HALL OF DEMOCRACY DEVELOPMENT

WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

40 GEORGE STREET, BRISBANE 4000 DEVELOPMENT APPLICATION SUBMISSION

FINISHES SCHEDULE

ISSUE B: 09/11/2016

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03

REAL PROPERTY DESCRIPTION:

FN04 FN05 FN06 FN07

PROPERTY NUMBER: 879490 LOT NUMBER: 2B32444 LAND NUMBER: 10652634 DESCRIPTION: WIC NO.27446A&27446B - HARRIS TCE & WIC NO.27484A - THE MANSIONS WARD: CENTRAL LOT AREA: 5899 m2

FT01 FT02 FT03

LEGEND

ZONING: QPP-PC1 - PRINCIPAL CENTRE (CITY CENTRE) ZONE

BUILDING PROGRAM: EDUCATIONAL FACILITY / PUBLIC THEATRE / INFORMATION HUB BUILDING CLASS: CLASS 9B GFA: 2650m2 16 CAR SPACES.

GEORGE STREET / ALICE STREET EXTERNAL PERSPECTIVE

PROPOSED BUILDING DATA: BASEMENT PARKING SPACES: 97m2 END OF TRIP FACILITIES: 36m2 DRIVEWAY RAMP: 38m2 TOTAL BASEMENT GFA: 171m2

GROUND FLOOR RESTAURANT: 217m RECEPTION AREA: 160m2 AMENITIES: 100m2 TOTAL GROUND GFA: 388m2

FIRST FLOOR

COMPLIANCE NOTES NCC

AT ALL TIMES COMPLY WITH NCC AND LOCAL BUILDING AUTHORITY REQUIREMENTS. BUILDER TO SATISFY ALL REQUIRED DA CONDITIONS.

AUDITORIUM SPACES AND CONSTRUCTION TO COMPLY WITH NCC SECTION D TABLE D1.13 OFFICE SPACES AND CONSTRUCTION TO COMPLY WITH NCC SECTION D TABLE D1.13 ACCESS AND EGRESS IN THE BUILDING TO COMPLY WITH SECTION D SERVICES AND EQUIPTMENT FOR FIRE TO COMPLY WITH SECTION E FIRE WALLS TO COMPLY WITH SECTION C HEALTH AND AMENITIES REQUIREMENTS TO COMPLY WTIH SECTION F

EXCAVATE AS REQUIRED, DRAIN AWAY FROM BUILDING AT ALL TIMES CONNECTING TO EXISTING SEWER AND STORMWATER CONNECTIONS.

LIBRARY/STUDY SPACES: AUDITORIUM: 1015m2 AMENITIES: 100m2 TOTAL FIRST GFA: 1211m2

ALL LEVELS AND SET OUT POINTS TO BE CONFIRMED ON SITE. ALL REINFORCED CONRETE SLABS ARE TO BE LAID OVER A WATERPROOF MEMBRANE AND OVER A 50mm SAND BED. HAND RAILS AND BALUSTRADES TO COMPLY WITH NCC SECTION D. FIRE STAIRS TO COMPLY WITH NCC SECTION C AND D. ALL FIRE WALLS MUST BE FRL RATING 120/120/120 (IN ACCORDANCE WITH NCC SECTION C) AND MUST BE POURED TO CONNECT TO UNDERSIDE OF THE ROOF SHEETING.

SECOND FLOOR OFFICES: 515m2 AMENITIES: 118m2 AUDITORIUM: 128m2 WAITING AREAS: 290m2 TOTAL SECOND GFA: 1051m2

ALL FINISHES, MATERIALS AND STRUCTURAL COMPONENTS IS TO BE IN ACCORDANCE WITH STRUCTURAL ENGINEER'S DRAWINGS AND DETAILS. ANY DISCREPANCIES IN FINISHES OR MEASUREMENTS MUST FIRST BE CONFIRMED WITH ARCHITECT, PRIOR TO COMMENCEMENT OF WORK. WET AREAS TO COMPLY WITH SECTION F OF NCC. REFER TO HYDRAULIC ENGINEER'S DRAWINGS FOR PIPE LOCATIONS AND GRADIENTS TO BASEMENT SEWERAGE ROOM.

GFA SUMMARY In accordance with BCC definitions of GFA, the total GFA of the development does not include: services, vertical transport and the Basement.

ROOFER TO REFER TO HYDRAULIC ENGINEER'S DRAWINGS BEFORE PLACEMENT OF DOWNPIPES AND OVERFLOWS. TACTILE INDICATORS TO COMPLY WITH NCC SECTION D.

COVER PAGE SITE PLAN LANDSCAPE PLAN BASEMENT PLAN GROUND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN ROOF PLAN NORTH AND SOUTH ELEVATIONS EAST AND WEST ELEVATIONS SECTION 01 PART ONE SECTION 01 PART TWO SECTION 02 PART ONE SECTION 02 PART TWO SECTION 03 DETAILED FACADE SECTION 1 CONSTRUCTION DETAILS 1 CONSTRUCTION DETAILS 2 SERVICES DETAIL: CORE DETAIL PART ONE SERVICES DETAIL: CORE DETAIL PART TWO FIRE STAIR COMPLIANCE DETAIL FIRE TRAVEL DISTANCES WET AREA DETAILS

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16 B

Details

09.11.16

AUSTRALIAN STANDARDS FEMALE, MALE, AMBULANT AND PERSONS WITH DISABILITIES AMENITIES TO COMPLY WITH AS1428.1 ACCESS FOR PERSONS WITH DISABILITIES TO COMPLY WITH AS1428.1 INCLUDING RAMP GRADIENTS AND DISTANCES (MAX 1:14 WITH LANDINGS EVER 9m) TACTILE GROUND INDICATORS TO COMPLY WITH AS1428.1. TGSI'S TO BE 300mm FROM THE END OF A STAIR OR CHANGE IN GRADIENT AND BE 600mm DEEP. CAFE AND BAR TO COMPLY WITH AS4674-2004. WATERPROOF LOUVRES PROVIDED FOR MECHANICAL VENILLATION.

COUNCIL REQUIREMENTS AND LOCAL AUTHORITIES BUILDING MUST BE A COMPULSARY 3m SET BACK FROM BOUNDARY LINE. DRIVEWAY, CAR PARK AND LOADING DOCK MUST COMPLY WITH THE TRANSPORT ACESS PARKING, PLANNING AND SERVICS POLICY.

GROUND FLOOR: 388m2 FIRST FLOOR: 1211m2 SECOND FLOOR: 1051m2 TOTAL GFA: 2650m2

A100 A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A201 A203 A204 A301 A302 A303 A305 A401

LOCATION PLAN

STANDARD BUILDING NOTES CLASS 9B BUILDING REFER TO RELEVANT CONSULTANT DRAWINGS FOR INFORMATION RELATED TO MECHANICAL VENTILATION, HYDRAULIC, ELECTRICAL SERVICES. REFER TO INTERIOR CONSULTANT AND LANDSCAPE ARCHITECT'S DRAWINGS FOR FIT-OUTS AND LANDSCAPE DESIGN DETAILS. REFER TO SURVEY INFORMATION FOR PROPERTY BOUNDARIES AND OTHER SITE INFORMATION. REFER TO CIVIL ENGINEER'S DRAWINGS FOR EARTHWORKS AND ROAD WORK LEVELS. ALSO REFER TO ENGINEER'S DRAWINGS FOR CONCRETE SLABS, FOUNDATION AND FOORING DETAILS- ALL FOOTINGS DRAWN IN THIS SET IS AN INDICATION ONLY.

2

DRAWING SCHEDULE:

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

HEIGHT OF BUILDING DOES NOT EXCEED 20m IN ACCORDANCE WITH AIR CRAFT EASEMENT HEIGHTS AND TO NOT DWARF HERITAGE BUILDING.

DRAWN 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016

CHECKED 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016

GENERAL NOTES PRIOR TO COMMENCEMENT OF WORK, COMPLY WITH ALL SAFETY STANDARDS INCLUDING REQUIREMENTS FOR REMOVAL OF HAZARDOUS MATERIALS. COMPLY WITH ALL COUNCIL REQUIREMENTS REGARDING ROADWORK SAFETY AND CONTACTING SURROUNDING PROPERTIES OF DURATION AND SCOPE OF WORK. VERIFY LOCATION OF EXISTING SERVICES SUCH AS SEWERAGE AND STORMWATER CONNECTIONS PRIOR TO CONNECTIONS BEING MADE. PLOTTED LOCATION OF EXISTING SERVICES ON PLANS IS AN INDICATION ONLY.

DISCLAIMER THIS DRAWING SET AS WELL AS ANY SCHEDULES OR DOCUMENTS PROVIDED IS A LEGAL TRANSFER OF INFORMATION. THE ELECTRONIC DATA SHARED IS FOR CONVENIENCE OF USE AND REMAINS THE PROPERTY OF INSIDE OUTSIDE ARCHITECTURE. COPYING OR REPRODUCTION OF THIS DRAWING OR ELECTRONIC COPY WITHOUT THE EXPRESS WRITTEN CONSENT OF INSIDE OUTSIDE ARCHITECTURE IS NOT ALLOWED.

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

ACCURACY OF SERVICE INDICATIONS IN ALL DRAWINGS SHOULD NOT BE TAKEN OVER ENGINEERING CONSULTANT DRAWINGS.

CONSTRUCTION 2METERS FROM ANY EXISTING UNDERFROUND PIPEWORK IS NOT PERMITTED UNLESS PRIOR ORGANISED AND PERMITTED BY COUNCIL. ACCESS AND EGRESS FOR PERSONS WITH DISABILITIES TO COMPLY WITH AS1428.1

CONTRACTORS TO CONFIRM ALL DIMENSIONS AGAINST SITE MEASUREMENTS AND ANY DISCREPANCIES ARE TO BE CONFIRMED WITH THE ARCHITECT PRIOR TO COMMENCEMENT OF WORK.

REFER TO ENGINEER'S DRAWINGS IN CONJUNCTION WITH LANDSCAPE ARCHITECT'S DRAWINGS FOR RETAINING WALL DETAILS. PROVIDE ALL NECESSARY EXPANSION AND AND CONSTRUCTION JOINTS.

THIS DRAWING SET IS TO BE READ IN CONJUNCTION WITH DOOR AND WINDOW SCHEDULES, SPECIFICATION TABLES AND ANY OTHER DOCUMENTS (ENGINEER CONSULTANT DRAWINGS, SURVEY ETC).

CONTRACTOR TO ACQUIRE FINAL SERVICE CERTIFICATIONS FROM EACH CONTRACTOR AND ENGINEER AT THE COMPLETION OF CONSTRUCTION FOR BUILDING CERTIFIERS.

COPYWRITER OF THIS DRAWING AND ALL WORKS EXECUTED FROM SUCH, REMAINS THE PROPERTY OF INSIDE OUTSIDE ARCHITECTURE.

PERFORMANCE/DESIGN SOLUTIONS ARGUMENTS

i inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries

PUBLIC FOOTPATH AND SURROUNDING LANDSCAPE DESIGN

35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

IN THE BRISBANE CITY COUNSIL CITY PLAN CH4, GEORGE STREET IS A SUBTROPICAL BOULEVARD, WHICH INDUCED THE PLANTING OF LEOPARD TREES. THIS REQUIRES 6m OF NEW MIN. PUBLIC FOOTPATH WIDTH. EXISTING FOOT PATHS WILL BE REPAVED AND MAINTATINED WITH LANDSCAPING LIGHTING SEATING AND CITY CYCLE PROVISIONS PROVIDED.

COVER PAGE Status:

DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID GSEducationalVersion

A100

Revision

A


LINE TYPES COUNCIL WATER SUPPLY MAIN COUNCIL SEWERAGE MAIN

WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

59

29

19

147

RP NUMBER: 159900

SP NUMBER: 253246

RP NUMBER: 201074

SP NUMBER:597 241724

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03

SWMH

FN04 FN05 SWMH

FN06 FN07 FT01 FT02 FT03

LEGEND

▼1 3, 5 00

TELSTRA PIT

TELSTRA PIT

90°

41° 38' 31" 90.30m

PROPERTY BOUNDARY

TGSI

3,000

BICYCLE ACCESS

B.C.C SET BACK

▼14, 000

TELSTRA PIT

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

▼13, 00 0

GEORGE STREET

33°

PRIMARY PEDESTRIAN ACCESS

FALL

1:80

L FAL

SI TG

EXISTING HERITAGE BUILDING

FG

1:80

1:80

1:80

149°

90°

135°

145°

18

PROPOSED E.O.T ABOVE E.O.TGROUND PARKING FACILITIES

FIRE STAIRS 19 17

20

16

21

15

22

14

23

13

24

12

25

11

26

10

27 28 29

7

30

6

31

120° 90°

31 x 177 = 5,500

5

ARTIFICIAL POND

4 3 2

LINE OF FLOOR OVER

1:80

9 8

105°

FG

1:80

1:80

1:80

1

131° 135°

FALL

162°

1:80

165°

1:80

90° COL01

COL01

ARTIFICIAL POND

UP

58°

1 2

90°

3 4

135°

5 6 7

LIN

UP 8

E

OF

90°

9

FL

82° OO

R

10 11

ARTIFICIAL POND

12

TGSI

13

1:80

0 1:8

1:80

19 20 21

FG

1:80

166°

1:80

47°

135°

135°

170° TGSI

COL01

ARTIFICIAL POND

TGSI

147°

100°

GARDEN BED FG

W0.01

W0.02

WT01

W0.04

1:80

002 FLEXIBLE EXHIBITION AREA

METAL SCREEN

CT RL: 13, 000

146°

FN-04

D0.02 WT06 120/120/120

730 580 528

15

WT01

24 21

LINE OF FLOOR OVER

1

3

2

14

36

25

B

Details

09.11.16

69 RP NUMBER: 414 SL8740

1:80

FG

1:80

1:80

FALL

23 20

22 19

21 18

20 17

16 19

15 18

17 14

13 16

5

D0.04

FIT-OUT BY OTHERS

1:80

4

CONC RL: 13, 000

D0.06 D0.10

7

WC11

CT RL: 13, 000

WT02

WT01

CONC RL: 11, 620

D0.08

010 ELECTRICAL CUPBOARD CHW CONC RL: 11, 670

F+R DN200

COL01

D0.07

LOADING DOCK LIFT

HB09

HLV

FE

CONC RL: 11, 670 MSSB

MAX HEIGHT: 2372 MIN HEIGHT: 362

SERVICE LIFT CONC RL: 11, 670

FE

57° 21' 29" 27.7 9m

CONC RL: 13, 000

WT01

012 STORE WT01

14

16

15

17

18

20

13

015 BIN WASH

011 PWD AMENITIES

FE

009 MECH PLANT ROOM

WT01

D0.09

TGSI 2 1

4

D0.15

013 LOADING DOCK COL02

UP

172°

HC

SERVICE BAY 2 CONC RL: 11, 670

SERVICE ACCESS

TGSI

D0.16

014 FIRE CONTROL ROOM RL: 11, 670

3 2

PROPERTY BOUNDARY

D0.17

FALL

FALL

DRIVEWAY CROSSOVER

VEHICLE ACCESS

3,000 B.C.C SET BACK

LINE OF FLOOR OVER

1

UP TGSI

EXH

FG

FIRE BOOSTER

WATER PUMP

TRANS FORMER

1:80

TY BOUN

UP

EXH

PROPER

EXH

DARY

1:80

1:80

DRIVEWAY

3 2

1:80

CONC RL: 11, 670

RAMP GRADIENT 1:20

1

1:80

SUBSTATION

1:80

SWMH

CONC RL: 11, 670

FHR

WT01

▼12 , 000

WT01

WT02

SERVICE BAY 1

HYDRAULICS RISER

RAISED GRASS BED

COL01

TGSI

CONC RL: 11, 670

TGSI

1:80

008 KITCHEN

3

1

FALL

COL01

D0.14

2

FG

WT06 120/120/120

D0.05

UP UP

Revision Date A 26.08.16

EXH

UP

1

2

TGSI

19

21

146°

HC

CONC RL: 11, 670

RAMP GRADIENT 1:6COL02

3

1:80

WT02

CONC RL: 13, 000

CT RL: 13, 000

D0.13

UP

FOOT PATH

1

Revision History

6

9

8

7

6

5

10

4

3

11

COL02

014 BINS

HYDRAULICS RISER

1:80

1 A303

80°

CT RL: 13, 000

D0.11

WT02

WT01

1:80

FG 1:80

1:80

169°

FIRE STAIRS 03

007 DRY

D0.12

102°

145°

2

1

12

FALL

1:80

SHARED PATHWAY

HV

GARDEN BED

1:80

UP

8

UP

GARDEN BED

1:80

FG

9

UP

FIT-OUT BY OTHERS

PROPOSED DEVELOPMENT OUTLINE TOTAL GFA: 2,650 m2 3

11 10

613

H O.

12

26

COL01

3 2

TGS I

25

12

47

N

CONC RL: 13, 000

14 13

COL01

COL01

CONC RL: 12, 950 FIT-OUT BY OTHERS

58

AI

GRAND ATRIUM

24

006 COLD

004 BAR

005 RECEPTION AND TICKETS

22 23

D0.03

WT06 120/120/120

69

RT

15

FN-01

PS

FN-02

10 7

CU

RP NUMBER: 2B32444 FN-01

73°

TGSI

FN-05

FN-05

FIRE STAIRS 04

8 11

UP

E

49°

OK

73°

SM

ARTIFICIAL POND

16

FN-02 METAL SCREEN

10 13

LINE OF FLOOR OVER

18 17

4

21

12 9

40

LP

19

14 11

21 20

148°

19 20

15

LIGHT PIPE OVER HEAD

22

COL01

EXH

23

COL01

600 1,012 520 700

ARTIFICIAL POND

1,200

154°

TGSI

FN-05

WT02

125°

3,164

CT RL: 13, 000

NORTH EAST PANELS OF ATRIUM AUTOMATED FOR VENTILATION

TGS I

17 18

PASSENGER LIFT 01

WT02

GARDEN BED

UP

3,999

003 CAFE

1:80

COL01

COL01

COL01

16

▼12 , 500

1:80

3,000 B.C.C SET BACK

LP

TGSI

157°

FG

139°

95°

B.C.C SET BACK

W T0 1

CT RL: 13, 000

TGS I

COL01

3,000

WPL

MAILBOX

D0.01

W0.03

FN-01

001 EVENT INFORMATION

1:80

1:80

1:80

LINE OF

ARTIFICIAL POND

WPL

1:80

OVER

159°

FLOOR

113°

90° 164°

1:80

128° 124° 120°

56°

135°

90° FA LL

1:80

COL01

ARTIFICIAL POND

UP 1:80

118°

1:80

FG

1

GARDEN BED

1:80

1:80

COL01

2

1:8 0

FG

162°

142°

3

1:8 0

SHARED PATHWAY

4

1:80

80° 1:80

121°

COL01

▼11, 500

ARTIFICIAL POND

18

22

GARDEN BED

1

17

PROPERTY BOUNDARY 48° 21' 29" 44.59m

48° 21' 29" 72.04m PROPERTY BOUNDARY

▼1 3, 0 00

UP

16

FALL

▼1 3, 5 00

TGS I

15

1:80

1:80

125°

FG

1:80

1:80

2

1

3

5

4

6

7

9

8

10

12

11

13

15

14

16

17

0 1:8

FG

4

GARDEN BED

SI TG

31 x 177 = 5,500

2

121°

UP

18

144°

123°

COL01

135°

TGS I

3

143°

COL01

FIRE STAIRS

138°

ER

14

COL01

31

30

29

28

27

26

25

24

23

22

21

20

19

127°

OV

ALICE STREET

90°

101°

0 1:8

SWMH

122° 1:80

1:80

RP NUMBER: 2B32444

FG

1:80

LL FA

MARGARET STREET

00 ,0 14 ▼

80

111°

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

41° 38' 31" 85.95m

PEDESTRIAN REFUGE CONNECT TO EXISTING SEWER MAIN

HC

SWMH

WILLIAM STREET

SWMH

SWMH

0 ▼11, 00

25

75 CP NUMBER: 101 905886

▼10 , 500

RP NUMBER: 538 B32367

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

5 SP NUMBER: 5387738 i inside outside architecture

▼1 0, 0 00

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

SITE PLAN Status:

DEVELOPMENT APPLICATION

1

SITE PLAN 1:250

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

1:250 Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A101

Revision

A


LANDSCAPE SET OUT POINT 2

90°

1,111

B.C.C FOOT PATH

L.A VEGETATION SCHEDULE B.C.C FOOT PATH

2,708

B.C.C FOOT PATH

TGSI LANDSCAPE SET OUT POINT 1

CODE

NAME

T01 T02 T03 F01 S01 S02 S03 S04 S05 V01 V02

Moreton Fig Ficus macrophylla WALLBay TYPES Leopard Tree Libidibia ferrea CODE WALL Broad-leaved Paperbark Melaleuca quinquenervia WT01 CORE FILLED 190 BLOCK CAVITY BRICK WALL Water Azolla pinnata WT02Velvet CORE FILLED 190 BLOCK WALL WT03Bristle Rush STEEL STUD PARTITION Black Chorizandra enodis WT04 WALL Swamp GoodeniaGLASS Goodenia humilis WT05 GLASS CURTAIN WALL WITH STEEL MULLIONS Shield Hydrocotyle WT06PennywortCORE FILLED 200 BLOCK WALL,verticillata FRL: 120/120/120 Australian Native Lotus Nelumbo nucifera Flannel FlowerSCHEDULE Actinotus helanthii FINISHES Bower Vine Pandorea jasminoides CODE PRODUCT Black Coral Pea Kennedia nigricans

33° 26 2,0

2,238

RAMP 1:14

3,000

RL: 13, 300

TO 01 4,5

SI TG EXP. AGG RL: 13, 500

T02

TO 40 ,0 14 W:

EXP. AGG RL: 13, 500 2,596

149°

90°

135°

LEGEND

T01

RAMP 1:14

92 6,1

22

14

23

13

24

12

25

11

26

10

27

9

28

8

29

7

30

6

31

4 3 2

S04

5 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

131° 135°

V02

S02

V01

165°

5,532

00 ,0 14 ▼

COL01

V02

STEEL PIPE MISTING SYSTEM

COL01

V01

90°

CONC RL: 12, 700 200mm DEEP RECYCLED RAIN WATER

8,477

UP 8

V01

ARTIFICIAL POND

1

TGSI

F01

3,587 S02

S01

90°

4 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

S02

V01 V01

S03

S02

6,4 57

4,416

Revision History

S03 90°

135° 4,940

S02 S02

S02

4,2 03

56°

TO

W:

B

19 3,3

67 1,5

GRASS RL: 13, 000

COL01

TGS I

13

1,1 17

B.C.C FOOT PATH

21

20

19

18

17

16

FIRE STAIRS 03

UP UP

GRASS RL: 12, 500

COL01

EXP. AGG RL: 12, 500

UP

EXP. AGG RL: 12, 500

PROPOSED DEVELOPMENT OUTLINE TOTAL GFA: 2,650 m2 2

12

UP

1

14

TGS I

COL01

1

RP NUMBER: 2B32444 15

2 1

12

2

V01

40

3

16

UP

4

17

5

18

6

19

15

LIGHT PIPE OVER HEAD

20

7

21

14

22

8

23

COL01

FIRE STAIRS 04

13

NORTH EAST PANELS OF ATRIUM AUTOMATED FOR VENTILATION

9

F01

10

F01

10,0 61

4 3

11

V01

9

4

5

10

COL01 11

1

T03

UP

12

8

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

7

UP

COL01

LOADING DOCK LIFT MAX HEIGHT: 2372 MIN HEIGHT: 362

6,402

3,59 RL: 7 13 TIM , 480

169°

T02

1 A303

9,433

145°

, 880 RL: 12 TIM

TGSI

TGSI

7,62 0

146°

3 2 1

UP

4

RL: 12, 8 8 TIM 0

09.11.16

09 1,9

S03

S02

TIM

102° TOW:1 3,540

Details

6

COL01

Revision Date A 26.08.16

13 x DRESSED HWD TIMBER BATTENS 2,181 (80mm x 42mm AT 250 CRS)

V02

CONC RL: 13, 500 S03 200mm DEEP RECYCLED RAIN WATER

COL01

RL: 12, 600

EXP. AGG RL: 13, 000

RL: 12, 600

TOW: 14040

2

3

RL :

SHARED PATHWAY

4 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

V01

COL01

ARTIFICIAL POND

EXP. AGG RL: 13, 000

11

14

▼12 , 500

GARDEN BED

S02

4 x DRESSED HWD TIMBER BATTENSCOL01 (80mm x 42mm AT 250 CRS) V01

S03

14 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

21

S05

COMMENCEMENT OF WORK

3,395

30

29

28

27

26

25

24

23

22

21

31 4

5

6

7

8

9

10

11

12

13

14

15

V02

GARDEN BED

STEEL PIPE MISTING SYSTEM

RL: 13, 000

S05

T03

S01

EXP. AGG RL: 13, 000

9

TGSI

S03

EXP. AGG

V02

EXP. AGG RL: 13, 000

162°

V01

V01

47°

S01

TOW: 13, 620 RL: 13, 480

V02

8

V02

135°

S05

S02

S01

S01

7

S02

S01

S01

15

V02

73°

V01

V01

V01

S EN TT BA ) R RS BE 0 C TIM 25 D AT HW m D 2m SE x 4 ES m DR (80m

V02

49°

7x

V02

V02

135°

UP

COL01

CONC RL: 13, 500 200mm DEEP RECYCLED RAIN WATER

S01

0 96 3, :1 W TO 87 6,6

S04

GRASS RL: 13, 000

S04

ARTIFICIAL POND

LP

COL01

S02

154°

S04

3,492

S03

V01

S04

TGSI

3,686

1 V0

F01 OW : 1 RL: 1 3, 960 3 TIM , 480

F01

COL01

1 V0 1 V0

V02

73°

CONC RL: 13, 660 200mm DEEP RECYCLED RAIN WATER

RAMP 1:14

148°

V01

6

ARTIFICIAL POND

V02

S02

S02 STEEL PIPE S02 MISTING SYSTEM

S04

V02 S04

S03 RESS 10,39 9 (80m ED HWD mx4 TIMB 2mm ER B AT 25 A 0 C R TTENS S) 11,55 T 8

F01

22

S03

S04

S03

16

F01

S03

8,466

COL01

STEEL PIPE MISTING SYSTEM

V02 V02

125°

S01

V01

F01

15 x D

V02

V01 V02 V01

5

S02

S03

V02

CONC RL: 12, 700 200mm DEEP RECYCLED RAIN WATERS04

S02 S03

MO MOTORBIKE PARKING MSSB MECHANICAL SERVICES SWITCHBOARD LANDSCAPE NOTES OH OVERHEAD PB PLASTERBOARD (WET AREAS) PS PIPE STACK 1. ALL RETAINING R WALLS ARE IN-SITU RIDGECONCRETE UNLESS S SOAKER NOTED OTHERWISE SH SHOWER 2. PLANTING SYMBOLS ARE AN INDICATION SV SMOKE VENT OF PLANTS THAT ARE TO BE INCLUDED, EXACT LOCATION OFTIMBER PLANTING TIM HARDWOOD SLATS TO BE WC WATER CLOSET CONFIRMED WITH LANDSCAPE ARCHITECT BEFORE WPL WATER PROOF LOUVRES (HVAC)

S03

S04

S03

F01

S03

17

S01

V01

V01

, 040 TOW: 14

18

S02

S03

S01

S02

RAM P1 :14

3

F01

S03

S04

V01

5 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

ARTIFICIAL POND

21

S04

S04

S04

EXP. AGG RL: 13, 000

FLASHING LEGEND FIRE BOOSTER FLOOR GULLEY BR FIRE HOSE REEL AGED RECYCLED BRICK CHW CHILLED WATER CONCFIXTURE CONCRETE COL01FINISH 400mm DIAMETER CONCRETE COLUMN COL02 90 SQUARE HOLLOW SECTION CP FLOW AND RETURN CAR PARK CPT GLASS CARPET CRS GUTTER CORRUGATED ROOF SHEET(MAXLINE 340) CT CERAMIC TILES DP HYDRANT VALVE DOWNPIPE EXH TUBULAR LIGHT EXHAUST PIPE EXP. AGG ROUGH EXPOSED AGGREGATE MECHANICAL SERVICES F FLASHING SWITCHBOARD FB OVERHEAD FIRE BOOSTER FG PIPE STACK FLOOR GULLEY FHR FIRE HOSE REEL FT RIDGE FIXTURE FN SOAKER FINISH F+R FLOW AND RETURN FW SHOWER FLOOR WASTE SMOKE VENT GLASS G GT HARDWOOD TIMBER GUTTER SLATS HB HAND BASIN HV WATER CLOSET HYDRANT VALVE LP WATER PROOFTUBULAR LIGHT(MECH PIPE LOUVRES SERVICES)

146° RL: 13, 860

V01 V01 V02

19

STEEL PIPE MISTING SYSTEM

F01

6,75 6

2

F01

60 RL: 13, 8

20

B.C.C FOOT PATH

F01

S04

V01

38 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

V02

S03

F01

V01

TGSI

157°

139°

TOW: 13, 620

F01

3,103

S02

F01

S04

S02

S04

S05

S03

S02 F01

7,506

TOW: 13, 960

TOW: 13, 960

GARDEN BED

S04

S02

S01 121°

20

S02

TGS I

S04

COL01

95°

V02

STEEL PIPE MISTING SYSTEM 123°

15

18

4 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

S04

135°

65 9,3

S01

EXP. AGG RL: 13, 500

STEEL PIPE MISTING SYSTEM

1,8 22

S02

S05

CONC RL: 13, 500 S02 200mm DEEP A112 RECYCLED RAIN WATER

6,977

F01

S04

S03

ARTIFICIAL POND

RL: 13, 860 TOW TIM : 13 , 96 0 7,00 3 S02

3,374

UP

V01

F01 S02

159°

6,075

12,4 13

S02

S03

369 10, S02

S02

164°

RL: 12, 600

7,5 44

13 ,8 60 8,0 83

V02

143° COL01

19

S03

S02

GARDEN S05 BED

19 x

2,904

5 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

S02

17

CONC RL: 13, 500 200mm DEEP RECYCLED RAIN WATER

S03

S04

F01

S02 S05

COL01

S03

ARTIFICIAL POND

TGSI

147°

S02

S03

UP

100°

4

S02

S03

RL :

142°

2

13 ,8 60

DR ES (80 SED mm H x 42 WD T mm IMBE AT R 250 BAT C R TEN S) S

1,207

2,510

RL :

S02

113°

14

COL01

S02

S02

S02

S03 4

T03

S04

S03

CONC RL: 12, 700 200mm DEEP RECYCLED RAIN WATER

13

TGSI

2,744

3

STEEL PIPE MISTING SYSTEM

124° 120° S05

T03

1

S03

S01

T03 10 ,30 5

80°

S02 F01

90°

9

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 CHILLED HEXAGONAL WATER WALL TILE FN01 CORIAN SORREL FN02 CONCRETE KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING 400mm DIAMETER CONCRETE COLUMN FN03 CHARCOAL LOW PRESSURE LAMINATE ON MDF 90 SQUARE HOLLOW SECTION BACKING FN04 CAR PARK CORIAN ANTARCTICA FN05 SAWN RECYCLED TIMBER BENCH TOPS CARPET ROUGH (REFER TO INTERIOR DESIGN DETAILS) ROOF SHEET(MAXLINE FN06 CORRUGATED CEDARWOOD PANELSCLEAR FINISHED 340) FN07 CERAMICAUTEX "QUIET STUFF" LOW RANGE ACOUSTIC TILES PANELING- TALUS IN HERALD FT01 DOWNPIPE BLACK 25mm STEEL FRAMED GLASS CUBES FT02 EXHAUST INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS ROUGH EXPOSED AGGREGATE FT03 CORA VERTICAL BIKE RACKS

12,282

S03

128°

14 ,0 40

S04 3,8 50

22 6,6

TOW: 14, 040

RL: 13, 740 118° S05

W:

F01

RL: 13, 000

82°

S01

13

GARDEN BED

3,898

10

S05

166°

S03

CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R G GT HV LP MSSB OH PS R S SH SV TIM WC WPL

TL01 TL02 TL03

3

0 S04 , 04 : 14 W 0 O 5 T 7,0 F01

040 14, : W TO S03

5,37 0

121°

S04

T02

RL: 13, 740

98 3,3

13 ,8 60

S05

TO

GARDEN BED

0 86 3, :1 RL

▼1 3, 5 00

S05 170°

S05

EXP. AGG RL: 13, 500

1

4,5 20

5 11,31

SHARED PATHWAY

UP

TGS I

4 7,90

9,436

20

19

S05

14 GARDEN BED ,0 40 RL: 13, 740 S05

16

17 2

125° W:

0 , 04 : 14 W O

4 3

E01

B.C.C FOOT PATH

5,5 94

TO

T

S05

S03

90°

16

138°

4, 040 TOW: 1

144°

S05

7,800

4 1:1 MP RA

T03

▼1 3, 0 00

127°

SI TG

T03

S02

33 4,0

304 10,

FIRE STAIRS 4,96 4

S03

10

18 31 x 177 = 5,500

S03

6 7,52

V02 V01

S01 26 x DRESSED HWD TIMBER BATTENS S02 (80mm x 42mm AT 250 CRS) S01

12

TGS I

S03

S02

7

11

T03 10,737

135°

6

T03

T03

S03

S01

F01

5

7 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

58°

S03

UP

61 7,3

101°

S01

ARTIFICIAL POND

4

T03

S03 122°

S03 90°

3

GRASS RL: 13, 995

S04

F01

GRASS RL: 13, 000

5 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

S05

S04

44 6,1

EXP. AGG

2

5,35 2

111° S04

5 x DRESSED HWD TIMBER BATTENS (80mm x 42mm AT 250 CRS)

EXP. AGG RL: 13, 500

RL: 13, 000

V01

4,853

TOW: 14, 040

TOW: 14, 040

4,914 4,063

V02

1

T03

CONC RL: 12, 700 200mm DEEP 120° RECYCLED RAIN WATER

90°

1

T03

S03

ARTIFICIAL POND

162°

B.C.C FOOT PATH

S03

8,759

5

S04

4,1 60

21

15

S02 STEEL PIPE MISTING SYSTEM 105°

7,1 7,5 10 70

20

16

31 x 177 = 5,500

12,199

19 17

GRASS RL: 13, 000

S01

F01

EXP. AGG RL: 13, 000

145°

B.C.C FOOT PATH

FIRE STAIRS

7,998

PROPOSED E.O.T FACILITIES

18

B.C.C FOOT PATH

E02

7,243

S04

6,9 89

040 14, W:

81 6,8

EXISTING HERITAGE BUILDING

T02

T02

3 2 1

TGSI

COL01

UP

T02

TGSI

i

RAISED GRASS BED

inside outside architecture

GRASS RL: 12, 500

▼12 , 000

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

T01

T03

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au

3

80°

2 1

S05

UP

FOOT PATH

S05

TOW: 12,

RL: 12, 880 TIM 560

TGSI

S05

CONC RL: 11, 717

Client:

172°

Mr. G Keppler

3

S05

of Keppler Glass Industries

2 1

TGSI

UP

35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

B.C.C FOOT PATH

T02 B.C.C FOOT PATH

B.C.C FOOT PATH

LANDSCAPE PLAN

T01 Status:

SITE SET OUT POINT

L.B ▼11, 500

1

LANDSCAPE PLAN 1:100

DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

1:100 Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A102

Revision

A


63,740 190

9,558

21,201

190

32,411

190

5,431

190

9,777

190

190

9,567

190

7,065

190

WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

FINISHES SCHEDULE WC03

WC04

WC05 AMB

WT06

HB04

18

190

FT-03

FE

B03 E.O.T LADIES

B06 TANK ROOM

MECH RISER TO ABOVE

CONC RL: 7, 500

WT02

HB03

BIKE LIFT

190

WC02

SPOON DRAIN

SPOON DRAIN

HB02

5,801

6,006

WC01

HB01

3,217

190

190

WT02

B.1

FT-03

26

10

27

9

28

8

29

7

30

6

31

190

11,399

1

FHR

DB.03

UP

FW

COL01

WC06

WC07

WC08

WC09

COL01

COL01

COL01

LEGEND

WC10 AMB

SPOON DRAIN

WT02

HB06

B04 E.O.T MENS LINO RL: 7, 500

HB08 FT-02

FIXED LOCKERS

SH06

SH07

SH08

SH09

SH10 FT-03

DB.06

DB.01 SPOON DRAIN

190

SPOON DRAIN

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

FT-03

HB05

HB07

190

FT01 FT02 FT03

WT02

DB.05

5,800

6,001

CONC RL: 7, 500

CONC RL: 7, 500

DB.02

B.4

DB.06

CONC RL: 7, 500

FN06 FN07

B05 UNDERGROUND BIKE PARKING

FB

2

B.3

HV

3

31 x 177 = 5,500

4

B02 END OF TRIP FACILITIES LOBBY

SPOON DRAIN

SPOON DRAIN

DB.07

SPOON DRAIN

M08 02 WT

CP08

OO

7,708

HV

CP12

CP13

CP14

M05

DB.17 COL01

COL01

COL01

COL01

COL01

COL01

COL01

COL01

COL01

COL01

COL01

COL01

COL01

31

30

29

28

27

26

25

24

23

22

21

19

CP11

FHR

WT06

20

FIRE STAIRS 06

1,050

B.5

CP10

DISABLED PARKING CP16

SHARED ZONE

SP

WT06

CP09

DISABLED PARKING CP15

M06

N

DR

AIN

4,350

4,437

M07 R 7,910

18

FB

WT02

1

2

3

4

5

6

7

8

9

DB.20

B01 PUBLIC CAR PARK

1:80

FG

1:80

Revision Date A 26.08.16

COL01

COL01

COL01

COL01

COL01

CP02

CP03

CP04

CP05

CP06

CP07

M02

SUPPLY TANK

PASSENGER LIFT

28,306

SPOON DRAIN

SPOON DRAIN

WT02

SPOON DRAIN

190

14

13

15

12

16

11

17

10

18

9

19

8

20

7

21

6

22

5

23

4

WT02

DB.17

DB.08

3 2

DB.22

26 x 192 = 5,000

24 25 26

B14 WATER TREATMENT LOBBY

CONC RL: 7, 400

CONC RL: 7, 500

WT06 120/120/120

WT02

DB.09

FE

FE

B12 SERVICE LOBBY

DB.10

RL: 7, 500 CONC

SLAB INSET RL: 7, 400

16,388

CONC RL: 7, 500

B11 PLANT ROOM PLINTH RL: 7, 700

190

WT02

CONC RL: 7, 500

B07 FIRE PUMP ROOM CONC RL: 7, 500

SERVICE LIFT

SPOON DRAIN WT02

11,173

FW

B08 SWITCH BOARD

2,286

FE

10,000

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

CONC RL: 7, 500

RAMP GRADIENT 1:20

EXH

CONC RL: 7, 500

EXH SPOON DRAIN

B.10

inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY

190

WT02

190

190

WT02

B10 CARPARK EXHAUST ROOM

SPOON DRAIN

2,869

FE

i

SPOON DRAIN

DB.13

WT02

2,688

B.9

190

SPOON DRAIN

B09 ARCHIVE ROOM

3,637

FE

DB.12

190

DB.14

3,637

WT02

190

10,188

CONC RL: 7, 400

DB.11

DB.15

SPOON DRAIN

B17 SEWERAGE WASTE ROOM

FE

SPOON DRAIN

WT02

DB.25

PS FROM ABOVE

SPOON DRAIN

5,707

FE

SPOON DRAIN

DB.24

WT02

190

WT02

190

SPOON DRAIN

WT02

3,697

SPOON DRAIN

4,810

B16 WATER TREATMENT ROOM

HV

DB.16

190

SPOON DRAIN

DB.23

FIRE STAIRS 04

B13 LIFT MAINTENANCE

190

WT02

UP

190

4,350

CP01

WT06 120/120/120

M03

LOUVRED ROLLER SHUTTER DOOR 75% FREE AREA

FB

FHR

190

COL01

6,562

COL01

190

COL01

2,784

M04

190

COL01

7,611

1,050

WT02

RAMP GRADIENT 1:6

WT06 120/120/120

190

09.11.16

SPOON DRAIN

1

B.8

Details

CAR TURNING CIRCLE

FW

7,791

1:80

Revision History

M01

B.7

FG

1:80

1:80

1:80

SPOON DRAIN

1:80

WT06 120/120/120

SPOON DRAIN

1:80

B

S02 A112

22,219

FG

SLAB INSET RL: 7, 400

RAINWATER TANK

4,459

1:80

0 60 4,

DB.21

B.6

CONC RL: 7, 500

1:80

CONC RL: 7, 500

20,308

11,341

DB.18

0 60 7,

13,441

B15 TANK ROOM

B01 PUBLIC CAR PARK

CONC RL: 7, 500

SPOON DRAIN

10

11

12

13

14

15

16

SPOON DRAIN

DB.19

1:80

FE

UP

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

1:80

190

17

31 x 177 = 5,500

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN04 FN05

RAINWATER TANK

COL01

WT02

FIRE STAIRS 05 5

COL01

COL01

14,806

25

11

COL01

190

24

12

TL01 TL02 TL03

SH05

SPOON DRAIN

23

13

FT-02

SH04

FE

22

14

SH03

WT02

21

15

WT02

20

16

SH02

WT02

2,825

2,993

14,996

WT06

190

B.2

17

SH01

PRODUCT

FN03

DB.04 FIXED LOCKERS

CODE

FN01 FN02

SLAB INSET RL: 7, 400

LINO RL: 7, 500

19

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

5,451

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

BASEMENT PLAN Status: 190 190

190

5,281

190

5,281

190

190 9,353

190

22,417

10,000

190

3,026

190

190 190

2,321

4,491 190

190

DEVELOPMENT APPLICATION

7,064

1,796 190

9,475

190

190

9,475

190

11,986

59,653

9,569

20,294

3,455

2,800

2,800

2,800

2,800

2,800

2,800

2,800

2,800

2,800

3,104

3,200

4,705

4,788

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

B.A GSEducationalVersion

9,548

B.B

B.C

B.D

B.E

B.F

B.G

B.H

B.I

B.J

B.K

S01 A110

BASEMENT PLAN 1:100

S03 A114

1

Drawn by NR Modified by NR Checked by ZK Approved by DN

B.L

B.M

B.N

B.O

B.P

B.Q

1:100 Layout ID

A103

Revision

A


90°

41° 38' 31" 90.30m

3,000

BICYCLE ACCESS

B.C.C SET BACK

PROPERTY BOUNDARY

TGSI

33°

PRIMARY PEDESTRIAN ACCESS 6°

WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

SI TG

EXISTING HERITAGE BUILDING 149°

FINISHES SCHEDULE

90°

135°

145°

105°

18

10

20 21

15

22

14

23

13

24

12

25

11

26

10

27

9

28

8

29

7

30

6

31

4 3 2

90° LINE OF FLOOR OVER

FT01 FT02 FT03

131° 135°

111°

7,160

162°

LEGEND BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

165° 122° 90°

9

COL01

COL01

58°

UP 1 2

90°

3 4

135°

5

6,000

6 7

90°

101°

LIN

UP 8

E

OF

90°

9

FL

82° OO

R

10 11

OV

ER

12

143°

TGSI

13 14

COL01

COL01

123°

COL01

31

30

29

28

27

26

25

24

23

22

21

20

19

127°

135°

121°

UP 18

15

TGS I

16

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18 19 20

4

WPL

WPL

MAILBOX

159°

WT01

W0.04

FB FH

002 FLEXIBLE EXHIBITION AREA

METAL SCREEN

CT RL: 13, 000

146°

LP

FN-04

16

WT01

14,634

190 2,650 118 2,161 190

1

2

3

LINE OF FLOOR OVER

23 20

22 19

21 18

20 17

19 16

15 18

24 21

UP UP

008 KITCHEN CONC RL: 13, 000

D0.04

890

FIT-OUT BY OTHERS

D0.10

5

RAMP GRADIENT 1:6COL02

015 BIN WASH

CONC RL: 13, 000

WC11

CT RL: 13, 000

CONC RL: 11, 620

F+R DN200

LOADING DOCK LIFT MAX HEIGHT: 2372 MIN HEIGHT: 362

SERVICE LIFT

COL01

CONC RL: 11, 670

FE

D0.14

TGSI 3 2 1

4 2 1

UP COL02

HYDRAULICS RISER

i

2

LINE OF FLOOR OVER

3,915

C

5,000

350 350

2,778

350

2,557

190

350

5,930

2,782 190

6,035

DARY

135 3,330

5,490 190

350 3,761

35 Corrowoy Street, Mount Druitt NSW 2770

Drawn by NR Modified by NR Checked by ZK Approved by DN

350

13,401

350

16,086

HC

350

3,346

20,096

15,745

D

Mr. G Keppler of Keppler Glass Industries

DEVELOPMENT APPLICATION

5,620

E

11,110 S01 A110

a-1

Client:

Status:

12,793

S03 A114

5,770

B

3,500 17,323

4,566

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au

GROUND FLOOR PLAN

41° 38' 31" 85.95m

350 4,256 9,543 10,583

HALL OF DEMOCRACY

Drawing Name

7,783

9,135

TY BOUN

D0.17

45º

PEDESTRIAN REFUGE

26,217

TRANS FORMER

inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

+61 435 643 224

PROPERTY BOUNDARY

1,040

WATER PUMP

RL: 11, 670

1,539

DRIVEWAY CROSSOVER

014 FIRE CONTROL ROOM

FIRE BOOSTER

3,000 B.C.C SET BACK

VEHICLE ACCESS

D0.16

45º

1

CONC RL: 11, 670

SERVICE ACCESS

EXH

PROPER

5,395

172° 3

UP

EXH

HC

6,685

TGSI

1,806

CONC RL: 11, 670

EXH

SERVICE BAY 2

UP

A

SUBSTATION

WT01

CONC RL: 11, 670

FHR

WT01

WT02

SERVICE BAY 1

DRIVEWAY

2 1

25,660

COL01

RAMP GRADIENT 1:20

3

TGSI

TGSI

CONC RL: 11, 670

TGSI 13,034

UP

D0.15

013 LOADING DOCK

3

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

D0.07

D0.08

HB09

HLV

CONC RL: 11, 670

57° 21' 29" 27.7 9m

CONC RL: 11, 670

WT01

014 BINS

WT01

13

14

15

16

17

18

19

20

21

HYDRAULICS RISER

146°

TGSI

HC

012 STORE

010 ELECTRICAL CUPBOARD CHW

CONC RL: 11, 670 MSSB

011 PWD AMENITIES

D0.13

FE

WT01

WT02

COL02

FE

009 MECH PLANT ROOM

WT02

D0.09

D0.11

190

7

8

WT02

WT01

1 A303

10,440

D0.03

COL01

D0.06

WT01

12

HV

102°

80°

UP

6

UP

1,300

2

1

26

FE

CONC RL: 13, 000

D0.12

169°

WT06 120/120/120

D0.05

FIT-OUT BY OTHERS

UP

145°

TGS I

25

1

EXH

WT02

007 DRY

WT02

UP 1

4

9

11

9

8

7

6

5

4

3

2

10

1,275

1

3

10

CT RL: 13, 000

CT RL: 13, 000

3

11

COL01

COL01

004 BAR

005 RECEPTION AND TICKETS

2

12

613

H O.

13

FE

FIRE STAIRS 03 14

N

CONC RL: 13, 000

14

FIT-OUT BY OTHERS

25

AI

GRAND ATRIUM

24

COL01

3 2

12

36

RT

15

TGSI

FN-01

FN-01

73°

CONC RL: 12, 950

47

CU

FE

22 23

006 COLD

58

E

FN-05

69

16

UP

FE

10 7

17

HV

WT06 120/120/120

1,200

LINE OF FLOOR OVER

18

PS

FN-02 17 14

METAL SCREEN

19

FN-05

8 11

FN-02

13 16

LP

FIRE STAIRS 04

12 9

21

10 13

COL01

4

21

15

LIGHT PIPE OVER HEAD

22

COL01

EXH

23

OK

49°

600 1,012 520 700

FN-05

154°

SM

73°

3,164

CT RL: 13, 000

19 20

PASSENGER LIFT 01

003 CAFE NORTH EAST PANELS OF ATRIUM AUTOMATED FOR VENTILATION

TGS I

17 18

14 11

157°

UP

3,999

TGSI

148°

6,170

WT06 120/120/120 15

20

2,835

D0.02 730 580 528

95°

TGSI

GSEducationalVersion

3,000 B.C.C SET BACK

R

COL01

COL01

COL01

GROUND FLOOR PLAN 1:100

COL01

139°

TGS I

COL01

B.C.C SET BACK

W T0 1

CT RL: 13, 000

S02 A112

3,000

D0.01

W0.03

FN-01

001 EVENT INFORMATION

FLOOR

113°

W0.02

190

OVER

W0.01

09.11.16

350

164°

124° 120°

B

Details

4,541

90°

Revision Date A 26.08.16

200

100°

128°

Revision History

3,534

90° 118°

56°

135°

200

TGSI

147°

2,800

1

UP

4

5,540

COL01

12,878

121°

COL01

190

COL01

2

3,169

162°

142°

3

350

4

28,401

TGSI

80°

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

190

135°

170°

125°

1

47°

135°

166°

LINE OF

PROPERTY BOUNDARY

4,330 4,180

5

UP

2,974

TGS I

48° 21' 29" 72.04m

4,115

6

22

1

190

125°

7

21

2

350

144°

3

PROPERTY BOUNDARY 48° 21' 29" 44.59m

6,000

138°

17

SI TG

31 x 177 = 5,500

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN06 FN07

120°

1

8

TL01 TL02 TL03

FN04 FN05

31 x 177 = 5,500

5

PRODUCT

FN03

19 16

CODE

FN01 FN02

E.O.T ABOVE GROUND PARKING

17

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

F

6,910

G

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

b-1

1:100

H Layout ID

A104

Revision

A


41° 38' 31" 90.30m

B.C.C SET BACK

3,000

PROPERTY BOUNDARY

WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

EXISTING HERITAGE BUILDING

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

1,294

4,820

10,466

3,997

3,833

10,505

15,269

3,427

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05 FN06 FN07

1,137

7,192

2,129

WT01 W1.43 - W1.68 TYPICAL DIMENSIONS

250 500 250

FT03

W1.01

FN-02

500

7,160

FT01 FT02

FT-01

WT01

10

LEGEND

W1.68

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

W1.67 W1.66 W1.02 W1.65 W1.64

102 READING SPACE

W1.63 FN-01

CPT RL: 17, 000

W1.61

350

350

W1.62

WT01 FN-03.

4 84 82 2,0 4,

1,175

7 88 1,

W1.60

6,000

35 0

9

W1.59

45° W 1.0 7

8

W1.57

3 85

9

1 -0 FT

3,399

W1.58

10

12

FN-03.

13 14

COL01

W1.54

12 ,3 28

WT01

1,650

W1.55

W 1.0 6

19,000

8 1.0 W

8

11

W1.56

45°

CPT RL: 17, 000

547

1,687 2,355

6,036

WT01

N LP

107 GROUP STUDY AREA

1 2

1

2

3

4

5

6

4

200 2,301 828

COL01

WC14

WC22

WC18

WC19

CT RL: 17, 000

WC23

UR02

UR03 WC24

121 CLEANER'S CLOSET CT RL: 17, 000

UR04

WC16

WC21 AMB

WC25

WT01

WPL

WT01

W1.15

W1.14

W1.13

W1.12

W1.19

W1.18

W1.17

W1.16

UR05

WC26 AMB

EXH

EXH

WPL

EXH

WPL

WPL

WT03

WC20 WT03

WC15

TIM RL: 17, 000

CONC RL: 17, 000

W1.11 WT01

WPL

WPL

10,295

3,000 B.C.C SET BACK

FT-01

200

41° 38' 31" 85.95m

3,257

350

500

190

9,557

118

450

118

4,202

118

450

118

3,076

350

7,773

190 190

11,831

350

13,134

2,728

190

3,562 10,433

GSEducationalVersion

190

9,135

A

5,770

B

a-1

15,745

3,915

C

D

5,620

350 6,426

45º

350

E

11,110 S01 A110

25,660

S03 A114

FIRST FLOOR PLAN 1:100

Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224

Drawn by NR Modified by NR Checked by ZK Approved by DN

190

53,636

1

Client:

DEVELOPMENT APPLICATION

33,446 5,722

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au

Status:

13,734

200

HALL OF DEMOCRACY

FIRST FLOOR PLAN

45º 3,073

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

Drawing Name

PROPERTY BOUNDARY 350

i inside outside architecture

DARY

WC17

WC27

111 LIBRARY STORE ROOM

TY BOUN

WC13

119 MALE AMENITIESUR01

WT03

122 POLITICAL OBSERVATORY

PROPER

CT RL: 17, 000

WT03

CT RL: 17, 000

VOID TO LOADING DOCK BELOW

WT01

120 PWD AMENITIES

HYDRAULICS RISER

118 FEMALE AMENITIES

FN-01

HB15

D1.10

COL01

3,653

190

LP

WT02

350

PRIVATE OR GROUP STUDY

57° 21' 29" 27.7 9m

4,172

SERVICE LIFT

190

D1.06

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

6,558

7

D1.05

2,146

5 6

FB

HB14

HB12

PRIVATE OR GROUP STUDY

HB11

HYDRAULICS RISER

WT02

F+R DN200

D1.08

PRIVATE OR GROUP STUDY

HB10

D1.09

WT03

D1.11

HYDRAULICS RISER

CONC RL: 17, 000

D1.07

WT01

WT01

200

109 ELECTRICAL CUPBOARD CHW

CONC RL: 17, 000

FN-01

2 A303

7,322

CONC RL: 17, 000

FE

110 SERVICE LOBBY

200 2,854

FN-01

HB13

350

108 MECH PLANT ROOM

WT02

D1.04

PASSENGER LIFT 03

2,496

FE

PRIVATE OR GROUP STUDY

WT02

1

HV

MSSB

WT06 120/120/120

WC12

7

3

PASSENGER LIFT 02

WT05

WT06 120/120/120

WT06 120/120/120

FN-03

D1.12

HB09

FB

FHR

GRAND ATRIUM

13

14

15

16

17

18

19

20

21

2,153

WT05

FN-01

CONC RL: 17, 000 HV

8

WT02

FHR

WT06 120/120/120

2,925

FIRE STAIRS PWD 01 REFUGE

CONC RL: 17, 000

D1.03

TIM RL: 17, 000

12

2

UP

117 THEATRE WAITING SPACE

11

9

8

10

7

6

5

4

3

2

9

UP UP

FIRE STAIRS 03

13

10

1

3

COL01 PWD REFUGE

2,995

VOID

14

WT01

UP

1 -0 FN

CPT RL: 17, 000

8

LP

UP UP 9

PS RL: 17, 000

11

D1.13

WT06 120/120/120

8,0 80

12

10

H O.

LIGHT PIPE OVER HEAD

6,133

LINE OF FLOOR OVER

AI

23

09.11.16

200

21

20

19

18

17

RT

22

LIBRARY ENTRANCE

COL01

2,835

WT06 120/120/120 16

21

B

Details

PS

FN-03

15

LP

CU

20

WT04

13

19

WT04

COL01

Revision Date A 26.08.16

190

W1.09

106 PRINTING

LP

105 STORE CUPBOARD

PASSENGER LIFT 01

FN-01

14

CPT RL: 17, 000

E

WT 01

18

11

10,440

W 1.1 0

4, 87 5, 8 86 6

871

W 1.3 8

FN -0 2 FN-03 WT04

CPT RL: 17, 000

WT03

WT03

CPT RL: 17, 000

114 MEETING ROOM

Revision History

2,814

-0 2 FN

W 1.0 3

56 2

W 1.3 6 W 1.3 7

WT04

113 MEETING ROOM

UP

18,558

D1.16

OK

LINE OF FLOOR OVER

17

12

5,540

42 7

350

W 1.3 4

W 1.3 5

52,590

LINE AUDITO OF RIUM OV ER BH HEIG HT: 19, 4 00

16

SM

6,170

112 MEETING ROOM

WT04

15

COL01

146°

D1.15

D1.02

NORTH EAST PANELS OF ATRIUM AUTOMATED FOR VENTILATION

TIM RL: 17, 000

3,000 B.C.C SET BACK

LP

CPT RL: 17, 000 D1.14

116 THEATRE WAITING SPACE FN-03

FN-03.

101 RECEPTION

FN-03

FE

4, 10 9

41°

COL01

FN-03

128°

104 PRINT RESOURCES

W1.42

R

4

W1.41

FN-05

CPT RL: 17, 000

114° WT 01

W1.43

CPT RL: 17, 000

LP

80°

135°

PROPERTY BOUNDARY 48° 21' 29" 44.59m

FHR FB

1.3 2 1.3 3

W

W FN-03

WT 03

63° 4,9 31

W1.40

TE PU OM E A 5 C AR 11

B.C.C SET BACK

W1.39

2,504 FT-01

FT-01

122 NON-PRINT RESOURCES

1 -0

3,000

DP

FN-03

WT01

S02 A112

CONC RL: 17, 300

D1.01

LP

W1.44

2,479

110°

123 THEATRE

STAGE

FN-01

WPL

96° WT03

124 BAC K

7,576

STAGE

WT01

W 1.0 4

HV

2,987 1.3 0

W 1.3 1

W

48° 21' 29" 72.04m

W1.20

100°

DP

COL01

W1.45

FN

PROPERTY BOUNDARY

4,115

FN-03

W1.46

3 58

4,330

DP

8 61 5, 266 4,

WT01

W1.47

D

45°

W1.27

1 WT0

4,180

1. W

W1.28

W1.49

CPT RL: 17, 000

W1.48

0 25 CAL 0 YPI 25 .38 T ONS 1 SI 8 91 250 30 - WIMEN

FT-01

W1.26

W1.25

W1.24

WPL

1 -0 FN

ICAL 7 TYP - W1.2 S W1.21 IMENSION D W1.23 W1.22 W1.21

250

00 18, 2 RL: 00 TIM 17, 9 RL: 00 TIM 17, 6 RL: 00 17, 3 RL:

5

3,861

500

15°

250

TIM TIM

6

FT-01

8 10,80 4,750

5,544

2,504

W T0 1

22

FIRE STAIRS 02

FT-01

W1.51

21

2,102

19

W1.50

7

103 COLLABORATIVE SPACE

W 1.0 5

18

5,334

17

W1.52

20

2,153

2,685

15 16

1,759

6,000

8,620

UP W1.53

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

F

Drawing Scale

6,910

G

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

b-1

H

1:100 Layout ID

A105

Revision

A


41° 38' 31" 90.30m

3,000

B.C.C SET BACK

PROPERTY BOUNDARY

WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

EXISTING HERITAGE BUILDING

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05

10

FN06 FN07 FT01 FT02

7,160

FT03

LEGEND BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

9

6,000

61,782 17,503 350

1,763

16,657

2,527

13,873

15,722

11,369

118

118 2,625

6,323

118

7,533

6,008

315

4,033

390

40

3,460

412

WPL

WPL

3,445 350 350

500

3,073 190

GSEducationalVersion

FT-01

450

118

4,202

450

3,075

350

9,135

A

5,770

B

a-1

40 11,831

350

350 350

9,128 4,011

40

3,849

40

15,745

D

40

5,339

350 350 350 5,339 2,810 118 2,032 28,655

118 1,899

118

2,301 190

2,215

190 25 118

1,912

190 3,428 3,153

1,045

2,256

118

2,216

9,013 118

3,500 9,274 40 3,570

2,479

i

CONC RL: 17, 000 DP

3,626

FT-01

1,045

350

D2.22

FT-01

inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770

Status:

40

3,915

C

118 190

W2.35

118 118 390 390 390

W2.36

3,276 3,608 3,626

WT04 FE

FT-01 FN-01

350 350 350

DP

W2.34

8,562

FN-03

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

SECOND FLOOR PLAN

5,078 1,500

40

2,728

350

350 3,538

390

5,620

3,398 7,922 7,918

4,088

190

3,767 2,511 190

350

5,955

350 350

2,357 2,357

4,955 350

40 40

2,117 2,117

118

2,116

40 40

3,460 3,460

390 390

40

3,460

390

8,404

E

11,110 S01 A110

25,660

3,071 14,902 5,322

5,834 FN-03

214 OFFICE D2.18

FN-03

FN-03

2,479

7,554

24,117 118

1,069

FN-01

41° 38' 31" 85.95m 13,793

118

FT-01

DARY

216 STORE AND DELIVERIES

W2.37

W2.43

2,479

W2.33

WPL

FN-03 FN-03

09.11.16

Drawing Name

S03 A114

SECOND FLOOR PLAN 1:100

1,131 FN-03

213 OFFICE

D2.17

1,045 1,211

FN-03

1,012

FN-03

FT-01

350

D2.16

FN-03

1,615

WT04

TIM RL: 17, 000 LP

FN-03

1,045

WT04

D2.15

FN-03

W2.32

57° 21' 29" 27.7 9m

WT03

W2.39

TIM RL: 17, 000

1,045 619

FHR FN-03

212 OFFICE

61,782

1

W2.24

W2.23

W2.22

FB

HV 2

1

NCC SECTION D TABLE D.1.13 10.2m2 PER PERSON

CONC RL: 17, 000

W2.38

CONC RL: 17, 000

Details

+61 435 643 224

9,557

118

211 OFFICE

D2.14

WPL

24,117 5,722

FN-01

3,000 B.C.C SET BACK

200

200

FN-01

TY BOUN

FT-01

PROPERTY BOUNDARY 5,811 200

FT-01

WPL

O.H DUCT

D10 A401

D09 A401

W2.31

210 OFFICE

W2.49

W2.50

WT03

WC42 AMB

WC37 AMB

W2.51

UR10 W2.52

W2.53

W2.54

W2.55

W2.56

WC41

W2.47

DP

FN-03

PROPER

350

WC32

WC36

WT03

UR09 WC31

221 MEETING ROOM

TIM RL: 17, 000

224 CLEANER'S CLOSET

217 STORE ROOM

FN-03

222 MEETING ROOM

DP

CT RL: 17, 000

FN-03 FN-03

218 SENSITIVE RESOURCES

FN-03

FT-01

FN-01

216 PHD PRIVATE OFFICES

FN-03

WT01

FN-03 W2.48

FN-03 FN-03

SERVICE LIFT

FN-03

D2.21

D2.05

D2.04

DP

FN-03 FN-03

WT03 FN-03

FN-03 FN-03

FN-03 FN-03

D2.19

FN-03

D2.13

TIM RL: 17, 000

W2.41

UR08 WC40

FN-03

D2.20

FN-03 FN-03

FN-03

D2.12

FN-03

215 STORE ROOM

WT01

UR07

WC43

209 OFFICE

F+R DN200

FN-03

WT03

D2.03

WT03

FN-03

LP

CONC RL: 17, 000

FN-03

WT03

D2.11

FN-01

FN-03

FN-03

W2.42

WC35

CT RL: 17, 000

WC39

FN-03

WT03

WT02

D2.06

W2.44

WC38

CT RL: 17, 000

FN-03

CT RL: 17, 000

FN-03

220 ELECTRICAL CUPBOARD CHW

TIM RL: 17, 000

W2.45

WC30

WC34

226 MALE UR06 AMENITIES

FN-03

FN-03

FN-03

1,045

FN-03 FN-03

FN-03

223 MEETING ROOM

W2.46

1

CT RL: 17, 000

WC29

WC33

HYDRAULICS RISER

7,322

HYDRAULICS RISER

WC28

227 FEMALE AMENITIES

225 PWD AMENITIES

D2.25

201 POLITICAL OBSERVATORY

D2.23

WT03

HB19

HYDRAULICS RISER

HB18

WT03

HB17

WT03

HB16

3 A303

D2.24

HB22

FE

FN-03

W2.30

1,343

WT01

FN-03

TIM RL: 17, 000

FN-03

HB21

CONC RL: 17, 000

202 RECEPTION

WT04

HB20

219 MECH PLANT ROOM

FN-03

WT03

4,857

2,854

200

FN-01 D2.01

FN-03 FN-03

FN-03

200

10,440

D2.27

D2.26

5,540

FN-03

PASSENGER LIFT 03

FN-03

MSSB

6,626 12,207

WT06 120/120/120

FN-03

D2.10

WT01

SMOKE CURTAIN O.H

WT05

FN-03

WT01

FB

13

14

15

16

17

18

19

20

21

PS RL: 17, 000

CT RL: 17, 000

WT06 120/120/120

PASSENGER LIFT 02

FE

FN-03

W2.40

FHR

WT06 120/120/120

228 THEATRE WAITING SPACE

CONC RL: 17, 000 HV

FN-03

OFFICES ENTRANCE

12

FIRE STAIRS 01

WT05

11

9

8

10

7

6

5

4

3

2

1 UP

208 OFFICE

2, 12 7

WT01

5,719

2,835

PWD REFUGE

WT04

WT03

FN-01

W 2.0 1

FT -

D2.02

1,045

01

VOID

DP

2

W2.29

FT-01 FN-01

WT01 120/120/120

WPL

FN-03

207 OFFICE

3,722

LP

DP

FN-03

1,030

350

90°

4 T0 W

3

5,160

WT04 21

19

18

17

16

15

14

13

20

3

4

5

6

7

8

FN-03 D2.09

W T0 1

9

WT06 120/120/120

FN-01

124°

B

FT-01

WT03

PWD REFUGE

UP 10

CONC RL: 17, 000 11

W

FN-03

6,652

LP

FN-03

Revision Date A 26.08.16

D2.07

12

TIM RL: 17, 000

TIM RL: 17, 000

CT RL: 17, 000

2.0 2

LP

FIRE STAIRS 03

FN-03

WT06 120/120/120

FT -

15,274

5, 54 9

WT 01

7,883

230 AUDITORIUM

W2.57

203 MANAGER'S DESK

WPL

206a MEETING ROOM

WT06 120/120/120

FN-03

1 33 9,

D2.28

W2.27

FN-03

LP

01

118

16 ,4 19

D2.29

WT04

D2.09 D2.08

CT RL: 17, 000

FN-03

53°

LP

Revision History

6,386

W

TIM RL: 17, 000

FN-05

FN-03

2.0 3

GRAND ATRIUM

WT03

205 PWD AMENITIES

WT03

01

231 LIGHT & SOUND ROOM

FN-01

FIT-OUT BY OTHERS

FN-03

FN-01

3,000 B.C.C SET BACK

W2.26

FN-03

FT -

B.C.C SET BACK

W2.21

TIM RL: 17, 000

PROPERTY BOUNDARY 48° 21' 29" 44.59m

2.0 4 W

204 KITCHENETTE

W2.25

WT03

FN-03 WT03

3,000

W2.20

W2.19

W2.18

W2.17

W2.16

W2.15

W2.14

W2.13

W2.12

W2.11

W2.10

W2.09

W2.08

W2.07

W2.06

206 LUNCH AREA

FT -0 1

WT01

LP

81°

DP

WPL

FE

CT RL: 17, 000

S02 A112

229 BAR 13,672

DP

DP

LP

FE

34,518

DP

PL W

4

6,170

W2.05

94°

5,160

4,977

DP

WT01

350

4,330 4,180

WT01

6,265

5

LP

DP DP

DP

WT01

6

DP

00 21, 0 RL: 00 TIM 20, 6 RL: 00 TIM 20, 3 RL: 00 TIM 20, 0 RL: TIM , 700 9 1 RL: 00 TIM 19, 4 RL: TIM 00 19, 1 RL: TIM , 800 8 1 RL: 00 TIM 18, 5 RL: TIM

4,115

7

PROPERTY BOUNDARY

48° 21' 29" 72.04m

6,000

8

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

F

6,910

G

b-1

H

DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

1:100 Layout ID

A106

Revision

A


3,000

WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05

10

FN06 FN07

6,900 F

FT01 FT02

7,160

F

FT03

LEGEND BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

6,000

9

CRS 1°

G

45°

G

39 4,8

F

21,525

135°

8 2 ,18 12

F

G

5,320

6,000

F

CRS 1° 3,156

894 DP

7

G

7 10,49

DP

DP

32°

45°

4,115

4,058

18 5,6

75° 5,136

G

S G DP

5,908

G

100°

F

LP

DP

G

00 8,7

8,876

S

Revision Date A 26.08.16 B

S

G

DP

F

G

DP

Revision History

8,0 49

DP

6

45° ,539 5

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

Details

09.11.16

DP

G

767

LP

S02 A112

5

3,411

CRS 1°

2,186

1,625

3,000 LP G

1,083

3,000 CRS 1°

2,940 R

5 ,31 19

GL 16°

2,237

LP

SV

S

LP

SV

R

3,796

2,793

2,716

1,590

CRS 10°

VOID

9,342

CRS 1° F

CONDENSER UNIT 1 (DUTY)

LP CRS 1°

3

G

G

G

DP

G

CONDENSER UNIT 2 (STANDBY)

19,352

2,835

4,497

DP

STEEL PERFORATED MESH WITH KINGSPAN ACOUSTIC PANELS SURROUNDING SERVICE DECK

15,197

CHW F+R DN1000 DN200

MSSB

2 F

11,895

SERVICE DECK

6,632

G

SERVICE LIFT LP

F

2,931

8,591 CRS 1°

CRS 1° DP

3,235

G

G

11,438

17,617

LP DP

DP

4,013

15,569

10,440

G

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

3,565

6,170

9,098

11, 865

G

LP 171

G

2 ,77 19 24 ,96 6

146°

1,497

4,180

2000mm x 2000mm GLASS PANES

4

LP

S

15,081

CRS 1°

24,611

G

1,122

7,628

4,330

G

2,906

CRS 1°

F

i inside outside architecture

F DP

4,146

1 GL 1°

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

DP G

20,148

HALL OF DEMOCRACY 5,540

G

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au

12,126

3,000

15,869

Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

ROOF PLAN Status:

DEVELOPMENT APPLICATION

A

5,770

B

a-1

15,745

3,915

C

D

5,620

E

11,110 S01 A110

ROOF PLAN 1:100

9,135

S03 A114

1

25,660

F

6,910

G

b-1

H

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

1:100 Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A107

Revision

A


WALL TYPES

15mm TEMPERED GLASS PANELS AUTOMATED TO OPEN FOR BREEZES

ZINCALUME BOX GUTTER AND OVERFLOW BEHIND

10

9

8

7,162

7

6,000

6

6,000

5

4,113

4

4,332

15mm TEMPERED GLASS ATRIUM

3

4,182

CODE WT01 WT02 WT03 WT04 WT05 WT06

2

6,168

FINISHES SCHEDULE

1

2,833

10,440

20m HEIGHT RESTRICTION

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN03

20m HEIGHT RESTRICTION

FN04 FN05

CRS 16°

FN06 FN07 CRS 10°

CRS 10°

LP

FT03

LP

BR

FT-01

CRS 5°

LP

LEGEND

CRS 1°

CRS 1°

BR

+26,000 5 ROOF

W1.48

BR

CRS 10° BR

BCC SET-BACK

BCC SET-BACK

BR

FT-01 W2.57

LP FT-01

BR

W1.48 CRS 1°

FT-01

FT-01

D2.27 CRS 1°

+21,000 4 SECOND FLOOR

W1.07

W1.06

W1.05

W1.04

W1.03

FT-01

CONC FT-01

W1.01

W1.68

W1.67

W1.66

W1.65

W1.64

W1.63

W1.62

W1.61

W1.60

W1.59

W1.58

W1.57

W1.56

W1.55

W1.54

W1.53

W1.52

W1.51

+26,000 5 ROOF

W1.50

W1.49

W1.48

COL01

LP

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

PROPERTY BOUNDARY

LP

FT-01

FT01 FT02

CRS LP

PROPERTY BOUNDARY

CODE

FN01 FN02

CRS 10°

+21,000 4 SECOND FLOOR

COL01

BR

D1.12

+17,000 3 FIRST FLOOR

CONC

CONC DRESSED HWD TIMBER BATTENS

END OF TRIP FACILITIES

COL01

DRESSED HWD TIMBER BATTENS

COL01

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

CONC

+17,000 3 FIRST FLOOR

CONC LP

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

DRESSED HWD TIMBER BATTENS

NATURAL GROUND LINE +13,000 2 GROUND FLOOR

+13,000 2 GROUND FLOOR

NATURAL GROUND LINE

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History

1

Revision Date A 26.08.16

MARGARET STREET ELEVATION

B

Details

09.11.16

1:100

SERVICE DECK BEHIND

H

G

F

15mm TEMPERED GLASS ATRIUM

E

11,112

20m HEIGHT RESTRICTION

D

5,620

C

15,744

B

3,913

STEEL PERFORATED MESH WALL SURROUNDING SERVICE DECK

A

5,770

9,137

LP LP

FT-01 W2.04

W2.05 WPL

W2.06

W2.07

W2.08

W2.09

W2.10

W2.11

W2.12

W2.13

W2.14

W2.15

W2.16

W2.17

W2.18

W2.19

W2.20

W2.21

W2.22

BR

W2.23

FT-01 W2.29

W2.24 WPL

CRS 10°

FT-01 W2.03

FT-01 W2.02

W2.59

FT-01 W2.01

W2.58

LP

BR

LP

LP

BR FT-01 W1.42

W1.39

W1.29

W1.40

W1.30

W1.43

W1.44

W1.31

W1.45

W1.32

W1.46

W1.03

W1.33

W1.04

W1.34

W1.05

W1.35

W1.06

BR W1.27

W1.26

W1.25

W1.24

W1.23

W1.22

FT-01 W2.57

FT-01 W1.20

BR

W1.21

FT-01 W1.28

BR

+21,000 4 SECOND FLOOR

+26,000 5 ROOF

BR W1.36

W1.07

FT-01 W1.41 W1.37

FT-01 W1.08

W1.38

FT-01 W1.09

BCC SET-BACK

LP

BCC SET-BACK

+26,000 5 ROOF

PROPERTY BOUNDARY

6,908

15mm TEMPERED GLASS PANELS AUTOMATED TO OPEN FOR BREEZES

ZINCALUME BOX GUTTER AND DOWNPIPE BEHIND

PROPERTY BOUNDARY

20m HEIGHT RESTRICTION

CONDENSER UNIT BEHIND

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

+21,000 4 SECOND FLOOR

BR FT-01 W1.01

+17,000 3 FIRST FLOOR DRESSED HWD TIMBER BATTENS

BR

BR

D2.27

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

NATURAL GROUND LINE

inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

DRESSED HWD TIMBER BATTENS

HALL OF DEMOCRACY

NATURAL GROUND LINE +13,000 2 GROUND FLOOR

i

+17,000 3 FIRST FLOOR

+13,000 2 GROUND FLOOR

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

ELEVATIONS 1 Status:

DEVELOPMENT APPLICATION

2

GEORGE STREET ELEVATION 1:100

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

1:100 Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A108

Revision

A


WALL TYPES

1

2 10,440

3

4

2,833

5

6,168

6

4,182

7

4,332

8

4,113

9

6,000

CODE WT01 WT02 WT03 WT04 WT05 WT06

10

6,000

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

7,162

FINISHES SCHEDULE SERVICE DECK BEHIND

SERVICE LIFT OVERRUN

DOWNPIPE CONCEALED IN WALL OF SECOND FLOOR

GRAND ATRIUM

20m HEIGHT RESTRICTION

20m HEIGHT RESTRICTION

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05

CRS 16° CRS 10° LP

FT-01 W2.34

FT-01 W2.33

FT-01 W2.32

FT-01 W2.31

FT-01 W2.30

FT-01 W2.29

FT03

FT-01 W2.27

CRS 10°

BR

W2.26

BCC SET-BACK

LP

BCC SET-BACK

PROPERTY BOUNDARY +21,000 4 SECOND FLOOR

FT-01 W2.35

BR

FT01 FT02

CRS 10°

CRS 1°

CRS 1°

+26,000 5 ROOF

LP

FN06 FN07

FT-01 W2.04

W2.25 CRS 1° FT-01 W1.09

FT-01 W1.08 CRS 1°

FT-01 W1.11 BR

COL01

BR

COL01

COL01

COL01

BR

W1.03

W1.10

COL01

PROPERTY BOUNDARY

FT-01 W2.43

STEEL PERFORATED MESH WALL SURROUNDING SERVICE DECK

LP

CRS 5°

FT-01 W2.03

LEGEND BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

FT-01 W1.02

BR

BR

W2.07

+17,000 3 FIRST FLOOR BR

BR

BR

COL01

BR

BR

COL01

FIRE STAIRS 01

D0.02 WPL D0.04

+13,000 2 GROUND FLOOR

NATURAL GROUND LINE NATURAL GROUND LINE

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History

1

Revision Date A 26.08.16

ALICE STREET ELEVATION

B

Details

09.11.16

1:100

15mm TEMPERED GLASS PANELS AUTOMATED TO OPEN FOR BREEZES

ZINCALUME BOX GUTTER AND OVERFLOW BEHIND

A

20m HEIGHT RESTRICTION

B 9,137

C

15mm TEMPERED GLASS ATRIUM

SERVICE DECK BEHIND

D

5,770

E

3,913

F

15,744

G

5,620

20m HEIGHT RESTRICTION

H

11,112

6,908

LP CRS 10°

FT-01 W2.07

LP FT-01 W2.47

STEEL PERFORATED MESH WALL SURROUNDING SERVICE DECK

LP

FT-01 W2.43

CRS 10°

CRS 10°

W2.45

W2.44

W2.42

W2.41

W2.40

W2.39

W2.38

W2.37

WPL

WPL

WPL

WPL

WPL

WPL

WPL

WPL

W2.48

FT-01 W2.36

BR

BR W2.46

WPL

WPL

WPL W2.50

BR W2.49

WPL W2.51

W2.52

W2.53

W2.54 WPL

WPL

W2.55 WPL

FT-01 W2.57

W2.56

BR FT-01 W2.35

FT-01 W2.34

PROPERTY BOUNDARY

BCC SET-BACK

BCC SET-BACK

LP

CRS 10°

CRS 10°

WPL W1.14

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

FT-01 W1.11

WPL W1.15

WPL W1.13

W1.12

WPL W1.19

W1.18

W1.16

BR

WPL

CRS 10°

+21,000 4 SECOND FLOOR

W1.17

+26,000 5 ROOF

PROPERTY BOUNDARY

CRS 10°

i

BR

+17,000 3 FIRST FLOOR

inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

BR

HALL OF DEMOCRACY CARPARK ACCESS

+13,000 2 GROUND FLOOR

D0.16

LOADING DOCK

TRANSFORMER HYD. BOOSTER

NATURAL GROUND LINE

WATER PUMP

NATURAL GROUND LINE

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

ELEVATIONS 2 Status:

DEVELOPMENT APPLICATION

2

WILLIAM STREET ELEVATION 1:100

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

1:100 Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A109

Revision

A


1

2

3

4

5

6

7 WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

10,440

2,833

6,168

ZINCALUME VALLEY BEHIND WHERE FALLS MEET

4,182

SMOKE VENTS BEHIND- AUTOMATED TO OPEN IN THE EVENT OF A FIRE

MAXLINE 340 CORROGATED ROOF SHEETING

4,332

4,113

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02

SLIM LINE ZINCALUME SOAKER TO CONNECT ROOFING TO ATRIUM

FN03 FN04 FN05 FN06 FN07 FT01 FT02 FT03

LEGEND

CRS 5° LP

CRS 5° REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

+26,000 5 ROOF

WT05

WT05 W2.03

W2.02

FT.01

FT.01

WT05

LP

FT.01

W2.43

D2.05

CRS 5°

D2.03

221 MEETING ROOM

201 PHD RECEPTION

D2.01

PHD OFFICES REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

FN01 TIM

TIM

WT05

TIM

WT06

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

WT04

WT05

WT04

W1.43 FN07

W1.45 FN07

W1.46 FN07

WT05

PRIVATE OR GROUP STUDY

107 GROUP STUDY SPACES

FN01

113 MEETING ROOM

FN03

FN03

FN03

Details

09.11.16

101 RECEPTION

FN03 FN03

FN03 FN01

FN03

FN01

FN03

CPT

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

WT02 D0.15 WT05

METAL SCREEN

WT05

HYDRAULIC DOCK LIFT

LOADING DOCK

FN03

FN03

FN01 CPT

SERVICE BAY 02

Revision History

B

D1.12

VOID OVER LOADING DOCK

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

Revision Date A 26.08.16

LP

BCC SET-BACK

+17,000 3 FIRST FLOOR

PROPERTY BOUNDARY

WT02

W1.44 FN07

FRL: 120/120/120

+21,000 4 SECOND FLOOR

WT05 LP

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

004 BAR FN01

WT01

METAL SCREEN

003 CAFE FN05 FN05

FIRE BOOSTER

TL01

TL01

WT02

COL01

CARPARK EXHAUST DUCTWORK- LEADS TO B10

D0.14

B11 MECAHANICAL PLANT ROOM

B12 BASEMENT SERVICES LOBBY 2,300

B10 CARPARK EXHAUST ROOM

PLINTH RL: 7,700

+7,500 1 BASEMENT

MINIMUM CEILING HEIGHT

+13,000 2 GROUND FLOOR

FN01

FN02

D0.14

B01 PUBLIC CAR PARK

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

SPOON DRAIN

AG DRAIN

i inside outside architecture

B.10

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

B.9

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler

B.8

B.7

B.6

of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

SECTION 01 PART ONE Status:

DEVELOPMENT APPLICATION

±0

1

SECTION 01 PART ONE 1:50

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

VARIES Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A110

Revision

A


7

8

9

10 WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

4,113

6,000

7,160

6,000

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05 FN06 FN07 FT01 FT02 FT03

LEGEND

OUTLINE OF EXISTING HERITAGE BUILDING

+26,000 5 ROOF

THIN STEEL FRAMED WINDOW

CRS 5°

+21,000 4 SECOND FLOOR

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES FN06

W1.46 FN07

WT06

W1.61 FN07

W1.62 FN07

W1.63 FN07

FIRE STAIRS 02

W1.65 FN07

W1.66 FN07

W1.67 FN07

W1.68 FN07

W1.01

FN02

1000

FN01

CPT

STORAGE

CPT

WT01

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

FN07

102 READING SPACE

FRL: 120/120/120

FN01

W1.64 FN07

PROPERTY BOUNDARY

W1.45 FN07

FT01

BCC SET-BACK

W1.44 FN07

FRL: 120/120/120

W1.43 FN07

FRL: 120/120/120

WT06

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

Revision History Revision Date A 26.08.16 B

Details

09.11.16

+17,000 3 FIRST FLOOR

1 A201 575

+13,000 2 GROUND FLOOR

COL01

CARPARK EXHAUST DUCTWORK- LEADS TO B10

CARPARK EXHAUST DUCTWORK- LEADS TO B10 B01 PUBLIC CAR PARK

CAR PARK 13

B04 MALE END OF TRIP AMENITIES

FHR DB.18

DB.17

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

B03 FEMALE END OF TRIP AMENITIES

FB

+7,500 1 BASEMENT AG DRAIN

4,435

B.5

3,000

6,000

B.4

6,000

i inside outside architecture

B.3

B.2

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

B.1

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

SECTION 01 PART TWO Status:

DEVELOPMENT APPLICATION

±0

1

SECTION 01 PART TWO 1:50

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

VARIES Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A111

Revision

A


WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

A

B

C

D

E

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05

9,137

5,770

3,863

15,794

5,620

FN06 FN07 FT01 FT02

MAXLINE 340 CORROGATED ROOF SHEETING

MAXLINE 340 CORROGATED ROOF SHEETING

MAXLINE 340 CORROGATED ROOF SHEETING

FT03

LEGEND BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

FT01 W1.20

W1.21

W1.22

W1.23

W1.24

W1.25

W1.26

W1.27

LP

FT01

123 THEATRE

FT01

231 LIGHT & SOUND ROOM

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

W1.39

W1.40

W1.41

W1.42

W1.43

W1.44

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16 B

115 COMPUTER RESOURCES 116 THEATRE WAITING SPACE

124 BACK STAGE

STAGE TIM TIM

TIM

122 NON-PRINT RESOURCES

101 RECEPTION

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN01 CPT

Details

09.11.16

104 READING SPACE FN03

FN01

FN01

CPT

CPT

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

W0.01

W0.02

D0.01

W0.03

001 EVENT INFORMATION

002 FLEXIBLE EXHIBITION SPACE

003 CAFE

FN03

FN03

TL01

COL01 WT02

WT02

COL01

DB.21

COL01

COL01

COL01

COL01

COL01

COL01 NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

WT02

MOTORBIKE PARK 04

B14 WATER TREATMENT LOBBY

B15 TANK ROOM

COL01

TL01

DB.19

CAR PARK 08

CAR PARK 09

CAR PARK 10

B01 PUBLIC CAR PARK

DB.17

SPOON DRAIN

CAR PARK 11

CAR PARK 12

DB.01

RAMP GRADIENT 1:20

SPOON DRAIN

SPOON DRAIN

i

AG DRAIN

inside outside architecture

9,569

9,533

3,470

2,800

2,800

2,800

2,800

2,800

2,800

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

2,800

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au

B.A

B.B

B.C

B.D

B.E

B.F

B.G

B.H

B.I

B.J

B.K

Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

SECTION 02 PART ONE Status:

DEVELOPMENT APPLICATION

1

SECTION 02 PART ONE 1:50

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

VARIES Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A112

Revision

A


WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

E

F

G

H

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02

5,620

11,112

MAXLINE 340 CORROGATED ROOF SHEETING

FN03

6,908

MAXLINE 340 CORROGATED ROOF SHEETING

FN04 FN05 FN06 FN07

ZINCALUME VALLEY BEHIND WHERE FALLS MEET

FT01 FT02 FT03

LEGEND

FT01

+26,000 5 ROOF

W2.04

W2.05

W2.06

W2.07

W2.08

W2.09

W2.10

W2.11

W2.12

W2.13

204 KITCHENETTE

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

W1.43

W1.44

W1.45

W1.46

W1.03

W1.04

W2.14

W2.15

W2.16

W2.17

W2.18

W2.19

W2.20

W2.21

W2.22 W2.23

W2.24

W2.26

206 LUNCH AREA

W1.05 TIM

+21,000 4 SECOND FLOOR COL01

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History

101 RECEPTION

104 READING SPACE

FIRE STAIRS 02

FN03

Revision Date A 26.08.16

104 READING SPACE

B

D1.01

FN01 CPT

CPT

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

Details

09.11.16

+17,000 3 FIRST FLOOR

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

D0.01

W0.04 D0.02

003 CAFE

LIFT LOBBY

COL01

COL01

+13,000 2 GROUND FLOOR

TL01

COL01

COL01

COL01

FRL: 120/120/120

COL01

TL01

FRL: 120/120/120

TL01

WT06

CAR PARK 11

CAR PARK 12

CAR PARK 13

CAR PARK 14

CAR PARK 15

WT02

WT06

CAR PARK 16

FIRE STAIRS 04

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

DB.06 DB.08

DB.07

+7,500 1 BASEMENT

SPOON DRAIN

AG DRAIN

i inside outside architecture

2,800

2,800

2,800

2,800

3,104

3,200

4,705

4,788

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY

B.J

B.K

B.L

B.M

B.N

B.O

B.P

B.Q

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

SECTION 02 PART TWO Status:

DEVELOPMENT APPLICATION

1

SECTION 02 PART TWO 1:50

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

VARIES Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A113

Revision

A


1

2

3

4

5

6

7

8

9 WALL TYPES

10,440

2,833

6,168

4,182

4,332

4,113

6,000

6,000

7,162

CODE WT01 WT02 WT03 WT04 WT05 WT06

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

GL 16째

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02

LOUVRES ON NORTH EASTERN FACADE AUTOMATICALLY OPEN FOR NATURAL VENTILATION

OPEN GRAND ATRIUM- ALLOWS AIR AND WATER TO REACH PLANTS BELOW

CODE

FN03 FN04 FN05 FN06 FN07 FT01 FT02 FT03

LEGEND

LP

BCC SET-BACK

CRS 5째

FN06 W2.48

201 POLITICAL OBSERVATORY

208 THEATRE WAITING SPACE

BR

RB

ATRIUM CIRCULATION SPACE

GL01

GL01

GL01

GL01

GL01

GL01

GL01

GL01

GL01

GL01

GL01

GL01

GRAND ATRIUM

FN03

+26,000 ROOF

CRS 1째

WT05

WT05

D2.27

FN03

PASSENGER LIFT 03

FN03

FIRE STAIRS 01

W1.39

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

FN03

GL 1째

OUTLINE OF EXISTING HERITAGE BUILDING

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

FN06 WT05

FN03

WT01

FN03

+21,000 SECOND FLOOR

FT01 REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

W1.11

FN06

122 POLITICAL OBSERVATORY

208 THEATRE WAITING SPACE

BR

RB

PASSENGER LIFT 03

FIRE STAIRS 01

Revision Date A 26.08.16 B

GRAND ATRIUM

FN01

CPT

COL02

Details

09.11.16

WT05

WT05

FN01

COL02

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History

115 COMPUTER AREA

ATRIUM CIRCULATION SPACE D1.12

FN01

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

FN03

RECYCLED RAIN WATER PUMPED FROM TANKS IN BASEMENT- REFER TO ENGINEER'S DETAILS

50mm TOPPING SLABROUGH EXPOSED AGGREGATE

+17,000 FIRST FLOOR

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

WT01

50mm TOPPING SLABROUGH EXPOSED AGGREGATE

D0.01

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

DRESSED HWD TIMBER BATTENS

FN06 WT05

013 LOADING DOCK

ATRIUM CIRCULATION SPACE

MIST IRRIGATION SYSTEM

001 EVENT INFORMATION

GRAND ATRIUM WT05

RB

WT05

FN01

ARTIFICIAL POND

SHARED PATHWAY

200mm DEPTH OF WATER

TL01

+13,000 GROUND FLOOR

RAMP TO CARPARK WT02

COL01

COL01

2,300

CARPARK 03

MINIMUM CEILING HEIGHT

CARPARK EXHAUST DUCTWORK- LEADS TO B10

WT02

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

CARPARK EXHAUST DUCTWORK- LEADS TO B10 B01 PUBLIC CARPARK

DB.18

FHR

DB.17

CARPARK 09

FB

SPOON DRAIN

+7,500 BASEMENT

SPOON DRAIN

AG DRAIN

AG DRAIN

i inside outside architecture

2,869

B.10

10,188

7,790

4,460

13,441

B.9

4,437

B.5

6,001

B.4

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries

B.8

B.7

B.6

35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

SECTION 03 Status:

DEVELOPMENT APPLICATION

1

SECTION 03 1:50

Drawn by NR Modified by NR Checked by ZK Approved by DN Drawing Scale

VARIES Layout ID

GSEducationalVersion

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

A114

Revision

A


WALL TYPES

CRS 10°

CODE WT01 WT02 WT03 WT04 WT05 WT06

STEEL WINDOW FRAME

FINISHES SCHEDULE

FT01 W2.03

COLOURBOND FLASHING TO MATCH MAXLINE 340 ROOF SHEETING

MAXLINE 340 METAL ROOF SHEETING CRS 1°

BOX GUTTER TO ROOFER'S SPECIFICATIONS

40 HOT DIP GALVANISED SQUARE HOLLOW SECTION AT 250 CRS ONE WAY CONCRETE SLAB ROOF

D01 A203

110 RECYCLED BRISBANE BRICKS 10mm MORTAR SPACING

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

FN06

MAXLINE ROOF SHEETING BENT OVER TO FORM FASCIA

FLASHING W2.01

W2.02

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

W2.03

20mm RIGID INSULATION TUBULAR GLASS AND STEEL LIGHT PIPE PRISM

70mm LIGHT WEIGHT HOT DIP GALVANISED STEEL FRAMING

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

WT01

VERTICAL BRICK REINFORCEMENT TIES

D04 A202

FN06

STEEL CEILING TIES CEDAR WOOD CEILING FINISH

GL 1°

190 BLOCK WALL

HEAVY DUTY SARKING

FN07

80mm x 42mm HARDWOOD BLACKBUTT TIMBER BATTEN- ACT AS A TRELIS FOR VINES (V01 AND V02) OVER HEAD W1.68

FN07

FN07

W1.01

40 HOT DIP GALVANISED SQUARE HOLLOW SECTION AT 80 CRS

FT01 15mm TEMPERED GLASS IN STEEL FRAME. FRAME POWDER COATED TO MATCH CHARCOAL ROOF SHEETING

STEEL BOLTS THROUGH SLAB

203 MANAGER'S DESK

STEEL CEILING TIES

FN06

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05 FN06 FN07 FT01 FT02 FT03

LEGEND BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16

102 READING SPACE

WT02 D02 A203

B

Details

09.11.16

RENDERED BLOCK WORK

TIM

VERTICAL JOINT SHEETING REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

WT04

106 PRINTING AREA

CEDAR WOOD FINISH OPENING FOR GLASS FRAME

114 MEETING ROOM D1.16 1,020 860

45

RECTANGULAR HOLLOW ALUMINIUM FEATURE POSTS 6mm x 47mm ALIGN WITH RIDGES IN ROOF SHEETING

15

FLEXIBLE CUSHION- REFER TO INTERIOR DESIGNER'S DETAIL DRAWINGS

265

FN02

HINGED LID TO INTERIOR BENCH STORAGE

CAVITY FOR STORAGE FOR FLIXIBLE LEARNING SPACES

90

480

934

90 15 20

454

2,935 BULKHEAD HEIGHT

20 15 20 45

CAVITY FOR ELECTRICAL SERVICESREFER TO ELECTRICAL ENGINEER'S DRAWINGS FOR DETAILS

CPT

SUSPENDED FLOORS

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

RE-INFORCED CONCRETE SLAB REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

CEILING CAVITY FOR SERVICES

60mm x 4mm (WIDTH) RAKED OUTRIGGER WELDED TO REINFORCEMENT BARS BEFORE POURING SLAB D05 A202

i inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au

D03 A202

Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

DF01 DETAILED FACADE SECTION 1 Status:

1

NORTHERN FACADE DETAIL 1:20

2

NORTH EASTERN FACADE DETAIL 1:10

DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID GSEducationalVersion

A201

Revision

A


WALL TYPES GLASS TUBE

STEEL FRAMED WINDOWS

CODE WT01 WT02 WT03 WT04 WT05 WT06

STEEL TUBE

FT01

MIRRORED SURFACE

W2.03

COLOURBOND FLASHING TO EDGE OF WINDOW FRAMES FLASHING FALLING TOWARDS BOX GUTTER

BITUMENOUS GEL

FLASHING MAXLINE 340 ROOF SHEETING HEAVY DUTY SARKING

FINISHES SCHEDULE

STEEL PLATE WELDED TO RING STEEL RING FOR SUPPORT STEEL BOLTS THROUGH CONCRETE SLAB

HEAVY DUTY SARKING

FLASHING

POLYEURATHENE SEALANT

CEILING CAVITY FOR SERVICES

CEDAR WOOD CEILING FINISH

50mm CAVITY

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

FN06 FN07

FT03

LIGHT DISTRIBUTION METHOD FN06

LEGEND

FN06 BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

20mm RIGID INSULATION

FN06

CEDARWOOD FEATURE CEILING FINISH FLASHING

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

190 CORE FILLED BLOCK WALL

D01

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FT01 FT02

110mm RECYCLED BRISBANE BRICK

R3.0 INSULATION

TL01 TL02 TL03

FN04 FN05

10mm MORTAR STEEL CEILING TIES

PRODUCT

FN03

STEEL CEILING TIES REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

CODE

FN01 FN02

R3.0 INSULATION

40mm SQUARE HOLLOW SECTION AT 250 SECTIONS

BOX GUTTER DETAIL 1:10

D02

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

LIGHT PIPE TO ROOF JUNCTION 1:10

D03

LIGHT PIPE TO SLAB PLAN DETAIL 1:10

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16

W1.01

RECTANGULAR HOLLOW ALUMINIUM FEATURE POSTS 6mm x 47mm ALIGN WITH RIDGES IN ROOF SHEETING

MAXLINE 340 METAL ROOF SHEETING

CRS 1°

B

Details

09.11.16

102 READING SPACE 15mm STRUCTURAL PLYWOOD

40mm SQUARE HOLLOW SECTION AT 200 CRS

FN02: GREY IRONBARK ROUGH SAWN TIMBER SEATING

HEAVY DUTY SARKING 40mm SQUARE HOLLOW SECTION AT 80 CENTRES

REINFORCED CONCRETE SLAB ROOF

FLEXIBLE CUSHION- REFER TO INTERIOR DESIGNER'S DETAIL DRAWINGS

FIXED WITH POLY EURATHANE "LIQUID GLUE"

M15 BOLTS SCREWED INTO ONE WAY REINFORCED CONCRETE SLAB ROOF

FN02

15 mm STRUCTURAL PLY WOOD

R3.0 INSULATION HINGE FOR OPENABLE BENCH

70mm STEEL STUD LIGHT WEIGHT FRAMING

15mm STRUCTURAL PLYWOOD

CEILING CAVITY FOR SERVICES

STORAGE SPACE INSULATION BEHIND STEEL FRAME

45mm x 90mm TIMBER STUD WORK TO FRAME BENCH

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

45mm x 90mm TIMBER STUD WORK TO FRAME BENCH 15mm STRUCTURAL PLYWOOD CAVITY FOR ELECTRICAL SERVICES

15mm TEMPERED GLASS FALLING AT 1 DEGREE STAINLESS STEEL FRAME PAINTED TO MATCH COLOUR OF ROOF SHEETING

FN07

RAKED OUTRIGGER EXTENDING FROM STEEL FRAME AROUND GLASS- WELDED ONTO STEEL FRAMING

RAISED FLOOR UNITS

FLASHING

FN06

CLEAR FINISHED TIMBER BATTENS CLEAR FIXED TO STEEL FRAME

REFER TO ELECTRICAL ENGINEER'S DRAWINGS FOR DETAILS

GL 1°

W1.01

FT-01

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

RE-INFORCED CONCRETE SLAB

RUBBER SHIM

102 READING SPACE

i

42mm x 80mm TIMBER BATTENS TO ACT AS A TRELIS

inside outside architecture

60mm x 4mm (WIDTH) RAKED OUTRIGGER WELDED TO REINFORCEMENT BARS BEFORE POURING SLAB

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

CONSTRUCTION DETAILS 1 Status:

DEVELOPMENT APPLICATION

D04

WINDOW FRAME TO WALL JUNCTION 1:5

D05

WINDOW FRAME TO SLAB DETAIL 1:5

Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID GSEducationalVersion

A202

Revision

A


WALL TYPES +17,000 3 FIRST FLOOR

DRESSED HARDWOOD BLACKBUTT BATTENS (80mm x 42mm AT 250 CRS)

D07 A204

V01

CODE WT01 WT02 WT03 WT04 WT05 WT06

FINISHES SCHEDULE

V02 STEEL MIST IRRIGATION SYSTEMREFER TO MECHANICL CONSULTANT DRAWINGS FOR DETAILS

DRESSED HWD BLACKBUTT BATTENS (80mm x 42mm AT 250 CRS)

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02 FN03 FN04 FN05

DRESSED HWD BLACKBUTT FINISHED BENCH

FN06 FN07

300mm RECYCLED RAIN WATER PUMPED FROM WATER TANKS IN BASEMENT

FT01 FT02

2,920

FT03

EXPOSED AGGREGATE TOPPING SLAB

LEGEND WT02

POTS FOR WATER PLANTS DRESSED WITH RIVER GRAVEL

ARTIFICIAL POND

+13,000 2 GROUND FLOOR

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

GARDEN BED T03 S05

SHARED PATHWAY RL 13,000

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

D08 A204

RIVER GRAVEL

PRE-FABRICATED PLASTIC POND 50mm SAND LAYER

WATERPROOF MEMBRANE

MOISTURE BARRIER

50mm SAND LAYER GRAVEL BELOW POND

REINFORCED CONCRETE FOOTING

GRAVEL

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16 B

D06

Details

09.11.16

SHARED PATHWAY AND TIMBER BATTEN DETAIL 1:20

80mm x 42mm HARDWOOD BLACKBUTT TIMBER BATTENS- ACT AS A TRELIS FOR VINES (V01 AND V02) OVER HEAD 80mm x 42mm HARDWOOD BLACKBUTT TIMBER BATTEN POST CONNECTED TO SLAB OR RETAINING WALL BELOW

45°

OVERHEAD BATTENS AND POSTS CONNECTED IN A MITRED JOINT. BATTENS TO BE FIRST FIXED WITH A POLYEURATHANE "LIQUID NAIL" GLUE AND THEN NAILED FROM THE TOP WITH 40mm BULLETHEAD NAILS.

720

190

100mm x 25mm HARDWOOD DRESSED BLACKBUTT TIMBER BATTEN WITH ROUNDED TOP PROFILE

ARTIFICIAL POND

12mm HOT DIP GLAVANISED STEEL ROD PLACED AT 400 CRS

WT02

STEEL ROD WELDED TO STEEL PLATES BOLTED TO CONCRETE BENCH

BLOCKS EXPOSED WITH 10mm MORTAR BETWEEN UNITS 25 12

ANCHOR CUSTOMISED TO NOT INCLUDE BASE. POLE TO BE FIXED INTO BLOCK WALL WHEN WALL IS BEING CORE FILLED.

590

PRYDA HOT DIP GALVANISED STIRRUP POST ANCHOR

50 mm TOPPING SLAB WITH ROUGH EXPOSED AGGREGATE FINISH 475

WT02

950

SHARED PATHWAY

POLISHED STEEL CAP TO ROD

SHARED PATHWAY

REINFORCED CONCRETE BENCH POURED ON SITE- REFER TO ENGINEER'S DRAWINGS

ARTIFICIAL POND

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

13,000 GROUND FLOOR

i

D07

LANDSCAPE TIMBER BATTEN DETAIL 1:10

D08

LANDSCAPE OUTDOOR BENCH DETAIL 1:10

inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

CONSTRUCTION DETAILS 2 Status:

DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID GSEducationalVersion

A203

Revision

A


4 SECOND FLOOR WALL TYPES

FIRE STAIRS 03

CODE WT01 WT02 WT03 WT04 WT05 WT06

105 STORE CUPBOARD

WT06 FRL: 120/120/120

FRL: 120/120/120

WT06

HYDRAULICS RISER BEHIND

1,400

FRL: 120/120/120

MOTOR ROOMLESS SERVICE LIFT

WT02

109 ELECTRICAL CUPBOARD

STEEL SCREEN D1.03 50mm DIAMETER STEEL HANDRAIL

WT06

FINISHES SCHEDULE

FT01 FT02 FT03

LEGEND

D0.03

MOTOR ROOMLESS SERVICE LIFT

50mm DIAMETER STEEL HANDRAIL

WT06

LP FRL: 120/120/120

FIRE STAIRS 03

WT06

FRL: 120/120/120

WT06

FRL: 120/120/120

D0.10 WT02

WT06

FRL: 120/120/120

FN-01

WT06

HYDRAULICS RISER BEHIND

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

008 KITCHEN

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN06 FN07

FRL: 120/120/120

010 ELECTRICAL CUPBOARD

TL01 TL02 TL03

FN04 FN05

17,000 3 FIRST FLOOR

CHILLED WATER FLOW & RETURN DN200

PRODUCT

FN03

1000

HV

CODE

FN01 FN02

FRL: 120/120/120

CHILLED WATER FLOW & RETURN DN200

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FIRE STAIRS 04 PRESSURISED FIRE SHAFT

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

50mm DIAMETER STEEL HANDRAIL

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16

FN-01

B

Details

09.11.16

HV

13,000 2 GROUND FLOOR

CONC RL: 12, 520 PRESSURISED LIFT SHAFT

ST 25 24 23

11,670

22

FRL: 120/120/120

CHILLED WATER FLOW & RETURN DN200 WT06

19 18 17

B12 SERVICE LOBBY

16 15 WT06

WT06

FRL: 120/120/120

MOTOR ROOMLESS SERVICE LIFT

12

FRL: 120/120/120

B08 SWITCH BOARD

WT02

20

CARPARK EXHAUST DUCTWORK- LEADS TO B10

CONC RL: 10, 210

FRL: 120/120/120

LOADING DOCK LEVEL

2,100

21

WT06 NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

DB.11

HV i inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

CONC RL: 7, 500

7,500 1 BASEMENT

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries

SERVICE LIFT PIT

35 Corrowoy Street, Mount Druitt NSW 2770

1,725

+61 435 643 224 Drawing Name

CORE DETAIL 1 Status:

DEVELOPMENT APPLICATION

7,791 FALL 1:80

1

FALL 1:80

B.8

CORE DETAIL PART ONE 1:20

Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID

A301

GSEducationalVersion

AG DRAIN

AG DRAIN

Revision

A


WALL TYPES

2

3

4

CODE WT01 WT02 WT03 WT04 WT05 WT06

5

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

FINISHES SCHEDULE

2,833

6,168

CODE

PRODUCT

TL01 TL02 TL03

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN01 FN02

4,182

FN03

ZINCALUME VALLEY BEHIND WHERE FALLS MEET

FLOW AND RETURN RISERS CONTINUE TO SERVICE DECK

SERVICE LIFT TO CONDENSER

CONDENSER UNITS DUTY AND STANDBY BEHIND

SMOKE VENTS BEHIND- AUTOMATED TO OPEN IN THE EVENT OF A FIRE

MAXLINE 340 CORROGATED ROOF SHEETING

FN04 FN05

SLIM LINE ZINCALUME SOAKER TO CONNECT ROOFING TO ATRIUM

FN06 FN07 FT01 FT02

GL

FT03

16째

LEGEND BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

GRAND ATRIUM OPEN ABOVE CRS 10째

CRS 10째

SERVICE DECK STEEL PERFORATED MESH WALL SURROUNDING SERVICE DECK

FT-01

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

GL W2.57

16째

Revision History Revision Date A 26.08.16 B

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

WT06

WT06

WT06

FIRE STAIRS 03

D2.02

FRL: 120/120/120

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

205 PWD AMENITIES

MOTOR ROOMLESS SERVICE LIFT

FRL: 120/120/120

09.11.16

WT06 FRL: 120/120/120

WT02

220 ELECTRICAL CUPBOARD

FRL: 120/120/120

CHILLED WATER FLOW & RETURN DN200

REFER TO CONSULTANT DRAWINGS FOR CEILING CAVITY SERVICES

Details

204 KITCHENETTE

TL02 WT03 NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

FN-03 50mm DIAMETER STEEL HANDRAIL

FN-01 HV

i inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

CORE DETAIL 2 Status:

DEVELOPMENT APPLICATION

1 GSEducationalVersion

CORE DETAIL PART TWO 1:20

Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID

A302

Revision

A


2

2

HV

1,275 HV

1,275

RL: 17, 000

RL: 13, 480

50

50

50

WALL TYPES

20

gov 4 19 5

4

5

6 17 7

17

WT06

8

9

FT01 FT02 FT03

200 CORE FILLED MASONRY BLOCK WALL WT06

11

FHR

AND

12

FH

21,000 SECOND FLOOR

12

B

WT06

LANDING CONC RL: 21, 000

ST 20 19

120/120/120

18

COL01

FB

FRL: 120/120/120

1,270

TO

120/120/120

CE

0mm 380

TAN

RL: 15, 286

RL: 19, 286

550

17

FHR

16 15

FIRE STAIR 01 | GROUND FLOOR PLAN 1:20

14

FIRE STAIR 01 | FIRST FLOOR PLAN 1:20

2

10 EQUAL RISERS

WT06

FIRE STAIRS 01 STEEL

DIS

1,270

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

13

STEEL

1

FN06 FN07

FRL: 120/120/120

10

FIRE STAIRS 01

B

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN04 FN05

1,715

11

TL01 TL02 TL03

LEGEND

1,000

13

HOT DIP GALVANISED STEEL MESH SCREEN AFFIXED TO 200 BLOCK WALLS IN HOT DIP GALVANISED FRAME

14

120/120/120

10

PRODUCT

FN03

WT06 200 CORE FILLED BLOCK WALL

FIRE STAIRS 01

15

D1.12

15

14

FRL: 120/120/120

16

8

9

WT06 200 CORE FILLED BLOCK WALL

18

6

CODE

FN01 FN02

19

18

16

FINISHES SCHEDULE

3

PWD REFUGE AREA

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

1

2

20

7

550

3

250 50

2

UP

1

120/120/120

250 50

PASSENGER LIFT 03

WT06

550

UP

CODE WT01 WT02 WT03 WT04 WT05 WT06

LANDING CONC RL: 19, 286

13 12

Revision History Revision Date A 26.08.16

STEEL SCREEN

DP

1,182

17,000 FIRST FLOOR

2 3

250

CONC RL: 17, 000

20 19

4

18

gov

19

550

17

5 18

16

6 7

14

16 8

12

9

FIRE STAIRS 01

LANDING

13

15

50

10mm NON-SLIP SURFACE AT EDGES OF TREADS

15

17

D2.27

ST

CONC RL: 15, 286

14

10 13 11

WT06

WT06 200 CORE FILLED BLOCK WALL FRL: 120/120/120

WT06 200 CORE FILLED BLOCK WALL FRL: 120/120/120

50

10 EQUAL RISERS

20

LANDING

1,715

120/120/120

550

RL: 21, 000

09.11.16

FRL: 120/120/120

1,000

UP 1

PASSENGER LIFT 03

WT06 200 CORE FILLED BLOCK WALL FRL: 120/120/120

STEEL SCREEN

1,270

50

WT06 200 CORE FILLED BLOCK WALL FRL: 120/120/120

50mm DIAMETER STEEL HANDRAIL

PWD REFUGE AREA

HV

WT06

50

B

Details

200 CORE FILLED MASONRY BLOCK WALL WT06

2

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC)

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

STEEL

TO

1,270

CE

i inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

12

0mm FH 380 AND FHR

TAN

120/120/120

DIS

FIRE STAIRS 01

B

WT06

13,000 GROUND FLOOR

120/120/120

HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client:

FB

Mr. G Keppler

FHR

of Keppler Glass Industries 35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name

3

FIRE STAIR 01 | SECOND FLOOR PLAN 1:20

4

FIRE STAIR 01 | SECTION 1:20

FIRE STAIR DETAIL 01 Status:

DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID GSEducationalVersion

A303

Revision

A


C

B

TL02 SET OUT POINT

2,559 675

600

310

600

296

600

294

600

600

WALL TYPES

187

CODE WT01 WT02 WT03 WT04 WT05 WT06

1,919

350

88

502

252

600

HB20

HB21

WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120

TL03 TL02 SET OUT POINT

AS1428.1

EXCLUSION ZONE

EXCLUSION ZONE

227 FEMALE AMENITIES

118 413

25 25

950

FN06 FN07 FT01 FT02

LEGEND

WC38

594 406

475

1

UR08

UR09

406

54 950

5,344

2B

3

WC40

406

WC36

475

950

950

WC31

950

475

475

50

50

50

594

1

WC41

7,827

475 946

7,172 950

UR07

2 A202

C4

50

WC35

950

3

WC30

A1

WC39

475

475

2B

7,434

50

594

950

475

475

HYDRAULICS RISER

1 A202

C4

950

WC34

INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS

FN04 FN05

UR06

50

50 950 50

A1

WC29

TL01 TL02 TL03

FN03

FG

475

WC33

PRODUCT

FT03

FG

WC28

CODE

FN01 FN02

RL: 17, 000 AREA: 28.8m2 TL02

D2.25

475

25 950

226 MALE AMENITIES

D2.26

RL: 17, 000 AREA: 41.8m2 TL02

AS1428.1

EXCLUSION ZONE

406

AS1428.1

EXCLUSION ZONE

AS1428.1

EXCLUSION ZONE

475

AS1428.1

EXCLUSION ZONE

HB19

2,483

AS1428.1

HB18

780

HB17

940

HB16

FINISHES SCHEDULE

BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL

AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16 09.11.16

775

350

25

25

305

257

W2.50

1220

W2.49

UR10

W2.52

AMBULANT CUBICLE

W2.51

WC42

406

50

50

900 x 900 CIRCULATION SPACE

1,220

870

775

WC37

W2.53

W2.54

W2.55

W2.56

950

WC32

50

AMBULANT CUBICLE

870

475

900 x 900 CIRCULATION SPACE

50

50

594

B

Details

1,775 190

25

1,775

5,722

118 118

MALE AMENITIES PLAN 1:20

2

1

B

B

1,020

DYSON AIRBLADE HU02

118

2,402 4,447

FEMALE AMENITIES PLAN 1:20

FIXED PAPER TOWEL DISPENSER

TL02

HB17

475

600

200

600

200

600

WC33

HB19

HB18

200

600

450 234 390 234

WC34

WC35

WC36

895

PB

PB

WC37

WC36

WC35

WC34

WC33

CAROMA LUNA TOILET SUITE

HB

+21,000 4 SECOND FLOOR

TL02 743

1,014

376 118100 800

5,722

FEMALE AMENITIES ELEVATION 1:50

200

TL02 800 7,111

200

TL02 800

200

TL02 800

TL02

160

+21,000 4 SECOND FLOOR

800

TL02 800

200

TL02 800

200

TL02 800

200

TL02 800

200

800

100

+21,000 4 SECOND FLOOR

2,174

7,161

FEMALE AMENITIES ELEVATION 1:50

1B

TL02

+21,000 4 SECOND FLOOR

4,000

PB

1,200

PB

500

AMBULANT CUBICLE WC37

680 900

PB +21,000 4 SECOND FLOOR

HB

PB

900

HB16

PB

NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.

TL02

790

TL03 SET OUT POINT

PB

D2.26

500

CAROMA CUBUS WALL BASIN WITH QUATRO MIXER TAP

PB

4,000

2,300 1,200 4,000

PB

PB

790

TL03

CAROMA LUNA TOILET SUITE

PB

2,000

380

FIXED MIRRORS

1A

25

1,775

2,575

1

500

2,122

2,000

350

25

TL02 SET OUT POINT ALIGN WITH FLOOR TILING

FEMALE AMENITIES ELEVATION 1:50

1C

i inside outside architecture

1

Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au

C

HALL OF DEMOCRACY

DYSON AIRBLADE HU02

CAROMA LUNA URINAL SUITE

600

187

MALE AMENITIES ELEVATION 1:50

HB

496

2,275

2B

1,000 7,420

1,000

1,000

Drawing Name

1,913

WET AREA DETAILS

533

+21,000 4 SECOND FLOOR

+61 435 643 224

UR10

900

900 +21,000 4 SECOND FLOOR

35 Corrowoy Street, Mount Druitt NSW 2770

PB D2.26

2,600

UR09

PB

Mr. G Keppler of Keppler Glass Industries

4,000

4,000

UR08

PB

Client:

1,000

MALE AMENITIES ELEVATION 1:50

244

+21,000 4 SECOND FLOOR

+21,000 4 SECOND FLOOR

Status:

AMBULANT CUBICLE WC37

TL02

WC36

TL02

WC35

TL02

WC34

TL02

WC33

HB

680

600 209 2,437

UR07

TL02

PB

PB

1,249 716

TL02 SET OUT POINT ALIGN WITH FLOOR TILES

340 718

680

118

GSEducationalVersion

UR06

HB18 220

HB17 PB

2A

4,000

160

CAROMA CUBUS WALL BASIN WITH QUATRO MIXER TAP

1,900

1,200

TL03

TL03 SET OUT POINT

CAROMA LUNA TOILET SUITE

2,751

TL02

1,400

FIXED MIRRORS

TL02 531

44

800

160

2C

800

200

800

200

800

200

2,087 1,303 220

FIXED PAPER TOWEL DISPENSER

#Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au

800

100 564

924

MALE AMENITIES ELEVATION 1:50

496

1,027

+21,000 4 SECOND FLOOR

DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN

Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16

Drawing Scale

VARIES Layout ID

A401

Revision

A