DESIGN DEVELOPMENT BOOKLET
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
Site Analysis Trongate
Arch - Modern day position
Arch - 1892
SITE
Arch - 1924
People’s Palace
Site Plan 1:1250
?
2013 // Carlton gateway to park lost.
1893 // Dense block forms gateways.
DESIGN DEVELOPMENT BOOKLET
1807 // Street frames park entrance.
Landmarks
Building creates gateway and link to landmarks.
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
Building Concept Diagrams
Existing buildings on site removed. “Fragmented site”
Plinth cut into to form pools, transition between spa and large pool created through change in level. Landscaping takes follows same concept. forms cut out of material to create soft landscaping areas.
Solid mass creates plinth on site
Lighter material sits above solid mass forming dry building area
DESIGN DEVELOPMENT BOOKLET
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
First Floor Plan 1:200
Mix use space
Gym Area
Female
Break out garden
Male
Therapy
Restaurant Area
Treatment rooms
Sauna
Air handling plant Sauna
Hot Massage Steam Room
Site Plan 1:1250
Ground Floor Plan 1:200 Remainder of block master planed - mix used/residential. forming street edge.
Existing shops in bad repair. New shop units on ground floor with gym above
Shop Unit
Shop Unit
Shop Unit
Shop Unit
Male Changing
Transition Pool
Entrance lobby
Main Pool
AREA TO BE REVISED waiting Space
Female Changing
view pool
Frigidarium
Medic
Tepidarium Ice Bath
Temperature controlled rooms
DESIGN DEVELOPMENT BOOKLET
Fire Bath
Existing Tenement building kept and in into master plan.
Temperature controlled pools
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
Programmatic Diagrams Gym
Cafe Area
Entrance
Shop Units
Entrance Area
Entrance Void Cafe Area
Admin
Transition Zone
Pool Area
Male Changing
Changing Waiting space
Transition Void Massage
Female Changing
Massage
Sauna
Tepidarium
Pool Area
Viewing Deck
Ice Bath
Fire Bath
Turkish Bath
Entrance atrium placed in middle of building allowing two main approaches - Park entrance and Barrowlands entrance. Shop Units
Hydro Ice Bath
Fire Bath
Turkish Bath
Cafe Area
Changing Entrance Area
First Floor
Female Changing
Transition Zone
Changing
Pool Area
Male Changing
Waiting space
Shop Units
Sauna
Tepidarium
Ice Bath
Fire Bath
Turkish Bath
Controlled zone between entrance and pool/area area created. Building user passes through changing area into “transition zone”.
Cafe Area
Shop Units
Entrance Area
Female Changing
Transition Zone
Cafe Area Entrance Area
Pool Area
Male Changing
Female Changing
Transition Zone
POOL AREA Pool Area
Male Changing
Waiting space
Waiting space
SPA AREA Tepidarium
Tepidarium
Sauna
Ground Floor
DESIGN DEVELOPMENT BOOKLET
Ice Bath
Fire Bath
Turkish Bath
Sauna
Ice Bath
Fire Bath
Turkish Bath
Wet area split into Pool area and Spa area, both areas are differentiated between through the use of a change in level allowing each zone to cater for different building users if necessary. Transition zone acts as buffer between both areas.
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
DESIGN DEVELOPMENT BOOKLET
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
DESIGN DEVELOPMENT BOOKLET
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
OKE / aq4 arquitectura
DESIGN DEVELOPMENT BOOKLET
Nottingham Contemporary by Caruso St John Architects
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
Melbourne Residential Tower Pool
DESIGN DEVELOPMENT BOOKLET
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2
Site Model
Concept Models
Plinth cut into to create pools
Voids created to highlight entrance // transition // pool // areas
Solid mass plinth created - concrete. Lighter material sits above
DESIGN DEVELOPMENT BOOKLET
THE CARLTON BATHHOUSE GLASGOW GREEN
Neal Hemingway // Unit 2