIGHLIGHTS OFF CAMPUS
Share your news! Weddings, births, interesting travel experiences…we want to know!
Please send your inputs to Paula Wood. Include your name, phone number to:
paula.l.wood@nasa.gov Code 460 Ext. 6-9125 Congratulations to Nancy Ringel (443) on her first grandchild, Evelyn Grace. She was born on September 16, 2020, at 12:04pm, weighing 7 lbs., 3 oz, and was 21 inches long. Proud Mom and Dad are Kimberli and Anthony Knobel.
![](https://assets.isu.pub/document-structure/210212232818-95b2ab92e7861b338ec1b4972a27e2ae/v1/d35b807db9acb7fa405a35b4ac275753.jpg?width=720&quality=85%2C50)
Best wishes to Taryn Stradford (155.7) on the birth of her daughter, Imara, born on October 2, 2020, at 9:54pm. Imara weighed 6 lbs., 14 oz., and was 19 inches long.
Patricia Aldridge (452) is proud to announce the birth of her eighth grandchild, Ember Lee Gregory. She was born on October 14, 2020, weighing 7 lbs., 3 oz. Ember joins her four siblings, Malaya, Aiden, Liam and Rory, and her parents are Michael and Keshia Gregory.
![](https://assets.isu.pub/document-structure/210212232818-95b2ab92e7861b338ec1b4972a27e2ae/v1/f2164d44ea522cf882bed12240ee9346.jpg?width=720&quality=85%2C50)