Portfolio Nataliia Dnes

Page 1

GSPublisherEngine 0.46.100.59

NATALIIA DNES DESIGNER / ARCHITECT



E D U C A T I O N TECHNICAL UNIVERSITY OF VIENNA . AUSTRIA DIRECTION «ARCHITECTURE»

2014 SUMMER

EASA «EUROPEAN ARCHITECTURE STUDENTS ASSEMBLY». BULGARIA.

2011-2013

LVIV NATIONAL POLYTECHNIC UNIVERSITY. UKRAINE DIRECTION «ARCHITECTURE AND DESIGN»

2013 SUMMER

EASA «EUROPEAN ARCHITECTURE STUDENTS ASSEMBLY». SLOVENIA.

2007-2011

LVIV NATIONAL POLYTECHNIC UNIVERSITY. UKRAINE DIRECTION «ARCHITECTURE AND DESIGN»

2010 SUMMER

UNIVERSITY PRAXIS. POLAND.

2004-2007

NATURE - MATHEMATICAL LYZEUM . UKRAINE DIRECTION «MATHEMATICAL»

1997-2004

SECONDARY SCHOOL 22. UKRAINE

2012 MASTER

MASTER’S

-ONGOING

STUDIES

DEGREE

BACHELOR’S DEGREE

HIGH

FIRST

NATALIIA DNES DESIGNER / ARCHITECT DNESYA.N@GMAIL.COM + 4 3 6 6 0 2 8 7 5 8 2 5

P

R

O

F

I

L

E

FIRSTLY, I MUST ADMIT THAT I GREW UP IN A FAMILY OF DESIGNERS AND ARCHITECTS. IN 2012 I MOVED TO VIENNA TO EXPAND MY KNOWLEDGE AND WAS GRANTED A PLACE AT THE «VIENNA UNIVERSITY OF TECHNOLOGY». HERE I HAD THE OPPORTUNITY TO SPECIALISE IN THE SUBJECTS I PREFER. MY SPECIALIST SKILLS INCLUDE 3D VISUALIZATION, GRAPHIC DESIGN, COLLAGE AND PRODUCT DESIGN. MY WORK EXPERIENCE HAS BEEN QUITE DIVERSE, WHICH HAS GIVEN ME THE OPPORTUNITY TO THRIVE IN A VARIETY OF DISCIPLINES. I LIKE TO WORK WITH MY HANDS. I HAD A CHANCE TO PARTICIPATE IN SET AND COSTUME DESIGN FOR THE REKNOWNED SCHLOSSTHEATER SCHOENBRUNN IN VIENNA. I HAVE DEVELOPED MY GRAPHIC DRAWING SKILL SET THROUGH VARIOUS COLLABORATIVE PROJECTS WITH THE ARTIST TOMAK. MY OTHER ROLES INCLUDED ASSISTING AND HELPING TO ORGANIZE ONE OF HIS PERFORMANCES AND MANY EXHIBITIONS. HAVING WORKED AT SEVERAL ARCHITECT FIRMS I LEARNT HOW TO COOPERATE WITH CLIENTS AND FIND SOLUTIONS BASED ON TEAM EXPERIENCE. MY EXPERIENCE OF PARTICIPATING IN THE ARCHITECTURE COMPETITION, VIENNA TAUGHT ME TO PRODUCE WORK AT A PROFESSIONAL LEVEL WHILE UNDER HIGH PRESSURE CIRCUMSTANCES. I AM CURRENTLY FREELANCING, WHICH HAS GIVEN ME THE OPPORTUNITY TO BE MOBILE AND WORK WHEREVER I MAY BE. I LOVE STUDYING AND CREATING NEW PLACES UND DESIGN OBJECTS .

WORKSHOPS EXPERIENCE

SCHOOL

V E L I K O -T E R N O V O

Z U Z E M B E R G

K

I

E

L

C

E

SCHOOL

P R O F E SS I O N A L S K I L L S WORK

EXPERIENCE

2016 EUROPA

WORKING LIKE AS AN FREELANCER 3D DESIGER AND DRAFTSMAN .

2015 VIENNA

ARCHITECTURE OFFICE «HADAYA -DIEM» WORKING AS A DESIGNER AND VISUALIZER .

2014 VIENNA

ASISTENT BY ARTIST TOMAK. WORKING AS A PAINTER.

2013 VIENNA

ARCHITECTURE OFFICE «KUNSTUNDARCHITEKTUR» WORKING AS A DESIGNER AND VISUALIZER .

2013 VIENNA

ASISTENT BY «SCHOENBRUNNSCHLOSS OPER». WORKING AS A STAGE-DESIGNER AND KOSTUMER .

2012 VIENNA

ARCHITECTURE OFFICE «SCHLUDERARCHITECTUR» WORKING AS A DESIGNER AND VISUALIZER .

2011UKRAINE

DESIGN STUDIO «DNES» . DESIGNER AND VISUALIZER .

- ONGOING

- ONGOING

- ONGOING

- 2014

- WINTER

- 2013

- SUMMER

ARCHITECTURE COMPETITION 2016 VIENNA

„ BSZ BRUCK AN DER LEITHA” BY ARCHITECTURE OFFICE “TREBERSPURG & PARTNER ARCHITEKTEN” . THE FIRST PLACE.

2016 VIENNA

„WBW PURKERSDORF - WIENERWALDBAD“ BY ARCHITECTURE OFFICE “TREBERSPURG & PARTNER ARCHITEKTEN” . THE SECOND PLACE.

2015 VIENNA

“BAUTRÄGERWETTBEWERB KAGRAN WEST III” BY ARCHITECTURE OFFICE “TREBERSPURG & PARTNER ARCHITEKTEN” . THE SECOND PLACE.

- WINTER

- WINTER

- SUMMER

SKETCHUP

PHOTOSHOP

ARCHICAD

INDESIGN

AUTOCAD

MICROSOFT OFFICE

3DS

STUDIO

MAX

DRAWING

V-RAY

L

COLLAGE

A

N

E N G L I S H G E R M A N P O L I S H R U S S I A N UKRAINIAN

G

U C C C E N

-

O O O X

A M M M C A

P E R S O N A L

M M M E T

G

U N I C U N I C U N I C L L E I V

N

T

PRODUCTDESIGN

E ART

R

S A A A N E

T I V E T I V E T I V E T

S K I L L S

CREATIVITY KNOWLEDGE 3D PRINTING COMMUNICATION MOTIVATION

I

E

E

COLLAGE

S

FLEXIBILITY PUNCTUALITY

T

FASHION

S DANCE



- STUDENT PROJECTS -


CITY-RIVER IN KELCE, POLAND

IDEA, FUTURISTIC CONCEPT ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2010


CITY-RIVER IN KELCE, POLAND

IDEA, FUTURISTIC CONCEPT ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2010


NEW DISTRICT IN LVIV, UKRAINE

IDEA, FUTURISTIC CONCEPT ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2010


NEW DISTRICT IN LVIV, UKRAINE

IDEA, FUTURISTIC CONCEPT ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2010


FACADE RESTORATION IN LVIV, UKRAINE

ARCHITECTUAL ANALYSIS, DRAWING ____________________________________________________________________________ 2011


FACADE RESTORATION IN LVIV, UKRAINE

ARCHITECTUAL ANALYSIS, DRAWING ____________________________________________________________________________ 2011


MULTI-SPORT KOMPLEX IN LVIV, UKRAINE

IDEA, ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2012


MULTI-SPORT KOMPLEX IN LVIV, UKRAINE

IDEA, ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2012


MULTI-SPORT KOMPLEX IN LVIV. UKRAINE

IDEA, ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2012


MULTI-SPORT KOMPLEX IN LVIV, UKRAINE

IDEA, ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2012


WOOD PAVILION IN VIENNA, AUSTRIA

IDEA, DESIGN, PRODUCTION ____________________________________________________________________________ 2012


WOOD PAVILION IN VIENNA, AUSTRIA

IDEA, DESIGN, PRODUCTION ____________________________________________________________________________ 2012


FIBROSITY. NEW PASSAGE IN VIENNA, AUSTRIA

IDEA, FUTURISTIC CONCEPT ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2012


FIBROSITY. NEW PASSAGE IN VIENNA, AUSTRIA

IDEA, FUTURISTIC CONCEPT ARCHITECTURE, DESIGN, RENDERS ____________________________________________________________________________ 2012



- WORK PROJECTS -


41.32 m2 PARKETT

NOV 2015 BÜROGESTALTUNG johanna hadaya-diem architekt

164

250 T0

90 250 T0

114

BÜRO

F90

VAR. 1

E-CONTROL

RAUM 114

OFFICE “E-CONTROL” IN VIENNA, AUSTRIA

RENDERS ____________________________________________________________________________ 2016


OFFICE “NTG” IN VIENNA, AUSTRIA

158 257

120 258

120 258

120 258

120 258

120 258

120 258

120 258

1585 259

90 260

119 261

90 260

90 260

120 260

90 260 119 261

90 220 90 260

90 220

90 260

90 220

80 220

114 224

42 157

60 198

125 2265

90 260

80 220

118 2005 90 260

110 1995

110 1995

30 1965

119 2005

30 1965

30 1965

110 1995

114 224

BÜRO A

114 224

90 260

80 200

HVS

30 1965

90 260

90 220

119 2005

157

119 261 90 260

80 220

90 260

30 1965

90 260

90 260

0

90 260

80 220

120 200

119 261

110 1995

90 260

90 260

90 260

90 260

90 260

90 260

90 260

118 2005

118 2005

90 260

119 90 261 260

90 260

90 260

Trennwandvariante 2

119 261

Trennwandsystem: Holz mit Glasfeldern Türen: Holztüren

30 1965

90 260

BÜRO C

90 220

80 220

80 220

80 200

118 2005

95 227

90 260

95 227

Trennwandsystem: Holz mit 119 Glasfeldern 261 Türen: Holztüren AUFZUG

BÜRO B

AUFZUG

119 261

Trennwandvariante 2

114 224

114 224

BÜRO C

95 227

HVS

90 260

90 0 26

114 224

BÜRO B

120 200

90 260

95 227

90 0 26

BÜRO A

119 261

125 223 51 162

119 261

123 225

33 158

80 220

51 162

90 220

33 158

120 200

126 221

111 222

119 261

5 90 260

90 260

156 261

90 260

156 261

119 261

119 261

119 261

119 261

119 261

119 261

119 261

80 200

80 200

10 m

0

5

10 m

RENDERS ____________________________________________________________________________ 2016


CLASSIC APARTMENT IN VIENNA, AUSTRIA

RENDERS ____________________________________________________________________________ 2016


CLASSIC APARTMENT IN VIENNA, AUSTRIA

RENDERS ____________________________________________________________________________ 2016


CLASSIC APARTMENT IN VIENNA, AUSTRIA

RENDERS ____________________________________________________________________________ 2016


CLASSIC APARTMENT IN VIENNA, AUSTRIA

RENDERS ____________________________________________________________________________ 2016


CLASSIC APARTMENT IN VIENNA, AUSTRIA

RENDERS ____________________________________________________________________________ 2016


CLASSIC APARTMENT IN VIENNA, AUSTRIA

RENDERS ____________________________________________________________________________ 2016


RESTORANT “GASTHAUS” IN BUKOVEL, UKRAINE

RENDERS ____________________________________________________________________________ 2016


APARTMENT IN IVANO-FRANKIVSK, UKRAINE

DESIGN, RENDERS ____________________________________________________________________________ 2016


ARCHITECTURE COMPETITION “BAUTRÄGERWETTBEWERB KAGRAN WEST III” BY ARCHITECTURE OFFICE “TREBERSPURG UND PARTNER ARCHITEKTEN” IN VIENNA, AUSTRIA

TECHNICAL DRAWING, DIAGRAMS, COLLAGE ____________________________________________________________________________ 2015


ARCHITECTURE COMPETITION “BAUTRÄGERWETTBEWERB KAGRAN WEST III” BY ARCHITECTURE OFFICE “TREBERSPURG UND PARTNER ARCHITEKTEN” IN VIENNA, AUSTRIA

TECHNICAL DRAWING, DIAGRAMS, COLLAGE ____________________________________________________________________________ 2015


ARCHITECTURE COMPETITION „ BSZ BRUCK AN DER LEITHA” BY ARCHITECTURE BÜRO “TREBERSPURG UND PARTNER ARCHITEKTEN” IN VIENNA, AUSTRIA

Ansicht Nord

O RS

Ansicht Ost 1:200

E NN

Tag esli ch

tr e flex ion

+10,28

100

300

200

26

20

43

E MM SO

64

20 29

Verdunkelung, außenliegender Sonnenschutz

+6,64

100

300

200

WIN TER SON N

E

15

+7,28

64

29

20

15

+3,64

+3,00

300

TECHNICAL DRAWING, GRAPHIC 2016 DESIGN, COLLAGES ____________________________________________________________________________ 2015

300

„ BSZ BRUCK AN DER LEITHA”.


990424

Ur? Atus iditatessint ipit,4moptur? Qui totatet velestrum corepel estoreribus, ommodH/2 magnimus, aut labora nihillo dollest emporumqui verum Atus iditatessint Ur? Atus iditatessint laut Ur? aliciatur, sit eos re et liquia doluptatia site vid quaectest aut ut am fuga. Ost litiae nonsequ ipit, optur? Qui totaipit, optur? Qui tota-

Ur? Atus iditatessint

990424 ARCHITECTURE ipit, optur? Qui totaUr? Atus iditatessint Ur? Atus iditatessint COMPETITION „ BSZ BRUCK AN DER LEITHA” Ur? Atus iditatessint ipit, optur? Qui totaipit, optur? Qui totaipit, optur? Qui totaipit, optur? Qui totatet velestrum corepel tet velestrum corepel tet velestrum corepel tet velestrum corepel BY ARCHITECTURE BÜRO “TREBERSPURG UND PARTNER ARCHITEKTEN” IN VIENNA, AUSTRIA Kreativturm Bruck an dertetLeitha velestrum corepel tet velestrum corepel tet velestrum corepel tet velestrum corepel

urba Freiraner um

4

8

2

±0,00

-1,06

-1,12

mod magnimus, aut 5

6 4

6

3

1

2

9

4

-1,2m

3

5

1

5 4

-1,12

5

+0,40

4

+0,40

4

2

8

1

H/2

Grundriss Ur? Atus iditatessint ipit, optur? Qui totatet vele- OG 2 1:200 3 3 1. Bildnerische Erziehung 175,85m² strum corepel estoreribus,1 ommod magnimus, 12. Sammlung B.E. 28,26m² 4 3. Bildnerische Erziehung 2 75,14m² aut labora nihillo dollest emporumqui verum 4.Gang 27,51m ² 5.Putzraum 6,46m ² laut aliciatur, sit eos re et liquia doluptatia site 5 5 vid quaectest aut ut am fuga. Ost litiae nonsequ

0,00

3

+0,40

2

N

2

1. Bildnerische Erziehung 175,85m² Erziehung 175,85m² 1. Bildnerische 2. Sammlung B.E. 28,26m² 2. Sammlung B.E. 28,26m² 3. Bildnerische Erziehung 2 75,14m²Erziehung 2 75,14m 3. Bildnerische 4.Gang 27,51m ² 4.Gang 27,51m ² 5.Putzraum 6,46m ² 5.Putzraum 6,46m ²

4m

5 4

8

-1,12

-1,12

-1,06

6 +0,40

5

2

6

±0,00

-1,06

±0,00

-1,12

6

3 Lageplan 1:500

Ur? Atus iditatessint ipit, optur?Lageplan Qui totatet vele1:500 Lageplan 1:500 strum corepel estoreribus, ommod magnimus, Ur? Atus iditatessint1 9 9 dollest -1,2m emporumqui autoptur? laboraQui nihillo -1,2m verum ipit, tota2 1 2 3 laut aliciatur, sit eos re et liquia doluptatia site tet velestrum corepel 3 6 aut ut am fuga. vid quaectest Ost litiae nonsequ estoreribus, om- 5 ostiam sit quaepe audae nam est, sam, odione 4

Ur? Atus iditatessint Ur? Atus iditatessint Ur? Atus iditatessint Ur? Atus iditatessint ipit, optur? Qui totatet veleUr? Atus iditatessint ipit, optur? Qui totatet veleUr? Atus iditatessint ipit, optur? Qui totatet veleUr? Atus iditatessint ipit, optur? Qui totatet veleipit, Quiommod totaipit,estoreribus, optur?ommod Qui magnimus, totaipit, Quiommod totastrum corepel estoreribus, ommod magnimus, strum corepel strumoptur? corepel estoreribus, magnimus, strumoptur? corepel estoreribus, magnimus, aut labora nihillo dollest emporumqui verum aut laboraverum nihillo dollest verum labora nihillo dollest emporumqui aut emporumqui labora nihillo dollest emporumqui verum tet velestrum corepel tet velestrum corepel tetaut velestrum corepel laut aliciatur, sit eos re et liquia aliciatur, sit eos re et site liquia doluptatia sitealiciatur, sit eos re et liquia doluptatia site lautdoluptatia aliciatur,site sit eos relaut et liquia doluptatia laut vidfuga. quaectest ut am fuga. Ost litiae nonsequ vid quaectest aut ut am fuga. litiae nonsequ vidOst quaectest aut utestoreribus, am Ost aut litiae nonsequ vid quaectest aut ut am fuga. Ost litiae nonsequ omestoreribus, omestoreribus, omostiam sit quaepe audae nam est, sam, odione ostiam sit quaepe audae nam est, sam, odione mod magnimus, aut mod magnimus, aut mod magnimus, aut labora nihillo dollest labora nihillo dollest

Grundriss OG 2 1:200OG 2 1: Grundriss

N 2

3

N

1

3

1 2

-1,06

Schwarzplan 1:2000

-1,06

-1,12

Ur? Atus iditatessint ipit, optur? Qui totatet velestrum corepel estoreribus, ommod magnimus, aut labora nihillo dollest emporumqui verum laut aliciatur, sit eos re et liquia doluptatia site vid quaectest aut ut am fuga. Ost litiae nonsequ

H/2

4

0,00

Schwarzplan 1:2000

Schwarzplan 1:2000

-1,06

-1,12

Ur? Atus iditatessint ipit, optur? Qui totatet velestrum corepel estoreribus, ommod magnimus, aut labora nihillo dollest emporumqui verum laut aliciatur, sit eos re et liquia doluptatia site vid quaectest aut ut am fuga. Ost litiae nonsequ ostiam sit quaepe audae nam est, sam, odione

2

4m

5

0,00

estoreribus, ommod magnimus, aut

estoreribus, ommod magnimus, aut

H/2

beru Freirahigter um

estoreribus, ommod magnimus, aut

estoreribus, ommod magnimus, aut1

4m

1

-1,12

-1,12

estoreribus, ommod magnimus, aut labora nihillo dollest

Ur? Atus iditatessint ipit, optur? Qui totatet velestrum corepel estoreribus, om+0,40 mod magnimus, aut

estoreribus, ommod magnimus, aut labora nihillo dollest

estoreribus,+0,40ommod magnimus, aut labora nihillo dollest

+0,40

estoreribus, ommod magnimus, aut

-1,06

Schwarzplan 1:2000

Ur? Atus iditatessint Ur? Atus iditatessint Ur? Atus iditatessint ipit, optur? Qui totaipit, optur? Qui totaipit, optur? Qui totatet velestrum corepel tet velestrum corepel tet velestrum corepel estoreribus, omestoreribus, omestoreribus, omUr? Atus iditatessint iditatessint Ur? Atus iditatessint mod magnimus, aut mod magnimus, aut mod magnimus, aut Ur? Atus ipit, optur? Qui totaipit, optur? Qui totaipit, optur? Qui totalabora nihillo dollest tet velestrum laboracorepel nihillo dollest tet velestrum corepel tet velestrum corepel -1,06

Ur? Atus iditatessint ipit, optur? Qui totatet velestrum corepel estoreribus, ommod magnimus, aut labora nihillo dollest

urba Freiraner um

beru Freirahigter um

estoreribus, ommod magnimus, aut

urba Freiraner um

estoreribus, ommod magnimus, aut labora nihillo dollest

estoreribus, ommod magnimus, aut labora nihillo dollest

beru Freirahigter um

eativturm Bruck an der Leitha

±0,00

E r we iter ung des BSZ Bruck an der Lei tha

-1,06

Ur? Atus iditatessint ipit, optur? Qui totatet velestrum corepel estoreribus, ommod magnimus, aut labora nihillo dollest emporumqui verum Ur? iditatessint laut aliciatur, sit eos re etAtus liquia doluptatia site vid quaectest aut ut am fuga. Ost litiae ipit, optur? Quinonsequ totaUr? Atus iditatessint ostiam sit quaepe audae nam est, sam, odione

±0,00

+0,40

-1,12

an der Leitha

-1,06

Kreativturm Bruck ite ru ng des BSZ Bruck an der Leitha

N

+0,40

N

5

N

+0,40

Grundriss OG 2 1:200

warzplan 1:2000

+0,40

1 2

Ur? Atus iditatessint ipit, optur? Qui totatet velestrum corepel estoreribus, ommod magnimus, aut labora nihillo dollest emporumqui verum laut aliciatur, sit eos re et liquia doluptatia site vid quaectest aut ut am fuga. Ost litiae nonsequ ostiam sit quaepe audae nam est, sam, odione 0,00

3

3

6

6

5

5

4

1

8

8

-1,2m

4

3

1

3 4

5

-1,2m

5

4

5

2

8

6

3

1 9

6

-1,2m

4

1

5

6

Grundriss EG 1 1:200 1.Technisches Werken 1 60,04m² 2. Brennofenraum 15,05m² 3. Sammlung Tech.W. 30,00m² 4. Technisches Werken 2 60,00m ² 5. Maschinenraum 20,01m² 6. Gang 27,51m ²

N

1.Technisches Werken 1 60,04m² 2. Brennofenraum 15,05m² 3. Sammlung Tech.W. 30,00m² 4. Technisches Werken 2 60,00m ² 5. Maschinenraum 20,01m² 6. Gang 27,51m ²

Grundriss EG 1 1:200 1.Technisches Werken 1 60,04m² 2. Brennofenraum 15,05m² 3. Sammlung Tech.W. 30,00m² 4. Technisches Werken 2 60,00m ² 5. Maschinenraum 20,01m² 6. Gang 27,51m ²

3

2

0,00

3

Grundriss OG 1 1:200 1.Technisches Werken 1 60,04m² 2. Brennofenraum 15,05m² 3. Sammlung Tech.W. 30,00m² 4. Technisches Werken 2 60,00m ² 5. Maschinenraum 20,01m² 6. Gang 27,51m ²

5

6 5

Grundriss EGN 1 1:200

+0,40

2

1

N

+0,40

4. Technisches Werken 2 60,00m ² 5. Maschinenraum 20,01m² 6. Gang 27,51m ²

4. Technisches Werken 2 60,00m ² 3. Bildnerische Erziehung 2 75,14m² 5. Maschinenraum 20,01m² 4.Gang 27,51m ² 6. Gang 27,51m 5.Putzraum 6,46m ² ² +0,40

3

1

1.Technisches Werken1.Technisches 1 60,04m² Werken 1 60,04m² 2. Brennofenraum 15,05m² 2. Brennofenraum 15,05m² 3. Sammlung Tech.W.3.30,00m² Sammlung Tech.W. 30,00m² Grundriss OG 4.1Technisches 1:200 Werken4.2Technisches 60,00m ² Werken 2 60,00m ² 1.Technisches Werken 1 60,04m² 5. Maschinenraum 20,01m² 5. Maschinenraum 20,01m² 2. Brennofenraum 15,05m² 6. Gang 27,51m ² 6. Gang 27,51m ² 3. Sammlung Tech.W. 30,00m²

3. Sammlung Tech.W.3.30,00m² Sammlung Tech.W. 30,00m² Grundriss EG 1 ²1:200 4. Technisches Werken4.2Technisches 60,00m Werken 2 60,00m ² Grundriss OG 21 60,04m² 1:200 1.Technisches Werken 5. Maschinenraum 20,01m² 5. Maschinenraum 20,01m² 2. Brennofenraum 1. Bildnerische Erziehung15,05m² 175,85m² 6. Gang2. Sammlung 27,51m ²B.E. 28,26m² 6. Gang 27,51m ² 3. Sammlung Tech.W. 30,00m²

