M A K I N G
W A T E R
EXISTING BOSTON URBAN WATER GRADIENT
L O C A L
B O S T O N
90 MILES
2.2 M SERVED
4M SERVED
235 MGD DEMAND 400 MGD DEMAND
360 MGD TREATED 400 MGD TREATED 1.75 MGD CSO
0 CSO
EXISTING WATER DEMAND
PLANNED WATER LOCALIZATION AND PROJECTED WATER DEMA ND
EXISTING WATER LIFE CYCLE BOSTON
BOSTON WATER LOCALIZATION PLAN YEAR: 2090
PROPOSED WATER LIFE CYCLE BOSTON
REDUNDANT, MULTI-DIRECTIONAL GROWTH ORDER, ENERGY FRIENDLY
PROPOSED URBAN WATER GRADIENT CUT IN HALF
PHASE 1 - 25 YRS
PHASE 2 - 50 YEARS
PHASE 3 - 75 YEARS
AERIAL CONDITIONS
CSO
BOSTON EXISTING SCENARIO
BOSTON FEMA SCENARIO [10 YEAR POSSIBILITY]
BOSTON SLR+5 SCENARIO [50 YEAR POSSIBILITY]
BOSTON SLR+7 SCENARIO [100 YEAR POSSIBILITY]
M A K I N G
W A T E R
L O C A L
EXISTING BOSTON URBAN WATER GRADIENT
H A R T F O R D
45 MILES
1/2 M SERVED
1M SERVED
50 MGD DEMAND
100 MGD DEMAND
105 MGD TREATED
100 MGD TREATED
2.67 MGD CSO
0 CSO
EXISTING WATER DEMAND
PLANNED WATER LOCALIZATION AND PROJECTED WATER DEMA ND
EXISTING WATER LIFE CYCLE HARTFORD
HARTFORD WATER LOCALIZATION PLAN YEAR: 2090
PROPOSED WATER LIFE CYCLE HARTFORD
REDUNDANT, MULTI-DIRECTIONAL GROWTH ORDER, ENERGY FRIENDLY
PROPOSED URBAN WATER GRADIENT CUT IN HALF
PHASE 1 - 25 YRS
AERIAL CONDITIONS
CSO
BOSTON EXISTING SCENARIO
BOSTON FEMA SCENARIO [10 YEAR POSSIBILITY]
PHASE 2 - 50 YRS
PHASE 3 - 75 YEARS
M A K I N G
W A T E R
L O C A L
T Y P O L O G Y
&
I N T E R V E N T I O N
EXISTING AIRPORT
UNUSED OPEN SPACE
AIRPORT WATER TREATMENT
WATER STABILIZATION PONDS POOR EDGES
UV AND DISTRIBUTION IMPROVED HARD EDGES
TO
DE
ER
ISL
ST OR
MW AT E
AN
D
RM
SLR +7
SLR +5
NG
MT
SLR +7
FEMA
SLR +5
FEMA
EXISTING GOLF COURSE GOLF COURSE WATER TREATMENT
FR
OM
EQUAL ACCESS OPEN SPACE UR
BA
NW AS
TE
PU
BL
IC
SU
PP
LY I
RR
UV AND DISTRIBUTION IR
IG
RI
AT IO
N
GA TIO
N
EXISTING CEMETERY CEMETERY WATER TREATMENT
INF
RECREATIONAL OPEN SPACE W/ MULTIPLE FUNCTIONS WILL ATTRACT MORE USERS
ILT
RA TIO
N
IN
FIL TR
AT IO
+T
RE
AT M
N
EN
T
EXISTING URBAN PARK URBAN PARK WATER TREATMENT
GR
AV ITA TIO
NA
LD
IST
RI
BU
URBAN WATER TOWER FOR STORAGE AND DISTRIBUTION
TIO
N
EXISTING URBAN RESERVOIR URBAN RESERVOIR WATER TREATMENT
EXPANSION OF THE URBAN RESERVOIR AND COMPACTION OF THE URBAN AREA UR
BA
N
WA TE
R
ST OR
AG
E
EXISTING INDUSTRIAL INDUSTRIAL WATER TREATMENT
WATER PRODUCTION SPECIFICALLY FOR INDUSTRIAL USES IN
DU
SEASONAL POTENTIAL
ST
RI
AL
RE
-U
SE
ANAEROBIC POND
ULTRA VIOLET TREATMENT
URBAN WASTE WATER
FACULATIVE POND
RAINWATER CAPTURE
UV
AEROBIC MATURATION POND BOSTON WINTER CLASSIC
STORE
DISTRIBUTE
M A K I N G
W A T E R
L O C A L
E D G E
C O N D I T I O N S
FLEXIBLE EDGE TO ADAPT OVER TIME
SLR +7 SLR +5
SLR +7 SLR +5
FEMA
FEMA POND
SEA / RIVER
SEA / RIVER
PROPOSED ANTICIPATORY HARD EDGE
EXISTING HARD EDGE
ANTICIPATORY EDGE TO WHICH ALLOWS ACCESS TO WATER BODIES
SLR +7 SLR +5
SLR +7 SLR +5 POND
FEMA
FEMA
SEA / RIVER
SEA / RIVER
PROPOSED STEPPED ACTIVE EDGE
EXISTING ACTIVE EDGE
SECONDARY EDGE TO BECOME WATER EDGE IN THE FUTURE
SLR +7 SLR +5
SLR +7 SLR +5
POND
FEMA
FEMA SEA / RIVER
SEA / RIVER
PROPOSED DOUBLE BUFFER EDGE
EXISTING BUFFER EDGE
ELONGATED CONSERVATION AND PRESERVATION EDGES
SLR +7 SLR +5
SLR +7 SLR +5 POND
FEMA
FEMA
SEA / RIVER
SEA / RIVER
EXISTING MARSH EDGE
PROPOSED ELONGATED MARSH EDGE
REDUCED TRANSPORTATION ZONE TO EXPAND URBAN BUFFER
POND/ SEA/ RIVER
SEA / RIVER
PROPOSED EXTENDED URBAN EDGE
EXISTING URBAN EDGE
LANDSCAPE BUMPER TO PREVENT INDUSTRIAL RUNOFF
POND/ SEA/ RIVER
SEA / RIVER
PROPOSED LEVEE INDUSTRIAL EDGE
EXISTING INDUSTRIAL EDGE
URBAN WATER STORAGE
TREATMENT PROCESS
TOPOGRAPHICAL IMPROVEMENTS CAP
ANAEROBIC SLUDGE + BOD REMOVAL
FACULATIVE
AEROBIC
SLUDGE + BOD REMOVAL
PATHOGEN REMOVAL
UV FILTRATION
FILL
CUT