Local Transport Plan 3 Quarterly Review

Page 1

LTP3 Quarterly Review – October 2011



The LTP3 Quarterly Review – an update for Members The purpose of this document is to provide all Members with information about the Local Transport Plan (LTP) projects being delivered in each ward area. The Local Transport Plan contains an annual programme of projects. This programme is reviewed on a quarterly basis throughout the course of the year, and changes may be necessary in response to unforeseen events, such as the weather. LTP Quarterly Review will keep all Members fully informed, and will assist with the key decisions made by the Head of Development and the Portfolio Holder for the Environment & Strategic Housing. This report is a snapshot of progress made in delivering North East Lincolnshire Council’s LTP at October 1st 2011.

The review includes: • • • • •

how the programme is developed; a full list of LTP projects; the delivery timescales for each project; a breakdown of projects and costs by ward, and; a map of schemes by ward.

How the programme is developed There are three types of new project:• Those where a statutory duty exists, where the works are unavoidable or already committed to either from a previous year or as part of a wider project. (e.g. Highway Maintenance) • Major schemes (e.g. A18/A180 Link road) • Elective schemes, those schemes where there is no statutory duty but works are undertaken to improve conditions on the highway network (e.g. New bus shelters) The LTP programme is developed using the system described below. Where there is a statutory duty or where the works are either already committed to or unavoidable they are added to the LTP programme, the projects are then assessed against each of the eight LTP Challenges which are to:• • • • • • • •

Enable sustainable growth through effective transport provision. Improve journey times and reliability by reducing congestion. Support regeneration and employment by connecting people to education, training and jobs. Enable disadvantaged groups or people living in disadvantaged areas to connect with employment, healthcare, social and leisure opportunities. Improve the health of individuals by encouraging and enabling more physically active travel. Provide safe access and reduce the risk of loss, death or injury due to transport accidents or crime. Improve the journey experience on the local transport network. Ensuring that transport contributes to environmental excellence, including managing air quality and reducing transport related greenhouse gas emissions.

Major schemes are also assessed against these eight LTP Challenges and where the scheme is proven to address these local challenges, an initial feasibility study will be commissioned into how deliverable the scheme will be. Subject to the outcome of this study, and the scheme receiving local support, a full Major Scheme Bid is submitted. Finally, elective schemes are developed by individual programme managers based on a range of programme specific criteria and their impact on the eight LTP Challenges. Programme managers schemes are then combined and prioritised based on available resources and an assessment of their deliverability. In some cases, projects are combined within a geographical area allowing the Council to achieve, at the same time, greater value for money and reduced disruption for local residents. The diagram on the next page summarises these processes.

LTP3 Quarterly Review – October 2011


Members Guidelines for introducing new schemes into the LTP Programme. Ward Councillors are often a valuable source of ideas and suggestions for new schemes. The following guidelines are designed to assist this process. •

In the first instance Ward members should contact the Councils’s Lead Officer for Highways and Transportation, Claire Fitzsimmons on (01472) 324428 to discuss suggestions for new highway and transport schemes. Claire will be able to provide general feedback on the proposal and comment on how it supports wider Council objectives.

This suggestion will then be discussed by Claire with the Head of Highways & Transportation at Balfour Beatty (Marcus Asquith) who will in turn distribute the request to the relevant Programme Manager for more specialist comment.

The Programme Manager, will assess the request against the eight LTP3 Challenges, any other relevant programme specific criteria and the already agreed LTP Capital Programme for the year. Ward Members will then be given written feedback as to whether their proposal has been successfully included in future years Capital Programme.

The annual LTP Capital programme is assembled during quarter 4 of the previous financial year (January – March), and whilst proposals from Ward Members can be made at any time it may be that larger, more complex or expensive schemes are not considered for inclusion in the Capital Programme until this time.

LTP3 Quarterly Review – October 2011


A full list of LTP projects Maintenance Replacement of defective lighting columns Surface Dressing Programme, unclassified class roads Laceby Dual Carriageway A1173 Riby Road Windermere Avenue Surface Dressing Programme, unclassified class roads (Micro-asphalt) Boulevard Avenue Parapet Fence Replacement A46 Weelsby Road Market Hall Ramp Re-waterproofing A1136 Frederick Ward Way / Ellis Way / Victoria St South / Peaks Parkway Improve lighting in high crime areas Sutcliffe Avenue Highgate A1173 Kings Road Link Market Street A46 Laceby Road Hereford Avenue Laceby Road (South Side only ) A1098 Queens Parade / Taylors Ave Welholme Road footway renewal A180 Cleethorpe Road Fairfield Road A180 Cleethorpe Road (Flyover) (westbound) A1136 Deansgate / Bargate / Dudley St Junction A46 Laceby Road Brereton Avenue A1098 Taylors Ave Louth Road (A16) Surface Dressing Programme, B & C class roads Ashby Top Roundabout (A18 / B1203) Tactile crossing programme B1210 Stallingborough Road A1173 Kiln Lane Link Garden Street footway renewal PROW surface improvements PROW bridges B1210 Healing Road Abbey Road Ainslie Street PROW safer road crossings (Feasibility study, A180 / A1173 crossing)

£215,000 £202,460 £200,450 £142,000 £129,500 £127,010 £122,235 £118,000 £114,750 £111,570 £105,000 £ 95,795 £ 84,000 £ 80,000 £ 76,540 £ 69,080 £ 67,490 £ 63,045 £ 57,425 £ 55,915 £ 54,000 £ 52,090 £ 50,415 £ 48,210 £ 47,750 £ 47,000 £ 45,835 £ 45,200 £ 44,570 £ 40,000 £ 37,500 £ 37,020 £ 30,000 £ 29,995 £ 25,000 £ 20,000 £ 14,625 £ 14,050 £ 9,040 £ -

Road Safety Local Safety Schemes - various locations - (SCHEME ASSESSMENT) Scartho / Sutcliffe junction improvements Village Safety Improvements, Laceby and Aylesby Ward wide 20mph zones A180 Route Improvements (DESIGN ONLY THIS YEAR) School safety zones Road Safety Training (ongoing throughout school year) Washdyke / Pelham junction Broadway

£150,000 £ 93,600 £ 41,000 £ 40,000 £ 35,000 £ 25,000 £ 5,000 £ 1,700 £ -

Traffic Modernisation of traffic signals at various locations - Ladysmith Rd / Weelsby Rd Modernisation of traffic signals at various locations - Dudley St / Littlefield Lane Facilities for disabled people at pedestrian crossings Modernisation of traffic signals at various locations Clee Rd / Clee Cres Modernisation of traffic signals at various locations - Freeman St / Garibaldi St Modernisation of traffic signals at various locations - Ladysmith Rd / Columbia Rd UTC 6 & 7 (FEASIBILITY STUDY ONLY - NO SITE WORKS) Capital works to support car sharing ATC Hardware updates and new sites

£165,000 £ 80,000 £ 65,000 £ 50,000 £ 20,000 £ 20,000 £ 8,000 £ 5,000 £ 5,000

LTP3 Quarterly Review – October 2011


Healing Village

£

5,000

£ £ £ £ £ £

30,000 25,000 22,000 15,000 5,000 4,600

£ £ £ £ £ £ £

15,000 15,000 15,000 10,000 -

Public Transport Public Transport Information Cleethorpes Station Approach Already designed and tendered) Bus stop access improvements (undertaken with highway works) Bus shelters Hardware upgrades for Phone'n'Ride Windermere Avenue

Active Travel Pedalway Signage Cycle Parking New Waltham disused railway line off-road cycle path Capital works to support transport Community Action Plans Scartho Top - Ferriby Lane footpath improvements Littlefield Lane off-road cycle path Peaks Lane / Peaks Parkway off-road cycleway

Majors A18-A180 Link

£60,000

LTP3 Quarterly Review – October 2011


The delivery timescales for each project The table on the following page list each LTP scheme along with the ward which it has been assigned to, and estimate of the costs and its status as at the start of Quarter 3 (October 2011). Throughout this table and the subsequent maps and tables the following colouring system has been used: Maintenance Safety Traffic Public Transport Active Travel Majors

Including highway maintenance, surface dressing & street lighting Road safety Improvements to traffic signals and signage, supporting car sharing and upgrading the monitoring network Improvements to bus and rail facilities, including Phone n Ride Cycling and walking infrastructure and information A18/A180 Link Road.

LTP3 Quarterly Review – October 2011


LTP Highways and Transport Programme 2011-12

PH

Park

9,040

Abbey Road

Park

14,050

PH98

B1210 Healing Road

Wolds

14,625

PH

PROW bridges

Various - see Ward maps

20,000

PH

PROW surface improvements

Various - see Ward maps

25,000

PH94

Garden Street footway renewal

Park

29,995

PH6

A1173 Kiln Lane Link

Immingham

30,000

PH2

B1210 Stallingborough Road

Immingham

37,020

JD

Tactile crossing programme

Various - not mapped

37,500

Ashby Top Roundabout (A18 / B1203)

Wolds

40,000

Maintenance

Surface Dressing Programme, B & C class roads

Various - see Ward maps

44,570

PH4

Louth Road (A16)

Humberston & New Waltham

45,200

PH15

A1098 Taylors Ave

Haverstoe

45,835

PH91

Brereton Avenue

Sydney Sussex

47,000

PH19

A46 Lacbey Road

Yarborough

47,750

PH1

A1136 Deansgate / Bargate / Dudley St Junction

Park

48,210

PH5

A180 Cleethorpe Road (Flyover) (westbound)

West Marsh

50,415

PH90

Fairfield Road

Scartho

52,090

PH9

A180 Cleethorpe Road

East Marsh

54,000

PH93

Welholme Road footway renewal

Heneage

55,915

PH16

A1098 Queens Parade / Taylors Ave

Haverstoe

57,425

PH14

Laceby Road (South Side only )

South

63,045

PH92

Hereford Avene

South

67,490

PH13

A46 Laceby Road

South

69,080

PH88

Market Street

Croft Baker

76,540

PH7

A1173 Kings Road Link

Immingham

80,000

PH3

Highgate

Croft Baker

84,000

PH11-12

Sutcliffe Avenue

SR16-20

Improve lighting in high crime areas

Various - see Ward maps

105,000

A1136 Frederick Ward Way / Ellis Way / Victoria St South / Peaks Parkway

West Marsh

111,570

95,795

JD2

Market Hall Ramp Re-waterproofing

West Marsh

114,750

A46 Weelsby Road

Park

118,000

JD1

Boulevard Avenue Parapet Fence Replacement

Yarborough

122,235

Surface Dressing Programme, unclassified class roads (Micro-asphalt)

Various - see Ward maps

127,010

PH89

Windermere Avenue

Scartho

129,500

PH17

A1173 Riby Road

Immingham

142,000

PH18

Laceby Dual Carriageway

Wolds

200,450

PH27-87

Surface Dressing Programme, unclassified class roads

Various - see Ward maps

SR01-15

Replacement of defective lighting columns

Various - see Ward maps

MC

Road Safety

South

PH8

PH27-87

MC71 MC

Village Safety Improvements, Laceby and Aylesby

Wolds

Washdyke / Pelham junction

Immingham

202,460 215000 0 1,700

16/04/12

09/04/12

02/04/12

26/03/12

19/03/12

12/03/12

05/03/12

27/02/12

20/02/12

06/02/12

30/01/12

23/01/12

16/01/12

09/01/12

02/01/12

26/12/11

19/12/11

12/12/11

Q4 05/12/11

07/11/11

31/10/11

24/10/11

17/10/11

10/10/11

03/10/11

26/09/11

19/09/11

12/09/11

05/09/11

29/08/11

22/08/11

08/08/11

01/08/11

25/07/11

18/07/11

11/07/11

27/06/11

04/07/11

Delay

Comments

Project brought forward

Q3

20/06/11

13/06/11

06/06/11

30/05/11

23/05/11

16/05/11

09/05/11

02/05/11

25/04/11

18/04/11

Q2

Complete

Ongoing delivery

Project brought forward

Project brought forward

Project deferred to allow further consultation

Road Safety Training (ongoing throughout school year)

Various - not mapped

5,000

School safety zones

Various - see Ward maps

5,000

£20000 rollover to 2012/13

MC70

Broadway

Yarborough

5,000

Project deferred to allow further consultation

MC63

Ward wide 20mph zones

East Marsh

10,000

A180 Route Improvements (DESIGN ONLY THIS YEAR)

Various - not mapped

15,000

Scartho / Sutcliffe junction improvements

South

93,600

MC65-66

MC MC69 MC1-62

Traffic

Status 0

Ainslie Street

PH95

Local Safety Schemes - various locations - (SCHEME ASSESSMENT)

Various - see Ward maps

DP4

Modernisation of traffic signals at various locations - Freeman St / Garibaldi St

East Marsh

0

DP

UTC 6 & 7 (FEASIBILITY STUDY ONLY - NO SITE WORKS)

Various - not mapped

0

DP2

Modernisation of traffic signals at various locations Clee Rd / Clee Cres

Croft Baker

5,000

DP3

Modernisation of traffic signals at various locations - Dudley St / Littlefield Lane

Park

5,000

DP7

Healing Village

Wolds

5,000

Capital works to support car sharing

Various - not mapped

5,000

ATC Hardware updates and new sites

Various - see Ward maps

5,000

DP MG01-04 DP6

Heneage

20,000

Facilities for disbled people at pedestrian crossings

Various - see Ward maps

65,000

Modernisation of traffic signals at various locations - Ladysmith Rd /Weelsby Rd

East Marsh

MKL4

Windermere Avenue

Scartho

MKL

Hardware upgrades for Phone'n'Ride

Various - not mapped

5,000

MKL

Bus shelters

Various - not mapped

15,000

Bus stop access improvements (undertaken with highway works)

Various - see Ward maps

22,000

DP5

MKL2-03 & 05

Cleethorpes Station Approach Already designed and tendered)

Sidney Sussex

25,000

Public Transport Information

Various - not mapped

30,000

Scartho Top - Ferriby Lane footpath improvements

Scartho

Peaks Lane / Peaks Parkway off-road cycleway

Heneage

AS

Capital works to support transport Community Action Plans

Various - not mapped

AS2 AS4-6 AS7-8

Deferred pending renaissance plans for Freeman Street

£40000 rollover to 2012/13 £75000 rollover to 2012/13

0 0 10,000

New Waltham disused railway line off-road cyclepath

Humberston & New Waltham

15,000

Pedalway Signage

Various - not mapped

15,000

Cycle Parking

Various - not mapped

15,000

AS1

Littlefield Lane off-road cyclepath

Park

30,000

SR

A18-A180 Link

Immingham

60000

Current Programme Total Budget

£3,736,465 £3,888,000

(Overprogramming)

-4%

Delay awaiting signal design

4,600

MKL AS9

£20000 rollover to 2012/13

165,000

MKL8

AS3

£30000 rollover to 2012/13

150,000

Modernisation of traffic signals at various locations - Ladysmith Rd / Columbia Rd

DP8-21

Public Transport

Cost

PH20

PH27-87

Active Travel

Ward

PH96

PH97

Major Schemes

Project PROW safer road crossings (Feasibility study, A180 / A1173 crossing)

11/04/11

Map Ref.

04/04/11

Q1

Construction

13/02/12

Mobilisation

28/11/11

Tender

21/11/11

Design

14/11/11

Consultation

15/08/11

Key to show the status of each scheme:

Type

28/11/11

Update to end of w/c:

Deferred pending agreement on land acquisition Deferred pending agreement on land acquisition

Subject to DfT funding approval


LTP3 Highway and Transport Programme 2011-12 North East Lincolnshire

KEY

MC66

MC71 MC12 MC60

AS4

PH7

PH6

SR21 PH2

MC42 MC62 MC54

MC1 PH5 MC59 MC63 PH9 DP11 MC20 MC38 MC52 PH10 PH80 MC5 MC43 MC21 MC15 MC53 MC51 MC25 PH61 PH75 MC63 DP22 DP4 MC36 DP16 PH83 PH75 DP9 MC26 MC37 AS6 DP14 MC55 PH58 MC16 MC34 SR15 DP10 DP13 PH91 AS4 SR11 MC23 PH63 JD1 MC30 DP10 MC7 SR10 MC33 PH81 PH62 PH56 DP10 DP10 PH60 MC63 DP10 SR9 MC45 PH30 PH59 JD2 DP3 MC46 PH57 DP12 MC40 DP10 PH94 PH70 MKL8 PH78 SR17 PH85 PH1 SR13 MC47 PH69 MC39 PH72 PH73 SR14 DP8 PH53 MC29 PH86 DP5 PH54 PH88 PH67 PH93 PH79 MG2 PH20 PH76 MC49 PH55 MC14 PH65 MC48 MC22 PH26 PH74 PH84 PH52 AS1 MC19 PH25 MC4 PH87 PH50 PH51 PH48 PH71PH46PH66 AS4 DP2 MC41 MG1 AS4 PH22 PH47 PH45 PH3 PH68 MC50

PH17

DP7 PH98 MC32 DP20

MC61 SR12 MC28

PH27

MC70

MKL5

PH92

SR18

SR16

SR19 SR20 DP19 MC13 MC18 PH14 PH19 PH13 MC8

MC35

MC27

PH11

MC69

MC11

MKL4 DP17 PH8 DP18 MC58

AS4 MC10

PH37

MC6 AS3

MC9

PH12

AS5

DP15

PH44 SR7 MKL3 MC31 PH24 PH16 PH23 SR6 PH42 PH43 PH38 PH41 PH39 PH82 PH15 PH36 PH40 PH35 PH34

MG3 MC57

PH32

MC24

PH18

PH49

DP21 PH31

DP6 MC56

PH33 MC3 AS9

DP1

PH29

AS4

AS4 PH28

MC2

AS2 PH89

PH90

MKL4 PH4

MG4 MC17 SR2 SR4 SR3 SR1

MC44

SR8

MC65

This Product includes mapping data licensed from Ordnance Survey with the permission of the controller of HMSO. © Crown Copyright 2011. All rights reserved 10020759

SR5


A breakdown of projects and costs by ward In the following tables, projects within single ward areas, include those where they cross over the neighbouring ward boundaries. Cost breakdowns are therefore indicative, please see map for the full detail in each ward. There are also a number of schemes listed at the end of each section that take place across several wards.

Croft Baker

Map Ref PH15 PH03 PH88 DP02

Project

Cost (£s)

A1098 Taylors Avenue Highgate Market Street Modernisation of traffic signals at various locations Clee Rd / Clee Crescent

45,835 84,000 76,540 5,000

Status Complete Design Complete Design

Other cross ward schemes: • • • • •

Surface dressing of B&C class roads. Replacement of defective lighting columns. Local safety schemes. Pedalway cycle route signage. Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


East Marsh

Map Ref PH09-10 MC63 DP04 DP05

Project

Cost (£s)

Status

A180 Cleethorpe Road Ward wide 20mph zones Modernisation of traffic signals Freeman St / Garibaldi St Modernisation of traffic signals Ladysmith Rd / Columbia Rd

54,000 40,000 20,000 20,000

Construction Delayed Not Started Not Started

Other cross ward schemes: • • • • •

Surface dressing of B&C class roads. Local safety schemes. Pedalway cycle route signage. Facilities for disabled people at pedestrian crossings Surface dressing of unclassified roads

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Freshney There are no schemes specifically allocated to this ward during 2011/12

Other cross ward schemes: • •

Local safety schemes. Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Haverstoe

Map Ref PH16 PH15

Project

Cost (£s)

A1098 Queens Parade A1098 Taylors Avenue

57,425 45,835

Status Complete Complete

Other cross ward schemes: • • • •

Surface dressing of unclassified roads Local safety schemes. Pedalway cycle route signage. Automatic traffic count site upgrades

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Heneage

Map Ref

Project

Cost (£s)

Status

PH93 DP06

Welholme Rd footway Modernisation of traffic signals at Ladysmith Rd x Weelsby Rd

55,915 165,000

AS03

Peaks Lane – Peaks Parkway off road cycle lane.

-

Construction Design Deferred to future year

Other cross ward schemes: • • • • • •

Surface dressing of unclassified roads Replacement of defective lighting columns. Local safety schemes. Pedalway cycle route signage. Facilities for disabled people at pedestrian crossings Automatic traffic count site upgrades

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Humberston & New Waltham

Map Ref

Project

Cost (£s)

PH04 AS02

Louth Rd (A16) New Waltham Disused Rail Track

45,200 15,000

Status Complete Design

Other cross ward schemes: • • •

Replacement of defective lighting columns. Local safety schemes. Pedalway cycle route signage.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Immingham

Map Ref

Project

Cost (£s)

PH06 PH07 PH17

A1173 Kiln Lane A1173 Kings Road Link A1173 Riby Road B1210 Stallingborough Road Washdyke / Pelham Junction A18-A180 Link Road School Safety Zone

30,000 80,000 142,000 37,020 1,700 440,000 5,000

PH02 MC71 SR21 MC66

Status Tender Tender Tender Complete Complete Design Not Started

Other cross ward schemes: • •

Local safety schemes. Pedalway cycle route signage.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Park

Map Ref

Project

Cost (£s)

Status

PH01 PH08 PH96 PH94 PH20 DP03 AS01

A1136 Deansgate/Bargate/Dudley St Junction A46 Weelsby Road Ainslie Street Garden Street footway Abbey Road Modernisation of traffic signals at Dudley St x Littlefield Lane Littlefield Lane – Westward Ho

48,210 118,000 9,040 29,995 14,050 80,000 0

Complete Complete Complete Construction Complete Design Cancelled

Other cross ward schemes: • • • • • •

Replacement of defective lighting columns. Local safety schemes. Pedalway cycle route signage. Facilities for disabled people at pedestrian crossings Cycle parking Bus stop improvements

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Scartho

Map Ref

Project

Cost (£s)

Status

PH89 PH90 MKL04

Windermere Avenue Fairfield Rd Windermere Avenue Bus Stops

129,500 52,090 4,600

AS09

Scartho Top

0

Mobilisation Mobilisation Mobilisation Deferred to future year

Other cross ward schemes: •

Replacement of defective lighting columns.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Sidney Sussex

Map Ref

Project

Cost (£s)

PH91 MKL08

Brereton Avenue Cleethorpes Station Approach

47,000 25,000

Status Design On site

Other cross ward schemes: • • • •

Surface dressing of unclassified roads Local safety schemes. Pedalway cycle route signage. Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


South

Map Ref

Project

Cost (£s)

Status

PH13 PH14 PH92 PH11/12 MC69

A46 Laceby Road A46 Louth Rd (South Side Only) Hereford Avenue Sutcliffe Ave Scartho/Sutcliffe Junction

