1 minute read

Comings and Goings

Coming and Goings

July 1 through October 31, 2020

Comings

John Blackwood (383) to 460/ Hermes Project Jean Marie Denis (562) to 401/Project Formulation and Development Office (PFDO) John McCabe (564) to 424/ Total and Spectral Solar Irradiance Sensor-2 (TSIS-2) Theo Muench (552) to 496.1/ESPA Flight System Project Richard Slonaker (HQ) to 456/ Laser Enhanced Mission Communication Navigation and Operations Services (LEMNOS) Pipeline Tammy Brown (550) to 481/ Satellite Servicing Advanced Concepts Office (ACO) Anthony Nicoletti (592) to 401/ PFDO

Edmonia Caldwell (545) to 490.1/ Mars Organic Molecule AnalyzerMass Spectrometer (MOMA-MS) Kent Gaylor (JSC) to 450.1/ Networks Integration Management Office (NIMO) Cody Kelly (JSC) to 450.3/Search and Rescue (SAR) Gary Letchworth (802) to 460/ Interstellar Mapping and Acceleration Probe (IMAP) LaNetra Tate (HQ) to 450/ Exploration & Space Communication Projects Division (ESCPD) Kevin Tewey (External) to 418/ Geostationary and Extended Orbits (GEO-XO) Teresa Kauffman (External) to 407/ Earth Science Technology Office (ESTO)

Goings

Scott Galbraith (450) Retirement Zulma Phillips (480) Transfer to new agency Preston Burch (440) Retirement Julia Owens (450.2) to 580 Wanda Peters (400) to HQ Neil Mallik (450.1) to HQ Art Unger (401.1) Retirement

Reassignments/ Realignments Details within Code 400

Matt Strube (480) to 483/ Onorbit Servicing, Assembly, and Manufacturing 1 (OSAM-1) Roberto Aleman (460) to 429/ Landsat 9

Jim Pontius (460) to 426/Landsat NeXt

Brian Roberts (480.1) to 480/ NASA’s Exploration & In-space Services/NExIS Joe Stevens (490) to 401/Project Formulation and Development Office (PFDO) Vir Thanvi (450) to 450.2/ Technology Enterprise and Mission Pathfinder Office (TEMPO) Paul Buchanan (450) to 429/ Landsat 9

Vickie Dulski (429) to 482/Space Infrastructure Dexterous Robot (SPIDER) Barbara Grofic (440) to 440/ Associate Director, Astrophysics Projects Division (APD) Jason Hair (460) to 418/GEO-XO

Karen Rogers / Code 400 Administrative Officer

Wen-Ting Hsieh (492) to 427/ Pre-Aerosol, Clouds, and ocean Ecosystem (PACE) Jesse Walsh (483) to 401/ Project Formulation and Development Office (PFDO)

This article is from: