KENSINGTON PUBLIC LIBRARY Work Samples | Lanmark Group
1 01
LANMARK GROUP 2125 Mill Avenue , Brooklyn, NY 11234 T : (347) 462 4000 F : (347) 462 4001 www.lanmarkgc.com
DATE : 06-18-12 PROJECT NAME LOCATION
KENSINGTON BRANCH LIBRARY 4211 18TH AVENUE, BROOKLYN NY
DWG NO.
DRAWN BY CHECKED BY
RECORD DRAWINGS
RESIDENT ENGINEER
DDC
PLUMBING INSPECTOR
DDC
HVAC INSPECTOR
DDC
ELECTRICAL INSPECTOR
DDC
OFFSET BRACING
NOT OFFSET BRACING
AT COLUMN MIDDLE
AT CROSS
BRACING CONNECTION DETAIL
BRACING CONNECTION DETAIL
AT COLUMN TOP
BRACING CONNECTION DETAIL
AT COLUMN BASE PLATE
BRACING CONNECTION DETAIL
TYPICAL CONNECTION PLATE FOR HSS2x2
AT INTERMEDIATE BEAM BRACING DETAIL
TYPICAL KNEE BRACE DETAIL
BASE OR CAP PLATE FOR HSS4x4
LANMARK GROUP 2125 Mill Avenue , Brooklyn, NY 11234
2
T : (347) 462 4000 F : (347) 462 4001 www.lanmarkgc.com
DETAIL
A
SECTION
1
DETAIL
B
SECTION
2
DATE : 06-18-12 PROJECT NAME LOCATION
KENSINGTON BRANCH LIBRARY 4211 18TH AVENUE, BROOKLYN NY
DWG NO.
DRAWN BY CHECKED BY RESIDENT ENGINEER
DDC
PLUMBING INSPECTOR
DDC
HVAC INSPECTOR
DDC
ELECTRICAL INSPECTOR
DDC
RECORD DRAWINGS
102
MALT & MOLD Work Samples | William Architect
1 03
10'-7 1/4" 10"
12'-9"
William J. Rockwell architect LLC
WILLIAM / ARCHITECT
12'-6 1/2"
8'-11"
504 Grand Street E12 NY, NY 10002
william@williamarchitect.com/www.williamarchitect.com p 646 342 8946 f 212 353 1993
REPAIR PAINTED TIN CEILING AT OPENINGS. USE FLAT TIN OF SAME GAUGE THICKNESS
6'-0"
4'-10" 9'-6"
9'-6"
1'-3 3/4" 1'-3 3/4"
1'-3 3/4"
10'-9 3/4"
7'-9 3/4"
1'-3 3/4"
3'-3"
2'-1 1/4"
℄ COLUMN
OPEN
8"
1'-3 3/4"
2/25/12
Date
1
SOUTH ELEVATION
3'-4"
1'-7" 4'-11"
3/4"=1'-0"
ISSUED FOR ESTIMATING NOT FOR CONSTRUCTION
Copyright c 2012 William J. Rockwell architect LLC All rights reserved
1'-5 1/2" CLEAR FINISHED BIRCH OR MAPLE FINISH STYLE DOOR FRONTS AND DRAWERS
ESTIMATE
No.
Description
INTERIOR ELEVATIONS
1'-3 3/4"
1'-3 3/4"
6'-0"
1'-3 3/4"
1'-3 3/4"
2'-1 1/4" 1'-3 3/4" 1'-3 3/4" 1'-3 3/4"
1'-3 3/4"
= SHELF SCHEDULE TYPE (SEE A100)
2'-1 1/4"
CLEAR FINISHED BIRCH OR MAPLE FINISH STYLE DOOR FRONTS AND DRAWERS
REPAIR BRICK OR GYP. BOARD WALLS AT EXISTING TILE FLOOR TYP.