69,080 63,045 67,490 95,795 93,600

Complete Complete Complete Complete Mobilisation

Other cross ward schemes: • • •

Local safety schemes. Facilities for disabled people at pedestrian crossings Bus stop improvements

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Waltham There are no schemes specifically allocated to this ward during 2011/12

Other cross ward schemes: • •

Replacement of defective lighting columns. Automatic traffic count site upgrades

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


West Marsh

Map Ref

Project

Cost(£s)

Status

PH95 PH05 JD01 JD02

A1136 FWW/Ellis Way/Victoria St South/PPW A180 Cleethorpe rd Flyover Boulevard Avenue Parapet Fence Market Hall Ramp Re-waterproofing

111,570 50,415 122,235 114,750

Complete Complete Construction Construction

Other cross ward schemes: • • • •

Local safety schemes. Replacement of defective lighting columns. Pedalway cycle route signage. Facilities for disabled people at pedestrian crossings

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Wolds

Map Ref

Project

Cost(£s)

Status

PH99 PH18 PH98 DO01 / MC08 DP07 MC65

Ashby Top Roundabout (A18/B1203) Laceby Dual Carriageway B1210 Healing Road Village Safety Improvements – Laceby & Aylesby Healing Village Signage School Safety Zone

40,000 200,450 14,625 41,000 5,000 5,000

Design Complete Complete Consultation Design Not Started

Other cross ward schemes: •

Local safety schemes.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Yarborough

Map Ref

Project

Cost(£s)

PH19

A46 Laceby Road

47,750

MC70

Broadway

0

Status Complete Deferred to future year

Other cross ward schemes: • •

Local safety schemes. Replacement of defective lighting columns.

This product includes mapping data licensed from Ordnance Survey with permission of the Controller of HMSO. © Crown Copyright 2011. All rights reserved 10029759

LTP3 Quarterly Review – October 2011


Cross ward projects – see ward maps These are projects that are not specifically attached to one particular ward or area but are spread across several.

Map Ref

Project

Cost(£s)

Status

PH27-87 PH27-87 PH27-87 PH-PH-SR01-15 SR16-20 n/a MC01-62 n/a DP08-21 MC65-66 MG01-04 AS04-06 AS07-08 n/a n/a

Surface Dressing Programme (B&C) Surface Dressing Programme (UNC) Surface Dressing Programme (Micro-asphalt) PROW surface improvements PROW bridges Replacement of Defective Light Columns Improve lighting in higher crime areas Tactile Crossing Programme Local safety schemes assessment UTC Areas 6&7 Facilities for disabled people at pedestrian crossings School Safety Zones ATC upgrades and new sites Pedalway signage Cycle Parking Bus shelters Bus stop access improvements

44,750 202,460 127,010 25,000 20,000 215,000 105,000 37,500 150,000 8,000 65,000 25,000 5,000 15,000 15,000 15,000 22,000

Complete On going Mobilisation On going On going On going On going Mobilisation Design Design On going Design Complete On going On going On going On going

Projects in various locations – not mapped These are projects that don’t have a geographic element and are delivered across North East Lincolnshire.

Project

Cost(£s)

PROW safer road crossings studies

-

Road safety training A180 Route safety improvements (design stage only) Capital Works supporting Car Sharing Public transport information Hardware updates for Phone n Ride Capital Works to support TCAPs

5,000 35,000 10,000 30,000 5,000 10,000

Status Deferred to future year On going Design On going On going Design On going

LTP3 Quarterly Review – October 2011


Index of LTP projects 2011-12 Ref SR1-15 PH27-87 PH18 DP5 MC1-62 PH17 PH89 PH27-87 JD1 PH8 JD2 PH95 SR16-20 PH11-12 MC69 PH3 PH7 PH88 PH13 PH92 DP8-21 PH14 SR21 PH16 PH93 PH9 PH90 PH5 PH1 PH19 PH91 PH15 PH4 PH27-87 PH97 MC63 n/a PH2 n/a PH6 n/a PH94 n/a MC65-66 MKL8 MKL2-5 n/a DP6 n/a AS4-6 AS7-8 AS2 PH98 PH20 n/a PH96 n/a n/a MG1-4 DP7 n/a MKL4 DP3