2

4

6

9

Ur? Atus iditatessint ipit, optur? Qui totatet velestrum corepel estoreribus, ommod magnimus, aut labora nihillo dollest emporumqui verum laut aliciatur, sit eos re et liquia doluptatia site vid quaectest aut ut am fuga. Ost litiae nonsequ 2

2

0,00

9

1. Bildnerische Erziehung 175,85m² 2. Sammlung B.E. 28,26m² 3. Bildnerische Erziehung 2 75,14m² 4.Gang 27,51m ² 5.Putzraum 6,46m ²

2

0,00

1 1:200OG 1 1: Lageplan 1:500 Grundriss OG Grundriss

Grundriss EG 1 1:200EG 1 1:200 Grundriss

Grundriss OG 2 1:200

+0,40

1

4

N 175,85m² 1. Bildnerische Erziehung 2. Sammlung B.E. 28,26m² 3. Bildnerische Erziehung 2 75,14m² 1.Technisches Werken1.Technisches 1 60,04m² Werken 1 60,04m² 4.Gang 27,51m ² 2. Brennofenraum 15,05m² 5.Putzraum ² 2.6,46m Brennofenraum 15,05m²

Ansicht Süd 1:200 OG 1 1:200 Grundriss

4

4

1.Technisches Werken 1 60,04m² 8 2. Brennofenraum 15,05m² 3. Sammlung Tech.W. 30,00m² 4. Technisches Werken 2 60,00m ² 5. Maschinenraum 20,01m² 6. Gang 27,51m ²

Ansicht SüdAnsicht 1:200 Süd Grundriss OG 1 1:200 1:200 1.Technisches Werken91 60,04m² 2. Brennofenraum 15,05m² 3. Sammlung Tech.W. 30,00m² 4. Technisches Werken 2 60,00m ² 5. Maschinenraum 20,01m² 6. Gang 27,51m ²

Ansicht West 1:200

2

3 Ansicht West 1:200 1 Ansicht West 1:20 -1,2m

5

„ BSZ BRUCK AN DER LEITHA”.

TECHNICAL DRAWING,2016 GRAPHIC DESIGN, COLLAGES ____________________________________________________________________________ Ansicht Süd 1:200 Ansicht West 1:200 2015

6


IDEENWETTBEWERB

1

ARCHITECTURE COMPETITION „ WBW PURKERSDORF – WIENERWALDBAD” BY ARCHITECTURE BÜRO “TREBERSPURG UND PARTNER ARCHITEKTEN” IN PURKERSDORF, AUSTRIA

IDEENWETTBEWERB

1

IDEENWETTBEWERB

1

KONZEPT

Orientierung

-Weiterführung Idee Altbestand -Süd-West Ausrichtung -Orientierung zu Grünraum und Sonne -vielfältige Ausblicke

Baukörper

1

Besser Parken

-klare Eingangssituation -Landmark - gute Sichtbarkeit von Tullnerbachstrasse -gedeckter Vorplatz -ausführbar in Bauphasen

IDEENWETTBEWERB

1

P

Treberspurg & Partner Archite

IDEENWETTBEWERB

Treberspurg & Partner A

Dachlandschaft durch Nutzung der IDEENWETTBEWERB

-32 neue Stellplätze -kostengünstig durch Parkdeck -erweiterbar auf 50 Stellplätze 1 -angehobene über Park1 deck für mehr Qualität -Schallschutz

KONZEPT Treberspurg & Partner Architekten

-vielseitiges Angebot an unterschiedlichen IDEENWETTBEWERB Freiraumqualitäten -Energiegewinnung und Verschattung durch PV Dachgarten -Gründach

Treberspurg & Partner Architekten

KONZEPT

KONZEPT

1 Liegetribüne

+1,07

0,32

2 Sportplatz

0,1

P

5

Orientierung

KONZEPT

KONZEPT

0,00

-Weiterführung Idee Altbestand -Süd-West Ausrichtung -Orientierung zu Grünraum und Orientierung Sonne -Weiterführung Idee Altbestand -vielfältige Ausblicke -Süd-West Ausrichtung -Orientierung zu Grünraum und Sonne -vielfältige Ausblicke

P

0,05

7 0,00

3 Boulderwand

4

4 Badespass -Weiterführung Idee Altbestand

5

-Süd-West Ausrichtung -Orientierung zu Grünraum und Sonne Sonnendeck -vielfältige Ausblicke

Baukörper

-klare Eingangssituation -Landmark - gute Sichtbarkeit von Tullnerbachstrasse -gedeckter Vorplatz KONZEPT -ausführbar in Bauphasen

Orientierung Büro

F: 9,51 m2

(optional)

1 Liegetribüne

0,00

Besser Parken

-Weiterführung Idee Altbestand -Süd-West Ausrichtung -Orientierung zu Grünraum und Orientierung Sonne -Weiterführung Idee Altbestand 2 -vielfältige Ausblicke -Süd-West Ausrichtung -Orientierung zu Grünraum und Sonne -vielfältige Ausblicke

P

-32 neue Stellplätze -kostengünstig durch Parkdeck -erweiterbar auf 50 Stellplätze 3 Orientierung Baukörper über Park-angehobene Liegefläche -Weiterführung Idee Altbestand -klare Eingangssituation 1mehr Qualität -Süd-West Ausrichtung -Landmark - gute Sichtbar1 Liegetribüne deck für -Orientierung zu Grünraum und keit von Tullnerbachstrasse Orientierung Baukörper 6 Sonne -Schallschutz -gedeckter Vorplatz -Weiterführung Idee Altbestand -klare Eingangssituation -3,13

-vielfältige Ausblicke -Süd-West Ausrichtung -Orientierung zu Grünraum und Sonne -vielfältige Ausblicke -3,14

-Weiterführung Idee Altbestand -Süd-West Ausrichtung -Orientierung zu Grünraum und Sonne -vielfältige Ausblicke

Baukörper

-klare Eingangssituation -Landmark - gute Sichtbar1 Liegetribüne keit von Tullnerbachstrasse -gedeckter Vorplatz -ausführbar in Bauphasen 1 Liegetribüne

-ausführbar in Bauphasen -Landmark - gute Sichtbar1 Liegetribüne keit von Tullnerbachstrasse -gedeckter VorplatzN 2 Sportplatz -ausführbar in Bauphasen

Besser Parken

Baukörper

Besser Parken

P

P

Besser Parken

-klare Eingangssituation -Landmark - gute Sichtbar1 Liegetribüne keit von Tullnerbachstrasse Baukörper -gedeckter Vorplatz -klare Eingangssituation -ausführbar in Bauphasen -Landmark - gute Sichtbar1 Liegetribüne keit von Tullnerbachstrasse -gedeckter Vorplatz 2 Sportplatz -ausführbar in Bauphasen

-32 neue Stellplätze -kostengünstig durch Parkdeck -erweiterbar auf 50 Stellplätze Besser Parken -angehobene über Par -32 neue Stellplätze deck für mehr Qualität -kostengünstig durch Par -Schallschutz -erweiterbar auf 50 Stellp -angehobene deck für mehr Qualität -Schallschutz

Dachlandschaft

-32 neue Stellplätze -kostengünstig durch Parkdeck durch Nutzung der 7 -erweiterbar auf 50 Stellplätze -vielseitiges 8Angebot an unterschied Besser Parken Dachlandschaft -angehobene über ParkFreiraumqualitäten 3 -32 Boulderwand neue Stellplätze deck für mehr Qualität -Energiegewinnung und Verschattu -kostengünstig durch Parkdeck durch Nutzung der -Schallschutz durch PV Dachgarten -erweiterbar auf 50 Stellplätze -vielseitiges Angebot an un -Gründach 8 -angehobene über ParkFreiraumqualitäten deck für mehr Qualität -Energiegewinnung und Ve durch PV Dachgarten 4 -Schallschutz Badespass -Gründach Dachlandschaft 7

Dachlandschaft P -800m2 mehr Liegefläche

+1,07

0,49

0,32

durch Nutzung der Dachflächen P -vielseitiges Angebot an unterschiedlichen Besser Parken 2 Sportplatz Freiraumqualitäten -32 neue Stellplätze 3 Boulderwand durch Parkdeck -kostengünstig durchVerschattung Nutzung der -Energiegewinnung und -erweiterbar auf 50 Stellplätze -vielseitiges Besser Parken Dachlandschaft 8 Angebot an unterschiedlichen -angehobene über Park5 -Sonnendeck 7 durch PVStellplätze Dachgarten Freiraumqualitäten -32 neue deck für mehr Qualität -Energiegewinnung und Verschattung -kostengünstig durch Parkdeck durch Nutzung der -Schallschutz 3 Boulderwand durch PV Dachgarten -Gründach -erweiterbar auf 50 Stellplätze -vielseitiges Angebot an unterschiedlichen

P

+1,07

0,1

4

2 Sportplatz -32 neue Stellplätze 3-kostengünstig Boulderwand durch Parkdeck -erweiterbar auf 50 Stellplätze -angehobene über Parkdeck für mehr Qualität -Schallschutz 3 Boulderwand 4 Badespass

-0,02

4 Badespass -angehobene deck für mehr Qualität -Schallschutz

Dachlandschaft 7 4 Badespass - 5 Sonnendeck

8 5 über Park--Gründach Freiraumqualitäten -Energiegewinnung und Verschattung PV Dachgarten 6 durch Aktivzone 7 -Gründach Schwimmbadkollektoren 5 0,32

+1,07

4

P

0,49

0,1

0,00

0,05

P

0,49

0,32

(optional)

0,1

0,00

4

durch Nutzung der -vielseitiges 8 Angebot an unterschiedlichen Freiraumqualitäten 7 -Energiegewinnung und Verschattung durch 5PVSonnendeck Dachgarten 6 Aktivzone -Gründach 5 8 7 Schwimmbadkollektoren -0,02

0,00

0,05

+1,07

TECHNICAL DRAWING, GRAPHIC DESIGN, COLLAGES ____________________________________________________________________________ 2 Sportplatz 8 2015 +1,07

