HALL OF DEMOCRACY DEVELOPMENT
WALL TYPES CODE WT01 WT02 WT03 WT04 WT05 WT06
40 GEORGE STREET, BRISBANE 4000 DEVELOPMENT APPLICATION SUBMISSION
FINISHES SCHEDULE
ISSUE B: 09/11/2016
CODE
PRODUCT
TL01 TL02 TL03
INALCO GROUND PIEDRA TILE 1000 x 2500 INALCO AGE MOKA TILE 1000 x 1000 QUINTESSENZA ESAGNO ARS MIX 1 TILE 266 x 230 HEXAGONAL WALL TILE CORIAN SORREL KENNEDY'S TIMBERS GREY IRONBARK SAWN HWD TIMBER SEATING CHARCOAL LOW PRESSURE LAMINATE ON MDF BACKING CORIAN ANTARCTICA ROUGH SAWN RECYCLED TIMBER BENCH TOPS (REFER TO INTERIOR DESIGN DETAILS) CEDARWOOD PANELS- CLEAR FINISHED AUTEX "QUIET STUFF" LOW RANGE ACOUSTIC PANELING- TALUS IN HERALD BLACK 25mm STEEL FRAMED GLASS CUBES INTERLOC TIMBER LAMINATE (MILANO WALNUT) LOCKERS CORA VERTICAL BIKE RACKS
FN01 FN02 FN03
REAL PROPERTY DESCRIPTION:
FN04 FN05 FN06 FN07
PROPERTY NUMBER: 879490 LOT NUMBER: 2B32444 LAND NUMBER: 10652634 DESCRIPTION: WIC NO.27446A&27446B - HARRIS TCE & WIC NO.27484A - THE MANSIONS WARD: CENTRAL LOT AREA: 5899 m2
FT01 FT02 FT03
LEGEND
ZONING: QPP-PC1 - PRINCIPAL CENTRE (CITY CENTRE) ZONE
BUILDING PROGRAM: EDUCATIONAL FACILITY / PUBLIC THEATRE / INFORMATION HUB BUILDING CLASS: CLASS 9B GFA: 2650m2 16 CAR SPACES.
GEORGE STREET / ALICE STREET EXTERNAL PERSPECTIVE
PROPOSED BUILDING DATA: BASEMENT PARKING SPACES: 97m2 END OF TRIP FACILITIES: 36m2 DRIVEWAY RAMP: 38m2 TOTAL BASEMENT GFA: 171m2
GROUND FLOOR RESTAURANT: 217m RECEPTION AREA: 160m2 AMENITIES: 100m2 TOTAL GROUND GFA: 388m2
FIRST FLOOR
COMPLIANCE NOTES NCC
AT ALL TIMES COMPLY WITH NCC AND LOCAL BUILDING AUTHORITY REQUIREMENTS. BUILDER TO SATISFY ALL REQUIRED DA CONDITIONS.
AUDITORIUM SPACES AND CONSTRUCTION TO COMPLY WITH NCC SECTION D TABLE D1.13 OFFICE SPACES AND CONSTRUCTION TO COMPLY WITH NCC SECTION D TABLE D1.13 ACCESS AND EGRESS IN THE BUILDING TO COMPLY WITH SECTION D SERVICES AND EQUIPTMENT FOR FIRE TO COMPLY WITH SECTION E FIRE WALLS TO COMPLY WITH SECTION C HEALTH AND AMENITIES REQUIREMENTS TO COMPLY WTIH SECTION F
EXCAVATE AS REQUIRED, DRAIN AWAY FROM BUILDING AT ALL TIMES CONNECTING TO EXISTING SEWER AND STORMWATER CONNECTIONS.
LIBRARY/STUDY SPACES: AUDITORIUM: 1015m2 AMENITIES: 100m2 TOTAL FIRST GFA: 1211m2
ALL LEVELS AND SET OUT POINTS TO BE CONFIRMED ON SITE. ALL REINFORCED CONRETE SLABS ARE TO BE LAID OVER A WATERPROOF MEMBRANE AND OVER A 50mm SAND BED. HAND RAILS AND BALUSTRADES TO COMPLY WITH NCC SECTION D. FIRE STAIRS TO COMPLY WITH NCC SECTION C AND D. ALL FIRE WALLS MUST BE FRL RATING 120/120/120 (IN ACCORDANCE WITH NCC SECTION C) AND MUST BE POURED TO CONNECT TO UNDERSIDE OF THE ROOF SHEETING.
SECOND FLOOR OFFICES: 515m2 AMENITIES: 118m2 AUDITORIUM: 128m2 WAITING AREAS: 290m2 TOTAL SECOND GFA: 1051m2
ALL FINISHES, MATERIALS AND STRUCTURAL COMPONENTS IS TO BE IN ACCORDANCE WITH STRUCTURAL ENGINEER'S DRAWINGS AND DETAILS. ANY DISCREPANCIES IN FINISHES OR MEASUREMENTS MUST FIRST BE CONFIRMED WITH ARCHITECT, PRIOR TO COMMENCEMENT OF WORK. WET AREAS TO COMPLY WITH SECTION F OF NCC. REFER TO HYDRAULIC ENGINEER'S DRAWINGS FOR PIPE LOCATIONS AND GRADIENTS TO BASEMENT SEWERAGE ROOM.
GFA SUMMARY In accordance with BCC definitions of GFA, the total GFA of the development does not include: services, vertical transport and the Basement.
ROOFER TO REFER TO HYDRAULIC ENGINEER'S DRAWINGS BEFORE PLACEMENT OF DOWNPIPES AND OVERFLOWS. TACTILE INDICATORS TO COMPLY WITH NCC SECTION D.
COVER PAGE SITE PLAN LANDSCAPE PLAN BASEMENT PLAN GROUND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN ROOF PLAN NORTH AND SOUTH ELEVATIONS EAST AND WEST ELEVATIONS SECTION 01 PART ONE SECTION 01 PART TWO SECTION 02 PART ONE SECTION 02 PART TWO SECTION 03 DETAILED FACADE SECTION 1 CONSTRUCTION DETAILS 1 CONSTRUCTION DETAILS 2 SERVICES DETAIL: CORE DETAIL PART ONE SERVICES DETAIL: CORE DETAIL PART TWO FIRE STAIR COMPLIANCE DETAIL FIRE TRAVEL DISTANCES WET AREA DETAILS
BR CHW CONC COL01 COL02 CP CPT CRS CT DP EXH EXP. AGG F FB FG FHR FT FN F+R FW G GT HB HV LP MO MSSB OH PB PS R S SH SV TIM WC WPL
AGED RECYCLED BRICK CHILLED WATER CONCRETE 400mm DIAMETER CONCRETE COLUMN 90 SQUARE HOLLOW SECTION CAR PARK CARPET CORRUGATED ROOF SHEET(MAXLINE 340) CERAMIC TILES DOWNPIPE EXHAUST ROUGH EXPOSED AGGREGATE FLASHING FIRE BOOSTER FLOOR GULLEY FIRE HOSE REEL FIXTURE FINISH FLOW AND RETURN FLOOR WASTE GLASS GUTTER HAND BASIN HYDRANT VALVE TUBULAR LIGHT PIPE MOTORBIKE PARKING MECHANICAL SERVICES SWITCHBOARD OVERHEAD PLASTERBOARD (WET AREAS) PIPE STACK RIDGE SOAKER SHOWER SMOKE VENT HARDWOOD TIMBER SLATS WATER CLOSET WATER PROOF LOUVRES (HVAC) Revision History Revision Date A 26.08.16 B
Details
09.11.16
AUSTRALIAN STANDARDS FEMALE, MALE, AMBULANT AND PERSONS WITH DISABILITIES AMENITIES TO COMPLY WITH AS1428.1 ACCESS FOR PERSONS WITH DISABILITIES TO COMPLY WITH AS1428.1 INCLUDING RAMP GRADIENTS AND DISTANCES (MAX 1:14 WITH LANDINGS EVER 9m) TACTILE GROUND INDICATORS TO COMPLY WITH AS1428.1. TGSI'S TO BE 300mm FROM THE END OF A STAIR OR CHANGE IN GRADIENT AND BE 600mm DEEP. CAFE AND BAR TO COMPLY WITH AS4674-2004. WATERPROOF LOUVRES PROVIDED FOR MECHANICAL VENILLATION.
COUNCIL REQUIREMENTS AND LOCAL AUTHORITIES BUILDING MUST BE A COMPULSARY 3m SET BACK FROM BOUNDARY LINE. DRIVEWAY, CAR PARK AND LOADING DOCK MUST COMPLY WITH THE TRANSPORT ACESS PARKING, PLANNING AND SERVICS POLICY.
GROUND FLOOR: 388m2 FIRST FLOOR: 1211m2 SECOND FLOOR: 1051m2 TOTAL GFA: 2650m2
A100 A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A201 A203 A204 A301 A302 A303 A305 A401
LOCATION PLAN
STANDARD BUILDING NOTES CLASS 9B BUILDING REFER TO RELEVANT CONSULTANT DRAWINGS FOR INFORMATION RELATED TO MECHANICAL VENTILATION, HYDRAULIC, ELECTRICAL SERVICES. REFER TO INTERIOR CONSULTANT AND LANDSCAPE ARCHITECT'S DRAWINGS FOR FIT-OUTS AND LANDSCAPE DESIGN DETAILS. REFER TO SURVEY INFORMATION FOR PROPERTY BOUNDARIES AND OTHER SITE INFORMATION. REFER TO CIVIL ENGINEER'S DRAWINGS FOR EARTHWORKS AND ROAD WORK LEVELS. ALSO REFER TO ENGINEER'S DRAWINGS FOR CONCRETE SLABS, FOUNDATION AND FOORING DETAILS- ALL FOOTINGS DRAWN IN THIS SET IS AN INDICATION ONLY.
2
DRAWING SCHEDULE:
WALL CORE FILLED 190 BLOCK CAVITY BRICK WALL CORE FILLED 190 BLOCK WALL STEEL STUD PARTITION GLASS WALL GLASS CURTAIN WALL WITH STEEL MULLIONS CORE FILLED 200 BLOCK WALL, FRL: 120/120/120
HEIGHT OF BUILDING DOES NOT EXCEED 20m IN ACCORDANCE WITH AIR CRAFT EASEMENT HEIGHTS AND TO NOT DWARF HERITAGE BUILDING.
DRAWN 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016 30.08.2016
CHECKED 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016 09.11.2016
GENERAL NOTES PRIOR TO COMMENCEMENT OF WORK, COMPLY WITH ALL SAFETY STANDARDS INCLUDING REQUIREMENTS FOR REMOVAL OF HAZARDOUS MATERIALS. COMPLY WITH ALL COUNCIL REQUIREMENTS REGARDING ROADWORK SAFETY AND CONTACTING SURROUNDING PROPERTIES OF DURATION AND SCOPE OF WORK. VERIFY LOCATION OF EXISTING SERVICES SUCH AS SEWERAGE AND STORMWATER CONNECTIONS PRIOR TO CONNECTIONS BEING MADE. PLOTTED LOCATION OF EXISTING SERVICES ON PLANS IS AN INDICATION ONLY.
DISCLAIMER THIS DRAWING SET AS WELL AS ANY SCHEDULES OR DOCUMENTS PROVIDED IS A LEGAL TRANSFER OF INFORMATION. THE ELECTRONIC DATA SHARED IS FOR CONVENIENCE OF USE AND REMAINS THE PROPERTY OF INSIDE OUTSIDE ARCHITECTURE. COPYING OR REPRODUCTION OF THIS DRAWING OR ELECTRONIC COPY WITHOUT THE EXPRESS WRITTEN CONSENT OF INSIDE OUTSIDE ARCHITECTURE IS NOT ALLOWED.
NOTES: 1. THIS DRAWING IS FOR DESIGN GUIDANCE ONLY. REFER TO CONSTRUCTION DOCUMENTATION SET FOR FINAL DETAILS. 2. ALL DETAILS MUST COMPLY TO SITE CONDITIONS, RELEVANT AUTHORITIES AND AUSTRALIAN AND LOCAL BUILDING CODES. 3. CONTRACTOR TO CONFIRM ALL EXISTING SITE DIMENSIONS. 4. CONTRACTOR TO CONFIRM ALL BUILDING DIMENSIONS PRIOR TO COMMENCEMENT OF WORK. 5. CONTRACTOR TO CONFIRM RELEVANT DRAWINGS WITH CONSULTANTS PRIOR TO COMMENCEMENT OF WORK.
ACCURACY OF SERVICE INDICATIONS IN ALL DRAWINGS SHOULD NOT BE TAKEN OVER ENGINEERING CONSULTANT DRAWINGS.
CONSTRUCTION 2METERS FROM ANY EXISTING UNDERFROUND PIPEWORK IS NOT PERMITTED UNLESS PRIOR ORGANISED AND PERMITTED BY COUNCIL. ACCESS AND EGRESS FOR PERSONS WITH DISABILITIES TO COMPLY WITH AS1428.1
CONTRACTORS TO CONFIRM ALL DIMENSIONS AGAINST SITE MEASUREMENTS AND ANY DISCREPANCIES ARE TO BE CONFIRMED WITH THE ARCHITECT PRIOR TO COMMENCEMENT OF WORK.
REFER TO ENGINEER'S DRAWINGS IN CONJUNCTION WITH LANDSCAPE ARCHITECT'S DRAWINGS FOR RETAINING WALL DETAILS. PROVIDE ALL NECESSARY EXPANSION AND AND CONSTRUCTION JOINTS.
THIS DRAWING SET IS TO BE READ IN CONJUNCTION WITH DOOR AND WINDOW SCHEDULES, SPECIFICATION TABLES AND ANY OTHER DOCUMENTS (ENGINEER CONSULTANT DRAWINGS, SURVEY ETC).
CONTRACTOR TO ACQUIRE FINAL SERVICE CERTIFICATIONS FROM EACH CONTRACTOR AND ENGINEER AT THE COMPLETION OF CONSTRUCTION FOR BUILDING CERTIFIERS.
COPYWRITER OF THIS DRAWING AND ALL WORKS EXECUTED FROM SUCH, REMAINS THE PROPERTY OF INSIDE OUTSIDE ARCHITECTURE.
PERFORMANCE/DESIGN SOLUTIONS ARGUMENTS
i inside outside architecture Naushin Rahman | n8547661 | Zuzana Kovar 156 Rouen Road, Bardon 4065 (07) 3878 5787 | +61 434 205 740 info@inoutarchitecture.com.au
HALL OF DEMOCRACY #Site Address1, Brisbane 4000 Site Office: (07) 3378 2295 info@hallofdemocracy.com.au Client: Mr. G Keppler of Keppler Glass Industries
PUBLIC FOOTPATH AND SURROUNDING LANDSCAPE DESIGN
35 Corrowoy Street, Mount Druitt NSW 2770 +61 435 643 224 Drawing Name
IN THE BRISBANE CITY COUNSIL CITY PLAN CH4, GEORGE STREET IS A SUBTROPICAL BOULEVARD, WHICH INDUCED THE PLANTING OF LEOPARD TREES. THIS REQUIRES 6m OF NEW MIN. PUBLIC FOOTPATH WIDTH. EXISTING FOOT PATHS WILL BE REPAVED AND MAINTATINED WITH LANDSCAPING LIGHTING SEATING AND CITY CYCLE PROVISIONS PROVIDED.
COVER PAGE Status:
DEVELOPMENT APPLICATION Drawn by NR Modified by NR Checked by ZK Approved by DN
Date 24.08.16 Date 26.09.16 Date 26.10.16 Date 09.11.16
Drawing Scale
VARIES Layout ID GSEducationalVersion
A100
Revision
A