FOLIO Architect / Interior Designer / MSc Architectural Design Student
2019
.
WORKS
Irem Naz Kaya
issuu: https://issuu.com/nazkaya /docs/iremnazkaya_portfolio
web site: www.iremnazkaya.com
contact info:
iremnazkaya@gmail.com +90 506 516 9694 KavacÄąk Mahallesi/Maral Sokak No.69 /Beykoz/ Istanbul
2
INDEX
RESUME 4 POLIMI, ITU HALIC WORKSHOP
6
RADISSON BLU NIAMEY HOTEL
8
ISTANBUL AIRPORT TURKISH AIRLINES
18
INTERNATIONAL AND DOMESTIC LOUNGES SULEYMANIYE PALIMPSEST 22
3
irem naz kaya |e-rem nahz | 1 3 . 0 9 . 1 9 9 4
EDUCATION 2018 Sept.
Istanbul Technical University
2013-2018
Istanbul Technical University
MSc | Architectural Design
Bachelor of Architecture Double Major Program | (GPA 3.54/4.00) 2012-2017
Istanbul Technical University
2015-2016 Aug.- Jan
Auburn University, Alabama, U.S.
2008-2012
Nisantasi Anatolian High School
2000-2008
ITU GVO Ozel Dr. Natuk Birkan
Bachelor of Interior Architecture | (GPA 3.48/4.00) Exchange Scholarship Program
High School
Elementary School
COMPETITIONS & WORKSHOPS MIMED [ARCHED] - Association of Architecture
Education Student Awards - 3rd year category | Jury Special Award
KOCTAS Interior Design Competition - Resting/ Storage Space Design - with Burcu Berberoglu, Yasemin Zinzade | Honourable Mention
POSIAC Perceptions of Space | Exhibition Design IFAC International Festival of Art and Construction 4
RESUME
PROFFESIONAL 2018- June
Avci Architects - Architect, Interior Designer
- Istanbul 3rd International Airport THY Domestic and Main Lounges Interior Design Project, built Drawing key plans, and detailed sections, Making Coordinations with Softroom Architects and Con- struction Site - Radisson Blu Niamey Hotel Interior Concept Design, built - Suleymaniye Palimpsest Workshops - Suleymaniye Masterplan Study, Preparing Envisioning Diagrams, Drawings
- The Circle Academy International Workshop Coordinator * POLIMI, ITU Haliรง Workshop (28 March - 5 April 2020)
Tanju Ozelgin Studio - Internship | Office Editing Soho House Istanbul project, Drawing plans,sections and details for IRO Hong Kong
Mesa Mesken - Internship | Construction Site |
Construction management in TEMA Istanbul Project
Istanbul Technical University - Internship |
Academic Research Experiments : Use of waste glasses in cement and concrete production
SOFWARE SKILLS Adobe Photoshop
SketchUp
AutoCAD
Adobe Illustrator
3dsMax
Ms Office
Adobe InDesign
Rhinoceros
Wordpress
Vray
PUBLICATIONS ITU
Interior Architecture Students Project Collection Book | Urban Interiors
Editor | Assoc. Prof. Dr. Emine Gorgul Tamirhane | Project Appereance
https://issuu.com/projevii/docs/tamirhane_2017.com pressed
5
POLIMI, ITU HALIC WORKSHOP upcoming, 28 March - 5 April 2020
Collaborators: • The Circle (Gizem Kadıoglu, Irem Naz Kaya, Ece Çakır) • POLIMI MSLab (Antonella Contin, Gaia Caramellino, Valentina Galiulo) • UNIVERSITY OF GREENWICH (Ed Wall) • ITU
6
7
RADISSON BLU NIAMEY HOTEL Niamey, Niger, 2019 Concept Modelling, Drawings, Built The new hotel in Niamey city centre is sited on Boulevard de la Republique north of the Palais des Congres. Located also in this area are the Tunisian National University, the Federal Government Offices of Niger, the old Presidential Palace, the National Hospital of Niger and many other important institutional buildings. The new Niamey Hotel will take its position of importance alongside some of Niger’s most significant institutions. The hotel is conceived as an integrated banquet and congress hotel complex where the functions complement each other. The hotel will operate throughout the year with extensive views of the river Niger, to the West. The 194 key hotel includes a banquet hall, numerous conference rooms, an all-day dining restaurant, lounge bar, sports bar, swimming pools and a spa. There are 160 standard rooms, 12 executive suites, 7 extended suites, 13 junior suites, a royal presidential suite, and a presidential suite. The total area of the complex will be over 21,000sqm.
Worked as/in: • Interior Designer • Designing the Facade Pattern • Drawing and Modelling Interiors: Lobby, Presidential Suits, Standart Rooms, Extended Suites, Meeting Rooms, Pool and Terrace area. • Preparing BOQ lists • Preparing presentation documents in coordination with CGI Company 8
RADISSON BLU NIAMEY HOTEL
9
10
RADISSON BLU NIAMEY HOTEL
11
12
RADISSON BLU NIAMEY HOTEL
13
14
RADISSON BLU NIAMEY HOTEL
15
• Spa Lobby
16
RADISSON BLU NIAMEY HOTEL
• Meeting Room
17
ISTANBUL AIRPORT TURKISH AIRLINES INTERNATIONAL LOUNGES Istanbul, Turkey, 2019 Interiors, Local Architect The Flow Wall project, designed for Turkish Airlines new Istanbul airport by Softroom with Avcı Architects as local partner, creates a physical space that embodies Turkish Airlines’ new brand philosophy of ‘flow’ within the airport environment. The project that includes one of the longest parametric interior forms in the world with its length over one kilometre, creates a suite of lounges and forms an intuitive route through space that transcends barriers of language and culture. The Flow Wall project provides the visual signature that weaves through the six new lounges and creates a series of unified areas that cater for a variety of passengers’ needs.
Team: Avcı Architects + Softroom Photographs: Büsra Al Worked as: • • •
18
Istanbul 3rd International Airport THY Domestic and Main Lounge Phase 1 Drawing key plans and sections Making coordinations with Softroom Architects and construction site
ISTANBUL AIRPORT TURKISH AIRLINES INTERNATIONAL LOUNGES
19
Private Suites
Lockers
20
Toilet Block
Meeting Room
Daybeds
Tea Garden
Culinary Area
Library
Cinema
BOH
Kids Zone
ISTANBUL AIRPORT TURKISH AIRLINES INTERNATIONAL LOUNGES
1
Exclusive Lounge
2
Main International Business Lounge
3
Main International Frequent Flyer Lounge
4
Arrivals Lounge
5
Domestic Lounge
21
22
ISTANBUL AIRPORT TURKISH AIRLINES INTERNATIONAL LOUNGES
23
• Entrance
• Serveries
24
ISTANBUL AIRPORT TURKISH AIRLINES INTERNATIONAL LOUNGES
• Cinema
• Construction Process
25
3
3
4
5
4
5
50 mm R
T
Various
Various
T
4
DETAIL 1
4 Scale: 1:1
DETAIL 1
Scale: 1:1
Various CINEMA
CINEMA
CULINARY AREA
CULINARY AREA
CINEMA
CINEMA
Flush Aluminium Flush Aluminium Skirting Skirting
25
• Mesh Screen Pattern Detail
SECTION C-C SECTION C-C drawing • Ribbon wall2 section detail 2 Scale: 1:10 Scale: 1:10 Metal Capping
26 Timber Hanger
Timber Hanger
Metal Capping
5
DETAIL 2
5
Scale: 1:2
25
DETAIL 2
Scale: 1:2
18
12
ISTANBUL AIRPORT TURKISH AIRLINES INTERNATIONAL LOUNGES
27
SULEYMANIYE PALIMPSEST Istanbul, Turkey, 2018 Urban Rehabilitation Worked as: • Preparing Suleymaniye Project workshops with Team (Selçuk Avcı, Han Tümertekin, Can Çinici, Nevzat Sayın, Yüksel Demir, Pelin Dervis, etc. ) • Preparing design guidelines • Drawing and modelling Suleymaniye Master Plan • Preparing Envisioning Diagrams, Drawings
28
SULEYMANIYE PALIMPSEST
29
SÜ RÜ KÖ P
ıııı ııııı ııııı ıııııı ıııııı ıııııı
ıı ı ıııı ııı
I LVA R BU
ııı
RK
ııııııııııııı
ıııı ııı
ııııııııı
ıııı ıı
AT AT Ü
ııı ııı ıı ı
ı ı ı ııı ııı ııı ııı ııııııııııı ııı ııı ııı ııı ıııııı ıııı ııı ıııı ııı ı ı
ıı ıı ıı
ıııı ıı ııııııı ıı ı
ı ıı ıı
ı
ıı ıı ıı ıı
ıı ı
• Proposed Road Hierarchy
ıı ıı
ıııııııııııııı ıı ıı ıı ıı ıı
ı
ııııııııı ı ı ı ı ıııı ıııı ıııı ıııı ıı
ııı ııı ııı
ı ıı
ııı ııı ııı ııı ııı ııı ııı ııı ıııı ııı ıııı ııı ıııı ıı ııı ıııı ıııı ıııı ı ıı ı
ı ıı
ıı ıı ıı
ııı
ııı
ıı
ı ıı
30
ı ıııııııı ııı ıııı ıııı ııı ııı ııııı ıı ı ı ı ııı ıııı ııı ıı ııı ııı ııı ıııı ıııı ııı ıııı ıııı ıııı ııııı ııııı ııııı ııııı ıııı ıııı ıııı ıııı
ı ıı ıı ıı
ııııııııı
ıı ıı
ı ıı ıı
ıı ı
ıı
İ.Ü. KAMPÜSÜ
ıı
ıı ıı ıı
ıı
• Proposed Open Spaces
SÜLEYMANİYE KÜLLİYESİ
ı ıı ıı ıı
ııı ııı ııı ı
İ.Ü. KAMPÜSÜ
ı ıı ıı ıı
ııı
ı ı
ıı ııı ıııııı ıı ı ııı ııııı ıııııııııııı ııı ııı ııı ı ııııı ııııı ııı ı ı ı ııı
ııı ııı ı ııı ııı ııııı ııııı
ııı ı
ııııııııııııııııııııııııı ııııııııııııııııııııııııııııııııııııııı ı ıı ıııı ıııııı ııııııı ııııııı ıııııı ıı ııııı ııı ıı ıı ı
ıı
ııı ııı ııı ı
ıııı ıııııııı ıı ıııııııııııııııııııııııııııııı
ııı ııı
ı
ııı ııı
ııı
ııı ı ııı ııı ıı ı
ı ı ı ııı ıı ı ıııı ıııı ıı ııııııı
ııııııı
ı ııı ııı ııı
ıııı ııı ııı ıı ııı ııı ııı ııı ııı ııı
ıı ııı ııı ıııı ıııı ıııı
ı ıı ııı ııı ııı ııı
ııı ııı ıı ı ııı ııı
İMÇ
ıııııı ıııııııııı ıııııı ıııııııııı
İMÇ
LİÇ
ııı
HA
ıııı ı ıııı ııı ııı ıııı ııııı ııı ııııı ıı ııı ıııııı ı ıııı ı ııı ııı ıııı ıı ı ıııı ıııııı ııı ııı ıııı ıı ıııııı ıııı ııı ııııııı ııı ı ıııııııı ııı ıı ıı ııı ıı ııı ı ıı ı ıı ııı ııı ııı ıııı ııı ıııı ııı ııı ıııı ııı ııı ııı ı ıı ı ı ıı
• Proposed New Infill Area
ıı ı
• Historical Preservation Area
ııııııııııııııııııııııı
ııııııııı
Existing Route Proposed Route Traffic Flow
SULEYMANIYE PALIMPSEST
31
32
SULEYMANIYE PALIMPSEST
• Preparing Suleymaniye Project workshops with Team (Selçuk Avcı, Han Tümertekin, Can Çinici, Nevzat Sayın, Yüksel Demir, Pelin Dervis, etc.)
33
34
thank you ! contact info: iremnazkaya@gmail.com +90 506 516 9694 KavacÄąk Mahallesi/Maral Sokak No.69 /Beykoz/ Istanbul
35