Arch2140 2016 spring choi alya abourezk web

Page 1

p e r fo r m i n g a r t s s c h o o l The purpose of this performing arts school scheme was to generate a lot of interaction within and around the building structure. The main auditorium and classrooms occupy the two largest volumes and are situated at opposite sides of the school. The center volume connects the two spaces and acts as a common space for the students, housing an informal performance space as well as the school’s resource rooms. Additionally, the majority of this building is elevated off the ground to foster connect the two sides of the urban block and thus creating an urban, public space.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.