3 minute read

ROTARY DREAM PARK

The DREAM sculpture will be relocated to this new park by approximately summer 2023.

Phase 1 Improvements

The City is designing a new .619 acre park located on E. Front Street between N. Center Street and N. Mesquite Street and Union Pacific Railroad. The DREAM sculpture, currently located on property owned by the First Baptist Church east of Founders Plaza and the Levitt Pavilion, will be relocated to this new park.

Also, in recognition of their 100th anniversary, the Rotary Club of Arlington is donating a new sculpture which will also be located on the same site. The City will complete the design and construction for the installation of both pieces of work and maintain this park in the future.

The Rotary Club of Arlington has imagined and donated funding to be used on the commissioned sculpture to be done by Jen Lewin Studio. The sculpture will celebrate the Rotary Club’s 100 years of dedication, vision and involvement with the Arlington community.

The sculpture will be installed by approximately summer 2023 in conjunction with the centennial celebration. The masterplan of the new park will allow for an interactive experience and a gathering point for residents and visitors to downtown Arlington. The park’s location is ideal to connect the new developments on Front and Division streets to the increasing vibrant downtown core south of the railroad tracks.

Texas

Mineral Well Public Plaza

The City plans to rebuild history with this addition, expected to be completed in summer 2023.

This project will restore the famous Mineral Well that was torn down in 1951. This well is central to Arlington’s development and collective memory. As a result of this well and other historic buildings being torn down during the mid 1900’s, the Arlington community suffers from a disconnect with its historic past. Historic places and symbols are not well known to residents born outside of the city, and this is in part due to the limited number of recognizable cultural landmarks & lack of awareness of existing cultural landmarks. Recreating this historic well provides a platform to tell the story of one of the city’s most foundational places now lost to time. This Public Plaza development project will benefit both Arlington residents and heritage tourism efforts.

The project goal is to provide a public gathering place to memorialize the historic Mineral Well, through creation of a strong focal point and visual terminus for the view looking eastward down W. Main St. The proposed site is located at the west end of the plaza situated between City Hall and the George W. Hawkes Downtown Library.

The scope of work includes construction of a public plaza. The plaza will include focal point elements such as the architectural clock tower with art work, sculpted by a local artist, water feature, seating areas and sculptural elements that memorialize the Mineral Well.

The project will be funded through the Arlington Tomorrow Foundation and Arlington Parks and Recreation Department (APRD). APRD will operate and maintain the fountain and seek operating and maintenance funding in the City’s general fund budget to support these efforts. The City completed Competitive Sealed Proposal process of procurement for selecting the contractor. A selection committee conducted an evaluation process and selected a contractor who was deemed most qualified for this project. City Council approved Construction Contract with Millis Development and Construction - Dallas, LLC, of Missouri City, Texas in the amount $2,387,846.50. The Office of Business Diversity (OBD) recommended the City’s Aspirational 30% MWBE Goal for this contract. Construction began late 2022, with a dedication ceremony anticipated in summer 2023.

*Rendering

Entertainment District Corridor Landscape Improvements Entertainment District Landscape

Less than a mile north of Downtown Arlington is the Arlington Entertainment District. Well known for its increasing variety of professional sports franchises, Six Flags Over Texas, and Texas Live!, the District is readying itself for even more international attention with its growing number of sought-after hotels, an all-new Convention Center, and the National Medal of Honor Museum, all set to open within the next two years.

Conceptual design documents and construction documents for the existing medians along Six Flags Drive, from E. Copeland Road to Road to Six Flags E. have been completed. The landscape improvements will be limited within the existing medians and along portions of the existing right-of-way and amenities will include landscaping, irrigation, and light pole locations. The landscape design will be determined by the City, consultant, Six Flags Staff, and TxDOT through design meetings during the project, with an anticipated project completion date of summer 2023.

This article is from: