Architecture portfolio

Page 1

Natália Kostelníková architecture portfolio


» EDUCATION 2013-2014

ERASMUS student: VIA University College, Horsens, DENMARK Faculty of Construction&Technology course name: Architectural Technology and Construction Management (international)

2011-2013

Czech Technical University in Prague, CZECH REPUBLIC, Faculty of Civil Engineering, bachelor degree : Architecture and Building Engineering

2007-2011 2003-2011

Jan Cikker School of Arts in Banska Bystrica, SLOVAKIA Sports gymnasium in Banska Bystrica, SLOVAKIA (8-years high school, language oriented course: english&german)

» WORK EXPERIENCES › VOLUNTEERING 2011-2013

ISC CTU in Prague (International Student Club) OFFICE TEAM » providing office services for Erasmus students on CTU in Prague PR TEAM » designing promotion material, brochures, organising promo stands PHOTO TEAM » work as event photographer (parties, festivals, trips) organisation of: › SAF Festival (Study Abroad Fair) festival focused on opportunities to study abroad › Buddy weekend team building weekend organised for new members of ICS › National platform national weekend meeting for members of different ESN organisa tions in Czech Republic for 120 people › organizing of smaller workshops, teambuilding activities and parties

2011

“ Be better” festival organisation of high school festivals, art zone “ Yni vikend ” festival organisation of street festival, art zone Dreams&Teams (International programme founded by British Council) organisation of week for international students

2010,2011 2009 2003-2010

Riding Club, Lubietova, SLOVAKIA organisation of summer courses, workshops and activities for children


CURRICULUM VITAE TECHNICAL SKILLS

»

AutoCAD 2D

SketchUp Kerkythea 3dsMax Revit Adobe Photoshop Adobe Illustrator

» LANGUAGE SKILLS SLOVAKIAN/CZECH ENGLISH GERMAN FRENCH DANISH

Adobe InDesign Adobe Lightroom Microsoft Office

TEAMWORK

» PERSONAL QUALITIES

(WITH DIFFERENT

PROBLEM SOLVEING

PEOPLE AND CULTURES)

HARD WORKING

ECOFRIENDLY

OPEN MINDED

EMPATHIC

FOCUSED ON PEOPLES NEEDS

CREATIVE OPTIMISTIC



»» PROJECTS

› RESIDENTAL HOUSING MALVAZINKY, › RESIDENTAL HOUSING SØNDERBROGADE, »» HAND DRAWINGS

PRAGUE, CZECH REPUBLIC HORSENS, DENMARK


>>MALVAZINKY RESIDENTIAL HOUSING

view to Peacock hill LESS BUSY ROAD

main axis coming from the church

MAIN ROAD city panorama view

Âť

Perfect location between city centre,Old town and big natural country side, surrounded by city parks predetermines this area for family living. Surrounded houses are mixture of houses from 1950, 1989 and new modern houses. By walking in the area you can meet people different ages, from older people, mums with pushchairs to young children coming from schools. Main dominant of Malvazinky area is St. Filip and Jakub church, which is located in the middle of Malvazinky cemetary. Despite areas potential, surrounded landscape is very neglected, that is why project includes also small square before the plot.


tes walking minu 10

20 min utes wa lkin g 15 minutes wa lkin g

OLD TOWN

NATURAL PARKS

SWIMING POOL PODOLI THE CLOSEST BUS LINE THE CLOSEST SUBWAY LINE BIKE RUTE SKATE LINE PODOLI CITY PARK AREAS


CONCEPT ÂŤ Âť SITE PLAN

Special effort was put into keeping the shape of the building clean and straightforward, because the area arround the plot is already mixture of different architectural styles. I have kept the axis coming from the church continuing through the object, so people coming from top of the street, guided straight to the coffe in the middle between main blocks of the building can enjoy beautiful view on Prague. The south facade is opened to view on nearby hill. However the area around the plot is dislocated from any small coffes, groceries and the other small shops, i decided to design coffe and two small shops in the first floor of the building. There is also underground parking floor for the residents.



ELEVATION WEST FACADE

FLOOR PLAN 1st FLOOR


ELEVATION SOUTH FACADE

FLOOR PLAN 2-4th FLOOR


ÂťGARDEN

The purpose of the proposal was to create public, semi private and privat areas around the building and so make the building opened and used by everybody and still keep the private areas for residents, where can they feel comfortable, enjoy morning coffe or play with children.


»WINDOW DETAIL

WEST FACADE


>>SOCIAL RESIDENCE SØNDERBROGADE 34-48

AS THE INTERNATIONAL STUDENTS AT VIA UNIVERSITY, WE WERE ASKED TO WORK IN GROUPS BY 4. EACH OF US WAS FROM DIFFERENT COUNTRY FROM SLOVAKIA, POLAND, SPAIN UP TO AUSTRALIA. MAIN WAY OUT OF HORSENS

OLD BUILDINGS FROM 1870 KEEPING THE STREET

LINE

DOMINANT OF THE SURROUNDING IS

SØNDERBRO CHURCH BUILD IN NEW BUILDINGS FROM 1950

MAIN NOISY ROAD TO THE CITY CENTRUM, WAY TO THE UNIVERSITY

»CONCEPT solution

S

TR

EE

T S

TR

EE

T ST

R

EE

T


RESIDENTS VIEW

pick up the area

RANGE OF VISIBILITY

GREEN ROOF

+12,700

+10,200

+7,200

ST

R

EE

T

+4,200 +2,300 +1,200 +0,000

+1,200 +0,000


FLOOR PLAN 1-3rd FLOOR

ELEVATION

SOUTH-WEST FACADE

ÂťFLOOR PLAN FLEXIBILITY

The apartment design for this development allows for considerable flexibility in layout arrangements as demonstrated in the adjacent diagram. Only the kitchen and bathroom placement is fixed in order to maintain consistency in service layouts and cost planning. None of the internal walls are load bearing and can be moved or removed to meet client requirements. Families, single persons, pairs of friends, people with specific access requirements and many other living arrangements can be catered for with the flexibility of this development.