3'-0"
1'-5 1/4"
3'-0"
1'-3 1/2"
9'-0 1/4"
MALT AND MOLD 2321 East Broadway New York, NY 10002
DATE: 01/2012 SCALE: 3/4"=1'-0" DRAWING BY: WR, NB
A-200
104
DESERT ROOFTOPS - THE LAST LOT Work Samples | William Architect 59'-3"
William J. Rockwell architect LLC
WILLIAM / ARCHITECT
2'-3 1/2"
504 Grand Street E12 NY, NY 10002
8TH AVENUE
TH
ST
RE
ET
4'-0"
TEXTURED ASHPALT SHINGLES WITH 5" EXPOSURE. OVERHAND EAVE AND RAKE 3/8". USE 11 or 12 GAUGE GALVANIZED STEEL ROOFING NAILS. 5/8" OSB SHEATHING ANCHORED WITH #6D GALVANIZED ROOF NAILS
LOT 61
14'-0 1/2"
46
8T H
AV EN U
E
ASPHALT SATURATED ROOFING FELT, TO MINIMIZE WATER PENETRATION TO SHEATHING
W
2 X 8 WOOD RAFTERS 24" O.C.
LOT 63
SCREEN, MESH OR SHEATHING TO PREVENT ANIMALS/VERMIN INTO UNHABITABLE SPACES UNDER ROOFS
8"
14'-6 1/2"
1X6 CONTINUOUS PAINTED WOOD OR AZEK • • FASCIA BOARD
GRAVEL OR ARTIST APPROVED GROUND COVER
92'-0"
• • ••• •
MIN. 5/8" DIAM. (#5) x 48" LONG STEEL REBAR ANCHORING STAKES EVERY 4'-0" O.C. ALTERNATE ANGLED STAKES (TYP.) AND EMBED 30" MIN..
15'-2 1/2"
2'-6"
1/64" = 1'- 0"
15'-3"
PRESSURE TREATED WOOD 6X6 PERIMETER SILL PLATE AND HEADER.
PLOT PLAN
9'-4 1/2"
1 1/2" = 1'-0" 5'-10 1/2"
8'-3 1/2"
7'-0"
6
SECTION DETAIL 7'-5 1/2"
7'-7 1/2"
2 \\Imac27\saturn\ACTIVE PROJECTS\ART\VIEW 1 DOB copy.png
2 X 8 RAFTERS TO SPAN LESS THAN 9'-0" (TYP.) 2 -
17'-2"
14'-0"
mac27\saturn\ACTIVE PROJECTS\ART\VIEW 2 DOB .pn 27\saturn\ACTIVE PROJECTS\ART\VIEW2 copy.png
4'-0"
6
TYP. OVERALL SECTION - WIDEST SPAN
3
1/4" = 1'-0"
PLOT PLAN
8'-0" HIGH CHAIN LINK FENCE TO REMAIN. PUBLIC VIEWING FROM SIDEWALK ONLY
1/8" = 1'0"
SITE CONSTRUCTION DOB Review
NOV 8, 2011 OCT 31, 2011
DESERT ROOFTOPS
4
ELEVATION ALONG 8 AVE
GENERAL NOTES: 1. 2. 3. 4.
5
1/8" = 1'- 0"
THIS APPLICATION IS BEING FILED FOR THE INSTALLATION OF TEMPORARY STRUCTURES - NO CHANGE TO USE, EGRESS OR OCCUPANCY. DURATION OF TEMPORARY STRUCTURE IS FROM NOVEMBER 8th 2011 - FEBRUARY 5th, 2012 THE EXISTING 8'-0' HIGH CHAIN LINK FENCE AND GATES AT 8TH AVENUE ARE EXISTING TO REMAIN THROUGHOUT THE INSTALLATIONS DURATION NO PERSON ARE TO BE ALLOWED ON THE LOT DURING THE TEMPORARY EVENT. IT IS FOR PUBLIC VIEW FROM PUBLIC SIDEWALKS AND STREETS SURROUNDING THE LOT
740 8TH AVENUE
NORTH ELEVATION AT 46 ST
NEW YORK, NY 10036
1/8" = 1'0"
SPECIAL AND PROGRESS INSPECTIONS: -
STRUCTURAL SAFETY - STRUCTURAL STABILITY BC FINAL INSPECTION DIRECTIVE 14 OF 1975
ISSUED FOR CONSTRUCTION
Copyright c 2012 William J. Rockwell architect LLC All rights reserved
1
1017 61 AND 63
100'-0"
BLOCK: LOT:
william@williamarchitect.com/www.williamarchitect.com p 646 342 8946 f 212 353 1993
46TH STREET
1 05
70'-4" 8'-8 1/2"
PLANS, DETAILS AND NOTES OCT 2011
NB, WR WR
A100.00
106
387 GRAND STREET Work Samples | William Architect
1 07
26 COURT STREET Work Samples | William Architect
108
1 09
SYNO
SYNQ, formerly known as the Ozone Park Station, draws upon the characteristics of a vibrant and diverse neighborhood to reinvent the abandoned railway. Since the closure of the station, the site houses multiple businesses that provide services for the community. Therefore, preservation is just as important as the design intervention. SYNQ proposes activating the ground plane by introducing a continuous pedestrian artery (path) beginning and ending on grade at 101st Avenue between 99th and 100th streets. The path provides two modes of entering SYNQ. It will climb the exterior of the old station for a more direct access to the top or you may enter through the multilevel marketplace. The marketplace is unified with the path thus allowing unrestricted natural circulation.