-klare Eingangssituation -Landmark - gute Sichtbarkeit von Tullnerbachstrasse Baukörper -gedeckter Vorplatz 1 Liegetribüne -klare Eingangssituation -ausführbar in Bauphasen -Landmark - gute Sichtbarkeit von Tullnerbachstrasse -gedeckter Vorplatz -ausführbar in Bauphasen

+1,07

Lageplan 1:500

Orientierung

Baukörper

2 Sportplatz

KONZEPT

KONZEPT

-0,02

6 Aktivzone 7 Schwimmbadkollektoren

-klare Eingangssituation -Landmark - gute Sichtbarkeit von Tullnerbachstrasse -gedeckter Vorplatz -ausführbar in Bauphasen

8

0,49

Orientierung

Baukörper

-Weiterführung Idee Altbestand -Süd-West Ausrichtung -Orientierung zu Grünraum und Sonne -vielfältige Ausblicke

KONZEPT Treberspurg & Partner Architekten

IDEENWETTBEWERB

1

Orientierung

+1,07

Büro

F: 9,51 m2

-0,020,32

0,00

0,00

P

0,49

4

2

0,1

(optional)

0,00 0,05

Büro

F: 9,51 m2

0,49 0,32

P

3

0,00


ARCHITECTURE COMPETITION „ WBW PURKERSDORF – WIENERWALDBAD” BY ARCHITECTURE BÜRO “TREBERSPURG UND PARTNER ARCHITEKTEN” IN PURKERSDOR, AUSTRIA IDEENWETTBEWERB

Treberspurg & Partner Architekten

IDEENWETTBEWERB

3

Treberspurg & Partner Architekten 9 Saunaterrasse

2,00 Obe rl

icht

8

4,00

Obe rlich t

126 K

abin e

277

,00

Spin ning

n

m2

Obe rl

0,3 0,2 0,1

8 PV Dachgarten

4,00

50,0 0 m2

10 Treppe

icht

WC

13,1 5

DH

6,80 m2

H m2

Vorb ere 36,1 0

WC ich

/DU

7,35 m2

r Lage

m2

2

0m 14,9

0,00

DD

8,60

WC

D

2

,25 m 2 m 26

m. Bade m2

Arztz

i.

2

5m 15,2

5 15,2

sa /Kas Büro ,40 m2

bic Aero m2

16

40 200,

0,00

Ansicht Baukörper Tullnerbachstrasse 4,00

r Lage

ss Fitne m2 02 650,

2

5m 28,5

sse Terra m2 0 64,9

rk. e/Ve Küch ,00 m2

. Kühlr 2

80

6,30

m

Büro

4,00 2

0m 10,1

0,00

y Lobb

8,60

2

0m 58,0

WC 2 onal Pers m2 4,60 m

d pfba Dam 5 m2

ung 2 hließ Ersc 41,00 m

he Dusc m2 7,60

10,2

eD erob 2 Gard 75,00 m

P WC 2 m ü. 9,85 Teek 2 0m 15,5

Ansicht Baukörper Tullnerbachstrasse

10

a Saun 2

8

sage Mas 0 m2 10,4

sse Terra m2

5m 10,1

5 25,6

sage Mas 0 m2 10,0

P

eH erob 2 Gard 75,40 m

t ich erl Ob

tt Kle

d an erw

a Saun 2

ich ebere 2 Ruh 4,00 m

32 Stellplätze

5m 10,1

Grundriss EG 1:200 1. Bad Sommerbetrieb 2. Fitnesscenter Lobby, Garderoben

1

Erschliessung Liegelandschaft

Sola

a Saun 2 5m 10,1

rium2

8,00

11

ht erlic Ob

Grundriss UG 1:500

Sola

m

rium2

8,50

m

Grundriss OG 1:200

4 3

1 2

2

1. Gerätehalle 2. Sauna 3. Aerobic 4. Spinning

400

400

+8.00

400

3

3

400

+4.00

+0.00

+8.00

400

400

+8.00

9

+4.00

400

400

+4.00

Ansicht Süd 1:200

Ansicht Ost 1:200

-3.50

+0.00

+0.00

80 220

2

-3.50

TECHNICAL DRAWING, GRAPHIC DESIGN, COLLAGES ____________________________________________________________________________ 2015



- ART PROJECTS -


50 0

50 0

500

50 0

500

R = 355

GSPublisherEngine 0.46.100.59

500

500

500

„ TRILOGY OF OPERAS BY WOLFGANG AMADEUS MOZART” IN VIENNA, AUSTRIA

500

R = 355

STAGE DECORATION BY SCHLOSSTHEATER SCHOENBRUNN ____________________________________________________________________________ 2014

R = 355


FREE WORKS

WAX PICTURES ____________________________________________________________________________ 2015


PROJECT “HOW DO YOU FEEL ABOUT ARCHITECTURE”

CONTEMPORARY DANCE AND ARCHITECTURE ____________________________________________________________________________ 2015


COLLABORATION WITH ARTIST TOMAK

PAINTING ____________________________________________________________________________ 2015


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.