FLOOR PLAN

ROOF FLOOR

ELEVATION

NORTH-EAST FACADE



SUSTAINABLE DESIGN OF THE DEVELOPMENTÂť

SOLAR PENETRATION The orientation of this design allows for excellent solar exposure and light penetration. In both the winter and summer months residents will enjoy ample natural light and passive heating of their apartments. Hot summer afternoon sun is controled with a shade system installed in the balcony frame where residents can also enjoy Spring, Summer and Autumn sunsets. SUMMER WESTERN EVENING SUN

Airtight envelope surrounds building to ensure effective ventilation system function

Fresh air is supplied to the bathroom, bedrooms and living room

SOLAR PANELS AND CELLS

Energy from solar panels used for heating the water

SUMMER SOUTHERN MIDDAY SUN

SUMMER EASTERN MORNING SUN Hot water storage tange, pump and auxillary heating system are placed in basement

WESTERN WINTER EVENING SUN

Collected rainwater is used for toilets and WM

MID-DAY SOUTHERN WINTER SUN

EASTERN WINTER MORNING SUN

Storage tank and filtration system

VENTILATION The apartement layout in this development allows for efficient and effective ventilation. By positioning two service shafts at either side of each unit we are able to circulate fresh clean air through the bedrooms and living areas to Ventilation extraction points in the extraction bathroom and kitchen. located in This creates an kitchen excellent internal environment in each Air exchanger and apartment with no heating is hidden within humidity or moisture the elevator shaft issues.

SOLAR ENERGY SYSTEM Solar energy systems have been factored in to the orientation of this development and the roof design. The South East and North West facing gabled roof on each apartement means that solar hot water and PV cells could both be included in the development. We have estimated a total of 3900 kW/h are available annually from this system.

GREEN ROOF OVER PARKING

RAINWATER HARVESTING SYSTEM The development has capacity to harvest rainwater for the operation the buildings grey water systems like toilets and washing machines. With a large basement area there is capacity for water storage tanks and filtration systems. An electrical pumping system power by Solar PV panels will move the rainwater throughout the building.


U SHAPED CONCRETE FRAME

CONCRETE COLUMN

WOODEN SKIRTING (FC) INSULATION 10mm (WC) CAST IN-SITU CONCRETE (FC) WOODEN DECK BOARDS 25mm (CPT) POLY VAPOUR BARIER 2mm (FC) SMOOTH CONCRETE FINISH 5mm (WC) CAST IN-SITU CONCRETE 70mm (WC) HARD SOUND INSULATION 30mm (WC) HOLLOW-CORE DECK 220mm (WC) PLASTER 4mm (PST)

cast in-situ concrete filling(CC) steel reinforcement (CC) NEOPRENE RUBBER (CC)

NEOPRENE RUBBER (CC) ANCHOR BOLT (CC) MOUNTING WALL BRACKET (CC) SUPPORT FOR STEEL BRACKET (CC)

FASTENING DOWEL (WC) THERMAL SEPARATOR (WC) WALL BRACKET (WC)

PREFAB. CONCRETE SLAB

»BALCONY CONSTRUCTION

Solveing the balcony construction was part of my Detail 2 specialization.

REINFORCEMENT IN THE CONCRETE COLUMN (CC)

ANCHOR BOLT (CC) FOUNDATION PAT (CC) NEOPRENE RUBBER (CC)

GROUND SLAB


STEEL BRACKET ELEMENT FIXED TO THE CONCRETE COMPONENT(CC)

WOODEN SKIRTING (FC) INSULATION 10mm (WC) CAST IN-SITU CONCRETE (FC)

SLIDING FRAME OF THE DOOR (WNC)

TWO STEP JOINT (WNC)

WOODEN THRESHOLD (CPT)

CEMENT BOARD (WNC)

RUBBER JOINT (WNC)

STEEL BRACKET (WNC)

JOINT(WC)

ANCHOT BOLT (CC) MOUNTING WALL BRACKET (CC) SUPPORT FOR THE STEEL BRACKET

CAST IN-SITU CONCRETE (CC)

WOODEN DECK BOARDS 25mm (CPT) POLY VAPOUR BARIER 2mm (FC) SMOOTH CONCRETE FINISH 5mm (WC) CAST IN-SITU CONCRETE 70mm (WC) HARD SOUND INSULATION 30mm (WC) HOLLOW-CORE DECK 220mm (WC) PLASTER 4mm (PST)

NEOPRENE RUBBER (CC)

STEEL L BRACKET (WNC)

1:7

SECTION B-B

ATTACHEMENT TO THE WALL

ZINC PROTECTION AGAINST WATER (WC)

1:7

SECTION A-A

SECTION THROUGH THE BALCONY DOORS

SEALANT (WC) WOODEN LINING (CPT) AIRTIGHT FOIL (WNC) SEALANT(WNC) TWO STEP JOINT (WNC) PU RIGID FOAM (WNC) WOODEN WINDOW FRAME(WNC)



»HAND DRAWINGS




NatĂĄlia KostelnĂ­kovĂĄ born in 1992, Slovakia

email: n.kostelnikovagmail.com skype: natalia.kostelnikova tel.: +420 774 209 613 +421 902 785 757 current address: Slotsgade 19C, st. 194 8700, Horsens, Denmark


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.