The Critical Path - Winter 2020

Page 55

Coming and Goings

July 1 through October 31, 2020

LaNetra Tate (HQ) to 450/ Exploration & Space Communication Projects Division (ESCPD)

Matt Strube (480) to 483/ Onorbit Servicing, Assembly, and Manufacturing 1 (OSAM-1)

John Blackwood (383) to 460/ Hermes Project

Kevin Tewey (External) to 418/ Geostationary and Extended Orbits (GEO-XO)

Roberto Aleman (460) to 429/ Landsat 9

Jean Marie Denis (562) to 401/Project Formulation and Development Office (PFDO)

Teresa Kauffman (External) to 407/ Earth Science Technology Office (ESTO)

Comings

John McCabe (564) to 424/ Total and Spectral Solar Irradiance Sensor-2 (TSIS-2) Theo Muench (552) to 496.1/ESPA Flight System Project Richard Slonaker (HQ) to 456/ Laser Enhanced Mission Communication Navigation and Operations Services (LEMNOS) Pipeline Tammy Brown (550) to 481/ Satellite Servicing Advanced Concepts Office (ACO) Anthony Nicoletti (592) to 401/ PFDO Edmonia Caldwell (545) to 490.1/ Mars Organic Molecule AnalyzerMass Spectrometer (MOMA-MS) Kent Gaylor (JSC) to 450.1/ Networks Integration Management Office (NIMO)

Goings Scott Galbraith (450) Retirement Zulma Phillips (480) Transfer to new agency Preston Burch (440) Retirement Julia Owens (450.2) to 580 Wanda Peters (400) to HQ Neil Mallik (450.1) to HQ Art Unger (401.1) Retirement

Reassignments/ Realignments Details within Code 400

Jim Pontius (460) to 426/Landsat NeXt Brian Roberts (480.1) to 480/ NASA’s Exploration & In-space Services/NExIS Joe Stevens (490) to 401/Project Formulation and Development Office (PFDO) Vir Thanvi (450) to 450.2/ Technology Enterprise and Mission Pathfinder Office (TEMPO) Paul Buchanan (450) to 429/ Landsat 9 Vickie Dulski (429) to 482/Space Infrastructure Dexterous Robot (SPIDER) Barbara Grofic (440) to 440/ Associate Director, Astrophysics Projects Division (APD) Jason Hair (460) to 418/GEO-XO

Karen Rogers / Code 400

Administrative Officer

Cody Kelly (JSC) to 450.3/Search and Rescue (SAR)

Wen-Ting Hsieh (492) to 427/ Pre-Aerosol, Clouds, and ocean Ecosystem (PACE)

Gary Letchworth (802) to 460/ Interstellar Mapping and Acceleration Probe (IMAP)

Jesse Walsh (483) to 401/ Project Formulation and Development Office (PFDO)

Volume 28 Number 3 WINTER 2020

55


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.