Scheme Replacement of defective lighting columns Surface Dressing Programme, unclassified class roads Laceby Dual Carriageway Modernisation of traffic signals at various locations - Ladysmith Rd / Weelsby Rd Local Safety Schemes - various locations A1173 Riby Road Windermere Avenue Surface Dressing Programme, unclassified class roads (Micro-asphalt) Boulevard Avenue Parapet Fence Replacement A46 Weelsby Road Market Hall Ramp Re-waterproofing A1136 Frederick Ward Way / Ellis Way / Victoria St South / Peaks Parkway Improve lighting in high crime areas Sutcliffe Avenue Scartho / Sutcliffe junction improvements Highgate A1173 Kings Road Link Market Street A46 Laceby Road Hereford Avenue Facilities for disabled people at pedestrian crossings Laceby Road (South Side only ) A18/A180 Link Road A1098 Queens Parade / Taylors Ave Welholme Road footway renewal A180 Cleethorpe Road Fairfield Road A180 Cleethorpe Road (Flyover) (westbound) A1136 Deansgate / Bargate / Dudley St Junction A46 Laceby Road Brereton Avenue A1098 Taylors Ave Louth Road (A16) Surface Dressing Programme, B & C class roads Ashby Top Roundabout (A18 / B1203) Ward wide 20mph zones Tactile crossing programme B1210 Stallingborough Road A180 Route Improvements (Design only) A1173 Kiln Lane Link Public Transport Information Garden Street footway renewal PROW surface improvements School safety zones Cleethorpes Station Approach Bus stop access improvements PROW bridges Modernisation of traffic signals at various locations - Ladysmith Rd / Columbia Rd Bus shelters Pedalway Signage Cycle Parking New Waltham disused railway line off-road cycle path B1210 Healing Road Abbey Road Capital works to support transport Community Action Plans Ainslie Street Road Safety Training (ongoing throughout school year) Capital works to support car sharing ATC Hardware updates and new sites Healing Village Hardware upgrades for Phone'n'Ride Windermere Avenue Modernisation of traffic signals – Dudley St x Littlefield Lane

Value £215,000 £202,460 £200,450 £165,000 £150,000 £142,000 £129,500 £127,010 £122,235 £118,000 £114,750 £111,570 £105,000 £95,795 £93,600 £84,000 £80,000 £76,540 £69,080 £67,490 £65,000 £63,045 £60,000 £57,425 £55,915 £54,000 £52,090 £50,415 £48,210 £47,750 £47,000 £45,835 £45,200 £44,570 £40,000 £40,000 £37,500 £37,020 £35,000 £30,000 £30,000 £29,995 £25,000 £25,000 £25,000 £22,000 £20,000 £20,000 £15,000 £15,000 £15,000 £15,000 £14,625 £14,050 £10,000 £9,040 £5,000 £5,000 £5,000 £5,000 £5,000 £4,600 £5,000

LTP3 Quarterly Review – October 2011


DP2 MC71 n/a MC70 AS9 AS1 AS3 DP1 DP4 n/a

Modernisation of traffic signals at various locations Clee Rd / Clee Cres Washdyke / Pelham junction PROW safer road crossings (Feasibility study, A180 / A1173 crossing) Broadway Scartho Top - Ferriby Lane footpath improvements Littlefield Lane off-road cycle path Peaks Lane / Peaks Parkway off-road cycleway Village Safety Improvements, Laceby and Aylesby Modernisation of traffic signals at various locations - Freeman St / Garibaldi St UTC 6 & 7 (Feasibility only)

£ £ £ £ £ £ £ £

£5,000 £1,700 -

LTP3 Quarterly Review – October 2011