Buttes Chaumont Running Pavilion, Paris France

Page 1

RUNNING PAVILION at PARC des BU T T ES C HAUMONT_ M.ARCH DESIGN REALIZATION REPORT THE BARTLETT SCHOOL OF ARCHITECTURE NICHOLAS PAUL DEBRUYNE UNIT 23






01: PREFACE

02: BACKGROUND & CONTEXT

03: FORM, PLANS & DESIGN

2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09

3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14

two sides of the track

idea

4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15


05: BUILDING PERFORMANCE

06: BUILDING DELIVERY

5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08

6.01 6.02 6.03 6.04 6.05 6.06 6.07

07: BIBLIOGRAPHY

00:_ CONTENTS



SITE CLIENT

SCOPE

PROGRAM

0 0: PREFACE

01:_ PREFACE



02:_ BACKGROUND & CONTEXT


P A R I S

2.01 LOCATION

12 SECTION 02: BACKGROUND AND CONTEXT


2.02 SITE CONTEXT

13 SECTION 02: BACKGROUND AND CONTEXT


Suicide Bridge. Temple of Sibyl, 32 meteres

2000

Villages of la . of Paris; the area of

a ‘spectacular

Paris. Site of the Gibbet of St. Louis-

2.03 TWO SIDES OF THE TRACK

SECTION 02: BACKGROUND AND CONTEXT


TRANSFORMATION OF A PARK FOR PARIS

15 SECTION 02: BACKGROUND AND CONTEXT


2.05 MAP AND MEASURE IN ALPHAND’S DESIGN

16 SECTION 02: BACKGROUND AND CONTEXT


a

nt

Runni

ng

in

P

rc

d

es

B

s Chaum e t t u o

2.06 SITE ANALYSIS

25

17 SECTION 02: BACKGROUND AND CONTEXT

50

100

200m


2.07 PANORAMIC VIEWS

18 SECTION 02: BACKGROUND AND CONTEXT



01

06

02

03

05

2.08 RUNNING & TECHNOLOGY

20 SECTION 02: BACKGROUND AND CONTEXT


10 08

07

09

11

21 SECTION 02: BACKGROUND AND CONTEXT


2.09 FEEDBACK SURFACE IDEA

22 SECTION 02: BACKGROUND AND CONTEXT


23 SECTION 02: BACKGROUND AND CONTEXT



03:_ FORM, PL ANS & DESIGN


+

+

+

+


spaces.

3.01 IDEA

27


3.02 SITE STRATEGY

28


95

90

85

80

75

70

65

60

SECTION AA

3.03 BUILDING SITE

29


USER EXPERIENCE & PROGRAM STRATEGY

30


1

2

OUTDOOR GYM ZONE RUNNING LAB MEN’S CHANGING SPACE SHOWERS WARM UP ZONE WOMEN’S CHANGING SPACE SHOWERS LIFT PUBLIC MENS RESTROOM PUBLIC WOMENS RESTROOM

3

31


3.05 EARLY DESIGN STRATEGIES

32


A

B

C

D A B C D E

E

G

G

3.06 SITE AND EARLY BUILDING SECTIONS

33


01

3.07 DESIGN DEVELOPMENT WITH STORYBOARDING

02

03


07

05

06

35

08


01

02

03

structure.

3.08 DESIGN DEVELOPMENT

36


05

37


3.09 ROOF PLAN 7

1 3

15m

38



1

7 3


3.10 MASTER PLAN


08 01

05 06

3.11 SECTION AA 5

15

07


the toilets.

02

03



3.12 CHANGING FACILITIES PLAN


3.13 RUNNING LAB PLAN


PUBLIC RESTROOM PLAN



_

BUILDING FABRIC


02

01 03

ISOMETRIC VIEW

50


51


EXPLODED ISOMETRIC

52


53


bridge.

superstructure.

UNDERSTANDING BRIDGE DESIGN


55


PRELIMINARY BRIDGE DESIGN

56


5 structure.

6

1

3 2

57


superstructure

BRIDGE STRUCTURE DETAIL

58


Ø Ø

59


RUNNING SURFACES

60


MONDO速 TRACK

61


RETAINING WALL SELECTION

62


sheet pile wall

topsoil

• •

• • • •

63


Ø plate

threaded rod steel plate Ø

RETAINING WALL DETAIL


65


Ø

steel joists

parapet cap

TYPICAL WALL SECTION DETAIL

66


67


POLYCARBONATE

68


Zac des Radars B.P 62 91351 GRIGNY Cedex Tel : 33 1 69 02 85 85

69


RUNNING LAB SECTION & DETAIL 1

3

70


Ø

71


CHANGING FACILITY SECTION & DETAIL 1

3

72


Ø

73


POLYPROPYLENE CLIMBING NET


• • • • •

UV-proof

75


01

02

03

BENCH AND RAILING VARIATION & DETAIL

76

05


01

02

03

77

05



05:_ BUILDING PERFORMANCE


5.01 PASSIVE SYSTEMS & SUSTAINABILITY

80


life


5.02 RUNNING PERFORMANCE

82


83


+ 5.03 ENERGY FROM RUNNERS

=


cercuits or processors.

85


• exercise. • • • • • •

01

02

03

05

07

• •

06 •

08

FITNESS PERFORMANCE

86


to use.

4. No free weights 4. No free weights

sold sold

87


spaces.

5.05 HEATING, INSULATION & VENTILATION

88


out.

reduces heat loss

89


5.06 WATER SUPPLY AND SANITATION

90


91


5.07 MEANS OF ESCAPE

92


disabled people

5.08 ACCESSIBILITY

93



06:_

BUILDING DELIVERY


6.01 DELIVERY CONSTRAINTS

96 SECTION 06: BUILDING DELIVERY


• •

• • • • •

• • •

• • • • • • • •

6.02 HEALTH & SAFETY

97 SECTION 06: BUILDING DELIVERY


6.03 FRENCH BUILDING PROCESS

98 SECTION 06: BUILDING DELIVERY


99 SECTION 06: BUILDING DELIVERY


SYSTEMS OF DELIVERY

100 SECTION 06: BUILDING DELIVERY


101 SECTION 06: BUILDING DELIVERY


relocated earth

6.05 PILE DRIVING AND EXCAVATION

102 SECTION 06: BUILDING DELIVERY


SILENT PRESS

CLAMP CRANE

ENGINE UNIT

PILE RUNNER

PILE

OPERATIONS DECK UNIT RUNNER

103 SECTION 06: BUILDING DELIVERY


• • • • • •

• • • •

• • • • • • • • • • • • • • •

are:

6.06 BRIDGE CONSTRUCTION

SECTION 06: BUILDING DELIVERY


structure as it is erected.

6.07 CONSTRUCTION SEQUENCE

105 SECTION 06: BUILDING DELIVERY



Architectural

1867

Structures

07:_ BIBLIOGR APHY