The vision we have for the abandoned railway will serve as a commons in which business owners, families, and visitors take co-ownership of the space. The evolution of our design will allow the community to control the space based on immediate needs. SYNQ represents the initial spark for more imaginative uses for the cultural greenway.
110
1 11
Built landscape retains and transports rainwater through the underlayment of what used to be train rails; allowing for immediate reusage within SYNQ’s public gardening program.
C B A
The Stripped Ground Textures on the upper level of SYNQ form the public stairscape entrance on 99th Street and 103rd Avenue.
A
SECTION AT MARKETPLACE ENTRANCE
B
SECTION AT CULTURAL LANDSCAPE & EXISTING BUSINESSES
C
SECTION AT OUTDOOR ORCHESTRAL GREENSCAPE
112
1 13
114
HARLEM R.I.D.G.E ENYA CompeƟƟon
1 15
COMPONENT 1: MulƟ Model Transit Hub
VIEW POCKETS
COMPONENT 2: FOOD/ HEALTH/ EDUCATION
TRANSIT HUB: The abandoned sanitaƟon facility would transform into a transit hub for the public. The shell is maintained and the interior becomes a place of culture.
NOURISHING COMMUNITY CENTER: Environmental outreach for promoƟng urban agriculture and Nourishing HQ health programs.
FARMSCAPE BLOCKS: Project component creates public farm space controlled by Nourishing NY and funcƟons as a “classroom” would.
GREENHOUSES POOLS / ICE RINKS
PLAN CUT
GREEN TRAFFIC BARRIER S1
SEATING AREAS
S2
BIKE PATH
GREENWALLS COMMERCIAL POCKETS
116 N
LIVING INFRASTRUCTURE NYIT Thesis 2011_ Segrate, Milan The Living Infrastructure revises the idea of the tradiĆ&#x;onal megaform. It is an eco-armature which brings forth a new dimension of accessibility within the city of Segrate through local and regional forms of infrastructure. The built infrastructural environment has now become a place of occupaĆ&#x;on in the Contemporary city.
1 17
FACADE perFORMance Facade with purpose(s) that include shading for the units, water collecƟon; also funcƟoning as a porous and scaped surface for pedestrians.
LIVING_RESIDENTIAL Total of 165,000 sq Ō of new residenƟal community
LIVING_LAMINATED PUBLIC DOMAIN A performaƟve and volumetric landscape which collects rainwater for re-use while maintaining the properƟes of a leisure greenscape.
RAINWATER COLLECTION (rainwater harvested through reclamation tank below ground)
ELECTRIC LIGHT RAIL (localized transportation system)
PEDESTRIAN BIKE PATH (pedestrian layer
LAMINATION A conƟnuous morphed ground that Ɵes together new programs with the exisƟng city fabric through various pedestrian infrastructures.
LIVING_COMMERCIAL 20,000 sq Ō of new businesses directly connected to the “laminated public grain”.
ECO-POCKET Using the immediate context of the large lakes, this is a response to the polluƟon within the city’s water. Water purificaƟon is vital in Segrate’s rehabilitaƟon.
118
MOVEMENT ALCHEMY - PETROSINO SQUARE NYIT Fundamentals
1 19
120